SlideShare a Scribd company logo
1 of 32
Download to read offline
Project Undertaken by: Sk. Noor Mohammad
Trainer: Mr. Prabhas Surana
Lean Six Sigma Black Belt
Project Theme:- Increasing CSAT%
Present Pain areas
2
• High customer dissatisfaction will result into customer churn.
• Lack of satisfaction level will result into higher repeat calls and
in turn will increase daily abandoned %age.
Short Term
• Incessant Higher customer dissatisfaction will ruin company’s
brand image in front of client & other prospective customers.
• Incessant Higher customer dissatisfaction may cause for
loosing business in the long run.
Long Term
Define
Project Charter
3
Business Case
Digicon Technologies Ltd. is a leading BPO in BD. There
is a process called Airtel Inbound among many other
project which contributes to 80% of the total revenue.
High customer dissatisfaction threatens to loose its
business & brand image.
There is an opportunity to reduce customer
dissatisfaction % by using control factor, which would
help the organization to achieve increased efficiency and
competitiveness.
Goal Statement
To increase the Monthly CSAT% of the DTL Airtel
Inbound process by up to 2% within 31st Aug’15
along with consistency.
Opportunity Statement
With the help of Customer dissatisfaction data for
DTL, last 2 month’s defect % are 19% & 18%
respectively. Which causes huge customer churn of
Airtel BD and decreases client’s growth level as
well. Check below CSAT% for last 2 months:
Project Scope
In Scope: All the CSE taking calls for DTL Airtel Process.
Out of Scope:
1. CSE apart from DTL Airtel Inbound process.
2. CSE involved others apart from call taking
responsibility.
Month Satisfied Dissatisfied CSAT%
April'15 36073 9346 79%
May'15 34068 7832 81%
Define
Project Time Line
4
*** GANTT chart is being used to define the timeline of the project.
Define
Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Form Team
Finalize Charter
Training
Gather Data
Analyze Data
Select Solutions
Develop Implementation Plan
Monitor Result
Closure and Recognition
May'15
June'15Activity
Aug'15
July'15
Targeted Benefits
5
Define
 Ensuring Customer satisfaction.
 Count of churn customer will be decreased.
 Call volume will be increased ( Daily basis ).
 Repeat %age will be decreased on daily basis.
 Client satisfaction will be ensured.
 service quality will be improved.
 Company reputation will be increased.
Definitions
6
Define
Indicators Full Form Definition
CSAT Customer Satisfaction
Customer satisfaction is the measure of the overall
satisfaction of the interaction or service.
PFS Product Fact Sheets
The detailed overview along with features of an entire
product is described in this document which is provided by
Airtel
MIS Management Information System
A Team dedicted to supoort Operations Team with data
points on different KPIs
KMT Knowledge Management Team
A Team who deals with the know-how of all the products and
also involved in cascading the information to the Floor
agents
CSR Customer Service Representatives One who is assigned to answer calls
HRD Human Resource Department
The Department who deals with the recruitment of the CSRs
during requirement
SOP Standard Operating Procedure The standard guideline which CSR needs to follow
VOC Voice Of Customer Customer's opinion regarding Airtel product/process.
Team Member
A Approval of team decisions I.e., sponsor, business leader, MBB.
R Resource to the team, one whose expertise, may be needed on an ad-hoc basis.
M Member of team – whose expertise will be needed on a regular basis.
I Interested party, one who will need to be kept informed on direction, findings.
Key Stakeholders Define Measure Analyze Improve
Contro
l
Sponsor Wahid Sharif I & A I I I I
Project Leader Sk. Noor Mohammad R & A R & A R & A R & A I & A
Team Member Md. Salauddin Ahmed M M M M M
Team Member Mahmudul Hassan M M M M M
Team Member Hafizur Rahman M M M M M
Team Member Maruf Hossain M M M M M
Team Member ASM Salahuddin M M M M M
Communication Plan
Information or Activity Target Audience Information channel Who When
Project Status Leadership E-mails
Sk. Noor
Mohammad
BI- Weekly
Tollgate Review LSSBB E-mails / or meetings As per project plan
Project activities Members E-mails / or meetings Weekly
Define
7
Increasing CSAT%
Meet customer
satisfaction on every call
Increase day wise
CSAT%
The day wise CSAT%
should be >=83%
CTQs
LSL = 80%
USL = 85%
Any day where in the
FTD CSAT%<80%
Project GOAL
Definition
Target
LSL/USL
Defect Definition
CTQ Elements Define
8
SIPOC Define
9
Supplier Input Process Output Customer
Airtel Product Call
Customer awareness &
service
End customer of
Airtel
HRD
Customer Service
Representatives
Call handling
Ensure customer
satisfaction
End customer of
Airtel
Airtel Standards scripts
Start the call with the standard
greeting
Good customer
experience
End customer of
Airtel
Airtel SOPS
Understand the
query/request/complaint
Provide resolution to
customer's issue
Quality(Digicon &
Airtel)Team
Airtel Process training Quality of the resolution
Increase knowledge of
agents
Training & Quality
Team
Avaya
Access to CRM and
customer information
Verify the customer identity
Provide compact
customer service
End customer of
Airtel
Avaya Call recording Call monitoring
Take
preventive/corrective
actions
Quality(Digicon &
Airtel)Team
MIS Data points Data analysis
Measuring agent's
performance
Operation & Quality
Team
Training Department Soft skill Training
Provide quality service to
all customer
End customer of
Airtel
Quality Department Call audit Constant feedback/refresher
Make customer satisfy by
providing quality service
Airtel Management
Process Map (MACRO)-Flow Chart Define
10
Measure
11
As-Is Process Map ( MICRO) Measure
12
Data Collection Plan Measure
LSL USL
CSAT%
Customer satisfaction is
the measure of the
overall satisfaction of the
interaction or service.
Day wise CSAT%
going down under
80%
85% 80% 85% Day wise CSAT%
OpportunityKPI Operational Definition Defect Definition Performance Standard
Specification Limit
KPI Data Type Data Items Needed
Formula to be
used
Unit
What database
to be used to
track the data?
Is this
existing
database
or new?
If new, when
the database
will be ready
to use?
Sample
Planning
CSAT% Attribute
Satisfaction count,
Dissatisfaction count,
Wrap Up contributor
%age
CSAT%=(Total
Satisfied
count/Total
Reply)*100
Percent
age
MS Excel Existing NA
Apr'15 to
May'15
13
Pareto Analysis Measure
14
Unorganized Conversation, Dead Air, Argument, Hurriedness & Unhelpful attitude are
the Vital Xs which contributes to higher customer dissatisfaction and resulting into low
CSAT of the entire process.
***The above data is derived out of 3252 sample audits of Quality Auditors.
Sigma Calculation Measure
15
Total Opportunities 87319
Total Defects 17178
DPMO 196726.9
Sigma Level 2.35
We can see from the sigma calculation that the current process is running at a 2.35 sigma level, hence there is a
scope of improvement in this process.
Analyze
16
Normality Test Analyze
17
As the P Value is >0.05,
hence the data is normal
and can be considered to
go ahead and work on
this specific project.
Graphical Summary Analyze
18
As the P Value is
>0.05, hence the
data is normal
and can be
considered to go
ahead and work
on this specific
project.
Cause & Effect Analysis Analyze
19
Material MAN
Rush to wrap-up the call
Dominating nature
Reuce AHT by escaping SOP
Hurridness & interruption
Avoiding tendency
Willingness
Machine
Argument/
cunning attitude
Dead air
Inadequate pre
shift briefing
Not following SOP Inattentive on call
System navigation
issue
Lack of communication skill (lack of
fluency and pronunciation problem)
Method
Why CSAT%
is low ?
Poor Network
coverage
Lose the temper
Unhelpful Attitude
on hold
Not puttingSystem navigation
issue
Less enthusiastic
on call
Unorganized
Conversation
Unorganized
Knowledge drive
Charging
mechanism
Application Down
Lack of training
absence of soft
Too many system
check required
Lack of responsivenessLack of product knowledge
Complicated PFS
Complicated Product
Call drop from conversation
Vital Few Xs chosen for improvement Analyze
20
Impact
CATEGORY HIGH MEDIUM LOW
IN CONTROL
1. Lack of communication skill (lack of fluency and pronunciation
problem)
2. System navigation issue
3. Inattentive on call
4. Not following SOP 1. Complicated PFS
5. Argument/ cunning attitude
2. Unorganized Knowledge
drive
6. Hurridness & interruption 3. Inadequate pre shift briefing
7. Unhelpful Attitude 4. Absence of soft skill training
8. Less enthusiastic on call. 5. Charging mechanism
9. Lack of responsiveness
10.Lack of product knowledge
11.Willingness
12.Not putting on hold
13.Avoiding tendency
OUT OF
CONTROL
1. Call drop from conversation
1. Too many system checks
required
2. Poor Network coverage
3. Application Down
All the CSAT
controllable
parameters
belong to
the
parameters
of Call
Quality
 Vital few Xs chosen through controllable factors to prioritize the solutions based on the control
and noise factors.
Improve
21
Action Plan for Improvement Improve
22
Main Reason for low CSAT
How to fix/steps to be taken for the
failure points
Quantified targets on
the steps taken
Sub activities on the steps
taken
One who would own the activities
/KRA improvement and track them
Date of
Completion
Done/WIP
/Not done
SOP of top 10 negetive response
generators to be discussed with
low CSAT producing agents.
Calls will be monitored
on a regular basis
QA s need to discuss the
top negative response
contribution scenarios
during every briefing
sessions.
Quality 5-May WIP
Parameter wise TL wise scores to
be shared with OPS by quality
team & feedback to be shared on
the same.
Parameter wise
dashboard to be
published on a daily
basis.
Fatal reasons in Internal &
External Audits to be
regularly briefed among
the agents by the QA s.
MIS 2-May WIP
Calls to be monitored on a daily
basis by the QA's for their
respective team.
5 calls/Day to be
monitored & feedback
to be shared.
Monitoring calls from verint
by the TL on daily basis.
Feedback sharing signups
to be maintained.
Quality 7-May WIP
Increase CSAT to be driven across
the floor.
Call quality to be
tracked based on the
internal audit
observation &
TL/AM/QA s to drive the
same for their respective
teams.
Review to be done by the
process head/week once
the QMC scores come.
Quality 7-May WIP
Dead Air
Long call drill down to be done in
pick hours.
2 calls/QA to be audited
for his respective team
& dashboard to be
published regarding the
same.
Most of the calls being
monitored for the
perticular query IDs for
which the CSAT is low.
Quality 3-May WIP
Argument/Cunning Attitude
Refresher training to be arranged
on softskill.
Post refresher efficacy to
be mapped through 2
audits /agent by
Trainers.
The result of Internal
audits are send to training
team on a fortnight basis
as TNI for refresher.
Training 5-May WIP
Hurriedness/Interruption
Refresher session to be arranged
on call courtesy by maintaining
proper guideline.
2 calls/QA to be audited
& dashboard to be
published regarding the
same.
Training Team is taking
refreshers.
Training 10-May WIP
Unhelpful Attitude Hygene audits to be done.
Calls will be audited by
QA/KMT/Trainer &
dashboard to be
published regarding the
same.
Providing feedback on a
regular basis.
Quality/Training/KMT 1-May WIP
Unorganized Conversations
Improved Process Flow Improve
23
VOC Tracker has
been introduced to
increase CSAT% for
modification/change
the product/process
modalities.
Introduced
KAIZEN to
satisfy the
customer after
providing
service by
prioritizing
them before
end of the
call.
Initiative : VOC Tracker Improve
24
CSRs are used to write VOCs here regarding
product/process features.
** These VOCs help client to take decision to keep/change the product/process modalities. This
practice increases CSAT% rather chances the customers into churn.
Control
25
CSAT Trend – Month Wise Control
26
79%
81%
82%
83%
84%
77%
78%
79%
80%
81%
82%
83%
84%
April'15 May'15 June'15 July'15 Aug'15
CSAT Trend – Month Wise
 Significant improvement observed in month wise CSAT trend.
 By end of Aug’15, it has come up to 84% from 79%.
Impact Analysis – CSAT Control
27
 We identified total 25 agents whose CSAT were significantly low and below 76% CSAT score during Apr’15 & May’15.
 All these agents have undergone refresher Trainings and the Quality auditors kept them under rigorous call monitoring to
understand the implementation of learning through Refreshers.
 We have seen 100% agents have improved and their average CSAT have come up to 82% from 75% which impacted a
lot in the overall CSAT of the process.
72%
72%
73%
74%
74%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
76%
76%
76%
76%
77%
77%
77%
77%
81%
82%
89%
80%
81%
83%
79%
82%
88%
84%
78%
84%
80%
76%
81%
86%
81%
82%
82%
78%
91%
83%
82%
80%
78%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Pre-project score Post-project score
Impact Analysis - Pre vs Post Refresher Training
Impact Analysis – CQ Control
28
84%
79%
80%
82%
80%
82%
80%
76%
82%
83%
81%
79%
81%
80%
78%
83%
81%
82%
84%
81%
80%
80%
80%
80%
70%
79%
81%
85%
84%
84%
84%
84%
72%
80%
79%
85%
74%
80%
82%
83%
86%
83%
82%
83%
83%
82%
83%
80%
81%
85%
%
10 %
20 %
30 %
40 %
50 %
60 %
70 %
80 %
90 %
100 %
Pre-project score Post-project score
Impact Analysis - Pre vs Post Refresher Training
 We identified total of 25 agents whose Call Quality Scores were significantly below the target of 80%.
 All these agents have undergone refresher Trainings and the Quality auditors kept them under rigorous call monitoring to
understand the implementation of learning through Refreshers.
 We have seen improvement in the agents and their average Call Quality scores have come up to 82% from 80% which
impacted a lot in the overall CQ of the process.
Sigma Calculation – Post Project Control
29
Total Opportunities 84381
Total Defects 14202
DPMO 168308
Sigma Level 2.46
The Process sigma level has increased from 2.35 to 2.46. Hence the process have improved.
Process Capability – Post Project Control
30
Test of μ = 80.45 vs > 80.45
The assumed standard deviation = 0.01701
Variable N Mean StDev SE Mean 95% Lower Bound Z P
CSAT 62 83.1934 1.5747 0.0022 83.1898 1269.93 0.000
 As the P value is
less than 0.05,
hence here we
can reject the null
hypothesis.
 So we can say
that process i.e.
CSAT has
improved.
Changes done in Action Plan Control
31
Main Reason for low CSAT
How to fix/steps to be taken for the
failure points
Quantified targets on the
steps taken
Sub activities on the steps
taken
One who would own the
activities /KRA
improvement and track
them
Date of
completion
Done/WIP/
Not done
SOP of top 10 negetive response
generators to be discussed with low
CSAT producing agents.
Calls will be monitored on
a regular basis
QA s need to discuss the top
negative response
contribution scenarios
during every briefing
sessions.
Quality 5-May Done
Parameter wise TL wise scores to be
shared with OPS by quality team &
feedback to be shared on the same.
Parameter wise
dashboard to be
published on a daily
basis.
Fatal reasons in Internal &
External Audits to be
regularly briefed among the
agents by the QA s.
MIS Ongoing Done
Calls to be monitored on a daily basis
by the QA's for their respective team.
5 calls/Day to be
monitored & feedback to
be shared.
Monitoring calls from verint
by the TL on daily basis.
Feedback sharing signups
to be maintained.
Quality Ongoing Done
Increase CSAT to be driven across
the floor.
Call quality to be tracked
based on the internal
audit observation &
TL/AM/QA s to drive the
same for their respective
teams.
Review to be done by the
process head/week once
the QMC scores come.
Quality 7-May Done
Dead Air
Long call drill down to be done in pick
hours.
2 calls/QA to be audited
for his respective team &
dashboard to be
published regarding the
same.
Most of the calls being
monitored for the perticular
query IDs for which the
CSAT is low.
Quality Ongoing Done
Argument/Cunning Attitude
Refresher training to be arranged on
softskill.
Post refresher efficacy to
be mapped through 2
audits /agent by Trainers.
The result of Internal audits
are send to training team on
a fortnight basis as TNI for
refresher.
Training 5-May Done
Hurriedness/Interruption
Refresher session to be arranged on
call courtesy by maintaining proper
guideline.
2 calls/QA to be audited
& dashboard to be
published regarding the
same.
Training Team is taking
refreshers.
Training 10-May Done
Unhelpful Attitude Hygene audits to be done.
Calls will be audited by
QA/KMT/Trainer &
dashboard to be
published regarding the
same.
Providing feedback on a
regular basis.
Quality/Training/KMT Ongoing Done
Unorganized Conversations
Thank You
32

More Related Content

What's hot

Customer Experience Strategy & Operations Transformation
Customer Experience Strategy & Operations TransformationCustomer Experience Strategy & Operations Transformation
Customer Experience Strategy & Operations TransformationMarcel Barrera
 
How to improve call center quality and performance - Infographic
How to improve call center quality and performance - InfographicHow to improve call center quality and performance - Infographic
How to improve call center quality and performance - InfographicPointel Inc
 
Quality management in bpo
Quality management in bpoQuality management in bpo
Quality management in bpoGrm Venkatesh
 
How to Systematically Improve First Contact Resolution
How to Systematically Improve First Contact ResolutionHow to Systematically Improve First Contact Resolution
How to Systematically Improve First Contact ResolutionUpstream Works
 
Handle Time Analysis and Improvement
Handle Time Analysis and ImprovementHandle Time Analysis and Improvement
Handle Time Analysis and Improvementmattsenkumar
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptxPankaj Kumar
 
11 Ways to Help You Improve First Call Resolution
11 Ways to Help You Improve First Call Resolution11 Ways to Help You Improve First Call Resolution
11 Ways to Help You Improve First Call ResolutionTalkdeskInc
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Call Center Metrics
Call Center MetricsCall Center Metrics
Call Center Metricsvivaankumar
 
A Customer-Centric Approach to FCR
A Customer-Centric Approach to FCRA Customer-Centric Approach to FCR
A Customer-Centric Approach to FCRKnowlagent
 
I lss reduction%20in%20aht%2713 final
I lss reduction%20in%20aht%2713 finalI lss reduction%20in%20aht%2713 final
I lss reduction%20in%20aht%2713 finalchaitmk710586
 
Case study in improving csat with troubleshooting skills
Case study in improving csat with troubleshooting skillsCase study in improving csat with troubleshooting skills
Case study in improving csat with troubleshooting skillsImpact Learning Systems
 
Introduction to First Call Resolution
Introduction to First Call ResolutionIntroduction to First Call Resolution
Introduction to First Call ResolutionUpstream Works
 
The DMAIC process
The DMAIC processThe DMAIC process
The DMAIC processaamir kamal
 
High AHT reasons how to decrease it
High AHT reasons how to decrease itHigh AHT reasons how to decrease it
High AHT reasons how to decrease itAhmed Ramadan
 
Call Center Scorecarding
Call Center ScorecardingCall Center Scorecarding
Call Center ScorecardingSpectrum
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 

What's hot (20)

Customer Experience Strategy & Operations Transformation
Customer Experience Strategy & Operations TransformationCustomer Experience Strategy & Operations Transformation
Customer Experience Strategy & Operations Transformation
 
AHT action plan
AHT action planAHT action plan
AHT action plan
 
How to improve call center quality and performance - Infographic
How to improve call center quality and performance - InfographicHow to improve call center quality and performance - Infographic
How to improve call center quality and performance - Infographic
 
Quality management in bpo
Quality management in bpoQuality management in bpo
Quality management in bpo
 
How to Systematically Improve First Contact Resolution
How to Systematically Improve First Contact ResolutionHow to Systematically Improve First Contact Resolution
How to Systematically Improve First Contact Resolution
 
Handle Time Analysis and Improvement
Handle Time Analysis and ImprovementHandle Time Analysis and Improvement
Handle Time Analysis and Improvement
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptx
 
11 Ways to Help You Improve First Call Resolution
11 Ways to Help You Improve First Call Resolution11 Ways to Help You Improve First Call Resolution
11 Ways to Help You Improve First Call Resolution
 
Dmaic
DmaicDmaic
Dmaic
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
Call Center Metrics
Call Center MetricsCall Center Metrics
Call Center Metrics
 
A Customer-Centric Approach to FCR
A Customer-Centric Approach to FCRA Customer-Centric Approach to FCR
A Customer-Centric Approach to FCR
 
I lss reduction%20in%20aht%2713 final
I lss reduction%20in%20aht%2713 finalI lss reduction%20in%20aht%2713 final
I lss reduction%20in%20aht%2713 final
 
Case study in improving csat with troubleshooting skills
Case study in improving csat with troubleshooting skillsCase study in improving csat with troubleshooting skills
Case study in improving csat with troubleshooting skills
 
Introduction to First Call Resolution
Introduction to First Call ResolutionIntroduction to First Call Resolution
Introduction to First Call Resolution
 
The DMAIC process
The DMAIC processThe DMAIC process
The DMAIC process
 
High AHT reasons how to decrease it
High AHT reasons how to decrease itHigh AHT reasons how to decrease it
High AHT reasons how to decrease it
 
Call Center Scorecarding
Call Center ScorecardingCall Center Scorecarding
Call Center Scorecarding
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 

Viewers also liked

How to Measure Net Promoter Score (NPS)
How to Measure Net Promoter Score (NPS)How to Measure Net Promoter Score (NPS)
How to Measure Net Promoter Score (NPS)Kayako
 
How to Measure Your Customer Satisfaction Score (CSAT)
How to Measure Your Customer Satisfaction Score (CSAT)How to Measure Your Customer Satisfaction Score (CSAT)
How to Measure Your Customer Satisfaction Score (CSAT)Kayako
 
NPS vs. CSAT - A Guide to Measuring Customer Happiness
NPS vs. CSAT - A Guide to Measuring Customer HappinessNPS vs. CSAT - A Guide to Measuring Customer Happiness
NPS vs. CSAT - A Guide to Measuring Customer HappinessTalkdeskInc
 
Measuring Customer Satisfaction: CSAT, CES and NPS compared
Measuring Customer Satisfaction: CSAT, CES and NPS comparedMeasuring Customer Satisfaction: CSAT, CES and NPS compared
Measuring Customer Satisfaction: CSAT, CES and NPS comparedCheckMarket
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
CCSM project establishing & optimizing social media in cs xl case study_march...
CCSM project establishing & optimizing social media in cs xl case study_march...CCSM project establishing & optimizing social media in cs xl case study_march...
CCSM project establishing & optimizing social media in cs xl case study_march...Rudy A. Dalimunthe
 
Reduction of Slivers in IF Skin Panel
Reduction of Slivers in IF Skin PanelReduction of Slivers in IF Skin Panel
Reduction of Slivers in IF Skin PanelShashank Jha
 
DMAIC Yarn manufacturing report
DMAIC Yarn manufacturing reportDMAIC Yarn manufacturing report
DMAIC Yarn manufacturing reportBibekananda Swain
 
DMAI 2014 Strategic Plan
DMAI 2014 Strategic PlanDMAI 2014 Strategic Plan
DMAI 2014 Strategic PlanDan Meyer
 
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016To the Core - Designing Design Ready Organisations - Swinburne MEI 2016
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016Owen Hodda
 
CSAT Advanced Reporting System
CSAT Advanced Reporting SystemCSAT Advanced Reporting System
CSAT Advanced Reporting SystemAhmed Fawzy
 
How To Map Your Customer Journey
How To Map Your Customer JourneyHow To Map Your Customer Journey
How To Map Your Customer JourneyJay Bowen
 
Developing Customer Journey Maps
Developing Customer Journey MapsDeveloping Customer Journey Maps
Developing Customer Journey MapsOwen Hodda
 
Planning Customer Journey Maps
Planning Customer Journey MapsPlanning Customer Journey Maps
Planning Customer Journey MapsMarco Gervasio
 

Viewers also liked (16)

How to Measure Net Promoter Score (NPS)
How to Measure Net Promoter Score (NPS)How to Measure Net Promoter Score (NPS)
How to Measure Net Promoter Score (NPS)
 
How to Measure Your Customer Satisfaction Score (CSAT)
How to Measure Your Customer Satisfaction Score (CSAT)How to Measure Your Customer Satisfaction Score (CSAT)
How to Measure Your Customer Satisfaction Score (CSAT)
 
NPS vs. CSAT - A Guide to Measuring Customer Happiness
NPS vs. CSAT - A Guide to Measuring Customer HappinessNPS vs. CSAT - A Guide to Measuring Customer Happiness
NPS vs. CSAT - A Guide to Measuring Customer Happiness
 
Measuring Customer Satisfaction: CSAT, CES and NPS compared
Measuring Customer Satisfaction: CSAT, CES and NPS comparedMeasuring Customer Satisfaction: CSAT, CES and NPS compared
Measuring Customer Satisfaction: CSAT, CES and NPS compared
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
CCSM project establishing & optimizing social media in cs xl case study_march...
CCSM project establishing & optimizing social media in cs xl case study_march...CCSM project establishing & optimizing social media in cs xl case study_march...
CCSM project establishing & optimizing social media in cs xl case study_march...
 
Reduction of Slivers in IF Skin Panel
Reduction of Slivers in IF Skin PanelReduction of Slivers in IF Skin Panel
Reduction of Slivers in IF Skin Panel
 
DMAIC Yarn manufacturing report
DMAIC Yarn manufacturing reportDMAIC Yarn manufacturing report
DMAIC Yarn manufacturing report
 
DMAI 2014 Strategic Plan
DMAI 2014 Strategic PlanDMAI 2014 Strategic Plan
DMAI 2014 Strategic Plan
 
Presentación
PresentaciónPresentación
Presentación
 
Resume_Gaurav
Resume_GauravResume_Gaurav
Resume_Gaurav
 
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016To the Core - Designing Design Ready Organisations - Swinburne MEI 2016
To the Core - Designing Design Ready Organisations - Swinburne MEI 2016
 
CSAT Advanced Reporting System
CSAT Advanced Reporting SystemCSAT Advanced Reporting System
CSAT Advanced Reporting System
 
How To Map Your Customer Journey
How To Map Your Customer JourneyHow To Map Your Customer Journey
How To Map Your Customer Journey
 
Developing Customer Journey Maps
Developing Customer Journey MapsDeveloping Customer Journey Maps
Developing Customer Journey Maps
 
Planning Customer Journey Maps
Planning Customer Journey MapsPlanning Customer Journey Maps
Planning Customer Journey Maps
 

Similar to Black Belt Project on Increasing CSAT%

10 Questions To Ask When Evaluating IT Service Providers
10 Questions To Ask When Evaluating IT Service Providers10 Questions To Ask When Evaluating IT Service Providers
10 Questions To Ask When Evaluating IT Service ProvidersInsight
 
10 Questions to Ask About IT Outsourcing
10 Questions to Ask About IT Outsourcing10 Questions to Ask About IT Outsourcing
10 Questions to Ask About IT OutsourcingInsight
 
The role of it leadership in service and support v2
The role of it leadership in service and support v2The role of it leadership in service and support v2
The role of it leadership in service and support v2MetricNet
 
Measure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementMeasure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementTechWell
 
Managed Services Using SLAs and KPIs
Managed Services Using SLAs and KPIsManaged Services Using SLAs and KPIs
Managed Services Using SLAs and KPIsProlifics
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
Taking Splunk to the Next Level - Management
Taking Splunk to the Next Level - ManagementTaking Splunk to the Next Level - Management
Taking Splunk to the Next Level - ManagementSplunk
 
Intalio growing-your-business-with-bpm-11 nov14
Intalio growing-your-business-with-bpm-11 nov14Intalio growing-your-business-with-bpm-11 nov14
Intalio growing-your-business-with-bpm-11 nov14akrpri
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validationtjcornish
 
Six sigma it_service_delivery
Six sigma it_service_deliverySix sigma it_service_delivery
Six sigma it_service_deliveryStephen Hightower
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason Uyder
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizenpgopala
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 

Similar to Black Belt Project on Increasing CSAT% (20)

CV_BIJU.A
CV_BIJU.ACV_BIJU.A
CV_BIJU.A
 
10 Questions To Ask When Evaluating IT Service Providers
10 Questions To Ask When Evaluating IT Service Providers10 Questions To Ask When Evaluating IT Service Providers
10 Questions To Ask When Evaluating IT Service Providers
 
10 Questions to Ask About IT Outsourcing
10 Questions to Ask About IT Outsourcing10 Questions to Ask About IT Outsourcing
10 Questions to Ask About IT Outsourcing
 
Project Samadhan_SOP V- 1.1
Project Samadhan_SOP V- 1.1Project Samadhan_SOP V- 1.1
Project Samadhan_SOP V- 1.1
 
The role of it leadership in service and support v2
The role of it leadership in service and support v2The role of it leadership in service and support v2
The role of it leadership in service and support v2
 
Measure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementMeasure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive Improvement
 
Managed Services Using SLAs and KPIs
Managed Services Using SLAs and KPIsManaged Services Using SLAs and KPIs
Managed Services Using SLAs and KPIs
 
Djana Kazic
Djana KazicDjana Kazic
Djana Kazic
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Taking Splunk to the Next Level - Management
Taking Splunk to the Next Level - ManagementTaking Splunk to the Next Level - Management
Taking Splunk to the Next Level - Management
 
Intalio growing-your-business-with-bpm-11 nov14
Intalio growing-your-business-with-bpm-11 nov14Intalio growing-your-business-with-bpm-11 nov14
Intalio growing-your-business-with-bpm-11 nov14
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 
Six sigma it_service_delivery
Six sigma it_service_deliverySix sigma it_service_delivery
Six sigma it_service_delivery
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
Padmanabhan Resume
Padmanabhan ResumePadmanabhan Resume
Padmanabhan Resume
 
Salesforce PPT.pptx
Salesforce PPT.pptxSalesforce PPT.pptx
Salesforce PPT.pptx
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
June2008 Hdi Quality Presentation
June2008   Hdi Quality PresentationJune2008   Hdi Quality Presentation
June2008 Hdi Quality Presentation
 

Black Belt Project on Increasing CSAT%

  • 1. Project Undertaken by: Sk. Noor Mohammad Trainer: Mr. Prabhas Surana Lean Six Sigma Black Belt Project Theme:- Increasing CSAT%
  • 2. Present Pain areas 2 • High customer dissatisfaction will result into customer churn. • Lack of satisfaction level will result into higher repeat calls and in turn will increase daily abandoned %age. Short Term • Incessant Higher customer dissatisfaction will ruin company’s brand image in front of client & other prospective customers. • Incessant Higher customer dissatisfaction may cause for loosing business in the long run. Long Term Define
  • 3. Project Charter 3 Business Case Digicon Technologies Ltd. is a leading BPO in BD. There is a process called Airtel Inbound among many other project which contributes to 80% of the total revenue. High customer dissatisfaction threatens to loose its business & brand image. There is an opportunity to reduce customer dissatisfaction % by using control factor, which would help the organization to achieve increased efficiency and competitiveness. Goal Statement To increase the Monthly CSAT% of the DTL Airtel Inbound process by up to 2% within 31st Aug’15 along with consistency. Opportunity Statement With the help of Customer dissatisfaction data for DTL, last 2 month’s defect % are 19% & 18% respectively. Which causes huge customer churn of Airtel BD and decreases client’s growth level as well. Check below CSAT% for last 2 months: Project Scope In Scope: All the CSE taking calls for DTL Airtel Process. Out of Scope: 1. CSE apart from DTL Airtel Inbound process. 2. CSE involved others apart from call taking responsibility. Month Satisfied Dissatisfied CSAT% April'15 36073 9346 79% May'15 34068 7832 81% Define
  • 4. Project Time Line 4 *** GANTT chart is being used to define the timeline of the project. Define Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Form Team Finalize Charter Training Gather Data Analyze Data Select Solutions Develop Implementation Plan Monitor Result Closure and Recognition May'15 June'15Activity Aug'15 July'15
  • 5. Targeted Benefits 5 Define  Ensuring Customer satisfaction.  Count of churn customer will be decreased.  Call volume will be increased ( Daily basis ).  Repeat %age will be decreased on daily basis.  Client satisfaction will be ensured.  service quality will be improved.  Company reputation will be increased.
  • 6. Definitions 6 Define Indicators Full Form Definition CSAT Customer Satisfaction Customer satisfaction is the measure of the overall satisfaction of the interaction or service. PFS Product Fact Sheets The detailed overview along with features of an entire product is described in this document which is provided by Airtel MIS Management Information System A Team dedicted to supoort Operations Team with data points on different KPIs KMT Knowledge Management Team A Team who deals with the know-how of all the products and also involved in cascading the information to the Floor agents CSR Customer Service Representatives One who is assigned to answer calls HRD Human Resource Department The Department who deals with the recruitment of the CSRs during requirement SOP Standard Operating Procedure The standard guideline which CSR needs to follow VOC Voice Of Customer Customer's opinion regarding Airtel product/process.
  • 7. Team Member A Approval of team decisions I.e., sponsor, business leader, MBB. R Resource to the team, one whose expertise, may be needed on an ad-hoc basis. M Member of team – whose expertise will be needed on a regular basis. I Interested party, one who will need to be kept informed on direction, findings. Key Stakeholders Define Measure Analyze Improve Contro l Sponsor Wahid Sharif I & A I I I I Project Leader Sk. Noor Mohammad R & A R & A R & A R & A I & A Team Member Md. Salauddin Ahmed M M M M M Team Member Mahmudul Hassan M M M M M Team Member Hafizur Rahman M M M M M Team Member Maruf Hossain M M M M M Team Member ASM Salahuddin M M M M M Communication Plan Information or Activity Target Audience Information channel Who When Project Status Leadership E-mails Sk. Noor Mohammad BI- Weekly Tollgate Review LSSBB E-mails / or meetings As per project plan Project activities Members E-mails / or meetings Weekly Define 7
  • 8. Increasing CSAT% Meet customer satisfaction on every call Increase day wise CSAT% The day wise CSAT% should be >=83% CTQs LSL = 80% USL = 85% Any day where in the FTD CSAT%<80% Project GOAL Definition Target LSL/USL Defect Definition CTQ Elements Define 8
  • 9. SIPOC Define 9 Supplier Input Process Output Customer Airtel Product Call Customer awareness & service End customer of Airtel HRD Customer Service Representatives Call handling Ensure customer satisfaction End customer of Airtel Airtel Standards scripts Start the call with the standard greeting Good customer experience End customer of Airtel Airtel SOPS Understand the query/request/complaint Provide resolution to customer's issue Quality(Digicon & Airtel)Team Airtel Process training Quality of the resolution Increase knowledge of agents Training & Quality Team Avaya Access to CRM and customer information Verify the customer identity Provide compact customer service End customer of Airtel Avaya Call recording Call monitoring Take preventive/corrective actions Quality(Digicon & Airtel)Team MIS Data points Data analysis Measuring agent's performance Operation & Quality Team Training Department Soft skill Training Provide quality service to all customer End customer of Airtel Quality Department Call audit Constant feedback/refresher Make customer satisfy by providing quality service Airtel Management
  • 10. Process Map (MACRO)-Flow Chart Define 10
  • 12. As-Is Process Map ( MICRO) Measure 12
  • 13. Data Collection Plan Measure LSL USL CSAT% Customer satisfaction is the measure of the overall satisfaction of the interaction or service. Day wise CSAT% going down under 80% 85% 80% 85% Day wise CSAT% OpportunityKPI Operational Definition Defect Definition Performance Standard Specification Limit KPI Data Type Data Items Needed Formula to be used Unit What database to be used to track the data? Is this existing database or new? If new, when the database will be ready to use? Sample Planning CSAT% Attribute Satisfaction count, Dissatisfaction count, Wrap Up contributor %age CSAT%=(Total Satisfied count/Total Reply)*100 Percent age MS Excel Existing NA Apr'15 to May'15 13
  • 14. Pareto Analysis Measure 14 Unorganized Conversation, Dead Air, Argument, Hurriedness & Unhelpful attitude are the Vital Xs which contributes to higher customer dissatisfaction and resulting into low CSAT of the entire process. ***The above data is derived out of 3252 sample audits of Quality Auditors.
  • 15. Sigma Calculation Measure 15 Total Opportunities 87319 Total Defects 17178 DPMO 196726.9 Sigma Level 2.35 We can see from the sigma calculation that the current process is running at a 2.35 sigma level, hence there is a scope of improvement in this process.
  • 17. Normality Test Analyze 17 As the P Value is >0.05, hence the data is normal and can be considered to go ahead and work on this specific project.
  • 18. Graphical Summary Analyze 18 As the P Value is >0.05, hence the data is normal and can be considered to go ahead and work on this specific project.
  • 19. Cause & Effect Analysis Analyze 19 Material MAN Rush to wrap-up the call Dominating nature Reuce AHT by escaping SOP Hurridness & interruption Avoiding tendency Willingness Machine Argument/ cunning attitude Dead air Inadequate pre shift briefing Not following SOP Inattentive on call System navigation issue Lack of communication skill (lack of fluency and pronunciation problem) Method Why CSAT% is low ? Poor Network coverage Lose the temper Unhelpful Attitude on hold Not puttingSystem navigation issue Less enthusiastic on call Unorganized Conversation Unorganized Knowledge drive Charging mechanism Application Down Lack of training absence of soft Too many system check required Lack of responsivenessLack of product knowledge Complicated PFS Complicated Product Call drop from conversation
  • 20. Vital Few Xs chosen for improvement Analyze 20 Impact CATEGORY HIGH MEDIUM LOW IN CONTROL 1. Lack of communication skill (lack of fluency and pronunciation problem) 2. System navigation issue 3. Inattentive on call 4. Not following SOP 1. Complicated PFS 5. Argument/ cunning attitude 2. Unorganized Knowledge drive 6. Hurridness & interruption 3. Inadequate pre shift briefing 7. Unhelpful Attitude 4. Absence of soft skill training 8. Less enthusiastic on call. 5. Charging mechanism 9. Lack of responsiveness 10.Lack of product knowledge 11.Willingness 12.Not putting on hold 13.Avoiding tendency OUT OF CONTROL 1. Call drop from conversation 1. Too many system checks required 2. Poor Network coverage 3. Application Down All the CSAT controllable parameters belong to the parameters of Call Quality  Vital few Xs chosen through controllable factors to prioritize the solutions based on the control and noise factors.
  • 22. Action Plan for Improvement Improve 22 Main Reason for low CSAT How to fix/steps to be taken for the failure points Quantified targets on the steps taken Sub activities on the steps taken One who would own the activities /KRA improvement and track them Date of Completion Done/WIP /Not done SOP of top 10 negetive response generators to be discussed with low CSAT producing agents. Calls will be monitored on a regular basis QA s need to discuss the top negative response contribution scenarios during every briefing sessions. Quality 5-May WIP Parameter wise TL wise scores to be shared with OPS by quality team & feedback to be shared on the same. Parameter wise dashboard to be published on a daily basis. Fatal reasons in Internal & External Audits to be regularly briefed among the agents by the QA s. MIS 2-May WIP Calls to be monitored on a daily basis by the QA's for their respective team. 5 calls/Day to be monitored & feedback to be shared. Monitoring calls from verint by the TL on daily basis. Feedback sharing signups to be maintained. Quality 7-May WIP Increase CSAT to be driven across the floor. Call quality to be tracked based on the internal audit observation & TL/AM/QA s to drive the same for their respective teams. Review to be done by the process head/week once the QMC scores come. Quality 7-May WIP Dead Air Long call drill down to be done in pick hours. 2 calls/QA to be audited for his respective team & dashboard to be published regarding the same. Most of the calls being monitored for the perticular query IDs for which the CSAT is low. Quality 3-May WIP Argument/Cunning Attitude Refresher training to be arranged on softskill. Post refresher efficacy to be mapped through 2 audits /agent by Trainers. The result of Internal audits are send to training team on a fortnight basis as TNI for refresher. Training 5-May WIP Hurriedness/Interruption Refresher session to be arranged on call courtesy by maintaining proper guideline. 2 calls/QA to be audited & dashboard to be published regarding the same. Training Team is taking refreshers. Training 10-May WIP Unhelpful Attitude Hygene audits to be done. Calls will be audited by QA/KMT/Trainer & dashboard to be published regarding the same. Providing feedback on a regular basis. Quality/Training/KMT 1-May WIP Unorganized Conversations
  • 23. Improved Process Flow Improve 23 VOC Tracker has been introduced to increase CSAT% for modification/change the product/process modalities. Introduced KAIZEN to satisfy the customer after providing service by prioritizing them before end of the call.
  • 24. Initiative : VOC Tracker Improve 24 CSRs are used to write VOCs here regarding product/process features. ** These VOCs help client to take decision to keep/change the product/process modalities. This practice increases CSAT% rather chances the customers into churn.
  • 26. CSAT Trend – Month Wise Control 26 79% 81% 82% 83% 84% 77% 78% 79% 80% 81% 82% 83% 84% April'15 May'15 June'15 July'15 Aug'15 CSAT Trend – Month Wise  Significant improvement observed in month wise CSAT trend.  By end of Aug’15, it has come up to 84% from 79%.
  • 27. Impact Analysis – CSAT Control 27  We identified total 25 agents whose CSAT were significantly low and below 76% CSAT score during Apr’15 & May’15.  All these agents have undergone refresher Trainings and the Quality auditors kept them under rigorous call monitoring to understand the implementation of learning through Refreshers.  We have seen 100% agents have improved and their average CSAT have come up to 82% from 75% which impacted a lot in the overall CSAT of the process. 72% 72% 73% 74% 74% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 76% 76% 76% 76% 77% 77% 77% 77% 81% 82% 89% 80% 81% 83% 79% 82% 88% 84% 78% 84% 80% 76% 81% 86% 81% 82% 82% 78% 91% 83% 82% 80% 78% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Pre-project score Post-project score Impact Analysis - Pre vs Post Refresher Training
  • 28. Impact Analysis – CQ Control 28 84% 79% 80% 82% 80% 82% 80% 76% 82% 83% 81% 79% 81% 80% 78% 83% 81% 82% 84% 81% 80% 80% 80% 80% 70% 79% 81% 85% 84% 84% 84% 84% 72% 80% 79% 85% 74% 80% 82% 83% 86% 83% 82% 83% 83% 82% 83% 80% 81% 85% % 10 % 20 % 30 % 40 % 50 % 60 % 70 % 80 % 90 % 100 % Pre-project score Post-project score Impact Analysis - Pre vs Post Refresher Training  We identified total of 25 agents whose Call Quality Scores were significantly below the target of 80%.  All these agents have undergone refresher Trainings and the Quality auditors kept them under rigorous call monitoring to understand the implementation of learning through Refreshers.  We have seen improvement in the agents and their average Call Quality scores have come up to 82% from 80% which impacted a lot in the overall CQ of the process.
  • 29. Sigma Calculation – Post Project Control 29 Total Opportunities 84381 Total Defects 14202 DPMO 168308 Sigma Level 2.46 The Process sigma level has increased from 2.35 to 2.46. Hence the process have improved.
  • 30. Process Capability – Post Project Control 30 Test of μ = 80.45 vs > 80.45 The assumed standard deviation = 0.01701 Variable N Mean StDev SE Mean 95% Lower Bound Z P CSAT 62 83.1934 1.5747 0.0022 83.1898 1269.93 0.000  As the P value is less than 0.05, hence here we can reject the null hypothesis.  So we can say that process i.e. CSAT has improved.
  • 31. Changes done in Action Plan Control 31 Main Reason for low CSAT How to fix/steps to be taken for the failure points Quantified targets on the steps taken Sub activities on the steps taken One who would own the activities /KRA improvement and track them Date of completion Done/WIP/ Not done SOP of top 10 negetive response generators to be discussed with low CSAT producing agents. Calls will be monitored on a regular basis QA s need to discuss the top negative response contribution scenarios during every briefing sessions. Quality 5-May Done Parameter wise TL wise scores to be shared with OPS by quality team & feedback to be shared on the same. Parameter wise dashboard to be published on a daily basis. Fatal reasons in Internal & External Audits to be regularly briefed among the agents by the QA s. MIS Ongoing Done Calls to be monitored on a daily basis by the QA's for their respective team. 5 calls/Day to be monitored & feedback to be shared. Monitoring calls from verint by the TL on daily basis. Feedback sharing signups to be maintained. Quality Ongoing Done Increase CSAT to be driven across the floor. Call quality to be tracked based on the internal audit observation & TL/AM/QA s to drive the same for their respective teams. Review to be done by the process head/week once the QMC scores come. Quality 7-May Done Dead Air Long call drill down to be done in pick hours. 2 calls/QA to be audited for his respective team & dashboard to be published regarding the same. Most of the calls being monitored for the perticular query IDs for which the CSAT is low. Quality Ongoing Done Argument/Cunning Attitude Refresher training to be arranged on softskill. Post refresher efficacy to be mapped through 2 audits /agent by Trainers. The result of Internal audits are send to training team on a fortnight basis as TNI for refresher. Training 5-May Done Hurriedness/Interruption Refresher session to be arranged on call courtesy by maintaining proper guideline. 2 calls/QA to be audited & dashboard to be published regarding the same. Training Team is taking refreshers. Training 10-May Done Unhelpful Attitude Hygene audits to be done. Calls will be audited by QA/KMT/Trainer & dashboard to be published regarding the same. Providing feedback on a regular basis. Quality/Training/KMT Ongoing Done Unorganized Conversations