13. By-Products
• Activities under the scheme made hundreds
of recharge pits in this block this year. Which
excavated for main activity of the scheme
offers increased contact area and resident
time of surface water with the soil so that
maximum quantity of water can infiltrate and
augment the ground water storage
• Some example in next slides
14. Earthwork filled in the road and excavation causes formation of pond
Panchayat: Basudevpur
15. Excavation for road made a good earthen channel
Panchayat: Govindpur Khajuri