SlideShare a Scribd company logo
1 of 7
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 1 of 7
Logistics, Fulfilment and Procurement Business Process Consultant with 5 end to end SAP implementations
onsite, 1 SAP implementation from offshore and one onsite enhancement project experience
Total Experience – 21 years 3 months
9 years 0 months as SAP Logistics, Fulfilment and Procurement Consulting in Automobile, Media and EPC
domain.
12 years 3 months of domain experience in Capital Equipment Manufacturing Industry supplying Automobile
Customers Globally
Overseas Work Exp (9 years): UK 4 1/2 Years, South Africa 2 Years, Dubai 1 1/2 years, Germany 1 year
Subha was not only recognised by his client Nissan and Cambridge University Press for his sound business
process knowledge , but also awarded ACE ( Associate Consistently excel) as he was always rated as Star
Performer in his current organisation for last 7 years since 2009.
Summary of Experience
Subha Banerjee is a SAP Logistics and Procurement Solution Architect in SAP Practice Group at Tech Mahindra (Formerly
Mahindra Satyam and Satyam). He has 21 years of experience out of which since last 9 years, he has been in SAP field.
He comes with a strong manufacturing industry experience of 12 years in Ipsen International Gmbh, Germany. In SAP
field, he has worked in different roles in multiple countries as Solution Architect, Integration Lead, Subject Matter
Expert, Project Manager and Functional Consultant.
He has demonstrated great subject matter expertise and business process design skills during his engagement across
world with organizations like Birds Eye and Iglo UK, ARG Dubai, Nissan South Africa, Sony India, Cambridge University
Press, UK, Nissan Motors UK. His cross functional skill to other functional and technical SAP modules brings enormous
value to his delivery and capability. In addition to specializing in Automobile industry solutions, Media Solutions and EPC
processes, he has extensive knowledge and experience with MM, SD, PS, PP, PM, FI and CO modules and Solution
Manager. In his recent IS Media business transformation project in Cambridge, his solutions to Fulfilment and
distribution, Procurement and Finance are recognized, accepted and in use successfully since January 2013.
Currently Subha, based out of Cambridge is leading cutover activities and managing data migration activities for UK Roll
out scheduled on 9th Nov.
Summary of key Project Based Roles:
Role Organization Technology Client Period
CUP Global Fulfilment
UK Launch Cutover
Lead and Data
Migration Manager
Tech Mahindra ECC+IS
Media+Legacies+CRM
Cambridge University
Press, Cambridge, UK
July 16 till date (Onsite-
Cambridge UK)
CUP Global Fulfilment
UK Launch Distribution
and Supply Chain Lead
and UAT Manager
Tech Mahindra ECC+IS
Media+Legacies+CRM
Cambridge University
Press, Cambridge, UK
Mar 16 till Jun 16
(Onsite-Cambridge UK)
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 2 of 7
CUP Global Fulfilment
US Launch Cutover
Lead and Hyper care
Support Manager
Tech Mahindra ECC+IS
Media+Legacies+CRM
Cambridge University
Press, Cambridge, UK
June 15 till Feb 16
(Onsite-Cambridge UK)
SAP-Logistics and
Supply Chain Solution
Design Lead
Tech Mahindra ECC+IS
Media+Legacies+CRM
Cambridge University
Press, Cambridge, UK
July 13 till May 15
(Onsite-Cambridge UK)
SAP-Mainframe
Procurement
Integration Lead
Mahindra Satyam ECC+MAINFRAME Nissan Motors
Manufacturing,
Sunderland, UK
Mar 13 till June 13
(Onsite-Sunderland
/Offshore-Bangalore)
IS-Media Procurement
Solutions Architect
Mahindra Satyam ECC+IS
Media+Legacies
Cambridge University
Press, Cambridge, UK
Feb 12 till Feb 13
(Onsite-Cambridge)
Domain Expert Mahindra Satyam ECC+Legacies Sony, India Dec 11 till Jan 12
(Offshore-Bangalore)
Project Lead , Business
Analyst and SME
Mahindra Satyam ECC+Mainframe Nissan Motors Pty
Ltd, Rosslyn, South
Africa
April 11 till Dec
11(Onsite-Joburg)
Inventory Logistics’
and Manufacturing
Module Lead
Mahindra Satyam ECC+Mainframe Nissan Motors Pty
Ltd, Rosslyn, South
Africa
April 10 till Mar
11(Onsite-Joburg)
MM module Lead Mahindra Satyam ECC+ECNO AL Rostamani Group,
Dubai
Oct 08 till Mar
10(Onsite-Dubai)
MM Functional
Consultant
Mahindra Satyam SAP ECC Birds Eye and Iglo,
UK
Nov 07 till Sep 08
(offshore-Bangalore)
Senior Manager,
Manufacturing
Wesman Ipsen Manufacturing
Domain
Wesman Ipsen
Furnaces (P) Ltd,
India
Jul 95 till Oct 07
Education:
First class graduate engineer (B.E. - Metallurgy) - Calcutta University (Bengal Engineering Collage).
First Class First MBA (PGDBA-Marketing)-IBMR. Kolkata (AICTE)
Project Assignments
14 Customer : Cambridge University Press, Cambridge,
UK
Period : July 2013 till date
Industry : Books and Journals (Physical and Non-
physical)
Project Name : GFFP Project , SAP IS-Media Sales
and Distribution Implementation
Project Type : IS-Media End to End Implementation
Environment : ECC 6.0 (IS-Media)
Role : Onsite Logistics, Fulfilment and
Procurement Design: End to End solutions integrating SAP
with other systems
Cambridge University Press being oldest publishing
house (approx. 500 years old) having its central
presence in Cambridge with branches in United
States, Australia, South Africa, Asia and many other
country has taken up implementation of SAP IS-
Media beginning 2012. While it is scheduled for
rolling out SAP in different countries in phases till
2018, in the first phase it went live with Finance
and Procurement in SAP IS-Media on 7th Jan 2013 in
UK and USA (two major units).
This end to end implementation is planned to adapt
Global Products Group Concept along with inter-
branch trading model as part of its global business
transformation program. Switching over from
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 3 of 7
existing Vista system to SAP ERP is aimed towards
centralization of corporate management, increase in
operational efficiency as well as utilization of SAP
IS-Media Solutions.
CUP Global Fulfilment and distribution has gone live
in US geography on 11th Nov 2015
In the current phase, the Press in UK is scheduled
to go live with Global Fulfilment and distribution
module on 9th Nov 2016.
13 Customer : Nissan Motors UK, Sunderland, UK
Period : Mar 2013 till June 2013
Industry : Automobile
Project Name : NMGR, SAP ECC Integration with
Mainframe
Project Type : ECC 6.0 Reimplementation
Environment : ECC 6.0
Role : Procurement Solutions Lead (Onsite-
Offshore) (From UAT Phase)
Nissan Motors is currently integrating Mainframe
manufacturing planning into SAP ECC and
implementing procurement solutions for their Russia
(NMGR) plant.
12 Customer : Cambridge University Press, Cambridge,
UK
Period : 13 Months Feb 2012 – Mar 2013
Industry : Books and Journals (Physical and Non-
physical)
Project Name : GFFP Project , SAP IS-Media
Finance and Procurement Implementation
Project Type : IS-Media End to End Implementation
Environment : ECC 6.0 (IS-Media)
Role : Onsite Procurement Solutions Architect
Cambridge University Press being oldest publishing
house (approx. 500 years old) having its central
presence in Cambridge with branches in United
States, Australia, South Africa, Asia and many other
country has taken up implementation of SAP IS-
Media beginning 2012. While it is scheduled for
rolling out SAP in different countries in phases till
2014, in the first phase it went live with Finance
and Procurement in SAP IS-Media on 7th Jan 2013 in
UK and USA (two major units).
This end to end implementation is planned to adapt
Global Products Group Concept along with inter-
branch trading model as part of its global business
transformation program. Switching over from
existing Vista system to SAP ERP is aimed towards
centralization of corporate management, increase in
operational efficiency as well as utilization of SAP
IS-Media Solutions.
11 Customer : Sony India Software Centre, India
Period : 2 Months Dec 2011 – Jan 2012
Industry : FMCG Electronics
Project Name : SOLA Horizon Sh 2.0
Project Type : ECC integration with Legacy Systems
Environment : ECC 6.0 + Legacy Integration
Role : Offshore Domain Expert
Sony India Software Centre (SISC) integrating
planning tool HORIZON SH 2.0 with SAP to enable
plan Sony specific requirements.
10 Customer : Nissan Motors Pty Ltd, Rosslyn, South
Africa
Period : 9 Months April 2011 – Dec 2011
Industry : Automobile
Project Name : Phase 2 Development SHIFT_NSA
Project Type : Business Process Enhancement
Environment : ECC 4.7 Automobile + Mainframe
In Nissan South Africa Plant, post Go-live of
Shift_NSA Project, In Jan’2011, system stabilized in
March’2011. At the time of implementations, many
key business processes were changed. As a result
of these changes, some of the business functions
became more efficient and some of the functions
became unnecessarily cumbersome/highly loaded.
This Shift_ Phase-2 Development Project is intended
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 4 of 7
Role : Onsite Project Lead/Subject Matter Expert
/ Solution Lead
towards analysis of all the business processes with
the participation of business function lead’s
feedback and to draw up the process corrections
and implement the changes.
9 Customer : Nissan Motors Pty Ltd, Rosslyn, South
Africa
Period : 12 Months Apr 2010 – Mar 2011
Industry : Automobile
Project Name : SHIFT_NSA , SAP Implementation
Project Type : SAP ECC Reimplementation
Environment : ECC 4.7 Automobile + Mainframe
Role :Onsite Inventory ,Logistics, Manufacturing
Functional Lead
Nissan Motor Company wants to bring in certain
strategic changes in its global organization in order
to grow at a faster rate. At present Nissan South
Africa sales 40,000 vehicles in a year. As per South
Africa MIDP (Motor Industries development plan) to
get customs Duty incentives and other bonuses,
Nissan South Africa to produce 60000 vehicles by
year 2013.This in turn results in growth Of Nissan
Motors, Globally. In order to cope up with the
strategic changes and South Africa local MIDP
guidelines, Nissan wants to bring in certain
changes. As per the strategy, Nissan South Africa (at
present under GOM region) is going to be under
new strategic region formed as AMIE (Africa, Middle
East, India and Europe).
To implement this strategic changes, SHIFT_NSA
project is taken up which aimed at ERP to function
in Mainframe System and SAP talking to each other
by means of interface. As per the project, only
manufacturing planning to be carried out in
Mainframe System. Procurement,
Debtors’ payment, Vehicle sales and complete FI-
CO functions to happen in SAP system. The link
interfaces between mainframe system and SAP will
be sent via SAP XI (Stone branch middleware to be
used).
Project stake holders intended to go-live this ERP
implementation on 10th Jan’2011 and the same has
been achieved.
After go-live critical care support activities have
been taken till March’2011.
8 Customer : Central Trading Co, Abdullah Al
Rostamani Prop, Dubai UAE
Period : 5 Months Nov 2009 – Mar 2010
Industry : Trading
Project Name : Tamkeen
Project Type : Full Life Cycle SAP ECC Implementation
Environment : ECC 6.0+ ECNO
Role : Onsite Module Lead – SAP MM
Central Trading CO is a leader in Dubai and
Northern Emirates in trading of Michelin Tire,
Castrol Lubricants, Blue Star Air conditioners,
Foerch Products, JHC products, Battery products.
AARP is a leader in Dubai in leasing and rentals of
properties.
Full Cycle Implementation of SAP ECC 6.0 for
Central Trading Co (CTC) and Abdullah Al
Rostamani Prop (AARP), Dubai UAE within the
group Al Rostamani: Tamkeen.
7 Customer : Al Rostamani Pegel, Emirates Electrical
Engineering, Al Rostamani Communications Dubai, UAE
Period : 3 Months Aug 2009 – Oct 2009
Industry : Engineering, Construction, IT Services
To support on production issues for 3 months
immediate after Go-live for three companies included
in Project-1 Implementation of ECC 6.0 for Al
Rostamani Group
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 5 of 7
Project Name : Tamkeen
Project Type : Critical Post Go live Support- 3
Months
Environment : ECC 6.0+ ECNO
Role : Onsite Coordinator for all modules and
Lead for MM
6 Customer : Al Rostamani Pegel, Emirates Electrical
Engineering, Al Rostamani Communications Dubai, UAE
Period : 11 months Oct 2008 – Jul 2009
Industry : Engineering, Construction, IT Services
Project Name : Tamkeen
Project Type : Full Life Cycle SAP ECC Implementation
Environment : ECC 6.0+ ECNO
Role : Onsite SAP MM Lead
Al Rostamani Communications is a leader in the
business of IT Products and Services in Dubai and
Abu Dhabi.
Emirates Electrical Engineering is pioneer in
Substation-Cabling-Hi-tension Projects in UAE
Al Rostamani Pegel is a leader in the Civil
Constructions in Dubai
Full Cycle Implementation of SAP ECC 6.0 for Al
Rostamani Communications (ARC), Emirates
Electrical Engineering (EEE) and Al Rostamani Pegel
(ARP), Dubai UAE within the group Al Rostamani:
Tamkeen.
5 Customer : Birds Eye Iglo, UK
Project Name : BEIG Project Pioneer
Period : 11 months Nov 2007 – Sep 2008
Industry : Frozen Food Manufacturing and Supply
Project Type : Full Life Cycle Implementation of PP, MM,
SD, PM, FI/CO modules (Along with EP, BW)
Environment : SAP ECC 6.0
Role : Offshore MM Consultant
BEIG i.e. Birds Eye Iglo is a break away from
Unilever Limited and is a combination of brand Birds
Eye and Iglo who are into frozen food retail chain.
They have got their presence in almost all the major
European Countries (at present 9 countries). BEIG
is has ordered for implementing SAP ERP as well as
SAP BI which have been implemented successfully
on May 4th 2008. The project has been implemented
in Onsite-Offshore mix strategy by Satyam. It’s the
biggest SAP Implementation at Europe for the
current year.
4 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata
Period : 6 months (04/2006) – (9/2006)
Industry : Capital Equipment Manufacturing
Project Name : BOM Route Of Procurement Planning
Project Type : Oracle ERP
Environment : India Shop Floor Production Planning
Role : Central Coordinator
Enhancing towards complete automatic
procurement process which will be the result of
MRP run. This was done to achieve JIT concept in
Inventory Management.
3 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata
Period : 12 months (04/2006) – (03/2007)
Industry : Capital Equipment Manufacturing
Project Type :Implementation of functional
prototype as seen at Germany
Environment : India Shop Floor Manufacturing
Role : Plant Manager
To implement similar manufacturing and business
process sequence as Ipsen International, Germany .
Wesman Ipsen is a leading manufacturer of Heat
Treatment Equipment Installation having its
customer base with all leading Automobile
Manufacturers like TATA MOTORS, TVS, BAJAJ,
and HERO HONDA.
Wesman Ipsen Furnaces is a joint venture between
Ipsen International, Germany (51%) and Wesman
Engineering Co Limited, India (49%). Ipsen
International, Germany has got its customer base
with all major automobile giants of Europe including
Volkswagen, Daimler Chrysler, Ford, BMW etc.
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 6 of 7
2 Customer : Ipsen International, Kleve, Germany
Period : 9 months (07/2005) – (03/2006)
Industry : Capital Equipment Manufacturing
Project Type : Understanding Complete Systems
and Operations
Environment : German Shop floor Manufacturing
Role : Manufacturing Process Lead
To understand ERP system, sales activity, design,
procurement, manufacturing, quality systems of
Ipsen International, Germany with working hands
on with them and with the objective of
implementing the same at India.
1 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata
Period : 20 months (07/2002) – (03/2004)
Industry : Capital Equipment Manufacturing
Project Name : Complete ERP Implementation
Project Type : End to End ERP Implementation
Environment : Oracle ERP
Role : Central Coordinator
To implement all the modules of ERP in the new
green field manufacturing facility towards south of
Kolkata towards objective of developing an efficient
and much more productive business organization.
Non SAP (Functional Experience) Jul 1995 to Oct 2007 – Wesman Ipsen Furnaces (P) Limited
 Have customised and implemented ERP (Done through Eastern Software Systems) in the new plant in the year 2003,
which has definitely reduced cost of manufacturing and have increased productivity of individuals.
 Played role of central coordinator in implementing purchase module, inventory module, production module, sales module
and part of finance module directly related to manufacturing.
 Implemented manufacturing cycle identical to the one followed at present organisation’s principal Ipsen International,
Germany starting from Kick off Meeting, production planning, purchase, inventory management, workforce planning,
assembly work, stage inspection, final inspection and sign off documentation.
 Planned the manufacturing hall layout in the year 2001as well as in the year 2005 & 2007 when the hall was extended
twice.
 Procured material handling equipment, brick cutting machines, pipe threading machines, compressor, welding machines,
drilling machine, power saw, material handling trolleys & relocated so as to best utilized in assembly shop.
 Involved in purchase of office equipment like copier/scanner/printer, filing racks, computers.
 Excise registration with the help of consultant when new manufacturing facilities were set up in the year 2002 and
conversant with excise documentation.
 Customer includes automobile majors worldwide like Volkswagen, Daimler Chrysler, John Deere, Tata Motors, Hero
Honda, TVS, and Bosch etc.
Skills Definition
Skills Proficiency (High / Medium / Low)
Communication with Business Process Owners High
SAP MM High
SAP Data Migration High
SAP Cutover and Hyper care High
SAP Project Lead High
SAP ECC Solution Architect High
SAP Integration Lead High
SAP SD, IS-media High
Subha Banerjee Email: subha1500@gmail.com
Mobile: +44 74664 67163 (Cambridge)
Page 7 of 7
SAP PS,LE Medium
SAP WM,FI,CO,PP,PM Low
Solution Manager Low
MS-Office High
SAP ABAP Low
SAP BASIS Low
People Management High
Business Process Knowledge in multiple Industry Domain High
Present Address : 40, Fennec Close, Cambridge, CB1 9GG, United Kingdom
Phone: 0044 1223 560112, Mobile: +44 74664 67163 (UK)
Permanent Address : Flat No. 1B, Sagar, 353, P. Majumdar Road, C2, Green Park, Kolkata-700078, India Phone: 0091-
33-24842501
Email: subha1500@gmail.com

More Related Content

What's hot (20)

Gokula_Gopinath_Resume
Gokula_Gopinath_ResumeGokula_Gopinath_Resume
Gokula_Gopinath_Resume
 
Rajasekhar_resume
Rajasekhar_resumeRajasekhar_resume
Rajasekhar_resume
 
Ravikumar
Ravikumar Ravikumar
Ravikumar
 
Sudipta Ghosh
Sudipta GhoshSudipta Ghosh
Sudipta Ghosh
 
KeitthReynolds_resume v31SCM
KeitthReynolds_resume v31SCMKeitthReynolds_resume v31SCM
KeitthReynolds_resume v31SCM
 
Akshay bhapkar cv
Akshay bhapkar cvAkshay bhapkar cv
Akshay bhapkar cv
 
OngChaiYingResume
OngChaiYingResumeOngChaiYingResume
OngChaiYingResume
 
SHRAVANI RESUME
SHRAVANI RESUMESHRAVANI RESUME
SHRAVANI RESUME
 
Updated Resumee
Updated ResumeeUpdated Resumee
Updated Resumee
 
Dick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer 2016 Resume
Dick Kramer 2016 Resume
 
BhagathSingh_Resume
BhagathSingh_ResumeBhagathSingh_Resume
BhagathSingh_Resume
 
Resume_Linkedin
Resume_LinkedinResume_Linkedin
Resume_Linkedin
 
Vijai Gunalan
Vijai GunalanVijai Gunalan
Vijai Gunalan
 
Cv mr1
Cv mr1Cv mr1
Cv mr1
 
SreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOASreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOA
 
Nitin Mandloi
Nitin MandloiNitin Mandloi
Nitin Mandloi
 
Duygu_Uzunel_CV_SAP_EN
Duygu_Uzunel_CV_SAP_ENDuygu_Uzunel_CV_SAP_EN
Duygu_Uzunel_CV_SAP_EN
 
Curriculum Vitae v 6.0- Itamar Gelber
Curriculum Vitae v 6.0- Itamar GelberCurriculum Vitae v 6.0- Itamar Gelber
Curriculum Vitae v 6.0- Itamar Gelber
 
Sreekanth Chadalawada CV
Sreekanth Chadalawada CVSreekanth Chadalawada CV
Sreekanth Chadalawada CV
 
Resume Sudhir Pore -2016
Resume Sudhir Pore -2016Resume Sudhir Pore -2016
Resume Sudhir Pore -2016
 

Similar to SUBHA18092016

Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack Brophy
 
Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack Brophy
 
Jack_Brophy_Resume_July_2015
Jack_Brophy_Resume_July_2015Jack_Brophy_Resume_July_2015
Jack_Brophy_Resume_July_2015Jack Brophy
 
Jack_Brophy_Resume_October_2015
Jack_Brophy_Resume_October_2015Jack_Brophy_Resume_October_2015
Jack_Brophy_Resume_October_2015Jack Brophy
 
Updated CV - Devendra Gaware
Updated CV - Devendra GawareUpdated CV - Devendra Gaware
Updated CV - Devendra GawareDevendra Gaware
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran Kelany
 
siemensprojects
siemensprojectssiemensprojects
siemensprojectsNauman Zia
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh Nayak
 
Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017Wilson Xing
 
Resume_Jegatheesan-JKT
Resume_Jegatheesan-JKTResume_Jegatheesan-JKT
Resume_Jegatheesan-JKTJag Jagdeesh
 
Anand Singh FICO
Anand Singh FICOAnand Singh FICO
Anand Singh FICOAnand Singh
 

Similar to SUBHA18092016 (20)

Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack brophy resume_june_2016
Jack brophy resume_june_2016
 
Jack brophy resume_june_2016
Jack brophy resume_june_2016Jack brophy resume_june_2016
Jack brophy resume_june_2016
 
Jack_Brophy_Resume_July_2015
Jack_Brophy_Resume_July_2015Jack_Brophy_Resume_July_2015
Jack_Brophy_Resume_July_2015
 
Jack_Brophy_Resume_October_2015
Jack_Brophy_Resume_October_2015Jack_Brophy_Resume_October_2015
Jack_Brophy_Resume_October_2015
 
Faizan khalil
Faizan khalilFaizan khalil
Faizan khalil
 
Asmaa_Abood_CV
Asmaa_Abood_CVAsmaa_Abood_CV
Asmaa_Abood_CV
 
Updated CV - Devendra Gaware
Updated CV - Devendra GawareUpdated CV - Devendra Gaware
Updated CV - Devendra Gaware
 
CV_PP
CV_PPCV_PP
CV_PP
 
CV_PP
CV_PPCV_PP
CV_PP
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resume
 
siemensprojects
siemensprojectssiemensprojects
siemensprojects
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017
 
SAPBI_7Years_Sweden_CV
SAPBI_7Years_Sweden_CVSAPBI_7Years_Sweden_CV
SAPBI_7Years_Sweden_CV
 
Resume_Jegatheesan-JKT
Resume_Jegatheesan-JKTResume_Jegatheesan-JKT
Resume_Jegatheesan-JKT
 
Word Version_Doungporn_2015070N
Word Version_Doungporn_2015070NWord Version_Doungporn_2015070N
Word Version_Doungporn_2015070N
 
Presales Profile
Presales ProfilePresales Profile
Presales Profile
 
Anand Singh FICO
Anand Singh FICOAnand Singh FICO
Anand Singh FICO
 
Resume_FLEXCUBE
Resume_FLEXCUBEResume_FLEXCUBE
Resume_FLEXCUBE
 
SBK_CV
SBK_CVSBK_CV
SBK_CV
 

SUBHA18092016

  • 1. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 1 of 7 Logistics, Fulfilment and Procurement Business Process Consultant with 5 end to end SAP implementations onsite, 1 SAP implementation from offshore and one onsite enhancement project experience Total Experience – 21 years 3 months 9 years 0 months as SAP Logistics, Fulfilment and Procurement Consulting in Automobile, Media and EPC domain. 12 years 3 months of domain experience in Capital Equipment Manufacturing Industry supplying Automobile Customers Globally Overseas Work Exp (9 years): UK 4 1/2 Years, South Africa 2 Years, Dubai 1 1/2 years, Germany 1 year Subha was not only recognised by his client Nissan and Cambridge University Press for his sound business process knowledge , but also awarded ACE ( Associate Consistently excel) as he was always rated as Star Performer in his current organisation for last 7 years since 2009. Summary of Experience Subha Banerjee is a SAP Logistics and Procurement Solution Architect in SAP Practice Group at Tech Mahindra (Formerly Mahindra Satyam and Satyam). He has 21 years of experience out of which since last 9 years, he has been in SAP field. He comes with a strong manufacturing industry experience of 12 years in Ipsen International Gmbh, Germany. In SAP field, he has worked in different roles in multiple countries as Solution Architect, Integration Lead, Subject Matter Expert, Project Manager and Functional Consultant. He has demonstrated great subject matter expertise and business process design skills during his engagement across world with organizations like Birds Eye and Iglo UK, ARG Dubai, Nissan South Africa, Sony India, Cambridge University Press, UK, Nissan Motors UK. His cross functional skill to other functional and technical SAP modules brings enormous value to his delivery and capability. In addition to specializing in Automobile industry solutions, Media Solutions and EPC processes, he has extensive knowledge and experience with MM, SD, PS, PP, PM, FI and CO modules and Solution Manager. In his recent IS Media business transformation project in Cambridge, his solutions to Fulfilment and distribution, Procurement and Finance are recognized, accepted and in use successfully since January 2013. Currently Subha, based out of Cambridge is leading cutover activities and managing data migration activities for UK Roll out scheduled on 9th Nov. Summary of key Project Based Roles: Role Organization Technology Client Period CUP Global Fulfilment UK Launch Cutover Lead and Data Migration Manager Tech Mahindra ECC+IS Media+Legacies+CRM Cambridge University Press, Cambridge, UK July 16 till date (Onsite- Cambridge UK) CUP Global Fulfilment UK Launch Distribution and Supply Chain Lead and UAT Manager Tech Mahindra ECC+IS Media+Legacies+CRM Cambridge University Press, Cambridge, UK Mar 16 till Jun 16 (Onsite-Cambridge UK)
  • 2. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 2 of 7 CUP Global Fulfilment US Launch Cutover Lead and Hyper care Support Manager Tech Mahindra ECC+IS Media+Legacies+CRM Cambridge University Press, Cambridge, UK June 15 till Feb 16 (Onsite-Cambridge UK) SAP-Logistics and Supply Chain Solution Design Lead Tech Mahindra ECC+IS Media+Legacies+CRM Cambridge University Press, Cambridge, UK July 13 till May 15 (Onsite-Cambridge UK) SAP-Mainframe Procurement Integration Lead Mahindra Satyam ECC+MAINFRAME Nissan Motors Manufacturing, Sunderland, UK Mar 13 till June 13 (Onsite-Sunderland /Offshore-Bangalore) IS-Media Procurement Solutions Architect Mahindra Satyam ECC+IS Media+Legacies Cambridge University Press, Cambridge, UK Feb 12 till Feb 13 (Onsite-Cambridge) Domain Expert Mahindra Satyam ECC+Legacies Sony, India Dec 11 till Jan 12 (Offshore-Bangalore) Project Lead , Business Analyst and SME Mahindra Satyam ECC+Mainframe Nissan Motors Pty Ltd, Rosslyn, South Africa April 11 till Dec 11(Onsite-Joburg) Inventory Logistics’ and Manufacturing Module Lead Mahindra Satyam ECC+Mainframe Nissan Motors Pty Ltd, Rosslyn, South Africa April 10 till Mar 11(Onsite-Joburg) MM module Lead Mahindra Satyam ECC+ECNO AL Rostamani Group, Dubai Oct 08 till Mar 10(Onsite-Dubai) MM Functional Consultant Mahindra Satyam SAP ECC Birds Eye and Iglo, UK Nov 07 till Sep 08 (offshore-Bangalore) Senior Manager, Manufacturing Wesman Ipsen Manufacturing Domain Wesman Ipsen Furnaces (P) Ltd, India Jul 95 till Oct 07 Education: First class graduate engineer (B.E. - Metallurgy) - Calcutta University (Bengal Engineering Collage). First Class First MBA (PGDBA-Marketing)-IBMR. Kolkata (AICTE) Project Assignments 14 Customer : Cambridge University Press, Cambridge, UK Period : July 2013 till date Industry : Books and Journals (Physical and Non- physical) Project Name : GFFP Project , SAP IS-Media Sales and Distribution Implementation Project Type : IS-Media End to End Implementation Environment : ECC 6.0 (IS-Media) Role : Onsite Logistics, Fulfilment and Procurement Design: End to End solutions integrating SAP with other systems Cambridge University Press being oldest publishing house (approx. 500 years old) having its central presence in Cambridge with branches in United States, Australia, South Africa, Asia and many other country has taken up implementation of SAP IS- Media beginning 2012. While it is scheduled for rolling out SAP in different countries in phases till 2018, in the first phase it went live with Finance and Procurement in SAP IS-Media on 7th Jan 2013 in UK and USA (two major units). This end to end implementation is planned to adapt Global Products Group Concept along with inter- branch trading model as part of its global business transformation program. Switching over from
  • 3. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 3 of 7 existing Vista system to SAP ERP is aimed towards centralization of corporate management, increase in operational efficiency as well as utilization of SAP IS-Media Solutions. CUP Global Fulfilment and distribution has gone live in US geography on 11th Nov 2015 In the current phase, the Press in UK is scheduled to go live with Global Fulfilment and distribution module on 9th Nov 2016. 13 Customer : Nissan Motors UK, Sunderland, UK Period : Mar 2013 till June 2013 Industry : Automobile Project Name : NMGR, SAP ECC Integration with Mainframe Project Type : ECC 6.0 Reimplementation Environment : ECC 6.0 Role : Procurement Solutions Lead (Onsite- Offshore) (From UAT Phase) Nissan Motors is currently integrating Mainframe manufacturing planning into SAP ECC and implementing procurement solutions for their Russia (NMGR) plant. 12 Customer : Cambridge University Press, Cambridge, UK Period : 13 Months Feb 2012 – Mar 2013 Industry : Books and Journals (Physical and Non- physical) Project Name : GFFP Project , SAP IS-Media Finance and Procurement Implementation Project Type : IS-Media End to End Implementation Environment : ECC 6.0 (IS-Media) Role : Onsite Procurement Solutions Architect Cambridge University Press being oldest publishing house (approx. 500 years old) having its central presence in Cambridge with branches in United States, Australia, South Africa, Asia and many other country has taken up implementation of SAP IS- Media beginning 2012. While it is scheduled for rolling out SAP in different countries in phases till 2014, in the first phase it went live with Finance and Procurement in SAP IS-Media on 7th Jan 2013 in UK and USA (two major units). This end to end implementation is planned to adapt Global Products Group Concept along with inter- branch trading model as part of its global business transformation program. Switching over from existing Vista system to SAP ERP is aimed towards centralization of corporate management, increase in operational efficiency as well as utilization of SAP IS-Media Solutions. 11 Customer : Sony India Software Centre, India Period : 2 Months Dec 2011 – Jan 2012 Industry : FMCG Electronics Project Name : SOLA Horizon Sh 2.0 Project Type : ECC integration with Legacy Systems Environment : ECC 6.0 + Legacy Integration Role : Offshore Domain Expert Sony India Software Centre (SISC) integrating planning tool HORIZON SH 2.0 with SAP to enable plan Sony specific requirements. 10 Customer : Nissan Motors Pty Ltd, Rosslyn, South Africa Period : 9 Months April 2011 – Dec 2011 Industry : Automobile Project Name : Phase 2 Development SHIFT_NSA Project Type : Business Process Enhancement Environment : ECC 4.7 Automobile + Mainframe In Nissan South Africa Plant, post Go-live of Shift_NSA Project, In Jan’2011, system stabilized in March’2011. At the time of implementations, many key business processes were changed. As a result of these changes, some of the business functions became more efficient and some of the functions became unnecessarily cumbersome/highly loaded. This Shift_ Phase-2 Development Project is intended
  • 4. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 4 of 7 Role : Onsite Project Lead/Subject Matter Expert / Solution Lead towards analysis of all the business processes with the participation of business function lead’s feedback and to draw up the process corrections and implement the changes. 9 Customer : Nissan Motors Pty Ltd, Rosslyn, South Africa Period : 12 Months Apr 2010 – Mar 2011 Industry : Automobile Project Name : SHIFT_NSA , SAP Implementation Project Type : SAP ECC Reimplementation Environment : ECC 4.7 Automobile + Mainframe Role :Onsite Inventory ,Logistics, Manufacturing Functional Lead Nissan Motor Company wants to bring in certain strategic changes in its global organization in order to grow at a faster rate. At present Nissan South Africa sales 40,000 vehicles in a year. As per South Africa MIDP (Motor Industries development plan) to get customs Duty incentives and other bonuses, Nissan South Africa to produce 60000 vehicles by year 2013.This in turn results in growth Of Nissan Motors, Globally. In order to cope up with the strategic changes and South Africa local MIDP guidelines, Nissan wants to bring in certain changes. As per the strategy, Nissan South Africa (at present under GOM region) is going to be under new strategic region formed as AMIE (Africa, Middle East, India and Europe). To implement this strategic changes, SHIFT_NSA project is taken up which aimed at ERP to function in Mainframe System and SAP talking to each other by means of interface. As per the project, only manufacturing planning to be carried out in Mainframe System. Procurement, Debtors’ payment, Vehicle sales and complete FI- CO functions to happen in SAP system. The link interfaces between mainframe system and SAP will be sent via SAP XI (Stone branch middleware to be used). Project stake holders intended to go-live this ERP implementation on 10th Jan’2011 and the same has been achieved. After go-live critical care support activities have been taken till March’2011. 8 Customer : Central Trading Co, Abdullah Al Rostamani Prop, Dubai UAE Period : 5 Months Nov 2009 – Mar 2010 Industry : Trading Project Name : Tamkeen Project Type : Full Life Cycle SAP ECC Implementation Environment : ECC 6.0+ ECNO Role : Onsite Module Lead – SAP MM Central Trading CO is a leader in Dubai and Northern Emirates in trading of Michelin Tire, Castrol Lubricants, Blue Star Air conditioners, Foerch Products, JHC products, Battery products. AARP is a leader in Dubai in leasing and rentals of properties. Full Cycle Implementation of SAP ECC 6.0 for Central Trading Co (CTC) and Abdullah Al Rostamani Prop (AARP), Dubai UAE within the group Al Rostamani: Tamkeen. 7 Customer : Al Rostamani Pegel, Emirates Electrical Engineering, Al Rostamani Communications Dubai, UAE Period : 3 Months Aug 2009 – Oct 2009 Industry : Engineering, Construction, IT Services To support on production issues for 3 months immediate after Go-live for three companies included in Project-1 Implementation of ECC 6.0 for Al Rostamani Group
  • 5. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 5 of 7 Project Name : Tamkeen Project Type : Critical Post Go live Support- 3 Months Environment : ECC 6.0+ ECNO Role : Onsite Coordinator for all modules and Lead for MM 6 Customer : Al Rostamani Pegel, Emirates Electrical Engineering, Al Rostamani Communications Dubai, UAE Period : 11 months Oct 2008 – Jul 2009 Industry : Engineering, Construction, IT Services Project Name : Tamkeen Project Type : Full Life Cycle SAP ECC Implementation Environment : ECC 6.0+ ECNO Role : Onsite SAP MM Lead Al Rostamani Communications is a leader in the business of IT Products and Services in Dubai and Abu Dhabi. Emirates Electrical Engineering is pioneer in Substation-Cabling-Hi-tension Projects in UAE Al Rostamani Pegel is a leader in the Civil Constructions in Dubai Full Cycle Implementation of SAP ECC 6.0 for Al Rostamani Communications (ARC), Emirates Electrical Engineering (EEE) and Al Rostamani Pegel (ARP), Dubai UAE within the group Al Rostamani: Tamkeen. 5 Customer : Birds Eye Iglo, UK Project Name : BEIG Project Pioneer Period : 11 months Nov 2007 – Sep 2008 Industry : Frozen Food Manufacturing and Supply Project Type : Full Life Cycle Implementation of PP, MM, SD, PM, FI/CO modules (Along with EP, BW) Environment : SAP ECC 6.0 Role : Offshore MM Consultant BEIG i.e. Birds Eye Iglo is a break away from Unilever Limited and is a combination of brand Birds Eye and Iglo who are into frozen food retail chain. They have got their presence in almost all the major European Countries (at present 9 countries). BEIG is has ordered for implementing SAP ERP as well as SAP BI which have been implemented successfully on May 4th 2008. The project has been implemented in Onsite-Offshore mix strategy by Satyam. It’s the biggest SAP Implementation at Europe for the current year. 4 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata Period : 6 months (04/2006) – (9/2006) Industry : Capital Equipment Manufacturing Project Name : BOM Route Of Procurement Planning Project Type : Oracle ERP Environment : India Shop Floor Production Planning Role : Central Coordinator Enhancing towards complete automatic procurement process which will be the result of MRP run. This was done to achieve JIT concept in Inventory Management. 3 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata Period : 12 months (04/2006) – (03/2007) Industry : Capital Equipment Manufacturing Project Type :Implementation of functional prototype as seen at Germany Environment : India Shop Floor Manufacturing Role : Plant Manager To implement similar manufacturing and business process sequence as Ipsen International, Germany . Wesman Ipsen is a leading manufacturer of Heat Treatment Equipment Installation having its customer base with all leading Automobile Manufacturers like TATA MOTORS, TVS, BAJAJ, and HERO HONDA. Wesman Ipsen Furnaces is a joint venture between Ipsen International, Germany (51%) and Wesman Engineering Co Limited, India (49%). Ipsen International, Germany has got its customer base with all major automobile giants of Europe including Volkswagen, Daimler Chrysler, Ford, BMW etc.
  • 6. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 6 of 7 2 Customer : Ipsen International, Kleve, Germany Period : 9 months (07/2005) – (03/2006) Industry : Capital Equipment Manufacturing Project Type : Understanding Complete Systems and Operations Environment : German Shop floor Manufacturing Role : Manufacturing Process Lead To understand ERP system, sales activity, design, procurement, manufacturing, quality systems of Ipsen International, Germany with working hands on with them and with the objective of implementing the same at India. 1 Customer : Wesman Ipsen Furnaces (P) Ltd, Kolkata Period : 20 months (07/2002) – (03/2004) Industry : Capital Equipment Manufacturing Project Name : Complete ERP Implementation Project Type : End to End ERP Implementation Environment : Oracle ERP Role : Central Coordinator To implement all the modules of ERP in the new green field manufacturing facility towards south of Kolkata towards objective of developing an efficient and much more productive business organization. Non SAP (Functional Experience) Jul 1995 to Oct 2007 – Wesman Ipsen Furnaces (P) Limited  Have customised and implemented ERP (Done through Eastern Software Systems) in the new plant in the year 2003, which has definitely reduced cost of manufacturing and have increased productivity of individuals.  Played role of central coordinator in implementing purchase module, inventory module, production module, sales module and part of finance module directly related to manufacturing.  Implemented manufacturing cycle identical to the one followed at present organisation’s principal Ipsen International, Germany starting from Kick off Meeting, production planning, purchase, inventory management, workforce planning, assembly work, stage inspection, final inspection and sign off documentation.  Planned the manufacturing hall layout in the year 2001as well as in the year 2005 & 2007 when the hall was extended twice.  Procured material handling equipment, brick cutting machines, pipe threading machines, compressor, welding machines, drilling machine, power saw, material handling trolleys & relocated so as to best utilized in assembly shop.  Involved in purchase of office equipment like copier/scanner/printer, filing racks, computers.  Excise registration with the help of consultant when new manufacturing facilities were set up in the year 2002 and conversant with excise documentation.  Customer includes automobile majors worldwide like Volkswagen, Daimler Chrysler, John Deere, Tata Motors, Hero Honda, TVS, and Bosch etc. Skills Definition Skills Proficiency (High / Medium / Low) Communication with Business Process Owners High SAP MM High SAP Data Migration High SAP Cutover and Hyper care High SAP Project Lead High SAP ECC Solution Architect High SAP Integration Lead High SAP SD, IS-media High
  • 7. Subha Banerjee Email: subha1500@gmail.com Mobile: +44 74664 67163 (Cambridge) Page 7 of 7 SAP PS,LE Medium SAP WM,FI,CO,PP,PM Low Solution Manager Low MS-Office High SAP ABAP Low SAP BASIS Low People Management High Business Process Knowledge in multiple Industry Domain High Present Address : 40, Fennec Close, Cambridge, CB1 9GG, United Kingdom Phone: 0044 1223 560112, Mobile: +44 74664 67163 (UK) Permanent Address : Flat No. 1B, Sagar, 353, P. Majumdar Road, C2, Green Park, Kolkata-700078, India Phone: 0091- 33-24842501 Email: subha1500@gmail.com