MTV NET Manager Responsibilities:
 Status of MTV Systems
 NET Manager Weekly work schedule
 Working Partnership with DynCorp International, CASCOM, TRADOC and
TACOM LAR’s
 Contract Support - Statement of Work (SOW), Contractor Data Requirements
List (CDRLs) & Data Item Description (DID’s)
 Road Map
 New Material Introductory Brief (NMIB)
 NET Timeline for OP/FLM Courses
 TACOM-Unique Logistics Support Applications (TULSA)
 Unit Training Assistance Program (UTAP)
Medium Tactical Vehicles (MTV)
Status of MTV Systems
Program of Record (POR): (6 Active)
(2 Types)
 M1157 10 Ton Dump Truck (Old System TSP)
 M1157A1P2 10 Ton Dump Truck (Updated System TSP)
(2 Types)
 1148 FMTV Load Handling System (LHS) Truck (Old System TSP)
 1148A1P2 FMTV Load Handling System (LHS) Truck (Updated System TSP)
Medium Tactical Vehicles (MTV)
Status of MTV Systems (Cont.)
Program of Record (POR): (6 Active)
M1088A1P2 Truck Tractor 5-Ton 6x6
M1087A1 Expansible Van
M1084A1P2 Truck Cargo 5-Ton 6x6 Dropside w/MHC
M1089A1P2 LTAS 8.5 ton Wrecker
Medium Tactical Vehicles (MTV)
MTV Weekly Work & Meetings
Report to Bldg 1350 John R. Road, Troy (Pod: N1003)
Monday:
 Start a Weekly Significant Activities Report (WSAR)
 Work on New Equipment Training (NET) Lesson Plans
Tuesday:
 Add to the Weekly Significant Activities Report (WSAR)
 Work on New Equipment Training (NET) Lesson Plans
 Bi – Weekly meeting with Medium Tactical Vehicle (MTV) Combined
Logistic Fielding Meeting, Time: 12:30 – 13:30hrs
 Receive Student Rosters / Course Critiques / NET Schedule
 MTV Discussions on any Contract Deliverables
 Discuss any Upcoming NMIB’s (Telephonic)
Wednesday:
 Finish Weekly Significant Activities Report (WSAR). Send to Supervisor
 Work on New Equipment Training (NET) Lesson Plans
Thursday:
 Work on New Equipment Training (NET) Lesson Plans
Friday:
 Inter students into TACOM-Unique Logistics Support Applications (TULSA)
 Work on Defense Acquisition University (DAU) courses
Medium Tactical Vehicles (MTV)
MTV Weekly Work & Meetings
Report to Bldg 1350 John R. Road, Troy (Pod: N1003)
Medium Tactical Vehicles (MTV)
Partnership
Partnership with MTV & DynCorp International:
 Partnership with MTV and DynCorp International during NMIB’s (Telephonic)
 Updating Training Support Packages (TSP’s) on MTV Equipment to Prepare
Systems for Sustainment
 Enforce Current DynCorp International Instructors Certification Program
 Oversee Instructor Key Personal Training (IKPT)
 Insurer Work Packages (WP) are Updated before the First Unit Equipped (FUE)
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
Partnership with CASCOM:
 Come up with a Field Level Maintenance (FLM) Critical Tasks List
 Work side by side during the LOG DEMO Technical Manual (TM)
Verification for the FLM Training Support Package (TSP)
 Work directly with CASCOM during IKPT
 Request for approval when changes are being made in the FLMNET POI
 Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE)
Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM,TRADOC and TACOM LAR’s
Partnership with TRADOC:
 Come up with a Operator (OP) Critical Tasks List
 Work side by side during the LOG DEMO Technical Manual (TM)
Verification for the OP Training Support Package (TSP)
 Work directly with TRADOC during IKPT
 Request for approval when changes are being made in the OPNET POI
 Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE)
Medium Tactical Vehicles (MTV)
Partnership
DynCorp International
CASCOM, TRADOC and TACOM LAR’s
Partnership with TACOM LAR’S:
 Invite TACOM LAR’s to IKPT
 Offer TACOM LAR’s seat in Program of Record (POR) FLMNET classes (Only)
Medium Tactical Vehicles (MTV)
Contract Support
 Write and Review the Statement of Work (SOW)
Pertaining to NET
 Write and Review the Contractor Data Requirements
List (CDRL’s) Pertaining to NET
 Review Provide Data Item Description (DID’s) Pertaining
to NET
Medium Tactical Vehicles (MTV)
Road Map for NET
 Statement of Work (SOW)
 Production Verification Test (PVT)
 LOG DEMO
 Operational Testing (OT)
 Instructor Key Personal Training (IKPT)
 First Unit Equip (FUE)
Could take several Months
or Years to get to the LOG DEMO
SOW
PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT 90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
Road Map for NET
Statement of Work (SOW): During the First meeting with Contractor and Sub-Contractor.
 Give Contractors a DVD with the following information:
 Example of a Training Support Package (TSP) I.E. Back ground for Template Plate, Font Size, Colors to use
during development and Systems Approach to Training (SAT) format and Analysis, Design, Development,
Implement, Evaluate (ADDIE) format. To help the contractor in developing the PowerPoint Slides, Instructor
Guide (IG) and Student Guide (SG). TRADOC Reg 350-70
 Example of a Class Sign in roster.
 Example of a Student critique.
 Work with the Contractor Developer to get the TSP ready for PVT.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
 Production Verification Test (PVT): It will be conducted at Aberdeen Proving Grounds (APG), Maryland or Yuma
Proving Grounds (YPG), New Mexico.
 Contactor gives NET training to APG/YPG personal so they can operate and test the equipment.
 Will be the first (1st) time the new TSP being used for training.
 During the PVT its the NET Manager responsibility to insure the Contractor is ready to teach the class. By
checking his Instructor Certification given by the Contractor. Also quizzing the instructors before class on the TSP
materials.
 Items the Contractor is responsible to bring for and during PVT – PowerPoint presentation, Instructor Guide,
Student Guide, Draft TM and a DVD for each student, with all the information covered in the training.
Medium Tactical Vehicles (MTV)
Road Map for NET
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
Road Map for NET
 LOG DEMO: It will be conducted at the Contractors Facility.
 Contactor will give a short OPNET & FLMNET training to demonstrators for the LOG DEMO.
 This will be the second (2nd) time the new TSP will be used for training.
 Training Support Package (TSP) will be updated during and after the LOG DEMO.
 Items the Contractor is responsible to update during the LOG DEMO – PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
Road Map for NET
 Operational Testing (OT): It will be conducted at a Government Facility in the United States.
 Contactor will give a OPNET & FLMNET training to the soldiers.
 This will be the third (3rd) time the new TSP will be used for training.
 Training Support Package (TSP) will be updated during and after the Operational Testing
(OT).
 Items the Contractor is responsible to update during the OT– PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
Road Map for NET
 Instructor Key Personal Training (IKPT): It will be conducted at the Contractors Facility.
 NET Manager will be responsible to contact CASCOM, TRADOC, TACOM LAR’s and DynCorp
International by email to attend the IKPT.
 Contactor will be responsible to teach a OPNET & FLMNET training to the mix group.
 This will be the forth (4th) time the new TSP will be used for training.
 Training Support Package (TSP) will be updated during, on the last day and after the
Instructor Key Personal Training (IKPT).
 Items the Contractor is responsible to update during the IKPT– PowerPoint presentation,
Instructor Guide, Student Guide and TM.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
Road Map for NET
 First Unit Equip (FUE): It will be conducted at a Government Facility in the United States.
 First Unit Equip (FUE) to receive the equipment will be dictated by G-8.
 DynCorp International will give a OPNET & FLMNET training to the soldiers.
 This will be the fifth (5th) time the new TSP will be used for training.
 Training Support Package (TSP) will be updated during and after the First Unit Equip (FUE).
 NET Manager is responsible to update during and after the FUE– PowerPoint presentation,
Instructor Guide, and Student Guide.
SOW PVT
LOG
DEMO
OT IKPT FUE
Could take several Months
or Years to get to the PVT
Could take several Months
or Years to get to the LOG DEMO
90 to 120 days
90 to 120 days
90 to 120 days
Medium Tactical Vehicles (MTV)
New Material Introductory Brief (NMIB)
NMIB Conducted for each Unit and Follow on IPR’s are Conducted
NMIB’s are Conducted Only by Telephonic
• MTV Log Managers - Briefs the Fielding
• DynCorp International - Briefs De-processing
• DynCorp International - Briefs New Equipment Training
• NET Manager – Re-Enforce Request for New Equipment Training and
inform Units about Unit Training Assistance Program (UTAP)
Unit Scheduling NET Based on Units Availability
Medium Tactical Vehicles (MTV)
 Operator New Equipment Training (OPNET) Course
 There are 6 systems in MTV. Based on type of MTV System being trained
on, the number of students and hours will be different
 DynCorp International Provides, 1 Instructor Per 6 Students
 Maximum 12 Students Per Class
 Target MOS for OPNET is 91 Series & Wrecker NET 91BH8 (Only)
 Training Focus is on Vehicle Operation, Familiarization & Safety
New Equipment Training (NET) Timeline for
Operator (OP) Course
Medium Tactical Vehicles (MTV)
 Field Level Maintenance (FLMNET) Course
 There are 6 Systems in MTV. Based on Type of MTV System being Trained on, the Number of
Students and Hours will be Different
 DynCorp International Provides, 1 Instructor Per 4 Students
 Maximum 8 Students Per Class
 Target MOS for FLMNET is 91 Series & Wrecker NET 91BH8 (Only)
 LARs are Encouraged to Attend the Training
 Training Focus:
 Sub-system Component Familiarization
 Maintenance Procedures
 Troubleshooting Procedures using Maintenance Support Device (MSD) with Interactive Electronic
Technical Manual (IETM)
 Software used Electronic Maintenance System (EMS) or Next Generation
New Equipment Training (NET) Timeline for Field
Level Maintenance (FLM) Course
 All Units Receive the Following on DVD after Training:
• Training Support Package
- Power Point Courseware (PP)
- Instructor Guide (IG)
- Student Guide (SG)
- Practical Exercise (PE)
- Written Test
Training Support Package (TSP)
New Equipment Training (NET)
Medium Tactical Vehicles (MTV)
Medium Tactical Vehicles (MTV)
TACOM-Unique Logistics Support Applications
(TULSA)
Medium Tactical Vehicles (MTV)
Unit Training Assistance Program
(UTAP)
Medium Tactical Vehicles (MTV)
Material, Fielding & Training (MF&T)
Questions?

More Related Content

Similar to MTV NET Manager Responsibilities

I corps courage university welcome brief
I corps courage university welcome briefI corps courage university welcome brief
I corps courage university welcome briefgroveskbg
 
2010 annual motor transport symposium master los brief
2010 annual motor transport symposium master los brief2010 annual motor transport symposium master los brief
2010 annual motor transport symposium master los briefUnited States Marine Corps
 
2014_ATIP_Final.pdf
2014_ATIP_Final.pdf2014_ATIP_Final.pdf
2014_ATIP_Final.pdf健 李
 
Pastor_Next Generation Pilot Training-1
Pastor_Next Generation Pilot Training-1Pastor_Next Generation Pilot Training-1
Pastor_Next Generation Pilot Training-1David Pastor
 
DoD_resume
DoD_resumeDoD_resume
DoD_resumeJin Dang
 
UAS Hackathon - PALS - DRONE ENGINEERING.pdf
UAS Hackathon - PALS - DRONE ENGINEERING.pdfUAS Hackathon - PALS - DRONE ENGINEERING.pdf
UAS Hackathon - PALS - DRONE ENGINEERING.pdfVickyVignesh409360
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10United States Marine Corps
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10United States Marine Corps
 
2023-Training-Catalog-LATAM-Mobile-Cranes.pdf
2023-Training-Catalog-LATAM-Mobile-Cranes.pdf2023-Training-Catalog-LATAM-Mobile-Cranes.pdf
2023-Training-Catalog-LATAM-Mobile-Cranes.pdfMarceloAlejandro38
 
SATCE Presentation for WATS 2016 Goodman
SATCE Presentation for WATS 2016 GoodmanSATCE Presentation for WATS 2016 Goodman
SATCE Presentation for WATS 2016 GoodmanJeremy Goodman
 
Gilco Consulting Services Semiconductor Presentation
Gilco Consulting Services Semiconductor PresentationGilco Consulting Services Semiconductor Presentation
Gilco Consulting Services Semiconductor Presentationgilco915
 
2011 annual motor transport symposium master los brief
2011 annual motor transport symposium master los brief2011 annual motor transport symposium master los brief
2011 annual motor transport symposium master los briefUnited States Marine Corps
 
Define Tollgate
Define TollgateDefine Tollgate
Define Tollgatedonhhenry
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang You sin
 
Briefing 2008oct V6
Briefing 2008oct V6Briefing 2008oct V6
Briefing 2008oct V6Bernard Lee
 
Briefing 2008oct V6
Briefing 2008oct V6Briefing 2008oct V6
Briefing 2008oct V6lcblcb1
 

Similar to MTV NET Manager Responsibilities (20)

I corps courage university welcome brief
I corps courage university welcome briefI corps courage university welcome brief
I corps courage university welcome brief
 
2010 annual motor transport symposium master los brief
2010 annual motor transport symposium master los brief2010 annual motor transport symposium master los brief
2010 annual motor transport symposium master los brief
 
iaf.pptx
iaf.pptxiaf.pptx
iaf.pptx
 
2014_ATIP_Final.pdf
2014_ATIP_Final.pdf2014_ATIP_Final.pdf
2014_ATIP_Final.pdf
 
JOSE CASIMIRO File
JOSE CASIMIRO FileJOSE CASIMIRO File
JOSE CASIMIRO File
 
Pastor_Next Generation Pilot Training-1
Pastor_Next Generation Pilot Training-1Pastor_Next Generation Pilot Training-1
Pastor_Next Generation Pilot Training-1
 
DoD_resume
DoD_resumeDoD_resume
DoD_resume
 
UAS Hackathon - PALS - DRONE ENGINEERING.pdf
UAS Hackathon - PALS - DRONE ENGINEERING.pdfUAS Hackathon - PALS - DRONE ENGINEERING.pdf
UAS Hackathon - PALS - DRONE ENGINEERING.pdf
 
jitendra resume 2016
jitendra resume 2016jitendra resume 2016
jitendra resume 2016
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10
 
2023-Training-Catalog-LATAM-Mobile-Cranes.pdf
2023-Training-Catalog-LATAM-Mobile-Cranes.pdf2023-Training-Catalog-LATAM-Mobile-Cranes.pdf
2023-Training-Catalog-LATAM-Mobile-Cranes.pdf
 
SATCE Presentation for WATS 2016 Goodman
SATCE Presentation for WATS 2016 GoodmanSATCE Presentation for WATS 2016 Goodman
SATCE Presentation for WATS 2016 Goodman
 
Commo Resume
Commo ResumeCommo Resume
Commo Resume
 
Gilco Consulting Services Semiconductor Presentation
Gilco Consulting Services Semiconductor PresentationGilco Consulting Services Semiconductor Presentation
Gilco Consulting Services Semiconductor Presentation
 
2011 annual motor transport symposium master los brief
2011 annual motor transport symposium master los brief2011 annual motor transport symposium master los brief
2011 annual motor transport symposium master los brief
 
Define Tollgate
Define TollgateDefine Tollgate
Define Tollgate
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016
 
Briefing 2008oct V6
Briefing 2008oct V6Briefing 2008oct V6
Briefing 2008oct V6
 
Briefing 2008oct V6
Briefing 2008oct V6Briefing 2008oct V6
Briefing 2008oct V6
 

MTV NET Manager Responsibilities

  • 1. Medium Tactical Vehicles (MTV) Training Instructor (AUTO) Occupation Series (1712), GS-12 Material, Fielding & Training (MF&T) Presented by: William R. Folds 23 Mar 2011
  • 2. Medium Tactical Vehicles (MTV) New Equipment Training (NET) Manager MTV NET Manager Responsibilities:  Status of MTV Systems  NET Manager Weekly work schedule  Working Partnership with DynCorp International, CASCOM, TRADOC and TACOM LAR’s  Contract Support - Statement of Work (SOW), Contractor Data Requirements List (CDRLs) & Data Item Description (DID’s)  Road Map  New Material Introductory Brief (NMIB)  NET Timeline for OP/FLM Courses  TACOM-Unique Logistics Support Applications (TULSA)  Unit Training Assistance Program (UTAP)
  • 3. Medium Tactical Vehicles (MTV) Status of MTV Systems Program of Record (POR): (6 Active) (2 Types)  M1157 10 Ton Dump Truck (Old System TSP)  M1157A1P2 10 Ton Dump Truck (Updated System TSP) (2 Types)  1148 FMTV Load Handling System (LHS) Truck (Old System TSP)  1148A1P2 FMTV Load Handling System (LHS) Truck (Updated System TSP)
  • 4. Medium Tactical Vehicles (MTV) Status of MTV Systems (Cont.) Program of Record (POR): (6 Active) M1088A1P2 Truck Tractor 5-Ton 6x6 M1087A1 Expansible Van M1084A1P2 Truck Cargo 5-Ton 6x6 Dropside w/MHC M1089A1P2 LTAS 8.5 ton Wrecker
  • 5. Medium Tactical Vehicles (MTV) MTV Weekly Work & Meetings Report to Bldg 1350 John R. Road, Troy (Pod: N1003) Monday:  Start a Weekly Significant Activities Report (WSAR)  Work on New Equipment Training (NET) Lesson Plans Tuesday:  Add to the Weekly Significant Activities Report (WSAR)  Work on New Equipment Training (NET) Lesson Plans  Bi – Weekly meeting with Medium Tactical Vehicle (MTV) Combined Logistic Fielding Meeting, Time: 12:30 – 13:30hrs  Receive Student Rosters / Course Critiques / NET Schedule  MTV Discussions on any Contract Deliverables  Discuss any Upcoming NMIB’s (Telephonic)
  • 6. Wednesday:  Finish Weekly Significant Activities Report (WSAR). Send to Supervisor  Work on New Equipment Training (NET) Lesson Plans Thursday:  Work on New Equipment Training (NET) Lesson Plans Friday:  Inter students into TACOM-Unique Logistics Support Applications (TULSA)  Work on Defense Acquisition University (DAU) courses Medium Tactical Vehicles (MTV) MTV Weekly Work & Meetings Report to Bldg 1350 John R. Road, Troy (Pod: N1003)
  • 7. Medium Tactical Vehicles (MTV) Partnership Partnership with MTV & DynCorp International:  Partnership with MTV and DynCorp International during NMIB’s (Telephonic)  Updating Training Support Packages (TSP’s) on MTV Equipment to Prepare Systems for Sustainment  Enforce Current DynCorp International Instructors Certification Program  Oversee Instructor Key Personal Training (IKPT)  Insurer Work Packages (WP) are Updated before the First Unit Equipped (FUE) DynCorp International CASCOM,TRADOC and TACOM LAR’s
  • 8. Partnership with CASCOM:  Come up with a Field Level Maintenance (FLM) Critical Tasks List  Work side by side during the LOG DEMO Technical Manual (TM) Verification for the FLM Training Support Package (TSP)  Work directly with CASCOM during IKPT  Request for approval when changes are being made in the FLMNET POI  Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE) Medium Tactical Vehicles (MTV) Partnership DynCorp International CASCOM,TRADOC and TACOM LAR’s
  • 9. Medium Tactical Vehicles (MTV) Partnership DynCorp International CASCOM,TRADOC and TACOM LAR’s Partnership with TRADOC:  Come up with a Operator (OP) Critical Tasks List  Work side by side during the LOG DEMO Technical Manual (TM) Verification for the OP Training Support Package (TSP)  Work directly with TRADOC during IKPT  Request for approval when changes are being made in the OPNET POI  Insurer Work Packages (WP) are updated before the First Unit Equipped (FUE)
  • 10. Medium Tactical Vehicles (MTV) Partnership DynCorp International CASCOM, TRADOC and TACOM LAR’s Partnership with TACOM LAR’S:  Invite TACOM LAR’s to IKPT  Offer TACOM LAR’s seat in Program of Record (POR) FLMNET classes (Only)
  • 11. Medium Tactical Vehicles (MTV) Contract Support  Write and Review the Statement of Work (SOW) Pertaining to NET  Write and Review the Contractor Data Requirements List (CDRL’s) Pertaining to NET  Review Provide Data Item Description (DID’s) Pertaining to NET
  • 12. Medium Tactical Vehicles (MTV) Road Map for NET  Statement of Work (SOW)  Production Verification Test (PVT)  LOG DEMO  Operational Testing (OT)  Instructor Key Personal Training (IKPT)  First Unit Equip (FUE) Could take several Months or Years to get to the LOG DEMO SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT 90 to 120 days 90 to 120 days 90 to 120 days
  • 13. Medium Tactical Vehicles (MTV) Road Map for NET Statement of Work (SOW): During the First meeting with Contractor and Sub-Contractor.  Give Contractors a DVD with the following information:  Example of a Training Support Package (TSP) I.E. Back ground for Template Plate, Font Size, Colors to use during development and Systems Approach to Training (SAT) format and Analysis, Design, Development, Implement, Evaluate (ADDIE) format. To help the contractor in developing the PowerPoint Slides, Instructor Guide (IG) and Student Guide (SG). TRADOC Reg 350-70  Example of a Class Sign in roster.  Example of a Student critique.  Work with the Contractor Developer to get the TSP ready for PVT. SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 14.  Production Verification Test (PVT): It will be conducted at Aberdeen Proving Grounds (APG), Maryland or Yuma Proving Grounds (YPG), New Mexico.  Contactor gives NET training to APG/YPG personal so they can operate and test the equipment.  Will be the first (1st) time the new TSP being used for training.  During the PVT its the NET Manager responsibility to insure the Contractor is ready to teach the class. By checking his Instructor Certification given by the Contractor. Also quizzing the instructors before class on the TSP materials.  Items the Contractor is responsible to bring for and during PVT – PowerPoint presentation, Instructor Guide, Student Guide, Draft TM and a DVD for each student, with all the information covered in the training. Medium Tactical Vehicles (MTV) Road Map for NET SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 15. Medium Tactical Vehicles (MTV) Road Map for NET  LOG DEMO: It will be conducted at the Contractors Facility.  Contactor will give a short OPNET & FLMNET training to demonstrators for the LOG DEMO.  This will be the second (2nd) time the new TSP will be used for training.  Training Support Package (TSP) will be updated during and after the LOG DEMO.  Items the Contractor is responsible to update during the LOG DEMO – PowerPoint presentation, Instructor Guide, Student Guide and TM. SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 16. Medium Tactical Vehicles (MTV) Road Map for NET  Operational Testing (OT): It will be conducted at a Government Facility in the United States.  Contactor will give a OPNET & FLMNET training to the soldiers.  This will be the third (3rd) time the new TSP will be used for training.  Training Support Package (TSP) will be updated during and after the Operational Testing (OT).  Items the Contractor is responsible to update during the OT– PowerPoint presentation, Instructor Guide, Student Guide and TM. SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 17. Medium Tactical Vehicles (MTV) Road Map for NET  Instructor Key Personal Training (IKPT): It will be conducted at the Contractors Facility.  NET Manager will be responsible to contact CASCOM, TRADOC, TACOM LAR’s and DynCorp International by email to attend the IKPT.  Contactor will be responsible to teach a OPNET & FLMNET training to the mix group.  This will be the forth (4th) time the new TSP will be used for training.  Training Support Package (TSP) will be updated during, on the last day and after the Instructor Key Personal Training (IKPT).  Items the Contractor is responsible to update during the IKPT– PowerPoint presentation, Instructor Guide, Student Guide and TM. SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 18. Medium Tactical Vehicles (MTV) Road Map for NET  First Unit Equip (FUE): It will be conducted at a Government Facility in the United States.  First Unit Equip (FUE) to receive the equipment will be dictated by G-8.  DynCorp International will give a OPNET & FLMNET training to the soldiers.  This will be the fifth (5th) time the new TSP will be used for training.  Training Support Package (TSP) will be updated during and after the First Unit Equip (FUE).  NET Manager is responsible to update during and after the FUE– PowerPoint presentation, Instructor Guide, and Student Guide. SOW PVT LOG DEMO OT IKPT FUE Could take several Months or Years to get to the PVT Could take several Months or Years to get to the LOG DEMO 90 to 120 days 90 to 120 days 90 to 120 days
  • 19. Medium Tactical Vehicles (MTV) New Material Introductory Brief (NMIB) NMIB Conducted for each Unit and Follow on IPR’s are Conducted NMIB’s are Conducted Only by Telephonic • MTV Log Managers - Briefs the Fielding • DynCorp International - Briefs De-processing • DynCorp International - Briefs New Equipment Training • NET Manager – Re-Enforce Request for New Equipment Training and inform Units about Unit Training Assistance Program (UTAP) Unit Scheduling NET Based on Units Availability
  • 20. Medium Tactical Vehicles (MTV)  Operator New Equipment Training (OPNET) Course  There are 6 systems in MTV. Based on type of MTV System being trained on, the number of students and hours will be different  DynCorp International Provides, 1 Instructor Per 6 Students  Maximum 12 Students Per Class  Target MOS for OPNET is 91 Series & Wrecker NET 91BH8 (Only)  Training Focus is on Vehicle Operation, Familiarization & Safety New Equipment Training (NET) Timeline for Operator (OP) Course
  • 21. Medium Tactical Vehicles (MTV)  Field Level Maintenance (FLMNET) Course  There are 6 Systems in MTV. Based on Type of MTV System being Trained on, the Number of Students and Hours will be Different  DynCorp International Provides, 1 Instructor Per 4 Students  Maximum 8 Students Per Class  Target MOS for FLMNET is 91 Series & Wrecker NET 91BH8 (Only)  LARs are Encouraged to Attend the Training  Training Focus:  Sub-system Component Familiarization  Maintenance Procedures  Troubleshooting Procedures using Maintenance Support Device (MSD) with Interactive Electronic Technical Manual (IETM)  Software used Electronic Maintenance System (EMS) or Next Generation New Equipment Training (NET) Timeline for Field Level Maintenance (FLM) Course
  • 22.  All Units Receive the Following on DVD after Training: • Training Support Package - Power Point Courseware (PP) - Instructor Guide (IG) - Student Guide (SG) - Practical Exercise (PE) - Written Test Training Support Package (TSP) New Equipment Training (NET) Medium Tactical Vehicles (MTV)
  • 23. Medium Tactical Vehicles (MTV) TACOM-Unique Logistics Support Applications (TULSA)
  • 24. Medium Tactical Vehicles (MTV) Unit Training Assistance Program (UTAP)
  • 25. Medium Tactical Vehicles (MTV) Material, Fielding & Training (MF&T) Questions?