The 1st exploratory test well Ankleshwar#1 was spudded
–in on 25th February 1960 with Russian rig URALMARSH-5D. The
first producing well of ONGC was christened as ‘VADODARA’ on
23rd June 1960.
Ankleshwar assets cover three district of Gujarat viz.
Baroda, Bharuch, & surat. The operational activities of asset are
spread over 5100sq.kms.
• Ankleshwar assets has 10 Drilling rigs.
• Ankleshwar assets has 15 work over rigs.
THERE ARE NUMBER OF DEPARTMENT AT
ANKLESHWAR ASSETS, THEY ARE
1) Administration
2) Drilling zone
3) Electrical dept.
4) Transportation dept.
5) Accounts
6) Civil dept.
7) Labour
8) Logging dept.
9) Planning dept.
EXPLORATION :
 In ordered to carry out the exploration in a new area
a set of activities to be done technically which are known as
the various stages in petroleum exploration.
THE DIFFERENT STAGE IN OIL/GAS EXPLORATION
AS FOLLOWS:
1) Pre study of prospecting area.
2) Propose mining right negotiation.
3) Acquisition of mining right.
4) Geological surveys, remote sensing.
5) Gravity, magnetic surveys.
6) Seismic surveys.
DRILLING TECHNOLOGY
o Rig – The drilling unit to drill a well called ‘RIG’.
 Drilling Rig – A drilling rig is a machine which
creates holes usually called bore holes in the
ground.
 Drilling rig can be massive structure housing
equipment used to drill water wells, oil wells or
natural gas extraction wells.
Based on the special requirement and
application, RIG may be classified as:-
1) ONSHORE RIG: Rigs are used for drilling on land.
These can be further sub-classified as:
 Mobile rigs
 Convectional rigs:
2)OFFSHORE RIG: rigs which are used for drilling in
water e.g. sea, lake, pound, river etc. These can be
subdivided as :
 Fixed platform
 Floating
PREPARING TO DRILL
Once the site has been selected, the crew goes
about preparing the land:
1) The land is cleared and levelled.
2) Access roads may be built.
3) Because water is used in drilling, there must be a
source of water nearby. If there is no natural source,
they drill a water well.
4) They dig a reserve pit, which is used to dispose of
rock cuttings and drilling mud during the drilling
process, and line it with plastic to protect the
environment.
SYSTEM OF AN OIL RIG
SYSTEM OF AN OIL RIG
1.MAST-it is a metal structure which support all rig equipment.
Height of mast is 52m,
2. Power system
 Large diesel engines - burn diesel-fuel oil to provide the
main source of power. It is directly connected to alternator
through coupling to generate electric power to operate rig..
 Specification
 Make- Cummins India limited, pune.
 Model no-KTA-50-G
 Power-1200HP at Speed of 1500rpm
 Idle speed- 1080-1120rpm
 Alternator-1430kva
3. HOISTING SYSTEM :
Hoisting is used to lifting heavy load of drill string
which consist of drill pipe, drill collar, Kelly, swivel
through out draw works & traveling block.
4. ROTATING EQUIPMENT :
• Rotary table : A rotary table is a mechanical device on
drilling rig that provides clockwise & anticlockwise
rotational force to the drill string.
• Drill Bit :The drill bit is located at bottom of the drill
string. It is used to backing up the rocks and sediment.
 There are two types of drill bit :
1.Poly Crystalline Diamond bit
size-17 ½”,12 ½”,8 ½”.
2. Diamond bit
5.CIRCULATION SYSTEM
Circulation system
Required to circulate drilling
Fluid at high pressure which consist of :
1. Mud pump
Maximum capacity : 3500 kg/cm².
2. Drill Pipe- O.D.- 0.386m, I.D.- 0.54m, Length – 9.2m.
6.Mud cleaning system- ingredient of drilling fluid is costly so that it is
reticulated in to the well.
There are three equipment used for cleaning
 Shale shaker
 Desander
 Desilter
PDC
IDP(INDUSTRY DEFINED PROBLEM)
In ONGC rig, there is needed of 1 crane to put pipe from
catwalk to pipe ramp. Also there is need of three operator to
perform the same operation, in which one operator is used to
operate the crane and two operators are used to hang the pipe
in travelling block of crane.
There is total cost of Rs 15,000/month for crane
maintenance and for worker salary.
There is already an air compressor at rig, which is
used to operate “Diesel engine air starter motor” and
to operate “Pneumatic crane” for hanging the pipe on
derrick .
61904252-ONGC-ANKLESHWAR-ASSET.pptx

More Related Content

What's hot

Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraAbhishant Baishya
 
Indian oil corporation barauni refinery
Indian oil corporation barauni refineryIndian oil corporation barauni refinery
Indian oil corporation barauni refineryRajeev Kumar
 
coal mining training report
coal mining training report coal mining training report
coal mining training report VIKRAMSINGH1231
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbUpal Jb
 
Summer training report
Summer training reportSummer training report
Summer training reportAayushi Lal
 
Iocl training report
Iocl training reportIocl training report
Iocl training reportAmitgomey
 
Hiren ongc report
Hiren ongc reportHiren ongc report
Hiren ongc reportHiren Patel
 
FINAL REPORT OF ONGC
FINAL REPORT OF ONGCFINAL REPORT OF ONGC
FINAL REPORT OF ONGCBIDHAN DAS
 
Internship Report_Arpan Saxena
Internship Report_Arpan SaxenaInternship Report_Arpan Saxena
Internship Report_Arpan SaxenaArpan Saxena
 
Ongc internship shivanshu
Ongc internship shivanshuOngc internship shivanshu
Ongc internship shivanshushivanshu suraj
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...LalitGoyal27
 
Summer Training Report at IOCL (chemical engineering)
Summer Training Report at IOCL (chemical engineering)Summer Training Report at IOCL (chemical engineering)
Summer Training Report at IOCL (chemical engineering)Gaurav Singh
 

What's hot (20)

Jaipur Fire
Jaipur FireJaipur Fire
Jaipur Fire
 
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
 
Indian oil corporation barauni refinery
Indian oil corporation barauni refineryIndian oil corporation barauni refinery
Indian oil corporation barauni refinery
 
coal mining training report
coal mining training report coal mining training report
coal mining training report
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jb
 
Ongc report
Ongc reportOngc report
Ongc report
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Opencast mining machineries
Opencast mining machineriesOpencast mining machineries
Opencast mining machineries
 
Iocl training report
Iocl training reportIocl training report
Iocl training report
 
IOC jaipur
IOC jaipurIOC jaipur
IOC jaipur
 
Hiren ongc report
Hiren ongc reportHiren ongc report
Hiren ongc report
 
FINAL REPORT OF ONGC
FINAL REPORT OF ONGCFINAL REPORT OF ONGC
FINAL REPORT OF ONGC
 
Internship Report_Arpan Saxena
Internship Report_Arpan SaxenaInternship Report_Arpan Saxena
Internship Report_Arpan Saxena
 
DIGBOI Rajan
DIGBOI RajanDIGBOI Rajan
DIGBOI Rajan
 
Ongc internship shivanshu
Ongc internship shivanshuOngc internship shivanshu
Ongc internship shivanshu
 
Presentation on ONGC
Presentation on ONGCPresentation on ONGC
Presentation on ONGC
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...
 
ONGC final ppt
ONGC final pptONGC final ppt
ONGC final ppt
 
ongc report
ongc reportongc report
ongc report
 
Summer Training Report at IOCL (chemical engineering)
Summer Training Report at IOCL (chemical engineering)Summer Training Report at IOCL (chemical engineering)
Summer Training Report at IOCL (chemical engineering)
 

Similar to 61904252-ONGC-ANKLESHWAR-ASSET.pptx

National mineral development corporation
National mineral development corporationNational mineral development corporation
National mineral development corporationPranjal Sao
 
National Mineral Development Corporation
National Mineral Development CorporationNational Mineral Development Corporation
National Mineral Development CorporationPranjal Sao
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningJasmeet Singh Saluja
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & IndiaVR M
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPPSaad Raja
 
Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
Offshore drilling and production equipment (1)
 Offshore drilling and production equipment (1) Offshore drilling and production equipment (1)
Offshore drilling and production equipment (1)nhuvangiap
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuVishweshwar Rao Narla
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggersEjaz Bhatti
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual meansSafdar Ali
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating EquipmentKiran Goswami
 

Similar to 61904252-ONGC-ANKLESHWAR-ASSET.pptx (20)

National mineral development corporation
National mineral development corporationNational mineral development corporation
National mineral development corporation
 
National Mineral Development Corporation
National Mineral Development CorporationNational Mineral Development Corporation
National Mineral Development Corporation
 
Summer training
Summer trainingSummer training
Summer training
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Machineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining studentsMachineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining students
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
Offshore drilling and production equipment (1)
 Offshore drilling and production equipment (1) Offshore drilling and production equipment (1)
Offshore drilling and production equipment (1)
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual means
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Mahadevpuri ug mine
Mahadevpuri ug mineMahadevpuri ug mine
Mahadevpuri ug mine
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

61904252-ONGC-ANKLESHWAR-ASSET.pptx

  • 1. TITLE OF I.D.P. System improvement of drilling RIG.
  • 3. ONGC ANKLESHWAR ASSET The 1st exploratory test well Ankleshwar#1 was spudded –in on 25th February 1960 with Russian rig URALMARSH-5D. The first producing well of ONGC was christened as ‘VADODARA’ on 23rd June 1960. Ankleshwar assets cover three district of Gujarat viz. Baroda, Bharuch, & surat. The operational activities of asset are spread over 5100sq.kms. • Ankleshwar assets has 10 Drilling rigs. • Ankleshwar assets has 15 work over rigs.
  • 4. THERE ARE NUMBER OF DEPARTMENT AT ANKLESHWAR ASSETS, THEY ARE 1) Administration 2) Drilling zone 3) Electrical dept. 4) Transportation dept. 5) Accounts 6) Civil dept. 7) Labour 8) Logging dept. 9) Planning dept.
  • 5. EXPLORATION :  In ordered to carry out the exploration in a new area a set of activities to be done technically which are known as the various stages in petroleum exploration. THE DIFFERENT STAGE IN OIL/GAS EXPLORATION AS FOLLOWS: 1) Pre study of prospecting area. 2) Propose mining right negotiation. 3) Acquisition of mining right. 4) Geological surveys, remote sensing. 5) Gravity, magnetic surveys. 6) Seismic surveys.
  • 6. DRILLING TECHNOLOGY o Rig – The drilling unit to drill a well called ‘RIG’.
  • 7.  Drilling Rig – A drilling rig is a machine which creates holes usually called bore holes in the ground.  Drilling rig can be massive structure housing equipment used to drill water wells, oil wells or natural gas extraction wells.
  • 8. Based on the special requirement and application, RIG may be classified as:- 1) ONSHORE RIG: Rigs are used for drilling on land. These can be further sub-classified as:  Mobile rigs  Convectional rigs: 2)OFFSHORE RIG: rigs which are used for drilling in water e.g. sea, lake, pound, river etc. These can be subdivided as :  Fixed platform  Floating
  • 9. PREPARING TO DRILL Once the site has been selected, the crew goes about preparing the land: 1) The land is cleared and levelled. 2) Access roads may be built. 3) Because water is used in drilling, there must be a source of water nearby. If there is no natural source, they drill a water well. 4) They dig a reserve pit, which is used to dispose of rock cuttings and drilling mud during the drilling process, and line it with plastic to protect the environment.
  • 10. SYSTEM OF AN OIL RIG
  • 11. SYSTEM OF AN OIL RIG 1.MAST-it is a metal structure which support all rig equipment. Height of mast is 52m, 2. Power system  Large diesel engines - burn diesel-fuel oil to provide the main source of power. It is directly connected to alternator through coupling to generate electric power to operate rig..  Specification  Make- Cummins India limited, pune.  Model no-KTA-50-G  Power-1200HP at Speed of 1500rpm  Idle speed- 1080-1120rpm  Alternator-1430kva
  • 12. 3. HOISTING SYSTEM : Hoisting is used to lifting heavy load of drill string which consist of drill pipe, drill collar, Kelly, swivel through out draw works & traveling block. 4. ROTATING EQUIPMENT : • Rotary table : A rotary table is a mechanical device on drilling rig that provides clockwise & anticlockwise rotational force to the drill string. • Drill Bit :The drill bit is located at bottom of the drill string. It is used to backing up the rocks and sediment.
  • 13.  There are two types of drill bit : 1.Poly Crystalline Diamond bit size-17 ½”,12 ½”,8 ½”. 2. Diamond bit 5.CIRCULATION SYSTEM Circulation system Required to circulate drilling Fluid at high pressure which consist of : 1. Mud pump Maximum capacity : 3500 kg/cm². 2. Drill Pipe- O.D.- 0.386m, I.D.- 0.54m, Length – 9.2m. 6.Mud cleaning system- ingredient of drilling fluid is costly so that it is reticulated in to the well. There are three equipment used for cleaning  Shale shaker  Desander  Desilter PDC
  • 14. IDP(INDUSTRY DEFINED PROBLEM) In ONGC rig, there is needed of 1 crane to put pipe from catwalk to pipe ramp. Also there is need of three operator to perform the same operation, in which one operator is used to operate the crane and two operators are used to hang the pipe in travelling block of crane.
  • 15. There is total cost of Rs 15,000/month for crane maintenance and for worker salary. There is already an air compressor at rig, which is used to operate “Diesel engine air starter motor” and to operate “Pneumatic crane” for hanging the pipe on derrick .