TBM Method
A tunnel boring machine (TBM) , is a machine used to excavate
tunnels with a circular cross section through a variety of soil
and rock strata.
Tunnel diameters can range from a metre (done with micro-TBMs)
to almost 20 metres to date.
Tunnel boring machines are used as an alternative to drilling and
blasting (D&B) methods in rock and conventional โ€˜hand miningโ€™
in soil.
TBMs have the advantages of limiting the disturbance to the
surrounding ground and producing a smooth tunnel wall. This
will reduce cost of lining.
5
6
7
8
9
Stages of TBM Construction
10
11
Hard Rock TBM
TBM
12
This method involves the use of a Tunnelling machine with a
shield and cutter head suitable for hard rock.
13
Earth Pressure Balance (EPB)
TBM
14
This is a mechanised tunnelling method in which a screw
conveyor arrangement which allows the pressure at the face of
the TBM to remain balanced without the use of slurry.
15
Slurry Pressure Balance
(SPB) TBM
16
The basic principle of this TBM is to maintain the face
pressure during the excavation phase by filling the working
chamber, located behind the cutter head, with slurry.
17
18
19
1. It gives correct section to the tunnel.
2. It withstands soil pressure when driven in soft soils.
3. It reduces losses in friction and erosive action, and
ensures stream line motion, when the tunnel has to
carry water by providing a smooth passage at good
velocity, free from turbulence.
4. It forms a good protective covering to certain types of
rocks prone to air slaking.
5. It keeps the inside of the tunnel free from water
percolation.
6. It supports large slabs of rock which might have
become loosened during blasting.
Tunnel Lining
Brick or stone masonry, timber or concrete materials used
for tunnel lining work.
20
a) In firm soil only a roof arch is provided, resting on
benches cut in firm rock at the sides.
b) If rock is less solid, side walls of masonry are also
added.
c) In soft or treacherous soil an invert is added in addition,
to protect the side walls from moving in as also to resist
the upward pressure of the soil.
Tunnel Lining
Tunnel Lining
๏ฎ Basically there are two types of
lining: Temporary and
Permanent. The make of water
and strength of the strata
through which the sinking
operation is to be carried out
govern the choice
๏ฎ In some situations temporary
support is not required,
whereas in others, it becomes
essential to protect the crew
and equipment from any side
fall.
Temporary Lining
Tunnel Lining
Permanent Lining
๏ฎ Placing the entire lining in one operation:
๏ฎ Concreting is done in short lengths by manual operation,
pressure gun, precast segments.
๏ฎ Placing the invert first, and the sides next and finally the roof
๏ฎ The lining next: This method provides a rigid base on which
the formwork for the sides and roof could be supported.
๏ฎ Concrete lining is done using proper form-work. The form
should show the true outline of the finished tunnel section.
๏ฎ Tunnel lining work is divided into three operations-Ground
mould fixing, lining frame and truss for center lining work
Tunnel Lining
Permanent Lining

More Related Content

Similar to ConstTech_Unit 4.4.pdf

Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
ย 

Similar to ConstTech_Unit 4.4.pdf (20)

Pile&Wellfoundation_ManualUpdated as on 20.5.16.pdf
Pile&Wellfoundation_ManualUpdated as on 20.5.16.pdfPile&Wellfoundation_ManualUpdated as on 20.5.16.pdf
Pile&Wellfoundation_ManualUpdated as on 20.5.16.pdf
ย 
2 1 excavation_basementconstruction
2 1 excavation_basementconstruction2 1 excavation_basementconstruction
2 1 excavation_basementconstruction
ย 
07 soil-grout threadbar
07 soil-grout threadbar07 soil-grout threadbar
07 soil-grout threadbar
ย 
u1t4tunneling.pptx
u1t4tunneling.pptxu1t4tunneling.pptx
u1t4tunneling.pptx
ย 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
ย 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdf
ย 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdf
ย 
Micropiles
Micropiles Micropiles
Micropiles
ย 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
ย 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
ย 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
ย 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
ย 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
ย 
Construction methods and equipments
Construction methods and equipmentsConstruction methods and equipments
Construction methods and equipments
ย 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
ย 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
ย 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
ย 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
ย 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
ย 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
ย 

More from SwapnilGorade1

1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf
SwapnilGorade1
ย 

More from SwapnilGorade1 (15)

ConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptxConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptx
ย 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
ย 
CTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptxCTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptx
ย 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
ย 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
ย 
Road-Note-Method-No-4.ppt
Road-Note-Method-No-4.pptRoad-Note-Method-No-4.ppt
Road-Note-Method-No-4.ppt
ย 
ACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdfACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdf
ย 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdf
ย 
Advance concrete technology.pdf
Advance concrete technology.pdfAdvance concrete technology.pdf
Advance concrete technology.pdf
ย 
ACT_unit2_1.pdf
ACT_unit2_1.pdfACT_unit2_1.pdf
ACT_unit2_1.pdf
ย 
scope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptxscope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptx
ย 
UNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptUNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.ppt
ย 
RTH_3.1.pdf
RTH_3.1.pdfRTH_3.1.pdf
RTH_3.1.pdf
ย 
1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf
ย 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdf
ย 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 

ConstTech_Unit 4.4.pdf

  • 1. 1
  • 2. 2
  • 3. 3
  • 4. 4
  • 5. TBM Method A tunnel boring machine (TBM) , is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. Tunnel diameters can range from a metre (done with micro-TBMs) to almost 20 metres to date. Tunnel boring machines are used as an alternative to drilling and blasting (D&B) methods in rock and conventional โ€˜hand miningโ€™ in soil. TBMs have the advantages of limiting the disturbance to the surrounding ground and producing a smooth tunnel wall. This will reduce cost of lining. 5
  • 6. 6
  • 7. 7
  • 8. 8
  • 9. 9 Stages of TBM Construction
  • 10. 10
  • 11. 11
  • 12. Hard Rock TBM TBM 12 This method involves the use of a Tunnelling machine with a shield and cutter head suitable for hard rock.
  • 13. 13
  • 14. Earth Pressure Balance (EPB) TBM 14 This is a mechanised tunnelling method in which a screw conveyor arrangement which allows the pressure at the face of the TBM to remain balanced without the use of slurry.
  • 15. 15
  • 16. Slurry Pressure Balance (SPB) TBM 16 The basic principle of this TBM is to maintain the face pressure during the excavation phase by filling the working chamber, located behind the cutter head, with slurry.
  • 17. 17
  • 18. 18
  • 19. 19 1. It gives correct section to the tunnel. 2. It withstands soil pressure when driven in soft soils. 3. It reduces losses in friction and erosive action, and ensures stream line motion, when the tunnel has to carry water by providing a smooth passage at good velocity, free from turbulence. 4. It forms a good protective covering to certain types of rocks prone to air slaking. 5. It keeps the inside of the tunnel free from water percolation. 6. It supports large slabs of rock which might have become loosened during blasting. Tunnel Lining Brick or stone masonry, timber or concrete materials used for tunnel lining work.
  • 20. 20 a) In firm soil only a roof arch is provided, resting on benches cut in firm rock at the sides. b) If rock is less solid, side walls of masonry are also added. c) In soft or treacherous soil an invert is added in addition, to protect the side walls from moving in as also to resist the upward pressure of the soil. Tunnel Lining
  • 21. Tunnel Lining ๏ฎ Basically there are two types of lining: Temporary and Permanent. The make of water and strength of the strata through which the sinking operation is to be carried out govern the choice ๏ฎ In some situations temporary support is not required, whereas in others, it becomes essential to protect the crew and equipment from any side fall. Temporary Lining
  • 22. Tunnel Lining Permanent Lining ๏ฎ Placing the entire lining in one operation: ๏ฎ Concreting is done in short lengths by manual operation, pressure gun, precast segments. ๏ฎ Placing the invert first, and the sides next and finally the roof ๏ฎ The lining next: This method provides a rigid base on which the formwork for the sides and roof could be supported.
  • 23. ๏ฎ Concrete lining is done using proper form-work. The form should show the true outline of the finished tunnel section. ๏ฎ Tunnel lining work is divided into three operations-Ground mould fixing, lining frame and truss for center lining work Tunnel Lining Permanent Lining