SlideShare a Scribd company logo
1 of 11
Download to read offline
AAhhmmeedd SSoobbhhyy MMoohhaammeedd AAllii
RRoottaattiinngg EEqquuiippmmeenntt EEnnggiinneeeerr
55 AAbbdd EEll--AAzziizz EEbbnn MMaarraawwaann,, ((SSiiddii GGaabbeerr)),, AAlleexxaannddrriiaa,, EEggyypptt
PPhhoonneess:: EEGGYYPPTT ((000022))0011222244447799775588 -- ((000022)) ((0033))55444422337755
IIRRAAQQ ((0000996644))77881144227788226666
EE--mmaaiill:: aa--ssoobbhhyy@@hhoottmmaaiill..ccoomm ------ AAhhmmeedd..ssoobbhhii@@eemmcceegg..ccoomm
Objectives
It will pleasure me to be a member in your organization
Personal Information
Date of Birth .............: 19th
march 1984
Place of Birth ............: Alexandria
Nationality.................: Egyptian.
City............................: Alexandria.
Marital Status............: single.
Military Status...........: Exempted.
Driving license …... valid
Education
University..................: Alexandria University, Faculty of Engineering, Mechanical Power
Department.
Degree.......................: Bachelor in Mechanical Power Engineering.
Graduation Year........: JUNE 2006.
All over Grade...........: Good.
Graduation Project....: hydraulic circuit Design of a Telescopic Crane
Project Grade…………: Excellent
Training course by EMC
1. Pump maintenance
2. Shaft alignment
3. SKF bearing basic and advanced
4. Level one vibration analysis (mobius certified)
5. Level two vibration analyses (mobius certified)
Job Experience
 (( Start of 2007 – Present))
Working as mechanical engineer for Egyptian maintenance company (EMC)
In ROTATING EQUIPMENT DEPATMENT at sites:-
1. DAMIETTA PETROCHEMICAL PLANT EGYPTIAN METHANIX (EMETHANEX)
2. (MISR FERTILIZER PRODUCTION COMPANY) (MOPCO)
3. DAMIETTA LNG PLANT SPANISH EGYPTIAN GAS (SEGAS)
4. EGYPTIAN LINEAR ALKYL BENZENE (ELAB)
5. MIDDLE EAST OIL REFINERY (MIDOR)
6. SOUTH OIL COMPANY (ZUBAIR SITE)(ENI) (IRAQ-- BASRAH) (S.O.C)
Job description
CONSTRUCTION JOBS:
o EMETHANIX SITE :
o ELAB SITE:
Work scope
Installation and pre commissioning of all rotating equipment such as;
 Pumps
1. Pump orientation according to plot plane drawings
2. Leveling pump skid
3. Pre alignment for the pump before installing the piping
4. adjust piping parallelism to avoid piping strain on pump
5. install piping with pump and make final alignment
 Induced air fan coolers
 Forced air fan coolers
1. adjusting fan cooler into plenum center
2. Adjusting of blade angle
3. Shrinking of fan pulley
4. Adjust tip clearance
5. install fan belt and adjust it's tension
 Cooling tower
1. adjusting fan cooler into plenum center
2. Adjusting of blade angle
3. Adjust tip clearance
 General Electric steam turbine (power generation)
1. Adjusting orientation of turbine and generator skids according to plot plane drawing
2. Adjust skid level according to vendor recommendation
3. Check turbine shaft end play
4. Install labyrinth seal
5. checking of gear mesh for gear box
6. Adjusting pre alignment between gear box and turbine according to vendor
recommendation
7. Adjusting pre alignment between gear box and generator according to vendor
recommendation
8. check of piping parallelism
9. Adjusting final alignment
 Boiler blowers
1. Adjust blower shaft leveling
2. check impeller clearance
3. Adjust blower alignment
 Siemens (steam turbine & BCL Compressor)
1. Adjusting orientation and skid level
2. check shaft leveling
3. check bearing clearance according to vendor recommendation
4. Adjusting pre alignment according to vendor recommendation
5. install compressor labyrinth seal
6. install dry gas seal
7. install thrust collar
 Screw and reciprocating compressor installation
1. Orientation according to plot plane drawings
2. Leveling skid
3. Sharing work with mitsui reciprocating compressor vendor during
 Cross head clearance check
 Piston rod run out
 Crank shaft deflection
 Lube oil passage check
 Compressor alignment
4. Sharing work with kobelco screw compressor vendor during alignment
GLOBAL MAINTENANCE JOBS:
o SEGAS SITE:
Work scope
 Perform protective and corrective maintenance for mechanical items such as:-
1. Pumps (over hang – OH2 & BB2 single impeller double suction and multi stages– vertical
single & multi stages)
2. BOIL OF GAS (BOG) Compressors
3. Induced and forced air fan cooler
4. Blowers
5. General Electric and Hitachi gas turbine by cleaning or changing
(Mist eliminator, filters, lubes oil, replacing seal gas filters)
o MIDOR SITE:
Work scope
 Perform protective maintenance for mechanical items such as:-
1. Changing bearing lube oil
2. Seal bot oil changing and its forced gas increase
3. Compressor lube oil changing
 Perform corrective maintenance such as:-
1. forced Air fan cooler
a. Changing damage belt
b. Changing bearing
c. pulley alignment
d. Adjust blade angle
e. Pneumatic actuator maintenance for variable pitch air fan cooler
2. Centrifugal pump
Perform a major overhaul
a. By repairing or changing some items such as:-
1. (Mechanical-labyrinth-rubber) seal
2. Sleeves – packing – bearing – throttle push- wear ring
b. Shaft run out test
c. Face rim alignment
d. End play adjusting according to pump type
3. Reciprocating compressor
a. Changing damage (oil, compression and rider) rings
b. Piston rod run out
c. Packing replacement
d. suction and discharge valves cleaning and spring retainer changing
o ZUBAIR SITE (SUBCOTARCTOR OF ENI) (IRAQ) FROM 1/9/2012 (TILL NOW)
Work scope
Manage and supervise senior mechanical engineers and technicians
Ensure quality of procedures during major overhauling of rotating equipments
Prepare spare list for each rotating equipment as per drawings and data sheet
Prepare mechanical seal spare parts for all pumps and follow up with vendors
Prepare material list for static equipment as per data sheet
Follow up the progress of wells head modifications (FLARE LESS PROJECT)
SHUTDOWN JOBS:
 SEGAS SITE;
 Gas turbine overhauling
Assigned to work as supervisor during shutdown at
Nuovo Pignone frame 7 gas turbine combustion inspection
Overhauling activities:-
1. Changing transition pieces and bullhorn support bracket
2. Changing liner and sleeve and install new extended kit
3. Changing strip seal
4. Changing fuel nozzles
5. IGV inspection
6. 2nd
stage bucket bore scope inspection
 Compressors overhauling.
Nuovo Pignone 3MCL1405 & BCL 804
Overhauling activities:-
1. Removing couplings
2. Dismantling hubs by hydraulic tool
3. Journal and thrust bearing has been replaced for all compressor
4. Dry gas seal has been replaced
5. Re assembly back couplings
Nuovo Pignone axial compressor AN200
Shut down activities:-
1. Replace compressor rotor
2. Install new dry gas seal
3. Install new bearing
IHI reciprocating compressor (BOG)
Overhauling activities:-
1. Replace rider and piston rings for 1st
and 2nd
stage
2. Install new extender kit called floating head technology instead of rider and piston rings in 3rd
stage
3. Inspection and cleaning for suction and discharge valves
4. Piston rod inspection and deflection checking
5. Crank shaft deflection measurements
6. High, low oil and intermediate packing seal replacement
o MOPCO SITE;
Assigned to work for UHDE as man power rotating equipment TEAM LEADER
During plant shutdown to follow up overhauling of
 GE Centrifugal Compressors 2BCL458 + 2BCL408
 MANTURBO Centrifugal compressor
Overhauling activities.
1. Change mechanical seal for all compressors
2. Inspection for journal bearing
3. Inspection for thrust bearing
4. Replace damage parts (journal pads, thrust pads & labyrinth)
5. Replace degassing tank
 Professional alignment skills
1. Face rim alignment
2. Reverse alignment method
3. Soft foot treatment
4. Familiar with laser alignment especially (easy laser device)
 Computer Skills
1. AutoCAD 2D, 3D.
2. Microsoft Office.
 Language Skills
1. Arabic………. : Mother tongue.
2. English………: Good.
3. Italian ………: studying in progress (level four out of five levels) considered accepted
 Hobbies
 Reading
 Traveling
 Football
Ahmed Sobhy mohamed
Ahmed Sobhy mohamed
Ahmed Sobhy mohamed
Ahmed Sobhy mohamed
Ahmed Sobhy mohamed

More Related Content

Viewers also liked

Advantage sap parts
Advantage sap partsAdvantage sap parts
Advantage sap parts
sapparts
 
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
2008* Embraer Day   ApresentaçãO OperaçõEs Industriais2008* Embraer Day   ApresentaçãO OperaçõEs Industriais
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
Embraer RI
 
Hydraulik andpmeumatic system
Hydraulik andpmeumatic systemHydraulik andpmeumatic system
Hydraulik andpmeumatic system
Surajkumar Jadhav
 
FSA Knowledge Series -- Gas Seal (demo)
FSA Knowledge Series  -- Gas Seal (demo)FSA Knowledge Series  -- Gas Seal (demo)
FSA Knowledge Series -- Gas Seal (demo)
MMCOslides
 

Viewers also liked (20)

Advantage sap parts
Advantage sap partsAdvantage sap parts
Advantage sap parts
 
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
2008* Embraer Day   ApresentaçãO OperaçõEs Industriais2008* Embraer Day   ApresentaçãO OperaçõEs Industriais
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
 
Hydraulik andpmeumatic system
Hydraulik andpmeumatic systemHydraulik andpmeumatic system
Hydraulik andpmeumatic system
 
Rolls Royce Trent XWB-97 Complete First Test Flight | Parker Aerospace
Rolls Royce Trent XWB-97 Complete First Test Flight | Parker AerospaceRolls Royce Trent XWB-97 Complete First Test Flight | Parker Aerospace
Rolls Royce Trent XWB-97 Complete First Test Flight | Parker Aerospace
 
Flowserve suzhou
Flowserve suzhouFlowserve suzhou
Flowserve suzhou
 
Super low friction DLC films
Super low friction DLC filmsSuper low friction DLC films
Super low friction DLC films
 
Week 10 part 3 pe 6282 mecchanical liquid and electrical
Week 10 part 3 pe 6282 mecchanical liquid and electricalWeek 10 part 3 pe 6282 mecchanical liquid and electrical
Week 10 part 3 pe 6282 mecchanical liquid and electrical
 
Mechanical seal
Mechanical sealMechanical seal
Mechanical seal
 
FSA Knowledge Series -- Gas Seal (demo)
FSA Knowledge Series  -- Gas Seal (demo)FSA Knowledge Series  -- Gas Seal (demo)
FSA Knowledge Series -- Gas Seal (demo)
 
Globe Star Engineers (India), Ahmedabad, Industrial Mechanical Seal
Globe Star Engineers (India), Ahmedabad, Industrial Mechanical Seal 	Globe Star Engineers (India), Ahmedabad, Industrial Mechanical Seal
Globe Star Engineers (India), Ahmedabad, Industrial Mechanical Seal
 
Mechanical seal
Mechanical sealMechanical seal
Mechanical seal
 
DLC coatings in oil and gas production
DLC coatings in oil and gas productionDLC coatings in oil and gas production
DLC coatings in oil and gas production
 
Wear of Metals
Wear of MetalsWear of Metals
Wear of Metals
 
Advances in tribology
Advances in tribologyAdvances in tribology
Advances in tribology
 
Dry gas seal Systems
Dry gas seal SystemsDry gas seal Systems
Dry gas seal Systems
 
Ppt on tribology.pp
Ppt on tribology.ppPpt on tribology.pp
Ppt on tribology.pp
 
Military Aerospace Presentation
Military Aerospace PresentationMilitary Aerospace Presentation
Military Aerospace Presentation
 
Mechanical seal for pumps
Mechanical seal for pumpsMechanical seal for pumps
Mechanical seal for pumps
 
Mechanical seal presentation 1
Mechanical seal presentation 1Mechanical seal presentation 1
Mechanical seal presentation 1
 
Hydrocarbon Traps & Seals
Hydrocarbon Traps & SealsHydrocarbon Traps & Seals
Hydrocarbon Traps & Seals
 

Similar to Ahmed Sobhy mohamed

Jcb js145 tier 4i and t4 f excavator service repair manual
Jcb js145 tier 4i and t4 f excavator service repair manualJcb js145 tier 4i and t4 f excavator service repair manual
Jcb js145 tier 4i and t4 f excavator service repair manual
kmf8sueddkk
 
Jcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manualJcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manual
kfm8se9idid
 

Similar to Ahmed Sobhy mohamed (10)

Maintenance on injecttor
Maintenance on injecttorMaintenance on injecttor
Maintenance on injecttor
 
Jcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manualJcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manual
 
Jcb js130 tier 4i and t4 f excavator service repair manual
Jcb js130 tier 4i and t4 f excavator service repair manualJcb js130 tier 4i and t4 f excavator service repair manual
Jcb js130 tier 4i and t4 f excavator service repair manual
 
Jcb js115 tier 4i and t4 f excavator service repair manual
Jcb js115 tier 4i and t4 f excavator service repair manualJcb js115 tier 4i and t4 f excavator service repair manual
Jcb js115 tier 4i and t4 f excavator service repair manual
 
Jcb js115 tier 4i and t4 f excavator service repair manual
Jcb js115 tier 4i and t4 f excavator service repair manualJcb js115 tier 4i and t4 f excavator service repair manual
Jcb js115 tier 4i and t4 f excavator service repair manual
 
Jcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manualJcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manual
 
Jcb js145 tier 4i and t4 f excavator service repair manual
Jcb js145 tier 4i and t4 f excavator service repair manualJcb js145 tier 4i and t4 f excavator service repair manual
Jcb js145 tier 4i and t4 f excavator service repair manual
 
Jcb js130 tier 4i and t4 f excavator service repair manual
Jcb js130 tier 4i and t4 f excavator service repair manualJcb js130 tier 4i and t4 f excavator service repair manual
Jcb js130 tier 4i and t4 f excavator service repair manual
 
Jcb js190 tier 4i and t4 f excavator service repair manual
Jcb js190 tier 4i and t4 f excavator service repair manualJcb js190 tier 4i and t4 f excavator service repair manual
Jcb js190 tier 4i and t4 f excavator service repair manual
 
Jcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manualJcb js180 tier 4i and t4 f excavator service repair manual
Jcb js180 tier 4i and t4 f excavator service repair manual
 

Ahmed Sobhy mohamed

  • 1. AAhhmmeedd SSoobbhhyy MMoohhaammeedd AAllii RRoottaattiinngg EEqquuiippmmeenntt EEnnggiinneeeerr 55 AAbbdd EEll--AAzziizz EEbbnn MMaarraawwaann,, ((SSiiddii GGaabbeerr)),, AAlleexxaannddrriiaa,, EEggyypptt PPhhoonneess:: EEGGYYPPTT ((000022))0011222244447799775588 -- ((000022)) ((0033))55444422337755 IIRRAAQQ ((0000996644))77881144227788226666 EE--mmaaiill:: aa--ssoobbhhyy@@hhoottmmaaiill..ccoomm ------ AAhhmmeedd..ssoobbhhii@@eemmcceegg..ccoomm Objectives It will pleasure me to be a member in your organization Personal Information Date of Birth .............: 19th march 1984 Place of Birth ............: Alexandria Nationality.................: Egyptian. City............................: Alexandria. Marital Status............: single. Military Status...........: Exempted. Driving license …... valid Education University..................: Alexandria University, Faculty of Engineering, Mechanical Power Department. Degree.......................: Bachelor in Mechanical Power Engineering. Graduation Year........: JUNE 2006. All over Grade...........: Good. Graduation Project....: hydraulic circuit Design of a Telescopic Crane Project Grade…………: Excellent Training course by EMC 1. Pump maintenance 2. Shaft alignment 3. SKF bearing basic and advanced 4. Level one vibration analysis (mobius certified) 5. Level two vibration analyses (mobius certified)
  • 2. Job Experience  (( Start of 2007 – Present)) Working as mechanical engineer for Egyptian maintenance company (EMC) In ROTATING EQUIPMENT DEPATMENT at sites:- 1. DAMIETTA PETROCHEMICAL PLANT EGYPTIAN METHANIX (EMETHANEX) 2. (MISR FERTILIZER PRODUCTION COMPANY) (MOPCO) 3. DAMIETTA LNG PLANT SPANISH EGYPTIAN GAS (SEGAS) 4. EGYPTIAN LINEAR ALKYL BENZENE (ELAB) 5. MIDDLE EAST OIL REFINERY (MIDOR) 6. SOUTH OIL COMPANY (ZUBAIR SITE)(ENI) (IRAQ-- BASRAH) (S.O.C) Job description CONSTRUCTION JOBS: o EMETHANIX SITE : o ELAB SITE: Work scope Installation and pre commissioning of all rotating equipment such as;  Pumps 1. Pump orientation according to plot plane drawings 2. Leveling pump skid 3. Pre alignment for the pump before installing the piping 4. adjust piping parallelism to avoid piping strain on pump 5. install piping with pump and make final alignment  Induced air fan coolers  Forced air fan coolers 1. adjusting fan cooler into plenum center 2. Adjusting of blade angle 3. Shrinking of fan pulley 4. Adjust tip clearance 5. install fan belt and adjust it's tension  Cooling tower 1. adjusting fan cooler into plenum center 2. Adjusting of blade angle 3. Adjust tip clearance
  • 3.  General Electric steam turbine (power generation) 1. Adjusting orientation of turbine and generator skids according to plot plane drawing 2. Adjust skid level according to vendor recommendation 3. Check turbine shaft end play 4. Install labyrinth seal 5. checking of gear mesh for gear box 6. Adjusting pre alignment between gear box and turbine according to vendor recommendation 7. Adjusting pre alignment between gear box and generator according to vendor recommendation 8. check of piping parallelism 9. Adjusting final alignment  Boiler blowers 1. Adjust blower shaft leveling 2. check impeller clearance 3. Adjust blower alignment  Siemens (steam turbine & BCL Compressor) 1. Adjusting orientation and skid level 2. check shaft leveling 3. check bearing clearance according to vendor recommendation 4. Adjusting pre alignment according to vendor recommendation 5. install compressor labyrinth seal 6. install dry gas seal 7. install thrust collar  Screw and reciprocating compressor installation 1. Orientation according to plot plane drawings 2. Leveling skid 3. Sharing work with mitsui reciprocating compressor vendor during  Cross head clearance check  Piston rod run out  Crank shaft deflection  Lube oil passage check  Compressor alignment 4. Sharing work with kobelco screw compressor vendor during alignment
  • 4. GLOBAL MAINTENANCE JOBS: o SEGAS SITE: Work scope  Perform protective and corrective maintenance for mechanical items such as:- 1. Pumps (over hang – OH2 & BB2 single impeller double suction and multi stages– vertical single & multi stages) 2. BOIL OF GAS (BOG) Compressors 3. Induced and forced air fan cooler 4. Blowers 5. General Electric and Hitachi gas turbine by cleaning or changing (Mist eliminator, filters, lubes oil, replacing seal gas filters) o MIDOR SITE: Work scope  Perform protective maintenance for mechanical items such as:- 1. Changing bearing lube oil 2. Seal bot oil changing and its forced gas increase 3. Compressor lube oil changing  Perform corrective maintenance such as:- 1. forced Air fan cooler a. Changing damage belt b. Changing bearing c. pulley alignment d. Adjust blade angle e. Pneumatic actuator maintenance for variable pitch air fan cooler 2. Centrifugal pump Perform a major overhaul a. By repairing or changing some items such as:- 1. (Mechanical-labyrinth-rubber) seal 2. Sleeves – packing – bearing – throttle push- wear ring b. Shaft run out test c. Face rim alignment d. End play adjusting according to pump type 3. Reciprocating compressor a. Changing damage (oil, compression and rider) rings b. Piston rod run out c. Packing replacement d. suction and discharge valves cleaning and spring retainer changing
  • 5. o ZUBAIR SITE (SUBCOTARCTOR OF ENI) (IRAQ) FROM 1/9/2012 (TILL NOW) Work scope Manage and supervise senior mechanical engineers and technicians Ensure quality of procedures during major overhauling of rotating equipments Prepare spare list for each rotating equipment as per drawings and data sheet Prepare mechanical seal spare parts for all pumps and follow up with vendors Prepare material list for static equipment as per data sheet Follow up the progress of wells head modifications (FLARE LESS PROJECT) SHUTDOWN JOBS:  SEGAS SITE;  Gas turbine overhauling Assigned to work as supervisor during shutdown at Nuovo Pignone frame 7 gas turbine combustion inspection Overhauling activities:- 1. Changing transition pieces and bullhorn support bracket 2. Changing liner and sleeve and install new extended kit 3. Changing strip seal 4. Changing fuel nozzles 5. IGV inspection 6. 2nd stage bucket bore scope inspection  Compressors overhauling. Nuovo Pignone 3MCL1405 & BCL 804 Overhauling activities:- 1. Removing couplings 2. Dismantling hubs by hydraulic tool 3. Journal and thrust bearing has been replaced for all compressor 4. Dry gas seal has been replaced 5. Re assembly back couplings Nuovo Pignone axial compressor AN200 Shut down activities:- 1. Replace compressor rotor 2. Install new dry gas seal 3. Install new bearing
  • 6. IHI reciprocating compressor (BOG) Overhauling activities:- 1. Replace rider and piston rings for 1st and 2nd stage 2. Install new extender kit called floating head technology instead of rider and piston rings in 3rd stage 3. Inspection and cleaning for suction and discharge valves 4. Piston rod inspection and deflection checking 5. Crank shaft deflection measurements 6. High, low oil and intermediate packing seal replacement o MOPCO SITE; Assigned to work for UHDE as man power rotating equipment TEAM LEADER During plant shutdown to follow up overhauling of  GE Centrifugal Compressors 2BCL458 + 2BCL408  MANTURBO Centrifugal compressor Overhauling activities. 1. Change mechanical seal for all compressors 2. Inspection for journal bearing 3. Inspection for thrust bearing 4. Replace damage parts (journal pads, thrust pads & labyrinth) 5. Replace degassing tank  Professional alignment skills 1. Face rim alignment 2. Reverse alignment method 3. Soft foot treatment 4. Familiar with laser alignment especially (easy laser device)  Computer Skills 1. AutoCAD 2D, 3D. 2. Microsoft Office.  Language Skills 1. Arabic………. : Mother tongue. 2. English………: Good. 3. Italian ………: studying in progress (level four out of five levels) considered accepted  Hobbies  Reading  Traveling  Football