It Contains the main references and points in success the life of storage and handling of the material on site for the MEP and can be applicable to other departments.
I believe this sheet is most important sheet in the life of the quality team.
3. Material Handling and storage procedure
Once material delivered to the site. What steps must be taken?
1. To handle it correctly and offloaded 2. To be checked by
concerned department
3. To Store it
correctly?
4. To Shift the
material to the
Site once required
4. Handling and storage of the material
1- once received the material there is a specific handling and storage
requirements need to be complied with:
A. Manufacturer requirements.
Contractual requirements.
5. Handling and storage of the material
Some material had a specific requirements of storage like:
A/C Stores for the
Chemicals
Ventilated or Shaded Stores
For low IP rated materials