SlideShare a Scribd company logo
1 of 2
Download to read offline
JOB TITLE: AUTOMOTIVE TECHNICIAN 1
DUTY NO.: 06 DUTY: PERFORM VEHICLE MANUAL DRIVE TRAIN REPAIR
TASK NO.: 06.05 TASK: Rectify propeller shaft assembly
LEVEL: 1 PERFORMANCE STANDARD: (Actions, Conditions, Criteria)
Rectify propeller shaft assembly using service manual, hand tools, special
tools, measuring tools, lubricant, and replacement parts so that propeller
shaft distinguished, propeller shaft removed and installed, and universal joint
examined are in accordance with the manufacturer s specifications.
SUB-TASKS/STEPS
ENABLING REQUIREMENTS
(Knowledge, Skill, Attitude and Safety)
TOOLS/EQUIPMENT/
MATERIALS
1. Distinguish
propeller shaft
location
2. Remove propeller
shaft
3. Examine propeller
shaft universal
joint
Knowledge on:
1.1 Types and function of propeller shaft
1.2 Construction and operation of propeller shaft
1.3 Layout of propeller shaft
Ability to:
1.1 Locate propeller shaft assembly
Knowledge on:
2.1 Procedures of removing propeller shaft
assembly
2.2 Centre support mounting
Ability to:
2.1 Dismantle propeller shaft assembly
2.2 Dismantle propeller shaft support mounting
2.3 Check the propeller shaft condition
2.4 Check the propeller shaft support mounting
condition
Knowledge on:
3.1 Function of universal joint
3.2 Construction and operation of universal joint
3.3 Procedures of dismantling and assembling
universal joint
1. service manual
2. hand tools
3. special tools
4. measuring tools
5. lubricant/grease
6. replacement parts
7. wheel stopper
8. personal protection
equipment
9. fender cover
4. Install propeller
shaft
Ability to:
3.1 Dismantle universal joint
3.2 Check condition of universal joint
3.3 Lubricate universal joint bearings
3.4 Assemble universal joint
Knowledge on:
4.1 Propeller shaft alignment
4.2 Procedures of fixing propeller shaft
Ability to:
4.1 Fix propeller shaft support bearing
4.2 Fix propeller shaft assembly
Attitude/Safety:
· Use wheel stopper
· Use personal protection equipment

More Related Content

Viewers also liked (20)

S/A Propaganda - Nota de Falecimento
S/A Propaganda - Nota de FalecimentoS/A Propaganda - Nota de Falecimento
S/A Propaganda - Nota de Falecimento
 
Ejemploslideshare
EjemploslideshareEjemploslideshare
Ejemploslideshare
 
Ejemplo slideshare
Ejemplo slideshareEjemplo slideshare
Ejemplo slideshare
 
Nota
NotaNota
Nota
 
Katac
KatacKatac
Katac
 
Zainal ardi
Zainal ardiZainal ardi
Zainal ardi
 
Nico santi y tomy
Nico santi y tomyNico santi y tomy
Nico santi y tomy
 
παροιμίες
παροιμίεςπαροιμίες
παροιμίες
 
φυλλο εργασιας πείραμα 1ο
φυλλο εργασιας πείραμα 1οφυλλο εργασιας πείραμα 1ο
φυλλο εργασιας πείραμα 1ο
 
Surtsey
SurtseySurtsey
Surtsey
 
"Haper" - screenplay presentation
"Haper" - screenplay presentation"Haper" - screenplay presentation
"Haper" - screenplay presentation
 
J0 beg xtu4mqc
J0 beg xtu4mqcJ0 beg xtu4mqc
J0 beg xtu4mqc
 
ETD 2283 PENGENALAN KEPADA KEUSAHAWANAN
ETD 2283 PENGENALAN KEPADA KEUSAHAWANANETD 2283 PENGENALAN KEPADA KEUSAHAWANAN
ETD 2283 PENGENALAN KEPADA KEUSAHAWANAN
 
Tp10
Tp10Tp10
Tp10
 
plaatsen van content op facebook
plaatsen van content op facebookplaatsen van content op facebook
plaatsen van content op facebook
 
Hari peladang penternak & nelayan melaka 2011
Hari peladang penternak & nelayan melaka 2011Hari peladang penternak & nelayan melaka 2011
Hari peladang penternak & nelayan melaka 2011
 
Luan van-ke-toan-tien-luong-va-cac-khoan-trich-theo-luong
Luan van-ke-toan-tien-luong-va-cac-khoan-trich-theo-luongLuan van-ke-toan-tien-luong-va-cac-khoan-trich-theo-luong
Luan van-ke-toan-tien-luong-va-cac-khoan-trich-theo-luong
 
Tm 13 novembre
Tm 13 novembreTm 13 novembre
Tm 13 novembre
 
aktiviti sepanjang tahun pusat sumber
aktiviti sepanjang tahun pusat sumberaktiviti sepanjang tahun pusat sumber
aktiviti sepanjang tahun pusat sumber
 
Gasing
GasingGasing
Gasing
 

Similar to L1.06.06.05

Similar to L1.06.06.05 (20)

L1.08.08.02
L1.08.08.02L1.08.08.02
L1.08.08.02
 
L1.07.07.07
L1.07.07.07L1.07.07.07
L1.07.07.07
 
L1.07.07.08
L1.07.07.08L1.07.07.08
L1.07.07.08
 
L1.08.08.01
L1.08.08.01L1.08.08.01
L1.08.08.01
 
L1.09.09.03
L1.09.09.03L1.09.09.03
L1.09.09.03
 
L1.06.06.03
L1.06.06.03L1.06.06.03
L1.06.06.03
 
L1.07.07.04
L1.07.07.04L1.07.07.04
L1.07.07.04
 
L1.07.07.03
L1.07.07.03L1.07.07.03
L1.07.07.03
 
L1.09.09.05
L1.09.09.05L1.09.09.05
L1.09.09.05
 
L1.08.08.03
L1.08.08.03L1.08.08.03
L1.08.08.03
 
L1.03.03.04
L1.03.03.04L1.03.03.04
L1.03.03.04
 
L1.07.07.06
L1.07.07.06L1.07.07.06
L1.07.07.06
 
L1.04.04.03
L1.04.04.03L1.04.04.03
L1.04.04.03
 
L1.05.05.01
L1.05.05.01L1.05.05.01
L1.05.05.01
 
OCS - Rig inspection workshop accredited by IADC - Bali Schedule
OCS - Rig inspection workshop accredited by IADC - Bali ScheduleOCS - Rig inspection workshop accredited by IADC - Bali Schedule
OCS - Rig inspection workshop accredited by IADC - Bali Schedule
 
OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADC
 
Ocs rig inspection workshop - july schedule
Ocs   rig inspection workshop - july scheduleOcs   rig inspection workshop - july schedule
Ocs rig inspection workshop - july schedule
 
"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”
 
L1.04.04.01
L1.04.04.01L1.04.04.01
L1.04.04.01
 
L1.04.04.02
L1.04.04.02L1.04.04.02
L1.04.04.02
 

More from Azahar Abdullah (7)

Occupational analysis
Occupational analysisOccupational analysis
Occupational analysis
 
L1.10.10.03
L1.10.10.03L1.10.10.03
L1.10.10.03
 
L1.10.10.02
L1.10.10.02L1.10.10.02
L1.10.10.02
 
L1.10.10.01
L1.10.10.01L1.10.10.01
L1.10.10.01
 
L1.07.07.05
L1.07.07.05L1.07.07.05
L1.07.07.05
 
L1.06.06.04
L1.06.06.04L1.06.06.04
L1.06.06.04
 
L1.05.05.02
L1.05.05.02L1.05.05.02
L1.05.05.02
 

L1.06.06.05

  • 1. JOB TITLE: AUTOMOTIVE TECHNICIAN 1 DUTY NO.: 06 DUTY: PERFORM VEHICLE MANUAL DRIVE TRAIN REPAIR TASK NO.: 06.05 TASK: Rectify propeller shaft assembly LEVEL: 1 PERFORMANCE STANDARD: (Actions, Conditions, Criteria) Rectify propeller shaft assembly using service manual, hand tools, special tools, measuring tools, lubricant, and replacement parts so that propeller shaft distinguished, propeller shaft removed and installed, and universal joint examined are in accordance with the manufacturer s specifications. SUB-TASKS/STEPS ENABLING REQUIREMENTS (Knowledge, Skill, Attitude and Safety) TOOLS/EQUIPMENT/ MATERIALS 1. Distinguish propeller shaft location 2. Remove propeller shaft 3. Examine propeller shaft universal joint Knowledge on: 1.1 Types and function of propeller shaft 1.2 Construction and operation of propeller shaft 1.3 Layout of propeller shaft Ability to: 1.1 Locate propeller shaft assembly Knowledge on: 2.1 Procedures of removing propeller shaft assembly 2.2 Centre support mounting Ability to: 2.1 Dismantle propeller shaft assembly 2.2 Dismantle propeller shaft support mounting 2.3 Check the propeller shaft condition 2.4 Check the propeller shaft support mounting condition Knowledge on: 3.1 Function of universal joint 3.2 Construction and operation of universal joint 3.3 Procedures of dismantling and assembling universal joint 1. service manual 2. hand tools 3. special tools 4. measuring tools 5. lubricant/grease 6. replacement parts 7. wheel stopper 8. personal protection equipment 9. fender cover
  • 2. 4. Install propeller shaft Ability to: 3.1 Dismantle universal joint 3.2 Check condition of universal joint 3.3 Lubricate universal joint bearings 3.4 Assemble universal joint Knowledge on: 4.1 Propeller shaft alignment 4.2 Procedures of fixing propeller shaft Ability to: 4.1 Fix propeller shaft support bearing 4.2 Fix propeller shaft assembly Attitude/Safety: · Use wheel stopper · Use personal protection equipment