Asamblea Anual SmartWater 4 Europe. Durante los días 9 y 10 de junio tuvo lugar en la Universidad Politécnica de Lille (Francia) la Asamblea Anual del proyecto Smart Water 4 Europe (https://sw4eu.com/), que reunió a las 21 empresas que forman el consorcio, donde ACCIONA AGUA lidera uno de los cuatro sitios de demostración europeos, el denominado SWING (Smart Water Innovation Network in the city of BurGos). El Departamento de I+D de la compañía fue representado por su director, Jorge Malfeito, así como por la responsable de innovación Ana Jiménez Banzo. Por su parte, el Departamento de Automatización y Control, cuyo director es Alejandro Beivide, fue representado por Adrián Campos.
Grand Assembly SW4EU Meeting. Last June 9 and 10, at the Polytechnic University of Lille , was held the Smart Water 4 Europe (https://sw4eu.com/) Annual Assemble. The meeting, meet the 21 companies of the consortium , where ACCIONA Agua leads one of the European project sites, the SWING project (Smart Water Innovation Network in the city of BurGos). ACCIONA Agua R&D department was represented by Jorge Malfeito ( R&D Director) and Ana Jimenez Banzo ( Innovation Manager). Moreover, The Automation and Control Department, whose Director is Alejandro Beivide, was represented by Adrian Campos .
2. ACCIONA Agua. Your partner in the water cycle
A brief look at the progress made on SWING
1. BURGOS, the city
2. BURGOS, hydraulic architecture
3. SWING, demo activities in 3 DMAs of the city
4. PARTNERS, organization and roles
5. SWING, dissemination in progress
6. SMART WATER METERS installation progress
7. SENSORS installation progress
8. NETWORK FOR TELEMETERING. Installation progress
9. SCADA progress
10. SOFTWARE INTEGRATION progress
11. BUSINESS INTELLIGENCE progress
Contents
4. ACCIONA Agua. Your partner in the water cycle
Arlanzón DWTP
Gamonal Water tanks
Villalonquéjar
Water tanks
Cerro San Miguel
Water tanks
2. BURGOS, hydraulic architecture
26 District Metered Areas (DMAs)
7. ACCIONA Agua. Your partner in the water cycle
5. SWING, dissemination in progress
7
8. ACCIONA Agua. Your partner in the water cycle 8
5. SWING, dissemination in progress
9. ACCIONA Agua. Your partner in the water cycle 9
6. SWING, smart water meters installation progress
• We have statistical tables to visualize changes, status and location for every meter.
• We have an application that registers data from the whole installation
• Pictures of every substitution/new installation are stored
substitution
10. ACCIONA Agua. Your partner in the water cycle 10
• 1500 smart meters are currently being installed in the demo site (approximately 1000 are already
installed)
Villalonquéjar Este DMA
Barriada Yagüe DMA
Virgen del Manzano DMA
WATER METERS STATUS
70 %
6. SWING, smart water meters installation progress
11. ACCIONA Agua. Your partner in the water cycle
• Optiqua EventLab® equipment has already
been installed in the distribution network
11
7. SWING, sensors installation progress
42° 22’ 19” N
3° 40’ 38” W
42° 20’ 45” N
3° 39’ 20” W
42° 20’ 10” N
3° 42’ 30” W
42° 21’ 51” N
3° 45’ 23” W
42° 21’ 07” N
3° 44’ 40” W
42° 21’ 00” N
3° 41’ 21” W
• S::can Nano::station® equipment is
currently being installed and is
scheduled for start-up the upcoming
week
• Two of these locations have a
coverage problem, so we are
currently considering a change in
either the communication
provider or the communication
technology
12. ACCIONA Agua. Your partner in the water cycle
• 3 EventLab systems installed and running
• 2 EventLab systems installed and at test stage
• Some communication problems have to be
solved
• 1 nano::station currently being set up
12
7. SWING, sensors installation progress
SENSOR STATUS
80 %
13. ACCIONA Agua. Your partner in the water cycle
8. SWING, network for telemetering. Installation progress
13
• Coverage and water meter types and locations have been analyzed
• The installation is being developed trying to
minimize the required number of devices
14. ACCIONA Agua. Your partner in the water cycle 14
NETWORK STATUS
70 %
• Villalonquéjar Este DMA was completed by
13 May 2015
• Barriada Yagüe DMA will finish this week
• Virgen del Manzano DMA installation starts
next week
8. SWING, network for telemetering. Installation progress
15. ACCIONA Agua. Your partner in the water cycle
9. SWING, SCADA progress
15
• Connection with real water meters is planned
for next week.
• Currently, meters are running in test
mode
• Sectoral meters are going to be integrated in
the upcoming days.
• Currently, only their representation is
missing.
• EventLab® equipment are already integrated
and running.
16. ACCIONA Agua. Your partner in the water cycle
10. SWING, software integration progress
16
• Big Data Center mounting is finished.
• Intuitive visualization of network elements
• Readings from GIS, SICAB and BI data base
• Billings visualization and DMA status
17. ACCIONA Agua. Your partner in the water cycle
11. SWING, Business Intelligence progress
17
SOFTWARE STATUS
70 %
• Network typology visualization.
• User management
• DMAs & sensors configuration. Tag validation.
18. ACCIONA Agua. Your partner in the water cycle
THANK YOU FOR YOUR ATTENTION
18
Editor's Notes
It must be said that Arlanzón DWTP is located 20 km East of the city and the uptake is next to the municipality of Villasur de Herreros, which is why we have not added it to the map.
-From the uptake, water comes to the village of Villasur through one DN1000 pipe.
-At Villasur, the pipe branches into two DN800 pipes which reach the Arlanzón DWTP.
-Three pipes (DN1000, DN600 and DN400) go out from Arlanzón DWTP.
-The DN400 one comes directly to the distribution network. The other two pipes come to the village of Ibeas de Juarros, where they each branch into three DN600 pipes (these are the three purple pipes in the map attached, one at the top of the map and two almost overlapped -see carefully please- at the bottom part). Two of them come to Cerro de San Miguel Water Tanks and the other one to Gamonal Water Tanks.
-From the Cerro de San Miguel water tanks entrance, a pipe emerges that supplies Villalonquéjar Water Tanks.
-In addition to this, another DN600 pipe comes to the Gamonal Water Tanks from Villaverde Peñahorada Pumping, which is used to supply some villages, since their pumping is out of work.