The Hazop technique is recently expanding, and has been developed by the giant ICI to analyze
the chemical plants, it is a qualitative technique driven by keywords and requires a team of people
coordinated by a cross-functional team leader. The Hazop study should be performed as soon as
possible at the design stage of the production processes. For the analysis required shop drawings
(P & ID; the technique can still be used:
a) in the phase of maximum design drawings of block
b) in the process of design review with final drawings
c) during construction and commissioning
d) during its operation.
The composition of the team must be open to:
1) process designers
2) process engineers
3) maintenance responsible
4) software experts
5) technical supplier companies.
The activity of Hazop team must be recorded on a form where they are registered:
1) No reference
2) word help
3) This deviation
4) causes
5) consequences
6) protection used
7) recommendations
8) responsibility.
The study can start when they are available:
1) the process flow diagram
2) P & ID
3) Lay out the process
4) data sheet of the materials, components, instrumentation, equipment
5) Operating instructions
6) Emergency procedures.
The process of analysis consists of the following phases:
1) dividing the entire system into sections (pumping, mixing, reaction, distillation, solvent recovery
etc)
2) choice of the node in the section that has a set of components and is well defined . A node is
for example a process line or an apparatus.
3) description of the purpose of the node (that is how it should work the process)
4) choice of a process parameter characterizing the node (eg, flow, temperature, pressure,
composition)
5) application of the word help (eg plus, minus, of etc.)
6) identification of deviations in the process. For deviation means the way in which the process
disregards the purpose indicated
7) determination of the causes of deviations
8) assessment of the consequences. The consequences can be both from a safety point of view
and from the point of view of the operability of the system.
9) protection to be provided for preventing the consequences
10) identification of countermeasures, actions to be taken to combat the causes of the deviations
The guide words are the heart dell'hazop, their proper use results in a well-made HAZOP; the most
used words are:
1) no;
1.1 significance: the function is absent, the purpose of the project is not reached
2) more
2.1 meaning: excessive function, beyond the designed
3) less
3.1 significance: insufficient function, lower than planned
4) as well as
4.1 meaning: this is an unwanted function in parallel
5) part of
5.1 significance: only part of the purpose of the planned has been reached
6) other than
6.1 significance: This is an unwanted feature instead of waiting dl project function
7) reverse;
7.1 significance: the opposite activities designed to sample function (flow back to the time of the
shutdown)
8) other words used guide are:
8.1 soon / later
8.2 before / after
8.3 faster / slower
8.4 in any other place.
These words guide together with the process parameters (flow, temperature, pressure,
composition, pH, speed 'tce) give rise to a number of combinations to be analyzed.
Example for reactor batch Checklist
PROBLEMS TO REAGENTS
1) incorrect reagents
2) impurities
3) insufficient amount / high
4) flow rate too fast / slow
5) contamination
EXHAUST PRESSURE SYSTEM
1) packing
2) vent condition biphasic
3) back pressure
4) Corrosion
MALFUNCTION MIXER
1) Insufficient mixing
2) mechanical failure
3) stop for lack EE
4) resulting layering liquid phases
INADEGUATE COOLING
1) ability to inadequate cooling system
2) lack electricity
3) system block pumping / flow
4) failure to coolers / cooling towers
5) failure to Fittings
6) failure to the control system
7) Loss of Coolant
TEMPERATURE
1) sensor failure
2) failure of the control system
3) in erroneous position sensor
FAILURE CONTROL SYSTEM
1) incorrect setting
2) Lack of Air / voltage
3) electrical / mechanical failure
It Is possible to suggest some corrective actions to mitigate the consequences of possible
deviations:
• Failure Alarm stirring with power reagent block
• High temperature alarm and high temperature of the reactor independently from the temperature
control system
• fail safe valves (open) on the cooling system
• flow switches and pressure on the cooling system with alarm and reagent supply blocks
• cooling water temperature indicator output
• maintenance of control procedures on safety valves or bursting disc
• reactor equipped with sprinkler system
• maximum level indicator
• any of the batch discharge tank
• Quality analysis to detect contaminants on reagents
In conclusion the Hazop technique has the advantage of having a series of guide words to identify
deviations spent neglected by other techniques, but it has the disadvantage of being only
qualitative and not to consider the simultaneity of occurrences.
Reference :
1)La prevenzione nell’industria chimica fine e farmaceutica- M. Mazzoli (Ge Specialities)
2)L’analisi dei rischi per la qualità e per l’ingegneria-Tartari .R.- Franco angeli

More Related Content

Similar to HAZOP Analysis Guide for Chemical Process Safety

Similar to HAZOP Analysis Guide for Chemical Process Safety (20)

industrial safety and hazar
industrial safety and hazarindustrial safety and hazar
industrial safety and hazar
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluids
 
HAZOP.PPT
HAZOP.PPTHAZOP.PPT
HAZOP.PPT
 
THE ROLE OF HUMAN ERROR IN ACCIDENTS
THE ROLE OF HUMAN ERROR IN ACCIDENTSTHE ROLE OF HUMAN ERROR IN ACCIDENTS
THE ROLE OF HUMAN ERROR IN ACCIDENTS
 
HAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdfHAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdf
 
Hazop group 7
Hazop   group 7Hazop   group 7
Hazop group 7
 
HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY
 
Hazid & hazops
Hazid & hazopsHazid & hazops
Hazid & hazops
 
1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx
 
HAZOP.pptx
HAZOP.pptxHAZOP.pptx
HAZOP.pptx
 
hazopanalysis-.pdf
hazopanalysis-.pdfhazopanalysis-.pdf
hazopanalysis-.pdf
 
hazop study.pptx
hazop study.pptxhazop study.pptx
hazop study.pptx
 
HAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxHAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptx
 
Hazop analysis
Hazop analysisHazop analysis
Hazop analysis
 
What is HAZOP?
What is HAZOP?What is HAZOP?
What is HAZOP?
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economics
 
HAZOP.pptx
HAZOP.pptxHAZOP.pptx
HAZOP.pptx
 
Hazop analysis complete report
Hazop analysis complete reportHazop analysis complete report
Hazop analysis complete report
 
HAZOP Module.pptx
HAZOP Module.pptxHAZOP Module.pptx
HAZOP Module.pptx
 
091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)
 

More from alfredo ruggiero

2.5 valutazione rischio esplosione impianto frigo
2.5 valutazione rischio esplosione impianto frigo2.5 valutazione rischio esplosione impianto frigo
2.5 valutazione rischio esplosione impianto frigoalfredo ruggiero
 
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICOalfredo ruggiero
 
production and maintenance
production and maintenanceproduction and maintenance
production and maintenancealfredo ruggiero
 
alfredo ruggiero engtech ticheme
alfredo ruggiero engtech tichemealfredo ruggiero engtech ticheme
alfredo ruggiero engtech tichemealfredo ruggiero
 
4.4 MANUTENZIONE E PROCEDURE
4.4 MANUTENZIONE E PROCEDURE4.4 MANUTENZIONE E PROCEDURE
4.4 MANUTENZIONE E PROCEDUREalfredo ruggiero
 
Chemtura_Sustainabilty_2016_FINAL_low_27May2016
Chemtura_Sustainabilty_2016_FINAL_low_27May2016Chemtura_Sustainabilty_2016_FINAL_low_27May2016
Chemtura_Sustainabilty_2016_FINAL_low_27May2016alfredo ruggiero
 
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTORE
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTOREPROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTORE
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTOREalfredo ruggiero
 
1.2Il ruolo della Produzione e della Manutenzione
1.2Il ruolo della Produzione e della Manutenzione1.2Il ruolo della Produzione e della Manutenzione
1.2Il ruolo della Produzione e della Manutenzionealfredo ruggiero
 
4.2 GESTIONE DELLE MODICHE
4.2 GESTIONE DELLE MODICHE4.2 GESTIONE DELLE MODICHE
4.2 GESTIONE DELLE MODICHEalfredo ruggiero
 
7.1 SIX SIGMA E PROCESSI CHIMICI
7.1  SIX SIGMA E PROCESSI CHIMICI7.1  SIX SIGMA E PROCESSI CHIMICI
7.1 SIX SIGMA E PROCESSI CHIMICIalfredo ruggiero
 
8.1 MINIMIZZAZIONE DEI RIFIUTI
8.1 MINIMIZZAZIONE DEI RIFIUTI8.1 MINIMIZZAZIONE DEI RIFIUTI
8.1 MINIMIZZAZIONE DEI RIFIUTIalfredo ruggiero
 
chemical reactor runaway case study
chemical reactor runaway case studychemical reactor runaway case study
chemical reactor runaway case studyalfredo ruggiero
 

More from alfredo ruggiero (20)

foto
fotofoto
foto
 
Annual_report_2014
Annual_report_2014Annual_report_2014
Annual_report_2014
 
2.5 valutazione rischio esplosione impianto frigo
2.5 valutazione rischio esplosione impianto frigo2.5 valutazione rischio esplosione impianto frigo
2.5 valutazione rischio esplosione impianto frigo
 
automation
automationautomation
automation
 
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO
6.1 AUTOMAZIONE SICURA DI PROCESSO CHIMICO
 
SHUTDOWN
SHUTDOWNSHUTDOWN
SHUTDOWN
 
WASTE MINIMIZATION
WASTE MINIMIZATIONWASTE MINIMIZATION
WASTE MINIMIZATION
 
green chemistry
green chemistrygreen chemistry
green chemistry
 
production and maintenance
production and maintenanceproduction and maintenance
production and maintenance
 
alfredo ruggiero engtech ticheme
alfredo ruggiero engtech tichemealfredo ruggiero engtech ticheme
alfredo ruggiero engtech ticheme
 
4.4 MANUTENZIONE E PROCEDURE
4.4 MANUTENZIONE E PROCEDURE4.4 MANUTENZIONE E PROCEDURE
4.4 MANUTENZIONE E PROCEDURE
 
Chemtura_Sustainabilty_2016_FINAL_low_27May2016
Chemtura_Sustainabilty_2016_FINAL_low_27May2016Chemtura_Sustainabilty_2016_FINAL_low_27May2016
Chemtura_Sustainabilty_2016_FINAL_low_27May2016
 
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTORE
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTOREPROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTORE
PROGETTAZIONE DI UN PROCESSO CHIMICO IN UN REATTORE
 
1.2Il ruolo della Produzione e della Manutenzione
1.2Il ruolo della Produzione e della Manutenzione1.2Il ruolo della Produzione e della Manutenzione
1.2Il ruolo della Produzione e della Manutenzione
 
4.2 GESTIONE DELLE MODICHE
4.2 GESTIONE DELLE MODICHE4.2 GESTIONE DELLE MODICHE
4.2 GESTIONE DELLE MODICHE
 
2.2 HAZOP
2.2 HAZOP2.2 HAZOP
2.2 HAZOP
 
3.1 PRODUZIONE
3.1 PRODUZIONE3.1 PRODUZIONE
3.1 PRODUZIONE
 
7.1 SIX SIGMA E PROCESSI CHIMICI
7.1  SIX SIGMA E PROCESSI CHIMICI7.1  SIX SIGMA E PROCESSI CHIMICI
7.1 SIX SIGMA E PROCESSI CHIMICI
 
8.1 MINIMIZZAZIONE DEI RIFIUTI
8.1 MINIMIZZAZIONE DEI RIFIUTI8.1 MINIMIZZAZIONE DEI RIFIUTI
8.1 MINIMIZZAZIONE DEI RIFIUTI
 
chemical reactor runaway case study
chemical reactor runaway case studychemical reactor runaway case study
chemical reactor runaway case study
 

HAZOP Analysis Guide for Chemical Process Safety

  • 1. HAZOP (Alfredo Ruggiero) The Hazop technique is recently expanding, and has been developed by the giant ICI to analyze the chemical plants, it is a qualitative technique driven by keywords and requires a team of people coordinated by a cross-functional team leader. The Hazop study should be performed as soon as possible at the design stage of the production processes. For the analysis required shop drawings (P & ID; the technique can still be used: a) in the phase of maximum design drawings of block b) in the process of design review with final drawings c) during construction and commissioning d) during its operation. The composition of the team must be open to: 1) process designers 2) process engineers 3) maintenance responsible 4) software experts 5) technical supplier companies. The activity of Hazop team must be recorded on a form where they are registered: 1) No reference 2) word help 3) This deviation 4) causes 5) consequences 6) protection used 7) recommendations 8) responsibility. The study can start when they are available: 1) the process flow diagram 2) P & ID 3) Lay out the process 4) data sheet of the materials, components, instrumentation, equipment 5) Operating instructions 6) Emergency procedures. The process of analysis consists of the following phases: 1) dividing the entire system into sections (pumping, mixing, reaction, distillation, solvent recovery etc) 2) choice of the node in the section that has a set of components and is well defined . A node is for example a process line or an apparatus. 3) description of the purpose of the node (that is how it should work the process) 4) choice of a process parameter characterizing the node (eg, flow, temperature, pressure, composition)
  • 2. 5) application of the word help (eg plus, minus, of etc.) 6) identification of deviations in the process. For deviation means the way in which the process disregards the purpose indicated 7) determination of the causes of deviations 8) assessment of the consequences. The consequences can be both from a safety point of view and from the point of view of the operability of the system. 9) protection to be provided for preventing the consequences 10) identification of countermeasures, actions to be taken to combat the causes of the deviations The guide words are the heart dell'hazop, their proper use results in a well-made HAZOP; the most used words are: 1) no; 1.1 significance: the function is absent, the purpose of the project is not reached 2) more 2.1 meaning: excessive function, beyond the designed 3) less 3.1 significance: insufficient function, lower than planned 4) as well as 4.1 meaning: this is an unwanted function in parallel 5) part of 5.1 significance: only part of the purpose of the planned has been reached 6) other than 6.1 significance: This is an unwanted feature instead of waiting dl project function 7) reverse; 7.1 significance: the opposite activities designed to sample function (flow back to the time of the shutdown) 8) other words used guide are: 8.1 soon / later 8.2 before / after 8.3 faster / slower 8.4 in any other place. These words guide together with the process parameters (flow, temperature, pressure, composition, pH, speed 'tce) give rise to a number of combinations to be analyzed. Example for reactor batch Checklist PROBLEMS TO REAGENTS 1) incorrect reagents 2) impurities 3) insufficient amount / high 4) flow rate too fast / slow 5) contamination EXHAUST PRESSURE SYSTEM 1) packing 2) vent condition biphasic
  • 3. 3) back pressure 4) Corrosion MALFUNCTION MIXER 1) Insufficient mixing 2) mechanical failure 3) stop for lack EE 4) resulting layering liquid phases INADEGUATE COOLING 1) ability to inadequate cooling system 2) lack electricity 3) system block pumping / flow 4) failure to coolers / cooling towers 5) failure to Fittings 6) failure to the control system 7) Loss of Coolant TEMPERATURE 1) sensor failure 2) failure of the control system 3) in erroneous position sensor FAILURE CONTROL SYSTEM 1) incorrect setting 2) Lack of Air / voltage 3) electrical / mechanical failure It Is possible to suggest some corrective actions to mitigate the consequences of possible deviations: • Failure Alarm stirring with power reagent block • High temperature alarm and high temperature of the reactor independently from the temperature control system • fail safe valves (open) on the cooling system • flow switches and pressure on the cooling system with alarm and reagent supply blocks • cooling water temperature indicator output • maintenance of control procedures on safety valves or bursting disc • reactor equipped with sprinkler system • maximum level indicator • any of the batch discharge tank • Quality analysis to detect contaminants on reagents In conclusion the Hazop technique has the advantage of having a series of guide words to identify deviations spent neglected by other techniques, but it has the disadvantage of being only qualitative and not to consider the simultaneity of occurrences. Reference : 1)La prevenzione nell’industria chimica fine e farmaceutica- M. Mazzoli (Ge Specialities) 2)L’analisi dei rischi per la qualità e per l’ingegneria-Tartari .R.- Franco angeli