5. Clear Lake High STaR Results
Infrastructure for Technology
Leadership, Administration, &
Instructional Support 2008-09
2009-10
Educator Preparation & 2010-11
Development
2020
Teaching & Learning
0 5 10 15 20 25 30
6. Understanding the Data
Target Tech is the goal for each sub area
1= Early Tech 2= Developing Tech
3= Advanced Tech 4= Target Tech
24 is the target number (by 2020) for each key
area, and there are 6 subareas for each key
area.
7. Key Area 1: Teaching and Learning
• Frequency/Design of Instructional Setting
• Content area connections
• Technology Applications- TA- TEKS
implementation
• Student Mastery of Technology Application
• Online Learning
• Pattern of Classroom Use
8. Key Area 2: Educator Preparation and
Development
• Models of Professional Development
• Professional Development Experience
• Access to Professional Development
• Capability of Educators
• Professional Development for Online Learning
• Levels of Understanding and Pattern of Use
9. Key Area 3:
Leadership, Admin., Instructional
Support
• Planning
• Leadership and Vision
• Instructional Support
• Budget
• Leadership and Support for Online Learning
• Communication and Collaboration
10. Key Area 4: Infrastructure for
Technology
• Technical Support
• Student per Computers
• Connection Speed for Internet Access
• Other Classroom Technology
• Distance Learning Capacity
• Local/Wide Area Network
11. In Summary- We need to address the
lowest Scores in the Following:
• Online Learning
• Professional Development for Online Learning
• Access to Professional Development
• Planning
• Instructional Support