Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Tim Beverage
Tyler Shisler
Garrett Goebel

Division
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 21
Division 22
Division 23
Division 26
Division 27
Division 28
Division 31
Division 32
Division 33
Division 34
Total Estimated Value:

Lab: 9:10 AM

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

Estimated Value

% of Total Cost

$4,557.57
$0.00
$195,936.25
$4,908.00
$107,594.78
$2,983.46
$24,398.31
$44,338.42
$8,915.40
$970.90
$3,020.00
$0.00
$0.00
$0.00
$0.00
$48,877.46
$15,607.40
$54,779.45
$0.00
$0.00
$30,688.63
$60,325.83
$1,597.94
$38,019.00
$647,518.79

0.70%
0.00%
30.26%
0.76%
16.62%
0.46%
3.77%
6.85%
1.38%
0.15%
0.47%
0.00%
0.00%
0.00%
0.00%
7.55%
2.41%
8.46%
0.00%
0.00%
4.74%
9.32%
0.25%
5.87%
100.00%

12/5/2012
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
Masonry Scaffold
Brick Washing
Grouted Cores
Split Face
CMU8x8x16
Grout for Bond Beam
Reinforcing
Bond Beam
Opening Lintels
Vert Dowels #5
Paint (primer)
Paint (final)
Total

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

01 54 23.70 0090
04 01 30 20 0400
04 05 16.30 0250

19.09
8165
1066.67

CSF
SF
Sf

$0.00
$0.00
$1.09

$132.00
$0.56
$1.88

$0.00
$0.13
$0.19

$132.00
$0.69
$3.16

$2,519.88
$5,633.85
$3,370.68

04 22 10.23 6200

8165

SF

$4.22

$5.45

$0.00

$9.67

$78,955.55

04 05 16.30 0020
04 05 19.26 0060
04 22 10.16 0130
04 22 10.32 0400
04 05 19.26 0060
09 91 23.72 2180
09 91 23.72 2480

645.333
2133.98
645.333
116
269.094
7500
7500

LF
lbs
LF
LF
lbs
SF
SF

$0.99
$0.49
$2.52
$3.38
$0.49
0.09
0.07

$0.91
$0.54
$2.88
$4.66
$0.54
0.13
0.13

$0.09
$0.00
$0.00
$0.46
$0.00
0
0

$1.99
$1.03
$5.40
$8.50
$1.03
0.22
0.2

$1,284.21
$2,198.00
$3,484.80
$986.00
$277.17
1650
1500

$40,653.68

$59,830.90

$1,375.56

$101,860.13
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

01 54 33.40 6410
01 52 13.20 0550
01 74 13.20 0050

Item/ Task
Chemical Toilet
Job Trailer
Jobsite Cleanup

8
8
6.4885

Months
Months
M.S.F.

$0.00
$0.00
$1.75

$0.00
$0.00
$26.50

$0.00
$0.00
$2.20

$180.00
$365.00
$30.45

$1,440.00
$2,920.00
$197.57

Total

$11.35

$171.95

$14.27

$4,557.57
0.70%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
Pre-cast Wall 8"
Footings A
Footing B
Footing D
Column Footing A
Column Footing B
Concrete Floors (MAT)
Concrete Floors (LBR)
Slab 6" x 6" WWM W2.9
8" Heavy Duty Concrete
Pavement
6" x 6" WWM W4
Concrete Elasomer
Sealant
Control Joint, Saw Cut
Total

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

03 46 13.50 0100
03 30 53.40 3933
03 30 53.40 3932
03 30 53.40 3932
03 30 53.40 3545
03 30 53.40 3555
03 31 05.35 0300
03 31 05.70 4300
03 22 05.50 0300

0.00
0.00
0.00
0.00
2.00
2.00
116.39
116.39
62.85
788.47

SF
SF
SF
SF
EA.
EA.
CY
CY
CSF
SF

$0.00
$137.00
$136.00
$136.00
$88.00
$132.00
$103.00
$0.00
$24.00
$2.70

$0.00
$118.00
$116.00
$116.00
$93.00
$139.00
$0.00
$16.00
$27.00
$0.95

$0.00
$0.67
$0.67
$0.67
$1.22
$1.82
$0.00
$0.50
$0.00
$0.01

$11.00
$11.00
$252.67
$252.67
$182.22
$272.82
$103.00
$16.50
$51.00
$3.66

$0.00
$0.00
$0.00
$0.00
$364.44
$545.64
$11,988.06
$1,920.42
$3,205.35
$2,885.80

7.88

CSF

6.31

GAL

$33.00
$58.50

$29.00
$0.00

$0.00
$0.00

$62.00
$58.50

$488.85
$369.00

350

LF

$0.05

$0.38

$0.08

$58.96

$408.96

$16,712.02

$5,133.88

$100.16

03 30 53.40 5020
03 22 05.50 0400
03 05 13.20 1600
03 35 29.35 0140

$22,176.52
30.26%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

04 72 10.10 0800

Item/ Task
Parapit Coping

240

LF

$12.50

$7.95

$0.00

$20.45

$4,908.00

Total

$3,000.00

$1,908.00

$0.00

$4,908.00
0.76%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
CL A1 6x6x1/4
BP 3/4x12x12
CL B1, D1 6x6x1/4
BP 3/4x14x14
CL C1 12x12x1/2
BP 3/4x 18x18
Anchor Bolts
Beam W8 x 15
Joist 20K 3
Joist 22K6
Joist 22K11
Joist W21 x 44
Joist W12x 26
Joist W12x16
1 1/2" 20g Deck Painted
1 1/2" 20 Ga. Galv Deck
3" 20 Ga. Galv.
Canopy L 6"x6"x 5/16"
Vertical Metal Ladder
CONNECTIONS
Platform Grating
4"x6" angle 1/4"
Vert Tube Supports
Connections for Platform
Canopy Decking
Roof Decking
Total

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

05 12 23.17 4550
05 12 23.77 4400
05 12 23.17 4550
05 12 23.77 4400
05 12 23.17 4750
05 12 23.77 4400
05 05 23.05 1120
05 12 23.75 0320
05 21 19.10 0210
05 21 19.10 0550
05 21 19.10 0570
05 12 23.75 4100
05 12 23.75 1500
05 12 23.75 1100
05 31 23.50 2650
05 31 23.50 2650
05 31 23.50 3300
05 12 23.65 0200
05 51 33.13 0100
See Calculations
05 53 13.10 0136
05 12 23.65 0100
05 12 23.17 4500
05 31 23.50 3300
05 31 23.50 2600

1.66666
2.55
3.33332
41.65
1.25
68.4
3
600
312
340
68
52
108
126.00
5189.0552
959.7778
1656.667
331.3334
20
305.06054
14.3054
9
1739.5
6488.5

EA
LB
EA
LB
EA
LB
SET
LF
LF
LF
LF
LF
LF
LF
SF
SF
SF
LF
V.L.F
SF
SF
EA
SF
SF

$206.00
$1.44
$206.00
$1.44
$1,450.00
$1.44
$10.10
$20.50
$5.15
$7.15
$9.35
$60.50
$36.00
$22.00
$1.56
$1.64
$2.78
$15.75
$36.00
45.5
$12.75
206
2.78
1.95

$46.50
$0.36
$46.50
$0.36
$58.00
$0.36
$19.60
$4.50
$2.17
$1.95
$1.95
$3.67
$3.07
$3.07
$0.38
$0.38
$0.47
$0.00
$18.75
$1.60
$0.00
$46.50
$0.47
0.41

$26.00
$0.20
$26.00
$0.20
$34.00
$0.20
$0.00
$2.49
$0.97
$0.87
$0.87
$1.52
$1.70
$1.70
$0.03
$0.03
$0.04
$0.00
$1.43
$0.12
$0.00
$26.00
$0.04
0.03

$278.50
$2.00
$278.50
$2.00
$1,542.00
$2.00
$29.70
$27.49
$10.84
$9.97
$12.17
$65.69
$40.77
$26.77
$1.97
$2.05
$3.29
$15.75
$56.18
$47.22
$12.75
$278.50
$3.29
2.39

$464.16
$5.10
$281.83
$83.30
$1,927.50
$136.80
$89.10
$16,494.00
$3,382.15
$3,389.80
$827.56
$3,415.88
$4,403.16
$3,373.02
$10,212.06
$1,967.54
$5,450.43
$5,218.50
$1,123.60
$0.00
$14,404.96
$182.39
$2,506.50
$3,009.73
$5,722.96
$15,507.52

$83,422.19

$13,360.83

$3,637.63

$103,579.56
16.62%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
Parapit Blocking (Top)
2"x8"
Roof Perimeter Blocking

Qty

Unit

Mat. $

06 11 10.38 0120

3.20

BF

$660.00

$0.00

$0.00

$660.00

$2,113.46

06 11 10.01 2625

0.4

MBF

$500.00

$1,675.00

$0.00

$2,175.00

$870.00

$2,313.46

$670.00

$0.00

Total

Labor $ Equip. $ Total $

Ext. $

$2,983.46
0.46%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
Slab Vapor barrier
Office Ceiling Sound
Attenuation
Slab/Foooting Insulation
Gutter 6" 28 Ga
Down Spout 3" 28 Ga
2' 6" x 3' Roof Hatch
3" poly ridgid insulation
Roof Membrane 60 mil
Total

Qty

Unit

Mat. $

07 26 10.10 0900

62.85

SQ

$4.54

$9.55

$0.00

$14.09

$885.56

07 21 16.20 0020

489

SF

$0.26

$0.26

$0.00

$0.52

$254.28

07 21 13.10 0080
07 71 23.10 2800
07 71 23.10 5700
07 72 33.10 0520
07 22 16.10 1745
07 54 19.10 8890

0.00
83.5
21
1
6445
64.45

SF
LF
LF
EA
SF
SQ

$0.41
$2.88
$1.28
$640.00
$1.23
$127.00

$0.35
$3.48
$2.20
$140.00
$0.30
$52.50

$0.00
$0.00
$0.00
$0.00
$0.00
$6.90

$0.76
$6.36
$3.48
$780.00
$1.53
$186.40

$0.00
$531.06
$73.08
$780.00
$9,860.85
$12,013.48

Labor $ Equip. $ Total $

$17,432.34 $6,521.26

$444.71

Ext. $

$24,398.31
3.77%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
DOORS
Door type C 8'x12'
Door type C 16'x12'
Overhead door insulation
Door type A 3'x7' frame
Door type A 3'-6"x7' frame
Door type A 2'-6"x7' frame
Door type A 2'-6"x7'
Door type A 3'x7'
Door type A 3'-6"x7'
Door type B
Door type B
Window Frame
3/8" Tempered Glass
Electronic Trolly
Hardware

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

08 36 13.10 2625
08 36 13.10 2750
08 36 13.10 2860
08 12 13.13 0100
08 12 13.13 0110
08 12 13.13 1180
08 13 13.13 0620
08 13 13.13 0640
08 13 13.13 0660
08 13 13.13 1212
08 12 13.13 0100
08 12 13.31 1200
08 81 10.10 1800
08 36 13.10 2950
See Calculations

1.
6.
1,248.
7.
1.
1.
1.
7.
1.
1.
1.
31.4
37.5
7
-

EA
EA
SF
EA
EA
EA
EA
EA
EA
EA
EA
LF
SF
EA
-

$1,008.00
$1,699.00
$4.50
$148.00
$155.00
$199.00
$435.00
$435.00
$630.00
$528.00
$148.00
$11.71
$15.85
$1,075.00
-

$340.80
$626.67
$0.00
$44.00
$44.00
$44.00
$41.50
$41.50
$47.00
$41.50
$44.00
$2.59
$9.10
$355.00
-

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
-

$1,348.80
$2,325.67
$4.50
$192.00
$199.00
$243.00
$476.50
$476.50
$677.00
$569.50
$192.00
$14.30
$24.95
$1,430.00
-

$1,348.80
$13,954.02
$5,616.00
$1,344.00
$199.00
$243.00
$476.50
$3,335.50
$677.00
$569.50
$192.00
$449.02
$935.63
$10,010.00
$4,988.45

$7,868.90

$0.00

Total

$31,481.07

$44,338.42
6.85%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
4" Gypsum Board Wall
6" Gypsum Board Wall
6" Metal Studs
3 5/8" Metal Studs
VCT Tile
Bathroom Wall Tile
Bathroom Floor Tile
Drop Ceiling
Total

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

09 21 16.33 3800
09 21 16.33 4000
09 21 16.33 4000
09 21 16.33 3800
09 65 19.10 7000
09 30 13.10 0020
09 30 13.10 3283
09 51 23.10 1110

1,234.3630769
115.992
80
404
221.765
235
55
275

SF
SF
SF
SF
SF
SF
SF
SF

$0.96
$1.14
$1.14
$0.96
$0.94
$2.42
$6.20
$0.75

$2.08
$2.21
$2.21
$2.08
$65.00
$6.50
$2.33
$0.56

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$3.04
$3.35
$3.35
$3.04
$1.59
$8.92
$8.53
$1.31

$3,752.46
$388.57
$268.00
$1,228.16
$352.61
$2,096.20
$469.15
$360.25

$3,120.67

$20,065.31

$0.00

$8,915.40
1.38%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
TP Dispenser
SS Grab Bar 42"
Seat Cover Dispenser
SS Grab Bar 36"
Hand Soap Dispenser
24" x 36" Mirror
Fire Extinguishers

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

10 28 13.13 6100
10 28 13.13 1105
10 28 13.13 6000
10 28 13.13 1100
10 28 13.13 4600
10 28 13.13 3100
10 44 16.13 2100

1
1
1
1
1
1
6

E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.

$17.05
$37.50
$158.00
$37.00
$42.00
$96.50
$79.50

$11.75
$17.65
$17.65
$17.65
$17.65
$23.50
$0.00

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$28.80
$55.15
$175.65
$54.65
$59.65
$120.00
$79.50

$28.80
$55.15
$175.65
$54.65
$59.65
$120.00
$477.00

$865.05

$105.85

$0.00

Total

$970.90
0.15%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
Air Compressor 5HP
Total

Qty

Unit

Mat. $

Labor $

Equip. $

11 11 13.10 0600

1

E.A.

$2,025.00

$995.00

$0.00

$3,020.00 $3,020.00

$2,025.00

$995.00

$0.00

$3,020.00
0.47%

Total $

Ext. $
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Item/ Task
4" Sanitary Line
3" Sanitary Line
2" Sanitary Line
1 1/2" Sanitary Line
Trench Drain
Sump Pump
Hot water Tank
Water Cooler
Water Closet
Sink
Sink Hookup
Vent Flashing and Caps
Backflow Preventer
Water Meter
100gpm Oil Interceptor
Hot Water Copper Tubing .5"
Cold Water Copper Tubing 1"
Cold Water Copper Tubing .75"
Air Line Copper .75"
Air Line Copper 1"
Air Line Copper 1.25"
Air Line Copper 2"
Air Line Copper .5"
Total

Qty

Unit

Mat. $

Labor $

22 11 13.74 4480
22 11 13.74 4470
22 11 13.74 4460
22 11 13.74 4420
22 14 26.19 6770
22 14 29.13 0800
22 34 30.13 2100
22 47 16.10 4640
22 42 13.40 3360
22 41 16.10 4180
22 41 16.10 6960
22 13 16.80 1450
22 11 19.42 4140
22 11 19.38 2100
22 13 23.10 4220
22 11 13.23 2140
22 11 13.23 2200
22 11 13.23 2180
22 11 13.23 2180
22 11 13.23 2200
22 11 13.23 2220
22 11 13.23 2260
22 11 13.23 2140

183.15
108.9
68.0163
40.7
106
1
1
1
1
1
1
3
1
1
1
22.5
32
41.75
45.5
25
50
25
20

L.F.
L.F.
L.F.
L.F.
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LF
LF
LF
LF

$8.30
$6.15
$3.46
$3.01
$154.00
$156.00
$1,225.00
$620.00
$505.00
$355.00
$480.00
$24.50
$455.00
$127.00
$12,500.00
$4.73
$10.84
$7.26
$7.26
$10.84
$14.80
$29.70
$4.73

$16.40
$14.85
$13.35
$12.15
$9.85
$87.50
$291.00
$147.00
$136.00
$98.50
$475.00
$25.50
$31.00
$36.50
$395.00
$5.40
$6.40
$5.75
$5.75
$6.40
$7.55
$10.40
$5.40

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$38,302.53

$10,574.94

$0.00

Equip. $ Total $
$24.70
$21.00
$16.81
$15.16
$163.85
$243.50
$1,516.00
$767.00
$641.00
$453.50
$955.00
$50.00
$486.00
$163.50
$12,895.00
$10.13
$17.24
$13.01
$13.01
$17.24
$22.35
$40.10
$10.13

Ext. $
$4,523.81
$2,286.90
$1,143.35
$617.01
$17,368.10
$243.50
$1,516.00
$767.00
$641.00
$453.50
$955.00
$150.00
$486.00
$163.50
$12,895.00
$227.93
$551.52
$543.17
$591.96
$430.88
$1,117.25
$1,002.50
$202.60
$48,877.46
7.55%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

Total

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

68
1
1
1
1
1
2
67
10
9
34
8
5
21
4
1
4
5
6
13

FT
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.
E.A.

$0.44
$1,375.00
$4,175.00
$2,225.00
$1,175.00
$185.00
$119.00
$36.00
$38.00
$72.50
$36.50
$124.00
$128.00
$236.00
$236.00
$106.00
$110.00
$221.00
406.75
$67.00

$0.69
$1,225.00
$1,475.00
$825.00
$129.00
$59.00
$51.50
$37.50
$72.00
$87.50
$77.50
$103.00
$93.50
$61.50
$61.50
$75.00
$103.00
$103.00
103
$72.50

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00

$1.13
$2,600.00
$5,650.00
$3,050.00
$1,304.00
$244.00
$170.50
$73.50
$110.00
$160.00
$114.00
$227.00
$221.50
$297.50
$297.50
$181.00
$213.00
$324.00
509.75
$139.50

$76.57
$2,600.00
$5,650.00
$3,050.00
$1,304.00
$244.00
$341.00
$4,924.50
$1,100.00
$1,440.00
$3,876.00
$1,816.00
$1,107.50
$6,247.50
$1,190.00
$181.00
$852.00
$1,620.00
$3,058.50
$1,813.50

26 05 90.10 2131
26 05 90.10 4031
26 05 90.10 4331

Thermostat Hookup
MPP Circuit Panel
MPL Circuit Panel
MDP-M Switchboard
Circuit Breaker 200 Amp
Circuit Breaker 70-100 Amp
Circuit Breaker 15-60 Amp
Lighting Fixture Box
Single Pole Switch
GFCI Recepticle
Duplex Recepticle
Emergency Light
Exit Light
Light Type A
Light Type B
Light Type E
Light Type H
Light Type J
Light Type W1
Light Type K
Home runs
Switch
Duplex Recepticle
GFCI Recepticle

Qty

26 05 90.10 9521
26 24 16.30 1000
26 24 16.30 2650
26 24 13.30 0200
26 24 13.30 0420
26 24 13.30 0280
26 24 13.30 0160
26 05 90.10 6130
26 05 90.10 2130
26 05 90.10 4330
26 05 90.10 4030
26 52 13.10 0500
26 53 13.10 0240
26 51 13.50 4500
26 51 13.50 4500
26 51 13.50 3480
26 51 13.50 3470
26 56 23.10 1100
26 56 23.10 1151
26 51 13.50 0910

Item/ Task

145.333
1385.917
446.25

Ln Ft
Ln Ft
Ln Ft

$1.90
$1.83
$3.63

$3.60
$3.88
$4.38

$0.00
$0.00
$0.00

$5.50
$5.71
$8.01

$799.33
$7,913.59
$3,574.46

$31,015.03 $23,764.42

$0.00

$54,779.45
8.46%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

RS Means Number

Item/ Task
Silt Fence
Footing Excavation
6'-10' Excavation
Sewer Excavation
Water Line Excavation
Sewer and Water Gravel Backfill
Soil Stripping
Compacted Subgrade
Compacted Subgrade
Soil Backfill
Compacted Subgrade

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

Qty

Unit

Mat. $

31 25 14.16 1000
31 23 16.13 0050
31 23 16.13 0500
31 23 16.13 0110
31 23 16.13 0110
31 23 23.16 0050
31 14 13.23 1420
31 23 23.24 0100
31 23 23.24 0100
31 23 23.13 2200
31 23 23.24 0100

1,023.00
1,918.00
30.00
46.00
22.00
32.00
4,270.00
0.00
3.01
1,087.00
2.15

L.F.
BCY
BCY
BCY
BCY
LCY
CY
HR
HR
CY
HR

$0.25
$0.00
$0.00
$0.00
$0.00
6.15
$0.00
$0.00
$0.00
$0.00
$0.00
$452.55

Total

Labor $ Equip. $
$0.35
$4.36
$2.95
$2.21
$2.21
2.23
$0.59
$64.00
$64.00
$0.73
$64.00

$0.00
$2.23
$2.88
$2.16
$2.16
34.38
$1.44
$28.50
$28.50
$2.33
$28.50

Total $

Ext. $

$0.60
$613.80
$6.59
$12,639.62
$5.83
$174.90
$4.37 $201.02
$4.37
$96.14
42.76
1368.32
$2.03 $8,662.72
$92.50
$0.00
$92.50
$278.43
$3.06 $3,326.22
$92.50
$198.88

$12,673.72 $14,439.15

$27,560.04
4.74%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

RS Means Number

Item/ Task
Heavy Duty Asphalt Surface
10" 304 Stone Base
Parking Lot Striping
HD 4" 304 Stone Base
Gravel Lot Surface
SLAB 4" ODOT Gravel
HD Concrete 4" 304 Stone Base
Total

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

Qty

Unit

Mat. $

32 12 16.14 0027
32 11 23.23 0250
32 17 23.14 0800
32 11 23.23 0301
32 11 23.23 0050
32 11 23.23 0301
32 11 23.23 0301

0.00
113.67
16.00
87.61
4,018.03
698.33
0.08

SF
SY
Stall
SY
SY
SY
CY

$2.32
$10.00
$4.40
$3.98
3.04
$3.98
$3.98
$16,550.24

Labor $ Equip. $
$0.21
$0.39
$1.66
$0.44
0.33
$0.44
$0.44
$1,742.12

$0.25
$0.86
$0.87
$0.72
0.72
$0.72
$0.72
$3,570.59

Total $

Ext. $

$2.78
$11.25
$6.93
$5.14
4.09
$5.14
$5.14

$0.00
$1,278.18
$110.88
$450.30
$16,433.76
$3,589.43
$0.40
$21,862.96
9.32%
Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number

GL 2"
GL 3/4"
GL 1 1/2"
GL 1 1/4"
GL 1"
GL 1/2" Stack
15"Concrete Pipe

Qty

Unit

Mat. $

Labor $

Equip. $

Total $

Ext. $

33 51 13.10 1100
33 51 13.10 1005
33 51 13.10 1060
33 51 13.10 1040
33 51 13.10 1010
33 51 13.10 1000
33 41 13.60 2020

Item/ Task

18
21
55
29
44
9
25

LF
LF
LF
LF
LF
LF
LF

$3.36
$1.47
$2.70
$2.04
$2.03
$0.91
$16.00

$2.80
$2.38
$2.66
$2.51
$2.51
$2.24
$11.85

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.23

$6.16
$3.85
$5.35
$4.55
$4.54
$3.15
$30.08

$110.88
$80.75
$294.25
$131.95
$199.76
$28.35
$752.00

$796.25

$745.94

$55.75

Total

1,597.935
0.25%

Three Tough Guys Construction
590 Woody Hayes Dr Rm. 103
Columbus, Ohio 43210
Lab: 9:10 AM

Tim Beverage
Tyler Shisler
Garrett Goebel

11/5/2013

Suburban Steel Maintenance Building
Project Number: SSMB-298-3450-2012

RS Means Number
Total

Qty

Unit

Mat. $

Labor $

Equip. $

34 71 13.17 2700

Item/ Task
Security Bollard

38

EA

$875.00

$92.00

$33.50

$33,250.00

$3,496.00

$1,273.00

Total $

Ext. $

$1,000.50 $38,019.00
$38,019.00
5.87%

More Related Content

Similar to Suburban Steel Maintenance Building

Similar to Suburban Steel Maintenance Building (20)

Construction Estimating Final Project
Construction Estimating Final ProjectConstruction Estimating Final Project
Construction Estimating Final Project
 
Rb
RbRb
Rb
 
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable CostSpace 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
 
Butler 4.26.12
Butler 4.26.12Butler 4.26.12
Butler 4.26.12
 
pinewood-baseball-2007
pinewood-baseball-2007pinewood-baseball-2007
pinewood-baseball-2007
 
Electronics recycling market update
Electronics recycling market updateElectronics recycling market update
Electronics recycling market update
 
Southdowns Baton Rouge Home Sales Prices 2009-2018
Southdowns Baton Rouge Home Sales Prices 2009-2018Southdowns Baton Rouge Home Sales Prices 2009-2018
Southdowns Baton Rouge Home Sales Prices 2009-2018
 
Resumen economico cig_20140331
Resumen economico cig_20140331Resumen economico cig_20140331
Resumen economico cig_20140331
 
Blue Chip Stock Club
Blue Chip Stock ClubBlue Chip Stock Club
Blue Chip Stock Club
 
Blue Chip Stock Club
Blue Chip Stock ClubBlue Chip Stock Club
Blue Chip Stock Club
 
Pass Thru Pay
Pass Thru PayPass Thru Pay
Pass Thru Pay
 
Blue Chip
Blue ChipBlue Chip
Blue Chip
 
Blue Chip Stock
Blue Chip StockBlue Chip Stock
Blue Chip Stock
 
10.3 2016 investor presentation pea
10.3 2016 investor presentation   pea10.3 2016 investor presentation   pea
10.3 2016 investor presentation pea
 
Shelby 4.26.12
Shelby 4.26.12Shelby 4.26.12
Shelby 4.26.12
 
Blue Chip Stock Club
Blue Chip Stock ClubBlue Chip Stock Club
Blue Chip Stock Club
 
Blue Chip Stock Club
Blue Chip Stock ClubBlue Chip Stock Club
Blue Chip Stock Club
 
bebobinder
bebobinderbebobinder
bebobinder
 
Blue Chip Stock Club
Blue Chip Stock ClubBlue Chip Stock Club
Blue Chip Stock Club
 
Resumen economico cig_20140721
Resumen economico cig_20140721Resumen economico cig_20140721
Resumen economico cig_20140721
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 

Suburban Steel Maintenance Building

  • 1. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Tim Beverage Tyler Shisler Garrett Goebel Division Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Division 10 Division 11 Division 12 Division 13 Division 14 Division 21 Division 22 Division 23 Division 26 Division 27 Division 28 Division 31 Division 32 Division 33 Division 34 Total Estimated Value: Lab: 9:10 AM Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Estimated Value % of Total Cost $4,557.57 $0.00 $195,936.25 $4,908.00 $107,594.78 $2,983.46 $24,398.31 $44,338.42 $8,915.40 $970.90 $3,020.00 $0.00 $0.00 $0.00 $0.00 $48,877.46 $15,607.40 $54,779.45 $0.00 $0.00 $30,688.63 $60,325.83 $1,597.94 $38,019.00 $647,518.79 0.70% 0.00% 30.26% 0.76% 16.62% 0.46% 3.77% 6.85% 1.38% 0.15% 0.47% 0.00% 0.00% 0.00% 0.00% 7.55% 2.41% 8.46% 0.00% 0.00% 4.74% 9.32% 0.25% 5.87% 100.00% 12/5/2012
  • 2.
  • 3. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Masonry Scaffold Brick Washing Grouted Cores Split Face CMU8x8x16 Grout for Bond Beam Reinforcing Bond Beam Opening Lintels Vert Dowels #5 Paint (primer) Paint (final) Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 01 54 23.70 0090 04 01 30 20 0400 04 05 16.30 0250 19.09 8165 1066.67 CSF SF Sf $0.00 $0.00 $1.09 $132.00 $0.56 $1.88 $0.00 $0.13 $0.19 $132.00 $0.69 $3.16 $2,519.88 $5,633.85 $3,370.68 04 22 10.23 6200 8165 SF $4.22 $5.45 $0.00 $9.67 $78,955.55 04 05 16.30 0020 04 05 19.26 0060 04 22 10.16 0130 04 22 10.32 0400 04 05 19.26 0060 09 91 23.72 2180 09 91 23.72 2480 645.333 2133.98 645.333 116 269.094 7500 7500 LF lbs LF LF lbs SF SF $0.99 $0.49 $2.52 $3.38 $0.49 0.09 0.07 $0.91 $0.54 $2.88 $4.66 $0.54 0.13 0.13 $0.09 $0.00 $0.00 $0.46 $0.00 0 0 $1.99 $1.03 $5.40 $8.50 $1.03 0.22 0.2 $1,284.21 $2,198.00 $3,484.80 $986.00 $277.17 1650 1500 $40,653.68 $59,830.90 $1,375.56 $101,860.13
  • 4. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 01 54 33.40 6410 01 52 13.20 0550 01 74 13.20 0050 Item/ Task Chemical Toilet Job Trailer Jobsite Cleanup 8 8 6.4885 Months Months M.S.F. $0.00 $0.00 $1.75 $0.00 $0.00 $26.50 $0.00 $0.00 $2.20 $180.00 $365.00 $30.45 $1,440.00 $2,920.00 $197.57 Total $11.35 $171.95 $14.27 $4,557.57 0.70% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Pre-cast Wall 8" Footings A Footing B Footing D Column Footing A Column Footing B Concrete Floors (MAT) Concrete Floors (LBR) Slab 6" x 6" WWM W2.9 8" Heavy Duty Concrete Pavement 6" x 6" WWM W4 Concrete Elasomer Sealant Control Joint, Saw Cut Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 03 46 13.50 0100 03 30 53.40 3933 03 30 53.40 3932 03 30 53.40 3932 03 30 53.40 3545 03 30 53.40 3555 03 31 05.35 0300 03 31 05.70 4300 03 22 05.50 0300 0.00 0.00 0.00 0.00 2.00 2.00 116.39 116.39 62.85 788.47 SF SF SF SF EA. EA. CY CY CSF SF $0.00 $137.00 $136.00 $136.00 $88.00 $132.00 $103.00 $0.00 $24.00 $2.70 $0.00 $118.00 $116.00 $116.00 $93.00 $139.00 $0.00 $16.00 $27.00 $0.95 $0.00 $0.67 $0.67 $0.67 $1.22 $1.82 $0.00 $0.50 $0.00 $0.01 $11.00 $11.00 $252.67 $252.67 $182.22 $272.82 $103.00 $16.50 $51.00 $3.66 $0.00 $0.00 $0.00 $0.00 $364.44 $545.64 $11,988.06 $1,920.42 $3,205.35 $2,885.80 7.88 CSF 6.31 GAL $33.00 $58.50 $29.00 $0.00 $0.00 $0.00 $62.00 $58.50 $488.85 $369.00 350 LF $0.05 $0.38 $0.08 $58.96 $408.96 $16,712.02 $5,133.88 $100.16 03 30 53.40 5020 03 22 05.50 0400 03 05 13.20 1600 03 35 29.35 0140 $22,176.52 30.26%
  • 5. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 04 72 10.10 0800 Item/ Task Parapit Coping 240 LF $12.50 $7.95 $0.00 $20.45 $4,908.00 Total $3,000.00 $1,908.00 $0.00 $4,908.00 0.76% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task CL A1 6x6x1/4 BP 3/4x12x12 CL B1, D1 6x6x1/4 BP 3/4x14x14 CL C1 12x12x1/2 BP 3/4x 18x18 Anchor Bolts Beam W8 x 15 Joist 20K 3 Joist 22K6 Joist 22K11 Joist W21 x 44 Joist W12x 26 Joist W12x16 1 1/2" 20g Deck Painted 1 1/2" 20 Ga. Galv Deck 3" 20 Ga. Galv. Canopy L 6"x6"x 5/16" Vertical Metal Ladder CONNECTIONS Platform Grating 4"x6" angle 1/4" Vert Tube Supports Connections for Platform Canopy Decking Roof Decking Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 05 12 23.17 4550 05 12 23.77 4400 05 12 23.17 4550 05 12 23.77 4400 05 12 23.17 4750 05 12 23.77 4400 05 05 23.05 1120 05 12 23.75 0320 05 21 19.10 0210 05 21 19.10 0550 05 21 19.10 0570 05 12 23.75 4100 05 12 23.75 1500 05 12 23.75 1100 05 31 23.50 2650 05 31 23.50 2650 05 31 23.50 3300 05 12 23.65 0200 05 51 33.13 0100 See Calculations 05 53 13.10 0136 05 12 23.65 0100 05 12 23.17 4500 05 31 23.50 3300 05 31 23.50 2600 1.66666 2.55 3.33332 41.65 1.25 68.4 3 600 312 340 68 52 108 126.00 5189.0552 959.7778 1656.667 331.3334 20 305.06054 14.3054 9 1739.5 6488.5 EA LB EA LB EA LB SET LF LF LF LF LF LF LF SF SF SF LF V.L.F SF SF EA SF SF $206.00 $1.44 $206.00 $1.44 $1,450.00 $1.44 $10.10 $20.50 $5.15 $7.15 $9.35 $60.50 $36.00 $22.00 $1.56 $1.64 $2.78 $15.75 $36.00 45.5 $12.75 206 2.78 1.95 $46.50 $0.36 $46.50 $0.36 $58.00 $0.36 $19.60 $4.50 $2.17 $1.95 $1.95 $3.67 $3.07 $3.07 $0.38 $0.38 $0.47 $0.00 $18.75 $1.60 $0.00 $46.50 $0.47 0.41 $26.00 $0.20 $26.00 $0.20 $34.00 $0.20 $0.00 $2.49 $0.97 $0.87 $0.87 $1.52 $1.70 $1.70 $0.03 $0.03 $0.04 $0.00 $1.43 $0.12 $0.00 $26.00 $0.04 0.03 $278.50 $2.00 $278.50 $2.00 $1,542.00 $2.00 $29.70 $27.49 $10.84 $9.97 $12.17 $65.69 $40.77 $26.77 $1.97 $2.05 $3.29 $15.75 $56.18 $47.22 $12.75 $278.50 $3.29 2.39 $464.16 $5.10 $281.83 $83.30 $1,927.50 $136.80 $89.10 $16,494.00 $3,382.15 $3,389.80 $827.56 $3,415.88 $4,403.16 $3,373.02 $10,212.06 $1,967.54 $5,450.43 $5,218.50 $1,123.60 $0.00 $14,404.96 $182.39 $2,506.50 $3,009.73 $5,722.96 $15,507.52 $83,422.19 $13,360.83 $3,637.63 $103,579.56 16.62%
  • 6. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Parapit Blocking (Top) 2"x8" Roof Perimeter Blocking Qty Unit Mat. $ 06 11 10.38 0120 3.20 BF $660.00 $0.00 $0.00 $660.00 $2,113.46 06 11 10.01 2625 0.4 MBF $500.00 $1,675.00 $0.00 $2,175.00 $870.00 $2,313.46 $670.00 $0.00 Total Labor $ Equip. $ Total $ Ext. $ $2,983.46 0.46% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Slab Vapor barrier Office Ceiling Sound Attenuation Slab/Foooting Insulation Gutter 6" 28 Ga Down Spout 3" 28 Ga 2' 6" x 3' Roof Hatch 3" poly ridgid insulation Roof Membrane 60 mil Total Qty Unit Mat. $ 07 26 10.10 0900 62.85 SQ $4.54 $9.55 $0.00 $14.09 $885.56 07 21 16.20 0020 489 SF $0.26 $0.26 $0.00 $0.52 $254.28 07 21 13.10 0080 07 71 23.10 2800 07 71 23.10 5700 07 72 33.10 0520 07 22 16.10 1745 07 54 19.10 8890 0.00 83.5 21 1 6445 64.45 SF LF LF EA SF SQ $0.41 $2.88 $1.28 $640.00 $1.23 $127.00 $0.35 $3.48 $2.20 $140.00 $0.30 $52.50 $0.00 $0.00 $0.00 $0.00 $0.00 $6.90 $0.76 $6.36 $3.48 $780.00 $1.53 $186.40 $0.00 $531.06 $73.08 $780.00 $9,860.85 $12,013.48 Labor $ Equip. $ Total $ $17,432.34 $6,521.26 $444.71 Ext. $ $24,398.31 3.77%
  • 7. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task DOORS Door type C 8'x12' Door type C 16'x12' Overhead door insulation Door type A 3'x7' frame Door type A 3'-6"x7' frame Door type A 2'-6"x7' frame Door type A 2'-6"x7' Door type A 3'x7' Door type A 3'-6"x7' Door type B Door type B Window Frame 3/8" Tempered Glass Electronic Trolly Hardware Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 08 36 13.10 2625 08 36 13.10 2750 08 36 13.10 2860 08 12 13.13 0100 08 12 13.13 0110 08 12 13.13 1180 08 13 13.13 0620 08 13 13.13 0640 08 13 13.13 0660 08 13 13.13 1212 08 12 13.13 0100 08 12 13.31 1200 08 81 10.10 1800 08 36 13.10 2950 See Calculations 1. 6. 1,248. 7. 1. 1. 1. 7. 1. 1. 1. 31.4 37.5 7 - EA EA SF EA EA EA EA EA EA EA EA LF SF EA - $1,008.00 $1,699.00 $4.50 $148.00 $155.00 $199.00 $435.00 $435.00 $630.00 $528.00 $148.00 $11.71 $15.85 $1,075.00 - $340.80 $626.67 $0.00 $44.00 $44.00 $44.00 $41.50 $41.50 $47.00 $41.50 $44.00 $2.59 $9.10 $355.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $1,348.80 $2,325.67 $4.50 $192.00 $199.00 $243.00 $476.50 $476.50 $677.00 $569.50 $192.00 $14.30 $24.95 $1,430.00 - $1,348.80 $13,954.02 $5,616.00 $1,344.00 $199.00 $243.00 $476.50 $3,335.50 $677.00 $569.50 $192.00 $449.02 $935.63 $10,010.00 $4,988.45 $7,868.90 $0.00 Total $31,481.07 $44,338.42 6.85% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task 4" Gypsum Board Wall 6" Gypsum Board Wall 6" Metal Studs 3 5/8" Metal Studs VCT Tile Bathroom Wall Tile Bathroom Floor Tile Drop Ceiling Total Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 09 21 16.33 3800 09 21 16.33 4000 09 21 16.33 4000 09 21 16.33 3800 09 65 19.10 7000 09 30 13.10 0020 09 30 13.10 3283 09 51 23.10 1110 1,234.3630769 115.992 80 404 221.765 235 55 275 SF SF SF SF SF SF SF SF $0.96 $1.14 $1.14 $0.96 $0.94 $2.42 $6.20 $0.75 $2.08 $2.21 $2.21 $2.08 $65.00 $6.50 $2.33 $0.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.04 $3.35 $3.35 $3.04 $1.59 $8.92 $8.53 $1.31 $3,752.46 $388.57 $268.00 $1,228.16 $352.61 $2,096.20 $469.15 $360.25 $3,120.67 $20,065.31 $0.00 $8,915.40 1.38%
  • 8. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task TP Dispenser SS Grab Bar 42" Seat Cover Dispenser SS Grab Bar 36" Hand Soap Dispenser 24" x 36" Mirror Fire Extinguishers Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 10 28 13.13 6100 10 28 13.13 1105 10 28 13.13 6000 10 28 13.13 1100 10 28 13.13 4600 10 28 13.13 3100 10 44 16.13 2100 1 1 1 1 1 1 6 E.A. E.A. E.A. E.A. E.A. E.A. E.A. $17.05 $37.50 $158.00 $37.00 $42.00 $96.50 $79.50 $11.75 $17.65 $17.65 $17.65 $17.65 $23.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28.80 $55.15 $175.65 $54.65 $59.65 $120.00 $79.50 $28.80 $55.15 $175.65 $54.65 $59.65 $120.00 $477.00 $865.05 $105.85 $0.00 Total $970.90 0.15% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task Air Compressor 5HP Total Qty Unit Mat. $ Labor $ Equip. $ 11 11 13.10 0600 1 E.A. $2,025.00 $995.00 $0.00 $3,020.00 $3,020.00 $2,025.00 $995.00 $0.00 $3,020.00 0.47% Total $ Ext. $
  • 9. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Item/ Task 4" Sanitary Line 3" Sanitary Line 2" Sanitary Line 1 1/2" Sanitary Line Trench Drain Sump Pump Hot water Tank Water Cooler Water Closet Sink Sink Hookup Vent Flashing and Caps Backflow Preventer Water Meter 100gpm Oil Interceptor Hot Water Copper Tubing .5" Cold Water Copper Tubing 1" Cold Water Copper Tubing .75" Air Line Copper .75" Air Line Copper 1" Air Line Copper 1.25" Air Line Copper 2" Air Line Copper .5" Total Qty Unit Mat. $ Labor $ 22 11 13.74 4480 22 11 13.74 4470 22 11 13.74 4460 22 11 13.74 4420 22 14 26.19 6770 22 14 29.13 0800 22 34 30.13 2100 22 47 16.10 4640 22 42 13.40 3360 22 41 16.10 4180 22 41 16.10 6960 22 13 16.80 1450 22 11 19.42 4140 22 11 19.38 2100 22 13 23.10 4220 22 11 13.23 2140 22 11 13.23 2200 22 11 13.23 2180 22 11 13.23 2180 22 11 13.23 2200 22 11 13.23 2220 22 11 13.23 2260 22 11 13.23 2140 183.15 108.9 68.0163 40.7 106 1 1 1 1 1 1 3 1 1 1 22.5 32 41.75 45.5 25 50 25 20 L.F. L.F. L.F. L.F. LF EA EA EA EA EA EA EA EA EA EA LF LF LF LF LF LF LF LF $8.30 $6.15 $3.46 $3.01 $154.00 $156.00 $1,225.00 $620.00 $505.00 $355.00 $480.00 $24.50 $455.00 $127.00 $12,500.00 $4.73 $10.84 $7.26 $7.26 $10.84 $14.80 $29.70 $4.73 $16.40 $14.85 $13.35 $12.15 $9.85 $87.50 $291.00 $147.00 $136.00 $98.50 $475.00 $25.50 $31.00 $36.50 $395.00 $5.40 $6.40 $5.75 $5.75 $6.40 $7.55 $10.40 $5.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $38,302.53 $10,574.94 $0.00 Equip. $ Total $ $24.70 $21.00 $16.81 $15.16 $163.85 $243.50 $1,516.00 $767.00 $641.00 $453.50 $955.00 $50.00 $486.00 $163.50 $12,895.00 $10.13 $17.24 $13.01 $13.01 $17.24 $22.35 $40.10 $10.13 Ext. $ $4,523.81 $2,286.90 $1,143.35 $617.01 $17,368.10 $243.50 $1,516.00 $767.00 $641.00 $453.50 $955.00 $150.00 $486.00 $163.50 $12,895.00 $227.93 $551.52 $543.17 $591.96 $430.88 $1,117.25 $1,002.50 $202.60 $48,877.46 7.55%
  • 10. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Total Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 68 1 1 1 1 1 2 67 10 9 34 8 5 21 4 1 4 5 6 13 FT E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. E.A. $0.44 $1,375.00 $4,175.00 $2,225.00 $1,175.00 $185.00 $119.00 $36.00 $38.00 $72.50 $36.50 $124.00 $128.00 $236.00 $236.00 $106.00 $110.00 $221.00 406.75 $67.00 $0.69 $1,225.00 $1,475.00 $825.00 $129.00 $59.00 $51.50 $37.50 $72.00 $87.50 $77.50 $103.00 $93.50 $61.50 $61.50 $75.00 $103.00 $103.00 103 $72.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $1.13 $2,600.00 $5,650.00 $3,050.00 $1,304.00 $244.00 $170.50 $73.50 $110.00 $160.00 $114.00 $227.00 $221.50 $297.50 $297.50 $181.00 $213.00 $324.00 509.75 $139.50 $76.57 $2,600.00 $5,650.00 $3,050.00 $1,304.00 $244.00 $341.00 $4,924.50 $1,100.00 $1,440.00 $3,876.00 $1,816.00 $1,107.50 $6,247.50 $1,190.00 $181.00 $852.00 $1,620.00 $3,058.50 $1,813.50 26 05 90.10 2131 26 05 90.10 4031 26 05 90.10 4331 Thermostat Hookup MPP Circuit Panel MPL Circuit Panel MDP-M Switchboard Circuit Breaker 200 Amp Circuit Breaker 70-100 Amp Circuit Breaker 15-60 Amp Lighting Fixture Box Single Pole Switch GFCI Recepticle Duplex Recepticle Emergency Light Exit Light Light Type A Light Type B Light Type E Light Type H Light Type J Light Type W1 Light Type K Home runs Switch Duplex Recepticle GFCI Recepticle Qty 26 05 90.10 9521 26 24 16.30 1000 26 24 16.30 2650 26 24 13.30 0200 26 24 13.30 0420 26 24 13.30 0280 26 24 13.30 0160 26 05 90.10 6130 26 05 90.10 2130 26 05 90.10 4330 26 05 90.10 4030 26 52 13.10 0500 26 53 13.10 0240 26 51 13.50 4500 26 51 13.50 4500 26 51 13.50 3480 26 51 13.50 3470 26 56 23.10 1100 26 56 23.10 1151 26 51 13.50 0910 Item/ Task 145.333 1385.917 446.25 Ln Ft Ln Ft Ln Ft $1.90 $1.83 $3.63 $3.60 $3.88 $4.38 $0.00 $0.00 $0.00 $5.50 $5.71 $8.01 $799.33 $7,913.59 $3,574.46 $31,015.03 $23,764.42 $0.00 $54,779.45 8.46%
  • 11. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel RS Means Number Item/ Task Silt Fence Footing Excavation 6'-10' Excavation Sewer Excavation Water Line Excavation Sewer and Water Gravel Backfill Soil Stripping Compacted Subgrade Compacted Subgrade Soil Backfill Compacted Subgrade 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Qty Unit Mat. $ 31 25 14.16 1000 31 23 16.13 0050 31 23 16.13 0500 31 23 16.13 0110 31 23 16.13 0110 31 23 23.16 0050 31 14 13.23 1420 31 23 23.24 0100 31 23 23.24 0100 31 23 23.13 2200 31 23 23.24 0100 1,023.00 1,918.00 30.00 46.00 22.00 32.00 4,270.00 0.00 3.01 1,087.00 2.15 L.F. BCY BCY BCY BCY LCY CY HR HR CY HR $0.25 $0.00 $0.00 $0.00 $0.00 6.15 $0.00 $0.00 $0.00 $0.00 $0.00 $452.55 Total Labor $ Equip. $ $0.35 $4.36 $2.95 $2.21 $2.21 2.23 $0.59 $64.00 $64.00 $0.73 $64.00 $0.00 $2.23 $2.88 $2.16 $2.16 34.38 $1.44 $28.50 $28.50 $2.33 $28.50 Total $ Ext. $ $0.60 $613.80 $6.59 $12,639.62 $5.83 $174.90 $4.37 $201.02 $4.37 $96.14 42.76 1368.32 $2.03 $8,662.72 $92.50 $0.00 $92.50 $278.43 $3.06 $3,326.22 $92.50 $198.88 $12,673.72 $14,439.15 $27,560.04 4.74% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel RS Means Number Item/ Task Heavy Duty Asphalt Surface 10" 304 Stone Base Parking Lot Striping HD 4" 304 Stone Base Gravel Lot Surface SLAB 4" ODOT Gravel HD Concrete 4" 304 Stone Base Total 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 Qty Unit Mat. $ 32 12 16.14 0027 32 11 23.23 0250 32 17 23.14 0800 32 11 23.23 0301 32 11 23.23 0050 32 11 23.23 0301 32 11 23.23 0301 0.00 113.67 16.00 87.61 4,018.03 698.33 0.08 SF SY Stall SY SY SY CY $2.32 $10.00 $4.40 $3.98 3.04 $3.98 $3.98 $16,550.24 Labor $ Equip. $ $0.21 $0.39 $1.66 $0.44 0.33 $0.44 $0.44 $1,742.12 $0.25 $0.86 $0.87 $0.72 0.72 $0.72 $0.72 $3,570.59 Total $ Ext. $ $2.78 $11.25 $6.93 $5.14 4.09 $5.14 $5.14 $0.00 $1,278.18 $110.88 $450.30 $16,433.76 $3,589.43 $0.40 $21,862.96 9.32%
  • 12. Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number GL 2" GL 3/4" GL 1 1/2" GL 1 1/4" GL 1" GL 1/2" Stack 15"Concrete Pipe Qty Unit Mat. $ Labor $ Equip. $ Total $ Ext. $ 33 51 13.10 1100 33 51 13.10 1005 33 51 13.10 1060 33 51 13.10 1040 33 51 13.10 1010 33 51 13.10 1000 33 41 13.60 2020 Item/ Task 18 21 55 29 44 9 25 LF LF LF LF LF LF LF $3.36 $1.47 $2.70 $2.04 $2.03 $0.91 $16.00 $2.80 $2.38 $2.66 $2.51 $2.51 $2.24 $11.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.23 $6.16 $3.85 $5.35 $4.55 $4.54 $3.15 $30.08 $110.88 $80.75 $294.25 $131.95 $199.76 $28.35 $752.00 $796.25 $745.94 $55.75 Total 1,597.935 0.25% Three Tough Guys Construction 590 Woody Hayes Dr Rm. 103 Columbus, Ohio 43210 Lab: 9:10 AM Tim Beverage Tyler Shisler Garrett Goebel 11/5/2013 Suburban Steel Maintenance Building Project Number: SSMB-298-3450-2012 RS Means Number Total Qty Unit Mat. $ Labor $ Equip. $ 34 71 13.17 2700 Item/ Task Security Bollard 38 EA $875.00 $92.00 $33.50 $33,250.00 $3,496.00 $1,273.00 Total $ Ext. $ $1,000.50 $38,019.00 $38,019.00 5.87%