Powergrid Corporation of India was established in 1989 to operate India's national power transmission grid. It took over transmission assets from central power generating companies and unified regional grids. Powergrid has since established India's interconnected transmission network spanning over 1.72 lakh circuit km. It operates as the central transmission utility and has achieved 99.82% network availability. However, the Modi government's National Monetization Pipeline policy now aims to lease parts of Powergrid's national asset to private corporations, sparking employee resistance to protect public ownership.
3. Major factors were:
Poor quality of power to the consumers
Abnormal average transmission and
distribution loss
Poor availability of transmission lines
4. 1980: the Rajadhyaksha Committee on
Power Sector Reforms
August,1989 : Policy Decision to form a
National Power Grid
Objective : integrated operation of the
Central and Regional Transmission
Systems
5. NPTC was incorporated on 23rd October, 1989 With an
authorized capital of Rs 5,000.00 Crore
By 1st April, 1992, the Company took over the Transmission
and Operations owned by the central power generating
companies such as the NTPC, NHPC, NEEPCO, NLC, THDC,
NJPC.
In October 1992, the National Power Transmission
Corporation’s name was changed to Power Grid Corporation
of India Limited (PGCIL), as we know of it today.
The journey took off with an asset of 22,228 ckt kms of
transmission line, 35 electric sub-stations and transmission
capacity of 12,101 MVA in 1992.
6.
7. Every single tower, every
single ckt km of transmission
line built by Powergrid are
saga of bravery, struggle,
sacrifice, dedication and
commitment by the
employees.
8. The total transmission network is
spread over the entire length and
breadth of the country.
Passed through plains and hills,
Canals and Rivers, Desert and
Dense Forest.
9. Each category involving deep
difficulty, danger and fatality.
One most complicated issue was,
“Right of Way (ROW)…to develop
high intensity transmission corridor in
an environment friendly manner
including protection of flora and
fauna”.
10. Many employees had been
victims of physical attack by
men in villages due to dispute
over ‘ROW’ and by animals in
forests,
in course of constructing
towers and laying transmission
lines.
11. The surrender of the Revolutionary
Achievement of the Powergrid Employees
and the Nation to private corporates:
The NMP
The Power
Transmission
Network built
by Powergrid
is a
Revolutionary
Achievement
in Powergrid
Management
Highly reliable and efficient transmission of
power with frequency stability, smooth,
uninterrupted availability of transmission
line within State, Region and Nation.
This has been possible due to Public Sector
culture of people orientation and matching
workforce with Dedication and Efficiency.
12.
13. Now in the name of bringing greater efficiency
(than 99.82%!) the Modi Government has
announced to handover a great portion of this
National Asset to private corporates under
National Monetisation Pipeline (NMP) policy.
18. Unified Load dispatch Centre (ULDC)
National Load Despatch Centre (NLDC)
ONE NATION – ONE GRID – ONE FREQUENCY
The Central Transmission Utility (CTU)
Crowned With ‘Maharatna’ Empowerment
19. o In 1994 took over the Regional Load Despatch Centres
from CEA
o Unified Load Despatch Centre (ULDC)
o Invested Man-Money-Materials
o Delivered Most Modern Technology driven RLDCs
o Reliable Grid Management
o National Load Despatch Centre (NLDC)
in the year 2009
o Significant Reduction in Transmission and
Distribution (T&D) Loss
20. Notified as the CTU under the Electricity Act on
November 27, 2003
This was the crucial job of planning and
co-ordination of transmission of electricity
through the Inter-State Transmission System
The responsibility of planning and co-
ordination of transmission of electricity through
the inter-state transmission system
21.
22. October 1991: North Eastern and Eastern grids were
connected
March 2003: WR and ER-NER were interconnected
August 2006: North and East grids were interconnected
forming Central Grid
December 2013: Southern Region was connected to Central
Grid in Synchronous mode with the commissioning of
765kV Raichur-Solapur Transmission line
23. 1,72,154 circuit kilometer (ckm) Transmission
Line
264 sub stations
2,73,000 Electric towers
Transmission capacity of 4,64,292 MVA
66,922 km of telecom network in 714 locations
of 206 cities in India
Business in overseas in 20 countries
Excellent Physical Performance with a Line
availability of over 99.82%
24. Starting from an authorized total share capital
of Rs. 5,000 Crore
Total income earned in the Financial year
2019-2020 was Rs. 38,670.96 Crore
Net profit was Rs. 11,059.40 Crore after tax
deduction
Total income earned in the Financial year 2020-
2021 was Rs. 40,823.53 Crore
Net profit was Rs. 12,036.00 Crore after tax
deduction
27. We will march towards
the All India General
Strike TOGETHER, Hand
in Hand
We will STRIKE
together to make the deaf
hear on 28th and 29th
March, 2022