SlideShare a Scribd company logo
1 of 2
CURRICULUM VITAE
PERSONAL DATA:
NAME : FA Survian Tegap Valianto
ADDRESS : Jl. Puri Asri Perdana Blok A3/5,
Padangsari, Banyumanik, Semarang –
Jawa Tengah
BIRTH/DATE PLACE : Semarang, May 12, 1975
MOBHILE PHONE : 0816698251
E-MAIL ADDRESS : alexiusfelix@gmail.com
SEX : Male
EDUCATION:
- Diploma III, Mechanical Engineering, Diponegoro University.
- Bachelor, Industrial Engineering, Mpu Tantular University.
JOB EXPERIENCE:
- Quality Control Supervisor PT. TEXMACO (Perkasa Heavyndo Engineering), the
producer textile machine and truck, and Work Shop Kendal, 1999-2001.
- PPC staff Technomeiji Rubber SDN BHD, PROTON Berhad branch, the national
manufacture car, Negeri Sembilan-Malaysia, 2001-2003.
- PPC supervisor PT. Elang Satria Jaya, Work Shop and motorcycle part producer,
Semarang, 2004-2006.
- PT. Puninar Jaya, 3PL department, duty to:
* Part and Accessories Supervisor, General Motor Indonesia.
* PPIC and Warehouse Section Head on NISSAN project division, Jakarta, 2006-
2008.
- PPIC and Logistics Departemen Head, PT. Triteguh Manungal Sejati
/Garudafood, Banjarbaru-South Borneo, 2010-present.
PLANNING AND INVENTORY TRAINEE:
- Training to Yokohama-Japan, PPIC (JIT) and Logistics, March 2006.
- Practice to Bangkok-Thailand, PPIC, May 2007.
JOB SCOPE:
• FORECAST/MRP (Material Requeriments Planning)
Calculations based on the Demand/Sales order and Bill of material.
• PROCUREMENT CONTROL
Monitoring the procurement process (PR, PO untill arrival).
Control the prices of materials (raw material, packaging material and office
equipments), purchase request, purchase order, freight cost and services from
suppliers to support Cost of Good Manufacture (COGM) and CAPEX.
Organize the material list; supplier name, lead time, load delivery and
minimum order.
• CREATE INCOMING SCHEDULE
Based on lead time of the supplier, delivery load, the minimum order, the
capacity of the warehouse, unloading capacity and production
requirements.
• STORAGE
Identification of the material (supplier name, date of arrival / FIFO, expired
date / FEFO), mapping, procedures to handle the material, inventory control,
labeling, quality status, cycle count and stock opname.
Setting the level of stock (minimum and maximum stock).
Control conditions and warehouse facilities.
• PRODUCTION PLANNING
Make MPS; Monthly and weekly planning, based on Sales forecast (confirmed
demand plan, expansion of the sales area and record sales history),
production process, machine capacity and man power capacity.
Collection of data as a basis for the OEE (Overall Equipment Effectiveness).
Manpower Planning (MPP) calculation.
• DELIVERY
Delivery schedule, customer request (quantity, quality and delivery time), load
capacity and transportation required.
• Work in process control.
• Create a budget (the prices of materials, man power planning and
salary) for control the Cost Of Good Manufacture.
• Conducting a tender for transporter.
• Make Standard Operational Procedure.
Semarang, March 2nd, 2016.
(FA SURVIAN TEGAP VALIANTO)

More Related Content

Similar to FA Survian's CV (20)

tahun 2015-04
tahun 2015-04tahun 2015-04
tahun 2015-04
 
Resume
ResumeResume
Resume
 
cv-syahrul
cv-syahrulcv-syahrul
cv-syahrul
 
Cv(Haytham Ashrey)
Cv(Haytham Ashrey)Cv(Haytham Ashrey)
Cv(Haytham Ashrey)
 
Cv(Haytham Ashrey)
Cv(Haytham Ashrey)Cv(Haytham Ashrey)
Cv(Haytham Ashrey)
 
Resume_achal
Resume_achalResume_achal
Resume_achal
 
Jordan CV
Jordan CVJordan CV
Jordan CV
 
my cv_US
my cv_USmy cv_US
my cv_US
 
CV Awal
CV AwalCV Awal
CV Awal
 
general tyres production planning and controlling
general tyres production planning and controllinggeneral tyres production planning and controlling
general tyres production planning and controlling
 
bukky
bukkybukky
bukky
 
SARDI SITEPU CV
SARDI SITEPU CVSARDI SITEPU CV
SARDI SITEPU CV
 
Resume
ResumeResume
Resume
 
DINAKARAN D RESUME
DINAKARAN D RESUMEDINAKARAN D RESUME
DINAKARAN D RESUME
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
RAJESH ROUSHAN .
RAJESH ROUSHAN .RAJESH ROUSHAN .
RAJESH ROUSHAN .
 
Someswara Rao, CV
Someswara Rao, CVSomeswara Rao, CV
Someswara Rao, CV
 
karthik New
karthik Newkarthik New
karthik New
 
Yogesh f2016
Yogesh f2016Yogesh f2016
Yogesh f2016
 
Hazem a.maher
Hazem a.maherHazem a.maher
Hazem a.maher
 

FA Survian's CV

  • 1. CURRICULUM VITAE PERSONAL DATA: NAME : FA Survian Tegap Valianto ADDRESS : Jl. Puri Asri Perdana Blok A3/5, Padangsari, Banyumanik, Semarang – Jawa Tengah BIRTH/DATE PLACE : Semarang, May 12, 1975 MOBHILE PHONE : 0816698251 E-MAIL ADDRESS : alexiusfelix@gmail.com SEX : Male EDUCATION: - Diploma III, Mechanical Engineering, Diponegoro University. - Bachelor, Industrial Engineering, Mpu Tantular University. JOB EXPERIENCE: - Quality Control Supervisor PT. TEXMACO (Perkasa Heavyndo Engineering), the producer textile machine and truck, and Work Shop Kendal, 1999-2001. - PPC staff Technomeiji Rubber SDN BHD, PROTON Berhad branch, the national manufacture car, Negeri Sembilan-Malaysia, 2001-2003. - PPC supervisor PT. Elang Satria Jaya, Work Shop and motorcycle part producer, Semarang, 2004-2006. - PT. Puninar Jaya, 3PL department, duty to: * Part and Accessories Supervisor, General Motor Indonesia. * PPIC and Warehouse Section Head on NISSAN project division, Jakarta, 2006- 2008. - PPIC and Logistics Departemen Head, PT. Triteguh Manungal Sejati /Garudafood, Banjarbaru-South Borneo, 2010-present. PLANNING AND INVENTORY TRAINEE: - Training to Yokohama-Japan, PPIC (JIT) and Logistics, March 2006. - Practice to Bangkok-Thailand, PPIC, May 2007.
  • 2. JOB SCOPE: • FORECAST/MRP (Material Requeriments Planning) Calculations based on the Demand/Sales order and Bill of material. • PROCUREMENT CONTROL Monitoring the procurement process (PR, PO untill arrival). Control the prices of materials (raw material, packaging material and office equipments), purchase request, purchase order, freight cost and services from suppliers to support Cost of Good Manufacture (COGM) and CAPEX. Organize the material list; supplier name, lead time, load delivery and minimum order. • CREATE INCOMING SCHEDULE Based on lead time of the supplier, delivery load, the minimum order, the capacity of the warehouse, unloading capacity and production requirements. • STORAGE Identification of the material (supplier name, date of arrival / FIFO, expired date / FEFO), mapping, procedures to handle the material, inventory control, labeling, quality status, cycle count and stock opname. Setting the level of stock (minimum and maximum stock). Control conditions and warehouse facilities. • PRODUCTION PLANNING Make MPS; Monthly and weekly planning, based on Sales forecast (confirmed demand plan, expansion of the sales area and record sales history), production process, machine capacity and man power capacity. Collection of data as a basis for the OEE (Overall Equipment Effectiveness). Manpower Planning (MPP) calculation. • DELIVERY Delivery schedule, customer request (quantity, quality and delivery time), load capacity and transportation required. • Work in process control. • Create a budget (the prices of materials, man power planning and salary) for control the Cost Of Good Manufacture. • Conducting a tender for transporter. • Make Standard Operational Procedure. Semarang, March 2nd, 2016. (FA SURVIAN TEGAP VALIANTO)