1. STUDENT RISK ASSESSMENT
Date 22/09/15 Location: Bueton
Recording Space
Task being assessed: Students taking photos in college
General Risk assessment
Student Name: Jac Colton
HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN
Hazard
Regardless of control measures
Persons
at risk
*1
Worst
outcome
*2
Probability
*3
Risk
Rating
A-E
Existing control measures taken
against the risk
What further control
measures are required when
and by whom
1. Lots of wires & cables
that could be tripped on
2. Electric Shock
Sf, St,
Cr, Cl,
V, D, X,
L, W
(ALL)
NR/Min
Min/Maj/
F
Ps
R
I will move all wires and cables out
the way when I’m taking the
photos
I will make sure that no power is
going to any equipment before use
I will warn my people about
the danger of wires and cables
(ALL)
I will talk to Chris Phelps and
ask if there are any live
electrics on before I take
photos
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
D = people with disabilities
X = young/inexperienced
L = lone workers
W = women of child-bearing
age
*2 This is without control measures
F = fatal
Maj = major injury or permanent disability
Min = minor injury
NR = non-reportable
*3 This is with control measures in place
Fr = frequent/likely/could occur repeatedly/expected
Pr = probable/not surprised/might occur often
Ps = possible/could occur sometime
R = remote/unlikely but conceivable
U = unlikely/improbable such that likelihood is almost zero