1. YUMIN LIUEMAIL: ARCHYUMI@GMAIL.COM
PHONE: 817 - 966 - 6081
ADDRESS: 1806 DON ALEJANDRO HOUSTON TEXAS 77091
PROFESSIONAL
EXPERIENCE
Currently preparing for Architect Registration Examination.
Goal is expand my knowledge in different types and stages of architecture.
90% complete on Intern Development Program (IDP)
with outstanding administrative hours to complete.
Boucher Design Group
Technical Designer / April 2016 - Present
● Produced schematic design analysis such as lease space exhibits,
circulation exhibits, parking garage car count exhibits, etc. for client to
better understand of the design.
● Utilized Photoshop and Revit to generate realistic renderings from interior
lobby space to street sight views.
● Developed architecture Revit model at design development stage for
clients.
● Produce Construction Document using Revit 2017 under the supervision of
a project manager.
Natex Architects
Project Manager / June 2015 - January 2016
● Developed a tree-like structure to support school atrium in order to minimize
the usage of beams and trusses.
● Quality control on drawing documents and project submittals at Schematic
Development, Design Development & 60 % Construction Document
● Collaborate on a team or individual to achieve all deadlines set by superiors
and client to allow project moving forward.
● Generated architectural model (BIM) background to coordinate with
engineer consultants to ensure no clash between
Mechanical/Electrical/Pumbling and Structural during construction phase of
the project.
● Monthly meetings with contractors and engineers to ensure all aspect of the
project has been discussed and resolved through design.
Intern Architect / October 2013 - May 2015
●
Generated accurate architectural existing Revit Model (BIM) before
Schematic Development phase of the project.
●
Designed learning spaces pre school district and client’s specification and
ensure all spaces met Americans with Disabilities Act (ADA) requirements.
●
Generated realistic images using Revit and Photoshop for monlthy
presentations to allow client better visualizing the progress of the project.
●
Produced demolition and phasing drawings show scoop of work to client
and contractors.
Haltner H.A.I., LLC
Intern Architect / September 2012 - September 2013
● Generated accurate architectural existing Revit Model (BIM) before
Schematic Development phase of the project.
● Produced plan/millwork details, site plan, elevations, finish plan, reflected
ceiling plan (RCP) and ceiling details specified by Project Manager.
● Generated fly-through and walk-through videos using 3DS Max design to
allow client visualize the design of the project.
● Generated realistic images using Revit and Photoshop to allow client better
visualizing the progress of the project.
2. PROJECT LIST Boucher Design Group
Technical Designer / April 2016 - Present
● LaCenterra Cinco Ranch - Alamo Drafthouse
NEW DEVELOPMENT - RETAIL
This is a new construction theater that will be the anchor of the final phase of a
mixed-use development. The 37,000-square-foot, roughly 900-seat theater will
contain eight auditoriums with extra-wide seats and non-conventional front rows
that allow for a better viewing experience.
Natex Architects
Project Manager / June 2015 - January 2016
● YOUNG WOMEN COLLEGE PREPARATORY ACADEMY
(HOUSTON ISD)
ADDITION & RENOVATION ED- UCATION
This is a 27 million addition and renovation project to a 1925 classic building
located downtown Houston. The school is upgrading classroom space to current
Houston Independent school district standards as well as additional spaces for
their STEM program, robotics and CTE classroom. The challenge for this project is
the limited property space and need to preserve existing trees to achieve LEED.
Intern Architect / October 2013 - May 2015
● KASHMERE HIGH SCHOOL
(HOUSTON ISD)
ADDITION & RENOVATION ED- UCATION
This is a 15 million addition and renovation project to a 1965 building located at
northeast of Houston. The school has 5 separated building and a covered
courtyard located at the center of the school. The goal is to brand the school to
attract more student as well as connecting loose buildings into one campus.
● FARRELL ELEMENTARY & STARRETT ELEMENTARY SCHOOL
(ARLINGTON ISD)
RENOVATION ED- UCATION
This is a small project to rework building circulation to create a security vestibule
for the schools.
● GRADY MIDDLE SCHOOL
(HOUSTON ISD)
ADDITION ED- UCATION
This is an addition to a newly renovated project located at uptown Houston. The
objective is to add additional science wing to 6th, 7th and 8th grade as well as
creating outdoor learning space for students to interact with natural environment
during their learning career.
Haltner H.A.I., LLC
Intern Architect / September 2012 - September 2013
●
PEOPLES STATE BANK OF HALLETTSVILLE
RENOVATION - COMMERICAL
This is a complete renovation to existing bank giving the bank a modern 21st
century interior. The challenge is to avoid asbestos located at the ceiling and floor
of the project.
3. YUMIN LIUEMAIL: ARCHYUMI@GMAIL.COM
PHONE: 817 - 966 - 6081
ADDRESS: 1806 DON ALEJANDRO HOUSTON TEXAS 77091
PORTFOLIO LINK:
TECHNICAL
SKILLS
EDUCATION
MEMBERSHIP
Autodesk Revit Architecture / 2010-2017
AutoCAD / 2010-2012
Rhinoceros / 4.0 & 5.0
Grasshopper
3DS Max Design / 2010-2012
UNIVERSITY OF HOUSTON
Master of Architecture / 2013 - 2015
52° N Nordic Traveling Studio / Summer 2014
THE UNIVERSITY OF TEXAS AT ARLINGTON
Bachelor of Science in Architecture / 2008 - 2011
BIM & Visualization
Advanced Visualization
American Institute of Architects / Associate member
Island Warrior Dragonboat / Team member
References available upon request.
Adobe Creative Suit / CS3 - CS 5
Photoshop / Illustrator/ Indesign
Sketch up / 6 - 9
Keyshot
http://issuu.com/yuminliu/docs/yu_min_liu___2016_portfolio_print1_/1