Submit Search
Upload
Suburban Steel Maintenance Building
•
0 likes
•
527 views
T
TylerShisler
Follow
This is the Excel File for the Suburban Steel Maintenance Building Estimating Project.
Read less
Read more
Education
Business
Report
Share
Report
Share
1 of 12
Download now
Download to read offline
Recommended
Csm 3450 final project (by division)
Csm 3450 final project (by division)
TylerShisler
Maths A - Skill sheets answers
Maths A - Skill sheets answers
westy67968
New holland 5635 tractor service repair manual
New holland 5635 tractor service repair manual
udfjjsekkemm
Who Wants To Be Millionaire Digiacomo David
Who Wants To Be Millionaire Digiacomo David
digiacomodj
Cedula de tuberias
Cedula de tuberias
Rolando Nuñez
Drip irrigation
Drip irrigation
charishma .v
Team dcsmat drip irrigation
Team dcsmat drip irrigation
Aravind Rajan
Superior Building Maintenance Services
Superior Building Maintenance Services
adornajames
Recommended
Csm 3450 final project (by division)
Csm 3450 final project (by division)
TylerShisler
Maths A - Skill sheets answers
Maths A - Skill sheets answers
westy67968
New holland 5635 tractor service repair manual
New holland 5635 tractor service repair manual
udfjjsekkemm
Who Wants To Be Millionaire Digiacomo David
Who Wants To Be Millionaire Digiacomo David
digiacomodj
Cedula de tuberias
Cedula de tuberias
Rolando Nuñez
Drip irrigation
Drip irrigation
charishma .v
Team dcsmat drip irrigation
Team dcsmat drip irrigation
Aravind Rajan
Superior Building Maintenance Services
Superior Building Maintenance Services
adornajames
Construction Estimating Final Project
Construction Estimating Final Project
Joshua Shoemaker
Rb
Rb
jbgaiennie
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
Community Development Department-Glendale, CA
Butler 4.26.12
Butler 4.26.12
visionstreetresearch
pinewood-baseball-2007
pinewood-baseball-2007
David Stegmiller
Electronics recycling market update
Electronics recycling market update
MassRecycle .
Southdowns Baton Rouge Home Sales Prices 2009-2018
Southdowns Baton Rouge Home Sales Prices 2009-2018
Bill Cobb, Appraiser
Resumen economico cig_20140331
Resumen economico cig_20140331
Condominio Los Inkas Golf
Blue Chip Stock Club
Blue Chip Stock Club
Chucky135
Blue Chip Stock Club
Blue Chip Stock Club
Chucky135
Pass Thru Pay
Pass Thru Pay
Jeremy Carrigg
Blue Chip
Blue Chip
RAMZI1121
Blue Chip Stock
Blue Chip Stock
Dana Coffield
10.3 2016 investor presentation pea
10.3 2016 investor presentation pea
FalcoCorporate
Shelby 4.26.12
Shelby 4.26.12
visionstreetresearch
Blue Chip Stock Club
Blue Chip Stock Club
gabriellejubray
Blue Chip Stock Club
Blue Chip Stock Club
ekv996
bebobinder
bebobinder
jason fort
Blue Chip Stock Club
Blue Chip Stock Club
Simon Lichter
Resumen economico cig_20140721
Resumen economico cig_20140721
Condominio Los Inkas Golf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
SoniaTolstoy
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
Chameera Dedduwage
More Related Content
Similar to Suburban Steel Maintenance Building
Construction Estimating Final Project
Construction Estimating Final Project
Joshua Shoemaker
Rb
Rb
jbgaiennie
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
Community Development Department-Glendale, CA
Butler 4.26.12
Butler 4.26.12
visionstreetresearch
pinewood-baseball-2007
pinewood-baseball-2007
David Stegmiller
Electronics recycling market update
Electronics recycling market update
MassRecycle .
Southdowns Baton Rouge Home Sales Prices 2009-2018
Southdowns Baton Rouge Home Sales Prices 2009-2018
Bill Cobb, Appraiser
Resumen economico cig_20140331
Resumen economico cig_20140331
Condominio Los Inkas Golf
Blue Chip Stock Club
Blue Chip Stock Club
Chucky135
Blue Chip Stock Club
Blue Chip Stock Club
Chucky135
Pass Thru Pay
Pass Thru Pay
Jeremy Carrigg
Blue Chip
Blue Chip
RAMZI1121
Blue Chip Stock
Blue Chip Stock
Dana Coffield
10.3 2016 investor presentation pea
10.3 2016 investor presentation pea
FalcoCorporate
Shelby 4.26.12
Shelby 4.26.12
visionstreetresearch
Blue Chip Stock Club
Blue Chip Stock Club
gabriellejubray
Blue Chip Stock Club
Blue Chip Stock Club
ekv996
bebobinder
bebobinder
jason fort
Blue Chip Stock Club
Blue Chip Stock Club
Simon Lichter
Resumen economico cig_20140721
Resumen economico cig_20140721
Condominio Los Inkas Golf
Similar to Suburban Steel Maintenance Building
(20)
Construction Estimating Final Project
Construction Estimating Final Project
Rb
Rb
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
Butler 4.26.12
Butler 4.26.12
pinewood-baseball-2007
pinewood-baseball-2007
Electronics recycling market update
Electronics recycling market update
Southdowns Baton Rouge Home Sales Prices 2009-2018
Southdowns Baton Rouge Home Sales Prices 2009-2018
Resumen economico cig_20140331
Resumen economico cig_20140331
Blue Chip Stock Club
Blue Chip Stock Club
Blue Chip Stock Club
Blue Chip Stock Club
Pass Thru Pay
Pass Thru Pay
Blue Chip
Blue Chip
Blue Chip Stock
Blue Chip Stock
10.3 2016 investor presentation pea
10.3 2016 investor presentation pea
Shelby 4.26.12
Shelby 4.26.12
Blue Chip Stock Club
Blue Chip Stock Club
Blue Chip Stock Club
Blue Chip Stock Club
bebobinder
bebobinder
Blue Chip Stock Club
Blue Chip Stock Club
Resumen economico cig_20140721
Resumen economico cig_20140721
Recently uploaded
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
SoniaTolstoy
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
Chameera Dedduwage
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
VS Mahajan Coaching Centre
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
Mahmoud M. Sallam
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
eniolaolutunde
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
UnboundStockton
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
thorishapillay1
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology ( Production , Purification , and Application )
Sakshi Ghasle
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
OH TEIK BIN
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Sarwono Sutikno, Dr.Eng.,CISA,CISSP,CISM,CSX-F
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Celine George
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
NirmalaLoungPoorunde1
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
Marc Dusseiller Dusjagr
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
JericReyAuditor
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
unnathinaik
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
Virag Sontakke
Recently uploaded
(20)
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology ( Production , Purification , and Application )
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
Suburban Steel Maintenance Building
1.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Tim Beverage Tyler Shisler Garrett Goebel Division Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Division 10 Division 11 Division 12 Division 13 Division 14 Division 21 Division 22 Division 23 Division 26 Division 27 Division 28 Division 31 Division 32 Division 33 Division 34 Total Estimated Value: Lab: 9:10 AM Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Estimated Value % of Total Cost $4,557.57 $0.00 $195,936.25 $4,908.00 $107,594.78 $2,983.46 $24,398.31 $44,338.42 $8,915.40 $970.90 $3,020.00 $0.00 $0.00 $0.00 $0.00 $48,877.46 $15,607.40 $54,779.45 $0.00 $0.00 $30,688.63 $60,325.83 $1,597.94 $38,019.00 $647,518.79 0.70% 0.00% 30.26% 0.76% 16.62% 0.46% 3.77% 6.85% 1.38% 0.15% 0.47% 0.00% 0.00% 0.00% 0.00% 7.55% 2.41% 8.46% 0.00% 0.00% 4.74% 9.32% 0.25% 5.87% 100.00% 12/5/2012
2.
3.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Masonry Scaffold Brick Washing Grouted Cores Split Face CMU8x8x16 Grout for Bond Beam Reinforcing Bond Beam Opening Lintels Vert Dowels #5 Paint (primer) Paint (final) Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 01 54 23.70 0090 04 01 30 20 0400 04 05 16.30 0250 19.09 8165 1066.67 CSF SF Sf $0.00 $0.00 $1.09 $132.00 $0.56 $1.88 $0.00 $0.13 $0.19 $132.00 $0.69 $3.16 $2,519.88 $5,633.85 $3,370.68 04 22 10.23 6200 8165 SF $4.22 $5.45 $0.00 $9.67 $78,955.55 04 05 16.30 0020 04 05 19.26 0060 04 22 10.16 0130 04 22 10.32 0400 04 05 19.26 0060 09 91 23.72 2180 09 91 23.72 2480 645.333 2133.98 645.333 116 269.094 7500 7500 LF lbs LF LF lbs SF SF $0.99 $0.49 $2.52 $3.38 $0.49 0.09 0.07 $0.91 $0.54 $2.88 $4.66 $0.54 0.13 0.13 $0.09 $0.00 $0.00 $0.46 $0.00 0 0 $1.99 $1.03 $5.40 $8.50 $1.03 0.22 0.2 $1,284.21 $2,198.00 $3,484.80 $986.00 $277.17 1650 1500 $40,653.68 $59,830.90 $1,375.56 $101,860.13
4.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 01 54 33.40 6410 01 52 13.20 0550 01 74 13.20 0050 Item/ Task Chemical Toilet Job Trailer Jobsite Cleanup 8 8 6.4885 Months Months M.S.F. $0.00 $0.00 $1.75 $0.00 $0.00 $26.50 $0.00 $0.00 $2.20 $180.00 $365.00 $30.45 $1,440.00 $2,920.00 $197.57 Total $11.35 $171.95 $14.27 $4,557.57 0.70% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Pre-cast Wall 8" Footings A Footing B Footing D Column Footing A Column Footing B Concrete Floors (MAT) Concrete Floors (LBR) Slab 6" x 6" WWM W2.9 8" Heavy Duty Concrete Pavement 6" x 6" WWM W4 Concrete Elasomer Sealant Control Joint, Saw Cut Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 03 46 13.50 0100 03 30 53.40 3933 03 30 53.40 3932 03 30 53.40 3932 03 30 53.40 3545 03 30 53.40 3555 03 31 05.35 0300 03 31 05.70 4300 03 22 05.50 0300 0.00 0.00 0.00 0.00 2.00 2.00 116.39 116.39 62.85 788.47 SF SF SF SF EA. EA. CY CY CSF SF $0.00 $137.00 $136.00 $136.00 $88.00 $132.00 $103.00 $0.00 $24.00 $2.70 $0.00 $118.00 $116.00 $116.00 $93.00 $139.00 $0.00 $16.00 $27.00 $0.95 $0.00 $0.67 $0.67 $0.67 $1.22 $1.82 $0.00 $0.50 $0.00 $0.01 $11.00 $11.00 $252.67 $252.67 $182.22 $272.82 $103.00 $16.50 $51.00 $3.66 $0.00 $0.00 $0.00 $0.00 $364.44 $545.64 $11,988.06 $1,920.42 $3,205.35 $2,885.80 7.88 CSF 6.31 GAL $33.00 $58.50 $29.00 $0.00 $0.00 $0.00 $62.00 $58.50 $488.85 $369.00 350 LF $0.05 $0.38 $0.08 $58.96 $408.96 $16,712.02 $5,133.88 $100.16 03 30 53.40 5020 03 22 05.50 0400 03 05 13.20 1600 03 35 29.35 0140 $22,176.52 30.26%
5.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 04 72 10.10 0800 Item/ Task Parapit Coping 240 LF $12.50 $7.95 $0.00 $20.45 $4,908.00 Total $3,000.00 $1,908.00 $0.00 $4,908.00 0.76% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task CL A1 6x6x1/4 BP 3/4x12x12 CL B1, D1 6x6x1/4 BP 3/4x14x14 CL C1 12x12x1/2 BP 3/4x 18x18 Anchor Bolts Beam W8 x 15 Joist 20K 3 Joist 22K6 Joist 22K11 Joist W21 x 44 Joist W12x 26 Joist W12x16 1 1/2" 20g Deck Painted 1 1/2" 20 Ga. Galv Deck 3" 20 Ga. Galv. Canopy L 6"x6"x 5/16" Vertical Metal Ladder CONNECTIONS Platform Grating 4"x6" angle 1/4" Vert Tube Supports Connections for Platform Canopy Decking Roof Decking Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 05 12 23.17 4550 05 12 23.77 4400 05 12 23.17 4550 05 12 23.77 4400 05 12 23.17 4750 05 12 23.77 4400 05 05 23.05 1120 05 12 23.75 0320 05 21 19.10 0210 05 21 19.10 0550 05 21 19.10 0570 05 12 23.75 4100 05 12 23.75 1500 05 12 23.75 1100 05 31 23.50 2650 05 31 23.50 2650 05 31 23.50 3300 05 12 23.65 0200 05 51 33.13 0100 See Calculations 05 53 13.10 0136 05 12 23.65 0100 05 12 23.17 4500 05 31 23.50 3300 05 31 23.50 2600 1.66666 2.55 3.33332 41.65 1.25 68.4 3 600 312 340 68 52 108 126.00 5189.0552 959.7778 1656.667 331.3334 20 305.06054 14.3054 9 1739.5 6488.5 EA LB EA LB EA LB SET LF LF LF LF LF LF LF SF SF SF LF V.L.F SF SF EA SF SF $206.00 $1.44 $206.00 $1.44 $1,450.00 $1.44 $10.10 $20.50 $5.15 $7.15 $9.35 $60.50 $36.00 $22.00 $1.56 $1.64 $2.78 $15.75 $36.00 45.5 $12.75 206 2.78 1.95 $46.50 $0.36 $46.50 $0.36 $58.00 $0.36 $19.60 $4.50 $2.17 $1.95 $1.95 $3.67 $3.07 $3.07 $0.38 $0.38 $0.47 $0.00 $18.75 $1.60 $0.00 $46.50 $0.47 0.41 $26.00 $0.20 $26.00 $0.20 $34.00 $0.20 $0.00 $2.49 $0.97 $0.87 $0.87 $1.52 $1.70 $1.70 $0.03 $0.03 $0.04 $0.00 $1.43 $0.12 $0.00 $26.00 $0.04 0.03 $278.50 $2.00 $278.50 $2.00 $1,542.00 $2.00 $29.70 $27.49 $10.84 $9.97 $12.17 $65.69 $40.77 $26.77 $1.97 $2.05 $3.29 $15.75 $56.18 $47.22 $12.75 $278.50 $3.29 2.39 $464.16 $5.10 $281.83 $83.30 $1,927.50 $136.80 $89.10 $16,494.00 $3,382.15 $3,389.80 $827.56 $3,415.88 $4,403.16 $3,373.02 $10,212.06 $1,967.54 $5,450.43 $5,218.50 $1,123.60 $0.00 $14,404.96 $182.39 $2,506.50 $3,009.73 $5,722.96 $15,507.52 $83,422.19 $13,360.83 $3,637.63 $103,579.56 16.62%
6.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Parapit Blocking (Top) 2"x8" Roof Perimeter Blocking Qty Unit Mat. $ 06 11 10.38 0120 3.20 BF $660.00 $0.00 $0.00 $660.00 $2,113.46 06 11 10.01 2625 0.4 MBF $500.00 $1,675.00 $0.00 $2,175.00 $870.00 $2,313.46 $670.00 $0.00 Total Labor $ Equip. $ Total $ Ext. $ $2,983.46 0.46% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Slab Vapor barrier Office Ceiling Sound Attenuation Slab/Foooting Insulation Gutter 6" 28 Ga Down Spout 3" 28 Ga 2' 6" x 3' Roof Hatch 3" poly ridgid insulation Roof Membrane 60 mil Total Qty Unit Mat. $ 07 26 10.10 0900 62.85 SQ $4.54 $9.55 $0.00 $14.09 $885.56 07 21 16.20 0020 489 SF $0.26 $0.26 $0.00 $0.52 $254.28 07 21 13.10 0080 07 71 23.10 2800 07 71 23.10 5700 07 72 33.10 0520 07 22 16.10 1745 07 54 19.10 8890 0.00 83.5 21 1 6445 64.45 SF LF LF EA SF SQ $0.41 $2.88 $1.28 $640.00 $1.23 $127.00 $0.35 $3.48 $2.20 $140.00 $0.30 $52.50 $0.00 $0.00 $0.00 $0.00 $0.00 $6.90 $0.76 $6.36 $3.48 $780.00 $1.53 $186.40 $0.00 $531.06 $73.08 $780.00 $9,860.85 $12,013.48 Labor $ Equip. $ Total $ $17,432.34 $6,521.26 $444.71 Ext. $ $24,398.31 3.77%
7.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task DOORS Door type C 8'x12' Door type C 16'x12' Overhead door insulation Door type A 3'x7' frame Door type A 3'-6"x7' frame Door type A 2'-6"x7' frame Door type A 2'-6"x7' Door type A 3'x7' Door type A 3'-6"x7' Door type B Door type B Window Frame 3/8" Tempered Glass Electronic Trolly Hardware Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 08 36 13.10 2625 08 36 13.10 2750 08 36 13.10 2860 08 12 13.13 0100 08 12 13.13 0110 08 12 13.13 1180 08 13 13.13 0620 08 13 13.13 0640 08 13 13.13 0660 08 13 13.13 1212 08 12 13.13 0100 08 12 13.31 1200 08 81 10.10 1800 08 36 13.10 2950 See Calculations 1. 6. 1,248. 7. 1. 1. 1. 7. 1. 1. 1. 31.4 37.5 7 - EA EA SF EA EA EA EA EA EA EA EA LF SF EA - $1,008.00 $1,699.00 $4.50 $148.00 $155.00 $199.00 $435.00 $435.00 $630.00 $528.00 $148.00 $11.71 $15.85 $1,075.00 - $340.80 $626.67 $0.00 $44.00 $44.00 $44.00 $41.50 $41.50 $47.00 $41.50 $44.00 $2.59 $9.10 $355.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $1,348.80 $2,325.67 $4.50 $192.00 $199.00 $243.00 $476.50 $476.50 $677.00 $569.50 $192.00 $14.30 $24.95 $1,430.00 - $1,348.80 $13,954.02 $5,616.00 $1,344.00 $199.00 $243.00 $476.50 $3,335.50 $677.00 $569.50 $192.00 $449.02 $935.63 $10,010.00 $4,988.45 $7,868.90 $0.00 Total $31,481.07 $44,338.42 6.85% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task 4" Gypsum Board Wall 6" Gypsum Board Wall 6" Metal Studs 3 5/8" Metal Studs VCT Tile Bathroom Wall Tile Bathroom Floor Tile Drop Ceiling Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 09 21 16.33 3800 09 21 16.33 4000 09 21 16.33 4000 09 21 16.33 3800 09 65 19.10 7000 09 30 13.10 0020 09 30 13.10 3283 09 51 23.10 1110 1,234.3630769 115.992 80 404 221.765 235 55 275 SF SF SF SF SF SF SF SF $0.96 $1.14 $1.14 $0.96 $0.94 $2.42 $6.20 $0.75 $2.08 $2.21 $2.21 $2.08 $65.00 $6.50 $2.33 $0.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.04 $3.35 $3.35 $3.04 $1.59 $8.92 $8.53 $1.31 $3,752.46 $388.57 $268.00 $1,228.16 $352.61 $2,096.20 $469.15 $360.25 $3,120.67 $20,065.31 $0.00 $8,915.40 1.38%
8.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task TP Dispenser SS Grab Bar 42" Seat Cover Dispenser SS Grab Bar 36" Hand Soap Dispenser 24" x 36" Mirror Fire Extinguishers Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 10 28 13.13 6100 10 28 13.13 1105 10 28 13.13 6000 10 28 13.13 1100 10 28 13.13 4600 10 28 13.13 3100 10 44 16.13 2100 1 1 1 1 1 1 6 E.A. E.A. E.A. E.A. E.A. E.A. E.A. $17.05 $37.50 $158.00 $37.00 $42.00 $96.50 $79.50 $11.75 $17.65 $17.65 $17.65 $17.65 $23.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28.80 $55.15 $175.65 $54.65 $59.65 $120.00 $79.50 $28.80 $55.15 $175.65 $54.65 $59.65 $120.00 $477.00 $865.05 $105.85 $0.00 Total $970.90 0.15% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Air Compressor 5HP Total Qty Unit Mat. $ Labor $ Equip. $ 11 11 13.10 0600 1 E.A. $2,025.00 $995.00 $0.00 $3,020.00 $3,020.00 $2,025.00 $995.00 $0.00 $3,020.00 0.47% Total $ Ext. $
9.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task 4" Sanitary Line 3" Sanitary Line 2" Sanitary Line 1 1/2" Sanitary Line Trench Drain Sump Pump Hot water Tank Water Cooler Water Closet Sink Sink Hookup Vent Flashing and Caps Backflow Preventer Water Meter 100gpm Oil Interceptor Hot Water Copper Tubing .5" Cold Water Copper Tubing 1" Cold Water Copper Tubing .75" Air Line Copper .75" Air Line Copper 1" Air Line Copper 1.25" Air Line Copper 2" Air Line Copper .5" Total Qty Unit Mat. $ Labor $ 22 11 13.74 4480 22 11 13.74 4470 22 11 13.74 4460 22 11 13.74 4420 22 14 26.19 6770 22 14 29.13 0800 22 34 30.13 2100 22 47 16.10 4640 22 42 13.40 3360 22 41 16.10 4180 22 41 16.10 6960 22 13 16.80 1450 22 11 19.42 4140 22 11 19.38 2100 22 13 23.10 4220 22 11 13.23 2140 22 11 13.23 2200 22 11 13.23 2180 22 11 13.23 2180 22 11 13.23 2200 22 11 13.23 2220 22 11 13.23 2260 22 11 13.23 2140 183.15 108.9 68.0163 40.7 106 1 1 1 1 1 1 3 1 1 1 22.5 32 41.75 45.5 25 50 25 20 L.F. L.F. L.F. L.F. LF EA EA EA EA EA EA EA EA EA EA LF LF LF LF LF LF LF LF $8.30 $6.15 $3.46 $3.01 $154.00 $156.00 $1,225.00 $620.00 $505.00 $355.00 $480.00 $24.50 $455.00 $127.00 $12,500.00 $4.73 $10.84 $7.26 $7.26 $10.84 $14.80 $29.70 $4.73 $16.40 $14.85 $13.35 $12.15 $9.85 $87.50 $291.00 $147.00 $136.00 $98.50 $475.00 $25.50 $31.00 $36.50 $395.00 $5.40 $6.40 $5.75 $5.75 $6.40 $7.55 $10.40 $5.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $38,302.53 $10,574.94 $0.00 Equip. $ Total $ $24.70 $21.00 $16.81 $15.16 $163.85 $243.50 $1,516.00 $767.00 $641.00 $453.50 $955.00 $50.00 $486.00 $163.50 $12,895.00 $10.13 $17.24 $13.01 $13.01 $17.24 $22.35 $40.10 $10.13 Ext. $ $4,523.81 $2,286.90 $1,143.35 $617.01 $17,368.10 $243.50 $1,516.00 $767.00 $641.00 $453.50 $955.00 $150.00 $486.00 $163.50 $12,895.00 $227.93 $551.52 $543.17 $591.96 $430.88 $1,117.25 $1,002.50 $202.60 $48,877.46 7.55%
10.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Total Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 68 1 1 1 1 1 2 67 10 9 34 8 5 21 4 1 4 5 6 13 FT E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. $0.44 $1,375.00 $4,175.00 $2,225.00 $1,175.00 $185.00 $119.00 $36.00 $38.00 $72.50 $36.50 $124.00 $128.00 $236.00 $236.00 $106.00 $110.00 $221.00 406.75 $67.00 $0.69 $1,225.00 $1,475.00 $825.00 $129.00 $59.00 $51.50 $37.50 $72.00 $87.50 $77.50 $103.00 $93.50 $61.50 $61.50 $75.00 $103.00 $103.00 103 $72.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $1.13 $2,600.00 $5,650.00 $3,050.00 $1,304.00 $244.00 $170.50 $73.50 $110.00 $160.00 $114.00 $227.00 $221.50 $297.50 $297.50 $181.00 $213.00 $324.00 509.75 $139.50 $76.57 $2,600.00 $5,650.00 $3,050.00 $1,304.00 $244.00 $341.00 $4,924.50 $1,100.00 $1,440.00 $3,876.00 $1,816.00 $1,107.50 $6,247.50 $1,190.00 $181.00 $852.00 $1,620.00 $3,058.50 $1,813.50 26 05 90.10 2131 26 05 90.10 4031 26 05 90.10 4331 Thermostat Hookup MPP Circuit Panel MPL Circuit Panel MDP-M Switchboard Circuit Breaker 200 Amp Circuit Breaker 70-100 Amp Circuit Breaker 15-60 Amp Lighting Fixture Box Single Pole Switch GFCI Recepticle Duplex Recepticle Emergency Light Exit Light Light Type A Light Type B Light Type E Light Type H Light Type J Light Type W1 Light Type K Home runs Switch Duplex Recepticle GFCI Recepticle Qty 26 05 90.10 9521 26 24 16.30 1000 26 24 16.30 2650 26 24 13.30 0200 26 24 13.30 0420 26 24 13.30 0280 26 24 13.30 0160 26 05 90.10 6130 26 05 90.10 2130 26 05 90.10 4330 26 05 90.10 4030 26 52 13.10 0500 26 53 13.10 0240 26 51 13.50 4500 26 51 13.50 4500 26 51 13.50 3480 26 51 13.50 3470 26 56 23.10 1100 26 56 23.10 1151 26 51 13.50 0910 Item/ Task 145.333 1385.917 446.25 Ln Ft Ln Ft Ln Ft $1.90 $1.83 $3.63 $3.60 $3.88 $4.38 $0.00 $0.00 $0.00 $5.50 $5.71 $8.01 $799.33 $7,913.59 $3,574.46 $31,015.03 $23,764.42 $0.00 $54,779.45 8.46%
11.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel RS Means Number Item/ Task Silt Fence Footing Excavation 6'-10' Excavation Sewer Excavation Water Line Excavation Sewer and Water Gravel Backfill Soil Stripping Compacted Subgrade Compacted Subgrade Soil Backfill Compacted Subgrade 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Qty Unit Mat. $ 31 25 14.16 1000 31 23 16.13 0050 31 23 16.13 0500 31 23 16.13 0110 31 23 16.13 0110 31 23 23.16 0050 31 14 13.23 1420 31 23 23.24 0100 31 23 23.24 0100 31 23 23.13 2200 31 23 23.24 0100 1,023.00 1,918.00 30.00 46.00 22.00 32.00 4,270.00 0.00 3.01 1,087.00 2.15 L.F. BCY BCY BCY BCY LCY CY HR HR CY HR $0.25 $0.00 $0.00 $0.00 $0.00 6.15 $0.00 $0.00 $0.00 $0.00 $0.00 $452.55 Total Labor $ Equip. $ $0.35 $4.36 $2.95 $2.21 $2.21 2.23 $0.59 $64.00 $64.00 $0.73 $64.00 $0.00 $2.23 $2.88 $2.16 $2.16 34.38 $1.44 $28.50 $28.50 $2.33 $28.50 Total $ Ext. $ $0.60 $613.80 $6.59 $12,639.62 $5.83 $174.90 $4.37 $201.02 $4.37 $96.14 42.76 1368.32 $2.03 $8,662.72 $92.50 $0.00 $92.50 $278.43 $3.06 $3,326.22 $92.50 $198.88 $12,673.72 $14,439.15 $27,560.04 4.74% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel RS Means Number Item/ Task Heavy Duty Asphalt Surface 10" 304 Stone Base Parking Lot Striping HD 4" 304 Stone Base Gravel Lot Surface SLAB 4" ODOT Gravel HD Concrete 4" 304 Stone Base Total 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Qty Unit Mat. $ 32 12 16.14 0027 32 11 23.23 0250 32 17 23.14 0800 32 11 23.23 0301 32 11 23.23 0050 32 11 23.23 0301 32 11 23.23 0301 0.00 113.67 16.00 87.61 4,018.03 698.33 0.08 SF SY Stall SY SY SY CY $2.32 $10.00 $4.40 $3.98 3.04 $3.98 $3.98 $16,550.24 Labor $ Equip. $ $0.21 $0.39 $1.66 $0.44 0.33 $0.44 $0.44 $1,742.12 $0.25 $0.86 $0.87 $0.72 0.72 $0.72 $0.72 $3,570.59 Total $ Ext. $ $2.78 $11.25 $6.93 $5.14 4.09 $5.14 $5.14 $0.00 $1,278.18 $110.88 $450.30 $16,433.76 $3,589.43 $0.40 $21,862.96 9.32%
12.
Three Tough Guys
Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number GL 2" GL 3/4" GL 1 1/2" GL 1 1/4" GL 1" GL 1/2" Stack 15"Concrete Pipe Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 33 51 13.10 1100 33 51 13.10 1005 33 51 13.10 1060 33 51 13.10 1040 33 51 13.10 1010 33 51 13.10 1000 33 41 13.60 2020 Item/ Task 18 21 55 29 44 9 25 LF LF LF LF LF LF LF $3.36 $1.47 $2.70 $2.04 $2.03 $0.91 $16.00 $2.80 $2.38 $2.66 $2.51 $2.51 $2.24 $11.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.23 $6.16 $3.85 $5.35 $4.55 $4.54 $3.15 $30.08 $110.88 $80.75 $294.25 $131.95 $199.76 $28.35 $752.00 $796.25 $745.94 $55.75 Total 1,597.935 0.25% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Total Qty Unit Mat. $ Labor $ Equip. $ 34 71 13.17 2700 Item/ Task Security Bollard 38 EA $875.00 $92.00 $33.50 $33,250.00 $3,496.00 $1,273.00 Total $ Ext. $ $1,000.50 $38,019.00 $38,019.00 5.87%
Download now