1. Medium Tactical Vehicles (MTV)
Training Instructor (AUTO)
Occupation Series (1712), GS-12
Material, Fielding & Training (MF&T)
Presented by:
William R. Folds
23 Mar 2011
2. Medium Tactical Vehicles (MTV)
New Equipment Training (NET)
Manager
MTV NET Manager Responsibilities:
Status of MTV Systems
NET Manager Weekly work schedule
Working Partnership with DynCorp International, CASCOM, TRADOC and
TACOM LAR’s
Contract Support - Statement of Work (SOW), Contractor Data Requirements
List (CDRLs) & Data Item Description (DID’s)
Road Map
New Material Introductory Brief (NMIB)
NET Timeline for OP/FLM Courses
TACOM-Unique Logistics Support Applications (TULSA)
Unit Training Assistance Program (UTAP)
3. Medium Tactical Vehicles (MTV)
Status of MTV Systems
Program of Record (POR): (6 Active)
(2 Types)
M1157 10 Ton Dump Truck (Old System TSP)
M1157A1P2 10 Ton Dump Truck (Updated System TSP)
(2 Types)
1148 FMTV Load Handling System (LHS) Truck (Old System TSP)
1148A1P2 FMTV Load Handling System (LHS) Truck (Updated System TSP)
4. Medium Tactical Vehicles (MTV)
Status of MTV Systems (Cont.)
Program of Record (POR): (6 Active)
M1088A1P2 Truck Tractor 5-Ton 6x6
M1087A1 Expansible Van
M1084A1P2 Truck Cargo 5-Ton 6x6 Dropside w/MHC
M1089A1P2 LTAS 8.5 ton Wrecker
5. Medium Tactical Vehicles (MTV)
MTV Weekly Work & Meetings
Report to Bldg 1350 John R. Road, Troy (Pod: N1003)
Monday:
Start a Weekly Significant Activities Report (WSAR)
Work on New Equipment Training (NET) Lesson Plans
Tuesday:
Add to the Weekly Significant Activities Report (WSAR)
Work on New Equipment Training (NET) Lesson Plans
Bi – Weekly meeting with Medium Tactical Vehicle (MTV) Combined
Logistic Fielding Meeting, Time: 12:30 – 13:30hrs
Receive Student Rosters / Course Critiques / NET Schedule
MTV Discussions on any Contract Deliverables
Discuss any Upcoming NMIB’s (Telephonic)
6. Wednesday:
Finish Weekly Significant Activities Report (WSAR). Send to Supervisor
Work on New Equipment Training (NET) Lesson Plans
Thursday:
Work on New Equipment Training (NET) Lesson Plans
Friday:
Inter students into TACOM-Unique Logistics Support Applications (TULSA)
Work on Defense Acquisition University (DAU) courses
Medium Tactical Vehicles (MTV)
MTV Weekly Work & Meetings
Report to Bldg 1350 John R. Road, Troy (Pod: N1003)
7. Medium Tactical Vehicles (MTV)
Partnership
Partnership with MTV & DynCorp International:
Partnership with MTV and DynCorp International during NMIB’s (Telephonic)
Updating Training Support Packages (TSP’s) on MTV Equipment to Prepare
Systems for Sustainment
Enforce Current DynCorp International Instructors Certification Program
Oversee Instructor Key Personal Training (IKPT)
Insurer Work Packages (WP) are Updated before the First Unit Equipped (FUE)
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
8. Partnership with CASCOM:
Come up with a Field Level Maintenance (FLM) Critical Tasks List
Work side by side during the LOG DEMO Technical Manual (TM)
Verification for the FLM Training Support Package (TSP)
Work directly with CASCOM during IKPT
Request for approval when changes are being made in the FLMNET POI
Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE)
Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
9. Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
Partnership with TRADOC:
Come up with a Operator (OP) Critical Tasks List
Work side by side during the LOG DEMO Technical Manual (TM)
Verification for the OP Training Support Package (TSP)
Work directly with TRADOC during IKPT
Request for approval when changes are being made in the OPNET POI
Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE)
10. Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM, TRADOC and TACOM LAR’s
Partnership with TACOM LAR’S:
Invite TACOM LAR’s to IKPT
Offer TACOM LAR’s seat in Program of Record (POR) FLMNET classes (Only)
11. Medium Tactical Vehicles (MTV)
Contract Support
Write and Review the Statement of Work (SOW)
Pertaining to NET
Write and Review the Contractor Data Requirements
List (CDRL’s) Pertaining to NET
Review Provide Data Item Description (DID’s) Pertaining
to NET
12. Medium Tactical Vehicles (MTV)
Road Map for NET
Statement of Work (SOW)
Production Verification Test (PVT)
LOG DEMO
Operational Testing (OT)
Instructor Key Personal Training (IKPT)
First Unit Equip (FUE)
Could take several Months
or Years to get to the LOG DEMO
SOW
PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT 90 to 120 days
90 to 120 days
90 to 120 days
13. Medium Tactical Vehicles (MTV)
Road Map for NET
Statement of Work (SOW): During the First meeting with Contractor and Sub-Contractor.
Give Contractors a DVD with the following information:
Example of a Training Support Package (TSP) I.E. Back ground for Template Plate, Font Size, Colors to use
during development and Systems Approach to Training (SAT) format and Analysis, Design, Development,
Implement, Evaluate (ADDIE) format. To help the contractor in developing the PowerPoint Slides, Instructor
Guide (IG) and Student Guide (SG). TRADOC Reg 350-70
Example of a Class Sign in roster.
Example of a Student critique.
Work with the Contractor Developer to get the TSP ready for PVT.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
14. Production Verification Test (PVT): It will be conducted at Aberdeen Proving Grounds (APG), Maryland or Yuma
Proving Grounds (YPG), New Mexico.
Contactor gives NET training to APG/YPG personal so they can operate and test the equipment.
Will be the first (1st) time the new TSP being used for training.
During the PVT its the NET Manager responsibility to insure the Contractor is ready to teach the class. By
checking his Instructor Certification given by the Contractor. Also quizzing the instructors before class on the TSP
materials.
Items the Contractor is responsible to bring for and during PVT – PowerPoint presentation, Instructor Guide,
Student Guide, Draft TM and a DVD for each student, with all the information covered in the training.
Medium Tactical Vehicles (MTV)
Road Map for NET
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
15. Medium Tactical Vehicles (MTV)
Road Map for NET
LOG DEMO: It will be conducted at the Contractors Facility.
Contactor will give a short OPNET & FLMNET training to demonstrators for the LOG DEMO.
This will be the second (2nd) time the new TSP will be used for training.
Training Support Package (TSP) will be updated during and after the LOG DEMO.
Items the Contractor is responsible to update during the LOG DEMO – PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
16. Medium Tactical Vehicles (MTV)
Road Map for NET
Operational Testing (OT): It will be conducted at a Government Facility in the United States.
Contactor will give a OPNET & FLMNET training to the soldiers.
This will be the third (3rd) time the new TSP will be used for training.
Training Support Package (TSP) will be updated during and after the Operational Testing
(OT).
Items the Contractor is responsible to update during the OT– PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
17. Medium Tactical Vehicles (MTV)
Road Map for NET
Instructor Key Personal Training (IKPT): It will be conducted at the Contractors Facility.
NET Manager will be responsible to contact CASCOM, TRADOC, TACOM LAR’s and DynCorp
International by email to attend the IKPT.
Contactor will be responsible to teach a OPNET & FLMNET training to the mix group.
This will be the forth (4th) time the new TSP will be used for training.
Training Support Package (TSP) will be updated during, on the last day and after the
Instructor Key Personal Training (IKPT).
Items the Contractor is responsible to update during the IKPT– PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
18. Medium Tactical Vehicles (MTV)
Road Map for NET
First Unit Equip (FUE): It will be conducted at a Government Facility in the United States.
First Unit Equip (FUE) to receive the equipment will be dictated by G-8.
DynCorp International will give a OPNET & FLMNET training to the soldiers.
This will be the fifth (5th) time the new TSP will be used for training.
Training Support Package (TSP) will be updated during and after the First Unit Equip (FUE).
NET Manager is responsible to update during and after the FUE– PowerPoint presentation,
Instructor Guide, and Student Guide.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
19. Medium Tactical Vehicles (MTV)
New Material Introductory Brief (NMIB)
NMIB Conducted for each Unit and Follow on IPR’s are Conducted
NMIB’s are Conducted Only by Telephonic
• MTV Log Managers - Briefs the Fielding
• DynCorp International - Briefs De-processing
• DynCorp International - Briefs New Equipment Training
• NET Manager – Re-Enforce Request for New Equipment Training and
inform Units about Unit Training Assistance Program (UTAP)
Unit Scheduling NET Based on Units Availability
20. Medium Tactical Vehicles (MTV)
Operator New Equipment Training (OPNET) Course
There are 6 systems in MTV. Based on type of MTV System being trained
on, the number of students and hours will be different
DynCorp International Provides, 1 Instructor Per 6 Students
Maximum 12 Students Per Class
Target MOS for OPNET is 91 Series & Wrecker NET 91BH8 (Only)
Training Focus is on Vehicle Operation, Familiarization & Safety
New Equipment Training (NET) Timeline for
Operator (OP) Course
21. Medium Tactical Vehicles (MTV)
Field Level Maintenance (FLMNET) Course
There are 6 Systems in MTV. Based on Type of MTV System being Trained on, the Number of
Students and Hours will be Different
DynCorp International Provides, 1 Instructor Per 4 Students
Maximum 8 Students Per Class
Target MOS for FLMNET is 91 Series & Wrecker NET 91BH8 (Only)
LARs are Encouraged to Attend the Training
Training Focus:
Sub-system Component Familiarization
Maintenance Procedures
Troubleshooting Procedures using Maintenance Support Device (MSD) with Interactive Electronic
Technical Manual (IETM)
Software used Electronic Maintenance System (EMS) or Next Generation
New Equipment Training (NET) Timeline for Field
Level Maintenance (FLM) Course
22. All Units Receive the Following on DVD after Training:
• Training Support Package
- Power Point Courseware (PP)
- Instructor Guide (IG)
- Student Guide (SG)
- Practical Exercise (PE)
- Written Test
Training Support Package (TSP)
New Equipment Training (NET)