3. ABOUT THE DEPARTMENT
The Department of Civil Engineering has been in existence since the inception of MIT in 2007. It
has grown into a full fledged Department with specializations in all the major areas of Civil
Engineering. The academic programmers offered by the Department are B. E. in Civil
Engineering, MTechs, M.Sc. Eng. (by research) and Ph.D.
Sample Footer Text
Mission of the Department
The Department is committed to develop competent professionals by offering need based curriculum in Civil Engineering areas,
promoting research and innovation to prepare the students for higher study, life-long learning and societal responsibility. The
department is also committed to provide good learning environment to develop professional ethics and skills in our students and to
provide engineering services to the society
Vision of the Department
To become a premier Civil Engineering Department offering excellent engineering education in design methods and advanced
technologies to the students, to pursue research in thrust areas and to offer professional services to the society
4. INTRODUCTION
Er.Ashok Kumar, PE, PMP, IGBC-AP
Professional Engineer | Advisory
Committee Member - IGBC Green
Education -National Level at CII - Indian
Green Building Council (IGBC) - Training
Partner for Larsen & Toubro & Other
Corporates
6. BELAWADI, NAGUVANAHALLI, POST, SRIRANGAPATNA, KARNATAKA 571438
Dr. B G Naresh Kumar Dr. Yashwant M.K
Dr. C. Ramakrishne Gowda
7. CONTENT
o Construction management training inaugural function
o Project management
o Site visit
RMC plant
cultural center
o Sketch up
o Asian paints & sequence of construction of buildings
o Asian paints visit
o Quantity surveying
o BBS
o Layout marking
o MSP
o Site visit
o Closing ceremony
8. TASKS PERFORMED / SESSIONS
⚫ Project Management Session
⚫ Precast Construction Session
⚫ Footing Centre Line Marking And Shuttering
⚫ Masonry
⚫ Urban And Byelaws Method
⚫ Painting And Emulsions
⚫ Plastering
⚫ Green Buildings
9. TASKS PERFORMED / SESSIONS
⚫ Reading Of Drawings
⚫ Session On Concrete Mix Design
⚫ Visit To RMC Plant
⚫ Layout Marking sessions
⚫ Plumbing certification programme
⚫ Flooring session
⚫ Bar bending session
10.
11. Day 1 MORNING SESSION
Inaugural Function by Er. Ashok Kumar
Dr. B G Naresh Kumar, is an academician and an administrator, maintained the spirit of teaching
since 38 years, molding many civil engineers.
Dr. C. Ramakrishnegowda
Professor and Head of civil Engineering
CMTI coordinator :
Dr. Yashwant M.K
Associate Professor at MITMYSORE | Concrete Technologist
Ravi Kiran L. Assistant Professor. M.Tech.,(Ph.D).
Ashish Dubay
Assistant Professor at Maharaja Institute of Technology Mysore
Gururaj M H. Assistant Professor at MIT Mysore.
14-08-2023
12. Day 2
By Yashas sir
MORNING SESSION
Project management
Roles & responsibility
AFTERNOON SESSION
Design finalization
Construction drawings
17-08-2023
13.
14.
15. Day 3
By Yashas sir
MORNING SESSION
Site visit
Ultratech RMC plant
18-08-2023
25. Day 11&12
Barbending Schedule
Morning And Afternoon Session
What is Bar Bending Schedule?
A bar bending schedule (BBS) is a tabular breakdown of reinforcing bars that includes details such as
bar type, total length, weight, and a drawing of the desired bending shape. Generally speaking, a bar
bending schedule is developed for every different kind of RCC operation. During the building process,
the need for bars of varying widths and lengths may be determined with the assistance of BBS, and
the bars can be organised and bent according to those specifications.
Details such as bar size and type, bending shape, number of sets or individual bars, bar length (in
running metres) and overall length, and total weight are provided.
Importance of Bar Bending Schedule
The process of cutting and bending steel bars is carried out by labourers at the construction site.
Because the labourers working on site do not have a strong technical background, it is challenging to
explain what they are doing with the assistance of drawings. Mistakes in steel cutting and bending are
possible. Because BBS specifies both the bar’s design and its cutting length, elucidating the concept
to them is a breeze.
A supervisor is able to easily instruct the workers, and the workers are able to do the necessary work
in accordance with the needs and parameters of the structural design.
By Er. Virupaksha Sir
31-08-2023 To 01-09-2023
27. 2/7/20XX 27
Day 13
Layout Marking
Morning And Afternoon Session
What is a layout mark?
A layout indicates where a structure needs to be placed on your
plot. The process of constructing a home begins with layout
marking. If not paid attention to, then your home might differ
from the plan.
1.First, set the placement of the pillars on the vacant plot
with the help of the engineer and architect. Then, with
the help of 2-3ft steel rods and a rope, set the baseline and
other boundaries
2.Confirm with experts that the size and positioning of the
walls are sufficient to bear the load of the building.
3.After fixing the location of pillar placement, mark the
excavation area with chalk powder.
04-09-2023
By Yashas Sir
28. 2/7/20XX 28
5.The depth of the pillars will depend on the condition of
the soil. If the soil is loose, the pillars should be placed
deeper.
4.Ensure soil testing is done before beginning the
excavation work.
6.Always ensure that the marking work is done according
to your homes plan
29. 2/7/20XX 29
Day 14&15
MS planning session
Morning And Afternoon Session
What Is Microsoft Project? Uses, Features and Pricing
Microsoft Project has been the most popular project management software for years. That’s mainly
because project managers and team members were used to other Microsoft products, not necessarily
because Microsoft Project is the best choice.
While there have been challenges to its rule, and many who have surpassed it, Microsoft remains a
giant in this industry. No discussion of project management software would be complete without
including Microsoft Project.
What Is Microsoft Project?
Microsoft Project is project management software that’s used
to create schedules, project plans, manage resources and keep
track of time. It has features such as Gantt charts, kanban
boards and project calendars for project management
professionals.
05-09-2023 To 06-09-2023
By Er Prem Sir
30. 2/7/20XX 30
Microsoft Project Features
There are plenty of features that project managers and their teams need to better manage their work
and MSP has a number of them. However, to get a full picture, here’s a list of the key features available
to customers who are willing to pay the price.
✓ Project Planning: Use Gantt charts and kanban boards to plan work. Microsoft Project’s planning
features are much more robust than those of Microsoft Planner.
✓ Communication & Collaboration: Teams can work together on projects. Alternatively, you can
use Microsoft Teams for a more cost-effective communication solution.
✓ Coauthoring: Stakeholders and team members work together to edit and update task lists and
schedules.
✓ Reporting: Pre-built reports that can track progress, resources, programs and portfolios.
✓ Roadmap: Track programs and project portfolios.
✓ Timesheets: Collect project and non-project time for payroll and invoicing.
✓ Resource Management: Manage resources by requesting and assigning tasks.
31. 2/7/20XX 31
Day 16
Report Making
Morning And Afternoon Session
"Report making" typically refers to the process of creating a report. Reports are documents that provide
information on a particular topic, issue, or project. Here's some helpful information on report making:
Purpose of Reports: Reports are used to convey information, analyze data, and make recommendations.
They are common in business, education, research, and many other fields.
Steps in Report Making:
Planning: Define the purpose, audience, and scope of your report.
Research: Gather data and information relevant to your report's topic.
Organization: Create an outline to structure your report logically.
Writing: Start writing your report, following the outline and using clear and concise language.
Formatting: Pay attention to formatting, headings, fonts, and spacing for a professional look.
Citations: Properly cite sources if you use external information.
Proofreading: Edit and proofread your report for grammar and spelling errors.
Graphics: Include charts, graphs, or tables to enhance understanding.
Conclusion and Recommendations: Summarize your findings and suggest any actions or
recommendations.
Appendices: Attach any additional materials or data that support your report.
07-09-2023
By Yashas Sir
34. 2/7/20XX 34
GRATEFUL!
• We are very fortunate that we underwent a beautiful, skillful internship with CMTI.
• We experienced industrial exposure which is very unique and essential other than curriculum.
• We extend our gratitude to Dept. of Civil engineering, HOD, and coordinators.