Nick Leone presented, "Curveball Problems for Your Benzene Fenceline Monitoring Program and How to Handle Them" at the AFPM/API Refinery Sector Rule Workshop in February 2016.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to Handle Them
1. www.all4inc.com | Philadelphia | Atlanta | Houston | Washington DC
Curveball Problems for Your Benzene
Fenceline Monitoring Program and
How to Handle Them
Nick Leone, P.E.| nleone@all4inc.com | 610.422.1121
With support from Steve Sherk, American Refining Group
AFPM/API Refinery Sector Rule Workshop
February 3, 2016
Presented by All4 Inc.
2. 2 Your environmental compliance is clearly our business.
Agenda
Scenarios
• Significant Weather Event During 14-Day Sampling Event
• Significant Leak has been Detected
• Elevated Benzene Concentrations are Measured and are
Completely Unexpected
• Labeled Sample Tubes do not Match Chain of Custody Records
Mitigation Tools
• Sample Schedule Adjustment
• Additional Sampler Deployment
• Expanded Chemical Analysis
• Labeling Considerations
3. 3 Your environmental compliance is clearly our business.
Day 14 Corresponds to the Arrival of a Category
III+ Hurricane or Winter Storm of the Century
Pull or Leave - Common sense on day 13
Applying U.S. EPA Ambient Monitoring Guidance
Significant Weather Event
4. 4 Your environmental compliance is clearly our business.
Benzene fenceline monitoring is a time integrated
sample over 14 days; no peak concentration.
Deploy a collocated tube after a repair has been
made.
The difference between the collocated tubes can
be utilized to delineate post-repair with pre-
repair concentrations levels.
Significant Leak has been Detected
5. 5 Your environmental compliance is clearly our business.
The anomaly lab result – elevated benzene
concentration.
A back trajectory analysis is a tool that utilizes
hourly wind direction data to evaluate potential
upwind sources of benzene.
Use meteorological data to your advantage –
wind direction is being collected.
Elevated Benzene Concentrations are Measured
6. 6 Your environmental compliance is clearly our business.
Elevated Benzene Concentrations are Measured
Back Trajectory Analysis
Refinery Property Line
Passive Benzene
Monitoring Tubes
Sources of Fugitive
Benzene Emissions
Flow VectorsUnexpected High
Benzene Sample
Result
Source C
Source A
Source B
Source D
Source E
7. 7 Your environmental compliance is clearly our business.
Expand lab analysis beyond benzene
• Chemical Mass Balance methodology can be used to
with expanded analytical data for source
apportionment
Hydrogen isotope ratio can help delineate the
source origin of benzene
Expanded Chemical Analysis
8. 8 Your environmental compliance is clearly our business.
Avoid strictly numeric site IDs
Implement barcode scanning
Use effective color coding
Audio and video recording
QA immediately after deployment
Labeled Sample Tube Mismatch
9. www.all4inc.com | Philadelphia | Atlanta | Houston | Washington DC
Questions?
Contact Information:
Nick Leone, P.E.
Project Manager
nleone@all4inc.com
610.422.1121
Kristin Gordon, P.E.
Houston Office Director
kgordon@all4inc.com
(281) 937-7553 x301