SlideShare a Scribd company logo
1 of 3
Download to read offline
Ajay Surendran
Mob: +255-772678505
ajaysur001@gmail.com
Carrier Objective
To be part of an esteemed organisation and make intensive use of my talents and experience
derived by working with prestigious projects in the UAE, INDIA, and EAST AFRICA, and ensure
my professional carrier as the organisation grows.
Experience
 ESTIM CONSTRUCTION COMPANY LTD.
Working as a Sr. Electrical Engineer from 28th August 2014 to till date, handling 8
different projects in Dar Es salaam, Tanzania and Lusaka, Zambia reporting directly to
director of the company.
Project executing is PSPF-2(residential and offices), Tanzania Port Authority (TPA) Office
tower, Evoke luminary (office project), Vijana stage 2 (hotel apartment & commercial
tower), NHC Wakulima street proposed residential tower, NHC mixed use
development (residential, hotel office and commercial tower), NHC Kawe residential
towers from Dar es salaam ,Tanzania and Lusaka residential tower from Zambia.
 ETA ASCON GROUP OF COMPANIES
Worked as an Electrical Engineer from 11th June 2011 to 5th August 2013, reported to
Project Manager.
Project executed is Cleave land clinic Hospital (high rise building-Five star hospital) in
Abu Dhabi, UAE.
 V RAHEJA PVT. LTD, INDIA
Worked from January 2011 to 31st may 2011 as an Electrical Engineer (contract base)
reported to Project Manager (Electrical).
Project executed is JW Marriot Hotel (high rise building-Five star hotel) in Bangalore,
India
 VOLTAS LIMITED (A TATA ENTERPRISE), UAE
Worked from 28th June 2008 to 5th July 2010 as a Sr. Electrical Supervisor reported to
Project Manager (Electrical).
Projects executed are Formula 1 (fast race track project) with 56 buildings surrounding
in an area of 15 sq.km, and Etihad Towers (high rise buildings comprising hotels, office
and residential apartments) in UAE.
 SOBHA DEVELOPERS PVT. LTD, INDIA
Worked from 8th Jan 2007 to 5th March 2008 as an Electrical Supervisor reporting to
Electrical Manager.
Projects executed are Sobha Daisy (high rise building-residential apartment) and Sobha
Lake view club house.
 VIJAYA ENTERPRISE, INDIA
Worked from June 2004 to December 2006 as an Electrical Supervisor reporting to
Electrical Engineer.
Project executed is Acme Harmony (high rise building-residential apartment).
Job Profile
My responsibilities consist, but not limited to the following:-
 Preparation & reviews for project concept.
 Carry out electrical design and review the electrical drawings.
 Carry out regular design and project reviews.
 Prepare the tender BOQ.
 Define project scope and perform project estimate.
 Ensure project estimates are accurate and the project scope is executable with in the budget.
 Preparation of specifications and BOQ for procurement.
 Offer the quotation from different suppliers as per the specification and BOQ.
 Receive, analyse and evaluate quotations suiting our requirements.
 Implement cost effective measures for reducing project cost.
 Preparation & Maintenance of Project files and documents.
 Conduct quantity survey and provide details of bill preparation.
 Review subcontractor BOQs and invoices for accuracy and completion.
 Verify subcontractor completed works are in line with contract requirements.
 Review submitted consultant and contractor proposals and submissions.
 Manage approval, completion of work and payment of project consultants and contractors.
 Study approved drawings and direct both foremen and labours to execute the work of
conduiting (both PVC and GI), wiring and installation of trunking, cable trays, cable
ladders and bus ducts, erection, testing and commissioning to electrical panels,
transformers, DG sets, etc in HV side, and fire alarm, BMS, communication system, CCTV
& door access controlling system, etc in ELV side.
 Ensure that the erection and installation is completed in compliance with the client
requirements viz. quality, specification, standard of material and timely execution of the
work, and ensure that no material is wasted during the process of activities such as
measuring, cutting materials, methods of work.
 Carry out various electrical works based on the time schedule of client and prepare
completion schedule and submit to Project Manager on a regular basis.
 Educate foremen with the client forecast schedule to prepare them in advance for the
work to be carried out at site on different locations.
 Function as a coordinator between electrical service and other MEP disciplines as well as
with the MEP personnel of main contractor, consultant and client.
 All the while carrying out the above works, ensures safety precautions are taken care of
and implemented as defined in the method statement.
Education Qualification
 B Tech in Electrical Engineering from KSOU, Mysore, Karnataka 2014
 Diploma in Electrical Engineering from Polytechnic college, Kannur, Kerala 2004
 Higher Secondary from Govt HSS Palayad, Kerala, India.
 SSLC from Govt HSS Palayad, Kerala, India.
Additional Qualification
• AUTOCAD 2010 (ELECTRICAL)
• INTEGRATED MANAGEMANT SYSTEMS, QHS SYSTEM DOCUMENTATION TRAINING COURSE
Personal Details
NAME : AJAY SURENDRAN
FATHER’S NAME : K P SURENDRAN
ADDRESS : KARTHIK, PO.MELUR, THALASSERY
KANNUR (DIST), KERALA
DATE OF BIRTH : 06-October-1982
MARITAL STATUS : MARRIED
NATIONALITY : INDIAN
LANGUAGE : ENGLISH, HINDI, MALAYALAM
Expected date of join : 90 days from the offer letter
Passport Details
PASSPORT NO : N4383351
PLACE OF ISSUE : DAR ES SALAAM
DATE OF EXPIRY : 20/10/2025
I, Ajay Surendran, hereby declare that all the details furnished above are correct to the best of
my knowledge and belief. If given an opportunity to serve in your esteemed firm, I will give my
best and do my duties sincerely towards the growth of your esteemed firm.
Yours sincerely,
(Ajay Surendran)

More Related Content

What's hot

shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul das
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineerfadel shihab
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CVAsif pasha
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
03.06.15_AVEEK BORAH REF lTR
03.06.15_AVEEK BORAH REF lTR03.06.15_AVEEK BORAH REF lTR
03.06.15_AVEEK BORAH REF lTRAveek Borah
 
VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916VIJEESH CR
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YVamsi Krishna
 
kannan elec
kannan eleckannan elec
kannan eleckannan v
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_templatetathanhluan
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.Aqib Bin aqeel
 
Ajay singh Bisht CV
Ajay singh Bisht CV Ajay singh Bisht CV
Ajay singh Bisht CV Ajay Bisht
 

What's hot (20)

Nithn CV
Nithn CVNithn CV
Nithn CV
 
shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineer
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
EUH CV 31016
EUH CV 31016EUH CV 31016
EUH CV 31016
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
03.06.15_AVEEK BORAH REF lTR
03.06.15_AVEEK BORAH REF lTR03.06.15_AVEEK BORAH REF lTR
03.06.15_AVEEK BORAH REF lTR
 
VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916
 
Electrical engineer CV
Electrical engineer CVElectrical engineer CV
Electrical engineer CV
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
kannan elec
kannan eleckannan elec
kannan elec
 
Senthamil profile
Senthamil profileSenthamil profile
Senthamil profile
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_template
 
Profile Sept 2016
Profile Sept 2016Profile Sept 2016
Profile Sept 2016
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.
 
Ajay singh Bisht CV
Ajay singh Bisht CV Ajay singh Bisht CV
Ajay singh Bisht CV
 
Ejaz Rasheed 5
Ejaz Rasheed 5Ejaz Rasheed 5
Ejaz Rasheed 5
 

Viewers also liked (15)

Mi familia 10
Mi familia 10Mi familia 10
Mi familia 10
 
Mi familia 10
Mi familia 10Mi familia 10
Mi familia 10
 
Mi vida en familia
Mi vida en familiaMi vida en familia
Mi vida en familia
 
Sistema excretor.2016
Sistema excretor.2016Sistema excretor.2016
Sistema excretor.2016
 
e-Apps Company Profile [Autosaved]
e-Apps Company Profile [Autosaved]e-Apps Company Profile [Autosaved]
e-Apps Company Profile [Autosaved]
 
48_494580_wodworksactionplan
48_494580_wodworksactionplan48_494580_wodworksactionplan
48_494580_wodworksactionplan
 
e-Apps_Staffing.ppt
e-Apps_Staffing.ppte-Apps_Staffing.ppt
e-Apps_Staffing.ppt
 
NUI OIM - AIPO
NUI OIM - AIPONUI OIM - AIPO
NUI OIM - AIPO
 
Misuse of-antibiotics
Misuse of-antibioticsMisuse of-antibiotics
Misuse of-antibiotics
 
Kuldeep
KuldeepKuldeep
Kuldeep
 
JDT Resume
JDT ResumeJDT Resume
JDT Resume
 
Incompatibilities of drug admixtures
Incompatibilities of drug admixtures Incompatibilities of drug admixtures
Incompatibilities of drug admixtures
 
Erikson’s theory of psychosocial development (1)
Erikson’s theory of psychosocial development (1)Erikson’s theory of psychosocial development (1)
Erikson’s theory of psychosocial development (1)
 
Kuldeep ppt11
Kuldeep ppt11Kuldeep ppt11
Kuldeep ppt11
 
hakeem kc cv
hakeem kc cvhakeem kc cv
hakeem kc cv
 

Similar to Ajay Surendran (20)

vivek-cv
vivek-cvvivek-cv
vivek-cv
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
Akhlaque Ahmad
Akhlaque AhmadAkhlaque Ahmad
Akhlaque Ahmad
 
CV
CVCV
CV
 
RESUME
RESUMERESUME
RESUME
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
resume (3) - Copy
resume (3) - Copyresume (3) - Copy
resume (3) - Copy
 
danish resume
danish resumedanish resume
danish resume
 
resume (4) - Copy
resume (4) - Copyresume (4) - Copy
resume (4) - Copy
 
resume_rejath_ - Copy
resume_rejath_ - Copyresume_rejath_ - Copy
resume_rejath_ - Copy
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume 1
Resume 1Resume 1
Resume 1
 
Qs mep updated new cv of s.dutta sep 2015
Qs  mep updated new cv of s.dutta sep  2015Qs  mep updated new cv of s.dutta sep  2015
Qs mep updated new cv of s.dutta sep 2015
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubai
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CV
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 

Ajay Surendran

  • 1. Ajay Surendran Mob: +255-772678505 ajaysur001@gmail.com Carrier Objective To be part of an esteemed organisation and make intensive use of my talents and experience derived by working with prestigious projects in the UAE, INDIA, and EAST AFRICA, and ensure my professional carrier as the organisation grows. Experience  ESTIM CONSTRUCTION COMPANY LTD. Working as a Sr. Electrical Engineer from 28th August 2014 to till date, handling 8 different projects in Dar Es salaam, Tanzania and Lusaka, Zambia reporting directly to director of the company. Project executing is PSPF-2(residential and offices), Tanzania Port Authority (TPA) Office tower, Evoke luminary (office project), Vijana stage 2 (hotel apartment & commercial tower), NHC Wakulima street proposed residential tower, NHC mixed use development (residential, hotel office and commercial tower), NHC Kawe residential towers from Dar es salaam ,Tanzania and Lusaka residential tower from Zambia.  ETA ASCON GROUP OF COMPANIES Worked as an Electrical Engineer from 11th June 2011 to 5th August 2013, reported to Project Manager. Project executed is Cleave land clinic Hospital (high rise building-Five star hospital) in Abu Dhabi, UAE.  V RAHEJA PVT. LTD, INDIA Worked from January 2011 to 31st may 2011 as an Electrical Engineer (contract base) reported to Project Manager (Electrical). Project executed is JW Marriot Hotel (high rise building-Five star hotel) in Bangalore, India  VOLTAS LIMITED (A TATA ENTERPRISE), UAE Worked from 28th June 2008 to 5th July 2010 as a Sr. Electrical Supervisor reported to Project Manager (Electrical). Projects executed are Formula 1 (fast race track project) with 56 buildings surrounding in an area of 15 sq.km, and Etihad Towers (high rise buildings comprising hotels, office and residential apartments) in UAE.
  • 2.  SOBHA DEVELOPERS PVT. LTD, INDIA Worked from 8th Jan 2007 to 5th March 2008 as an Electrical Supervisor reporting to Electrical Manager. Projects executed are Sobha Daisy (high rise building-residential apartment) and Sobha Lake view club house.  VIJAYA ENTERPRISE, INDIA Worked from June 2004 to December 2006 as an Electrical Supervisor reporting to Electrical Engineer. Project executed is Acme Harmony (high rise building-residential apartment). Job Profile My responsibilities consist, but not limited to the following:-  Preparation & reviews for project concept.  Carry out electrical design and review the electrical drawings.  Carry out regular design and project reviews.  Prepare the tender BOQ.  Define project scope and perform project estimate.  Ensure project estimates are accurate and the project scope is executable with in the budget.  Preparation of specifications and BOQ for procurement.  Offer the quotation from different suppliers as per the specification and BOQ.  Receive, analyse and evaluate quotations suiting our requirements.  Implement cost effective measures for reducing project cost.  Preparation & Maintenance of Project files and documents.  Conduct quantity survey and provide details of bill preparation.  Review subcontractor BOQs and invoices for accuracy and completion.  Verify subcontractor completed works are in line with contract requirements.  Review submitted consultant and contractor proposals and submissions.  Manage approval, completion of work and payment of project consultants and contractors.  Study approved drawings and direct both foremen and labours to execute the work of conduiting (both PVC and GI), wiring and installation of trunking, cable trays, cable ladders and bus ducts, erection, testing and commissioning to electrical panels, transformers, DG sets, etc in HV side, and fire alarm, BMS, communication system, CCTV & door access controlling system, etc in ELV side.
  • 3.  Ensure that the erection and installation is completed in compliance with the client requirements viz. quality, specification, standard of material and timely execution of the work, and ensure that no material is wasted during the process of activities such as measuring, cutting materials, methods of work.  Carry out various electrical works based on the time schedule of client and prepare completion schedule and submit to Project Manager on a regular basis.  Educate foremen with the client forecast schedule to prepare them in advance for the work to be carried out at site on different locations.  Function as a coordinator between electrical service and other MEP disciplines as well as with the MEP personnel of main contractor, consultant and client.  All the while carrying out the above works, ensures safety precautions are taken care of and implemented as defined in the method statement. Education Qualification  B Tech in Electrical Engineering from KSOU, Mysore, Karnataka 2014  Diploma in Electrical Engineering from Polytechnic college, Kannur, Kerala 2004  Higher Secondary from Govt HSS Palayad, Kerala, India.  SSLC from Govt HSS Palayad, Kerala, India. Additional Qualification • AUTOCAD 2010 (ELECTRICAL) • INTEGRATED MANAGEMANT SYSTEMS, QHS SYSTEM DOCUMENTATION TRAINING COURSE Personal Details NAME : AJAY SURENDRAN FATHER’S NAME : K P SURENDRAN ADDRESS : KARTHIK, PO.MELUR, THALASSERY KANNUR (DIST), KERALA DATE OF BIRTH : 06-October-1982 MARITAL STATUS : MARRIED NATIONALITY : INDIAN LANGUAGE : ENGLISH, HINDI, MALAYALAM Expected date of join : 90 days from the offer letter Passport Details PASSPORT NO : N4383351 PLACE OF ISSUE : DAR ES SALAAM DATE OF EXPIRY : 20/10/2025 I, Ajay Surendran, hereby declare that all the details furnished above are correct to the best of my knowledge and belief. If given an opportunity to serve in your esteemed firm, I will give my best and do my duties sincerely towards the growth of your esteemed firm. Yours sincerely, (Ajay Surendran)