3. 3
KRABI INTERNATIONAL AIRPORT
▰ Operate on 10 July 1999
▰ Can handle 3,689,672 passenger arrivals and
▰ Expansion will push capacity to five million hub for
Thai AirAsia and New Gen Airways.
▰ Accommodate the maximum size aircraft up to
Boeing B747 or Airbus A340.
▰ Single runway with the length 3,000 meters and the
width 45 meters, together with 7.50 meters of
pavement in each side
4. 4
THE LIST OF AIRLINES THAT OPERATE
TO AND FROM KRABI INTERNATIONAL AIRPORT
5. 5
PASSENGER FORECASTING
IN THE NEXT 10 YEARS
Total passenger arrivals at Krabi
International Airport increased from 240,905
visitors in 2006 to 2.03 million visitors in 2016,
translating into a 5-year CAGR of 33% and a 10 year
CAGR of 24%, making Krabi one of Southeast Asia’s
fastest growing tourism markets.
8. “Resource including electrical system,
airside system, check-in counter,
utilities system, first aid room,
parking lot, terminal, aerobridge,
Runway, and etc.
8
9. HUMAN RESOURCE IN KRABI AIRPORT
9
The quantity of employee
• The government officers 10 people
• Permanent employee 17 people
• The government employee 3 people
• Temporary staffs 90 people
• Outsource
- Security guard 78 people
- Cleaning personnel 60 people
- Gardener 10 people
TOTAL EMPLOYEE : 268 PEOPLE
10. FIRE ENGINE AIRCRAFT AND RESCUE
10
KRABI AIRPORT IS IN LEVEL CATEGORY 9
THAT HAVE 3 FIRE FIGHTING VEHICLES
11. MONEY OR CAPITAL RESOURCE
11
The development of Krabi Airport amounting
to 6,892 million baht during the period of 2018-2020
consists of the renovation of Terminal 1 and 2, with
the construction of Terminal 3 and the building of
2,000 parking spaces. Can accommodate 8 million
passengers per year.
30. STRATEGIC PLAN
▰ Increase the capacity of the larger aircraft.
▰ Increase the capacity to accommodate about 58 million
passengers in 2025
▰ Increase the number of airdcraft parking
▰ Enhance the standards of security and safety in
accordance with the International Civil Aviation
Organization (ICAO).
▰ Sourcing and installing Backbone Multiplexer (Multiservice
Access platform NGN) at ATC tower in 2014 - 2017
30
33. TACTICAL PLAN
33
Plan for budget approval to provide strategic
plan of maintenance. KBV is under the supervision of
Ministry of Finance. The Ministry of Transport or the
Department of Airport should be authorized to use funds
outside of the budget to airport director.
Plans for various equipment maintenance for
the airport director for example, budget for building
improvement. In addition to the Department of Airport
should have emergency funds to be used appropriately
and urgently
37. SCOPE OF MANAGER’S DUTIES IN KRABI AIRPORT
37
▰ Supervising shift personnel, devising and implementing operating
procedures, monitoring airport expenditures.
▰ coordinating construction or renovation .
▰ Ensure team member training is compliant and knowledge is retained
▰ Working with the resourcing and people teams to ensure a high
standard of recruitment and effectively managed.
▰ Fostering an enhanced awareness with all team members for
aviation safety and security policies
▰ Ability to plan, priorities a high volume of workload
▰ Responsible for the smooth running of the airport during shift as well
as initiate a proper response to emergencies.
39. CONTROLLING AS GOVERNANCE IN KRABI AIRPORT
39
The Board of Krabi airport aims to operate under
government corporate governance principles, best
practices for directors of listed companies, and relevant
laws, regulations and guidelines for transparency.
Corporate governance practices to meet domestic
standard to build the trust for government.
40. RESPONSIBILITIES OF MANAGER TO ANTI
CORRUPTION POLICY
40
▰ Approving the core procedure documents of airport form part of the anti-
corruption programme
▰ Overseeing implementation of the airport anti-corruption programme
▰Overseeing compliance by personnel with the anti-corruption policy and anti-
corruption programme in airport operation;
▰ Ensuring that the anti-corruption policy and programme are consistent with
good practice with all relevant to laws or other airport regulation;
▰ Providing advice and guidance to personnel on the anti-corruption policy and
anti-corruption programme and issues relating to corruption;
▰ Leading or co-ordinating compliance investigations of anti corruption at airport.
43. CONTINGENCY PLANNING
43
Power Failure Support Plan, In case power failure
Krabi airport has 1 main electric generator to generate
power within 15 second to implement continue airport
activities.
Emergency Plan, In aircraft emergency landing
with engine catches fire or engine problem, fire
department airport can suspend within immediately and
evacuate injured to nearby hospital less than 1 hour.