SlideShare a Scribd company logo
1 of 17
Copyright © Wellcem AS 2015
Well Therapy Solutions
Integrity, EOR and P&A
February 2016
Copyright © Wellcem AS 2015
 Private owned Norwegian oil service company
 Headquartered in Norway with branches located
around the world.
 Wellcem’s state of the art laboratory is located Norway
and is heavily involved in both research and
development projects as well as operational field
support.
 Research and Development plays a key role in the
company’s business model with focus on our
customer’s current and future needs.
Wellcem introduction
To be a leading provider of technology for
Plugging, Lost Circulation, Leak Stop, and
Sand Consolidation in Oil and Gas wells.
Vision
R&D
Partners
Copyright © Wellcem AS 2015
Clients and operations
 Europe
 Headquarters, Klepp Norway
 Middle East
 Dammam, KSA
 Dubai and Abu Dhabi, UAE
 Muscat, Oman
 Kuwait
 Asia
 Kuala Lumpur, Malaysia
 North America
 Houston, Texas US
Copyright © Wellcem AS 2015
ThermaSet® is a thermosetting resin that is pumped downhole in a liquid state.
 The curing process is activated downhole by temperature.
 A non-reactive polymer – particle free liquid
 Specific gravity can be adjusted from 0.7 - 2.5 SG
 Viscosity range 10 - 2000 CP
 Operating temperature range from -9 to 150 °C BHT, resistant to 320 °C in cured
conditions
Copyright © Wellcem AS 2015
Well Therapy Solutions
Specifications:
 Particle free fluid
 Specific gravity can be adjusted from 0.7 - 2.5 SG
 Viscosity range 10 – 2000 CP
 Operating temperature range from -9°C to 150°C
BHT, with physical and chemical resilience up to
320°C in its cured state.
Common applications:
 Competent well barrier for permanently abandoning wells
 Lost Circulation control – Treat & Drill without POOH
 Well bore strengthening
 Zonal Isolation / Water and Gas Shut off
 Strengthening the shoe
 Weak formations and zones with low fracture gradients
where low density systems are required i.e. foam cement.
 Consolidation of loose formations
Copyright © Wellcem AS 2015
Compressive Strength (psi)
Flexural Strength (psi)
Youngs Modulus (ksi)
Rupture Elongation (%)
ThermaSet ® Portland Cement
Mechanical Properties
11,168
6,526
324.884
3.5
8,412
1,450
536.639
0.01
Copyright © Wellcem AS 2015
Precision intervention
 Easy pumpable and can be placed with high
precision in the well
 Tunable density, viscosity and curing time
 Reduce WOC = Save time and reduce cost
BHT
Curing time
Density
Viscosity
http://www.wellcem.no/videos
Copyright © Wellcem AS 2015
Typical Operation execution model
Preparation:
 Arrangement of required materials
 Operation envelop ( In-house reactivity tests at all expected
downhole temperature values)
 Development of operational procedures for all possible scenarios
 Quality check of material and optimization of recipe in labs at well
conditions.
 Preparation of required equipment , materials and its
mobilization according to schedule
Execution:
 Inspection and quality check of equipment and materials on site
 Mixing and pump of ThermaSet® pill as per job specific
operational procedures
 Verifying the curing and plug integrity as per operational
procedures
 Handling of excess material and cleaning/flushing of surface
equipment as per operational procedures
Copyright © Wellcem AS 2015
Well Therapy Solutions
54
63
10
Sustained Casing pressure
Lost Circulation
Benefits of ThermaSet® :
 Superior, long lasting mechanical properties
 Temperature activated, particle free resin
 Easy pumpable and can be placed with high precision in the
well
 Tunable density, viscosity and curing time
 Right angle setting profile translating to a very quick transition
 Higher compressive, tensile strength and shear bond VS
conventional cement
 More flexible/not brittle/ Gas tight/ Good bonding to steel
 Will penetrate deeper into formations
 Significantly reduced WOC /rig time – Saving cost
 Qualified to the Norwegian NORSOK STANDARD D-010, as a
permanent P&A material
 Easy to prepare and handle on location
28
Tubular integrity
Plug & Abandonment
Comprehensiverunrecord
Copyright © Wellcem AS 2015
CASE HISTORIES
 Plug & Abandonment
 Lost Circulation
 Sustained Casing pressure
 Sand Consolidation
 Gas/Water shut-off
Copyright © Wellcem AS 2015
Pre-Placement Post-Placement
Operation
• Temporary P&A
Well
• Oil
• Depleted reservoir
• Parted tubing at 8496ft MD
• Perfs – 10850 – 11050ft MD
Plug
• Resin 28 m3
Result
• 100%
Isolation
Hod Field
The North Sea / Norwegian Continental Shelf
Copyright © Wellcem AS 2015
Pre-Placement Post-PlacementOperation
• Temporary P&A
Well
• Gas
• Depleted reservoir
Plug
• 26 m3 of
ThermaSet® Results
• 100% isolation
West Sole
The North Sea / UK Sector
Copyright © Wellcem AS 2015
Challenge:
Solution:
Conclusion:
Karan Field
Middle East
• While drilling the 12½ hole section of a high pressure gas well, the
operator encoutered a theif zone at 10,753’ MD.
• Mud losses were in excess of 480 BPH.
• A 250 Bbl conventional LCM pill was pumped with no success.
• 55 Bbls. of ThermaSet® was pumped through the bit above the thief
zone and allowed to flow into the loss zone
• Once ThermaSet® was allowed to cure, the rig was able to circulate
at 400 BPH.
• Top of the ThermaSet® plug was tagged at 10,705’ MD
• The pill was drilled out at 100 fph without any further losses.
Copyright © Wellcem AS 2015
Pre-Placement Post-Placement
Operation
• Remediation of Gas Communication
to Surface.
Well
• Gas observed on sea bed around BOP
• Gas-cut mud observed in returns
Plug
• Squeeze 5 m3 of neat ThermaSet®
Results
• 100% isolation
• Negligible Gas Traces
Goliat
The North Sea
Copyright © Wellcem AS 2015
Challenge:
Solution:
Conclusion:
Norwegian Continental Shelf
• The candidate well was a multi-lateral horizontal oil producer.
• One of the lateral junctions was positioned in an unconsolidated
reservoir sand where stability was a major concern.
• Fracture strength of the formation was evaluated to be 580 psi.
• When the well was completed, ThermaSet® was injected into the
sand formation at the junction.
• The lateral was completed with a liner and a screen.
• After ThermaSet® cured, applied pressure to the formation was
increased to 2,610 psi (180 bar).
• ThermaSet® treatment resulted in no sand production from the later
junction formation.
Copyright © Wellcem AS 2015
Challenge:
Solution:
Conclusion:
Troll Well E-6
Norway
• The candidate well was completed as a horizontal oil producer.
• After two days of production a large gas flux borke through.
• The well was sht down prior to ThermaSet® treatment
• Logging of the well indicated that the majority (70%) of the gas was
being produced from the last 600’ to 4200’ of the horizontal section.
• A 2400’ crack in the well was also noted dictating that complete
isolation was not the primary objective.
• A ThermaSet® plug was designed to penetrate the sand screen in the
completion assembly and plug the 600’ hole section at the toe.
• Following ThermaSet® treatment the well resumed oil production.
• Some gas was still being produced as anticipated, however at a
considerably lower rate.
Copyright © Wellcem AS 2015
Thank you for your
attention !

More Related Content

What's hot

Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Iceland Geothermal
 
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Abdulrahman Alkhowaiter
 
Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off pptAdjei Sephen
 
Hydraulic Fracturing 101
Hydraulic Fracturing 101Hydraulic Fracturing 101
Hydraulic Fracturing 101Brian Blankenship
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage WellsBaker Hughes
 
Operations ETI-DLH
Operations ETI-DLHOperations ETI-DLH
Operations ETI-DLHWin Nyunt Aung
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppeMuhammad Hanif
 
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...tmhsweb
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)Dr. Arzu Javadova
 
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...ziiishan
 
Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Akanksha Sidar
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Bj news cement squeeze job - vlc-1433
Bj news   cement squeeze job - vlc-1433Bj news   cement squeeze job - vlc-1433
Bj news cement squeeze job - vlc-1433Manuel S. Navarro
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine John Downs
 
EMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas BrochureEMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas BrochureEMIN Sistemas Geotecnicos
 
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONUNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONref-iqhub
 

What's hot (19)

Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple
 
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
 
Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off ppt
 
Hydraulic Fracturing 101
Hydraulic Fracturing 101Hydraulic Fracturing 101
Hydraulic Fracturing 101
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Shale gas presentation
Shale gas presentationShale gas presentation
Shale gas presentation
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
 
Operations ETI-DLH
Operations ETI-DLHOperations ETI-DLH
Operations ETI-DLH
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
 
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...
Advanced Well Construction Techniques Utilizing Solid Expandable Technologies...
 
NK Energy Presentation
NK Energy PresentationNK Energy Presentation
NK Energy Presentation
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
 
Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1 Water_Shut_Off_Winter traning(ISM)1
Water_Shut_Off_Winter traning(ISM)1
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Bj news cement squeeze job - vlc-1433
Bj news   cement squeeze job - vlc-1433Bj news   cement squeeze job - vlc-1433
Bj news cement squeeze job - vlc-1433
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine
 
EMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas BrochureEMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas Brochure
 
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONUNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
 

Similar to Wellcem - General Presentation 2016

Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil Statoil
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...Neil Woodward
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)Phillip Evans
 
Nature Group Presentation 2016
Nature Group Presentation 2016Nature Group Presentation 2016
Nature Group Presentation 2016Gert-Jan Davidzon
 
#Oges EOR Webinar #Panel Presentation
#Oges EOR Webinar #Panel Presentation#Oges EOR Webinar #Panel Presentation
#Oges EOR Webinar #Panel PresentationOges G(Pte) Ltd
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersStatoil
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvikCem Sayar
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PaulOkafor6
 
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...UK Carbon Capture and Storage Research Centre
 
Cool Flame Technologies - Tor Geir Engebretsen - April 2010
Cool Flame Technologies - Tor Geir Engebretsen - April 2010Cool Flame Technologies - Tor Geir Engebretsen - April 2010
Cool Flame Technologies - Tor Geir Engebretsen - April 2010Burton Lee
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon
 
An Introduction to Improved Cold Weather Concreting
An Introduction to Improved Cold Weather ConcretingAn Introduction to Improved Cold Weather Concreting
An Introduction to Improved Cold Weather ConcretingYara International
 
Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble Esemitodje
 
Fjords processing corporate presentation
Fjords processing corporate presentationFjords processing corporate presentation
Fjords processing corporate presentationIngjerd Jensen
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Groupprocess group
 

Similar to Wellcem - General Presentation 2016 (20)

Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
Navion Saga FSO
Navion Saga FSONavion Saga FSO
Navion Saga FSO
 
Nature Group Presentation 2016
Nature Group Presentation 2016Nature Group Presentation 2016
Nature Group Presentation 2016
 
#Oges EOR Webinar #Panel Presentation
#Oges EOR Webinar #Panel Presentation#Oges EOR Webinar #Panel Presentation
#Oges EOR Webinar #Panel Presentation
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiers
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvik
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
fishbone-.pptx
fishbone-.pptxfishbone-.pptx
fishbone-.pptx
 
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
 
Cool Flame Technologies - Tor Geir Engebretsen - April 2010
Cool Flame Technologies - Tor Geir Engebretsen - April 2010Cool Flame Technologies - Tor Geir Engebretsen - April 2010
Cool Flame Technologies - Tor Geir Engebretsen - April 2010
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 
An Introduction to Improved Cold Weather Concreting
An Introduction to Improved Cold Weather ConcretingAn Introduction to Improved Cold Weather Concreting
An Introduction to Improved Cold Weather Concreting
 
Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017
 
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
 
Fjords processing corporate presentation
Fjords processing corporate presentationFjords processing corporate presentation
Fjords processing corporate presentation
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
 
Hemiwedge Cartridge Valve
Hemiwedge Cartridge ValveHemiwedge Cartridge Valve
Hemiwedge Cartridge Valve
 
Compact Reliqâ„¢
Compact Reliqâ„¢Compact Reliqâ„¢
Compact Reliqâ„¢
 

Wellcem - General Presentation 2016

  • 1. Copyright © Wellcem AS 2015 Well Therapy Solutions Integrity, EOR and P&A February 2016
  • 2. Copyright © Wellcem AS 2015  Private owned Norwegian oil service company  Headquartered in Norway with branches located around the world.  Wellcem’s state of the art laboratory is located Norway and is heavily involved in both research and development projects as well as operational field support.  Research and Development plays a key role in the company’s business model with focus on our customer’s current and future needs. Wellcem introduction To be a leading provider of technology for Plugging, Lost Circulation, Leak Stop, and Sand Consolidation in Oil and Gas wells. Vision R&D Partners
  • 3. Copyright © Wellcem AS 2015 Clients and operations  Europe  Headquarters, Klepp Norway  Middle East  Dammam, KSA  Dubai and Abu Dhabi, UAE  Muscat, Oman  Kuwait  Asia  Kuala Lumpur, Malaysia  North America  Houston, Texas US
  • 4. Copyright © Wellcem AS 2015 ThermaSet® is a thermosetting resin that is pumped downhole in a liquid state.  The curing process is activated downhole by temperature.  A non-reactive polymer – particle free liquid  Specific gravity can be adjusted from 0.7 - 2.5 SG  Viscosity range 10 - 2000 CP  Operating temperature range from -9 to 150 °C BHT, resistant to 320 °C in cured conditions
  • 5. Copyright © Wellcem AS 2015 Well Therapy Solutions Specifications:  Particle free fluid  Specific gravity can be adjusted from 0.7 - 2.5 SG  Viscosity range 10 – 2000 CP  Operating temperature range from -9°C to 150°C BHT, with physical and chemical resilience up to 320°C in its cured state. Common applications:  Competent well barrier for permanently abandoning wells  Lost Circulation control – Treat & Drill without POOH  Well bore strengthening  Zonal Isolation / Water and Gas Shut off  Strengthening the shoe  Weak formations and zones with low fracture gradients where low density systems are required i.e. foam cement.  Consolidation of loose formations
  • 6. Copyright © Wellcem AS 2015 Compressive Strength (psi) Flexural Strength (psi) Youngs Modulus (ksi) Rupture Elongation (%) ThermaSet ® Portland Cement Mechanical Properties 11,168 6,526 324.884 3.5 8,412 1,450 536.639 0.01
  • 7. Copyright © Wellcem AS 2015 Precision intervention  Easy pumpable and can be placed with high precision in the well  Tunable density, viscosity and curing time  Reduce WOC = Save time and reduce cost BHT Curing time Density Viscosity http://www.wellcem.no/videos
  • 8. Copyright © Wellcem AS 2015 Typical Operation execution model Preparation:  Arrangement of required materials  Operation envelop ( In-house reactivity tests at all expected downhole temperature values)  Development of operational procedures for all possible scenarios  Quality check of material and optimization of recipe in labs at well conditions.  Preparation of required equipment , materials and its mobilization according to schedule Execution:  Inspection and quality check of equipment and materials on site  Mixing and pump of ThermaSet® pill as per job specific operational procedures  Verifying the curing and plug integrity as per operational procedures  Handling of excess material and cleaning/flushing of surface equipment as per operational procedures
  • 9. Copyright © Wellcem AS 2015 Well Therapy Solutions 54 63 10 Sustained Casing pressure Lost Circulation Benefits of ThermaSet® :  Superior, long lasting mechanical properties  Temperature activated, particle free resin  Easy pumpable and can be placed with high precision in the well  Tunable density, viscosity and curing time  Right angle setting profile translating to a very quick transition  Higher compressive, tensile strength and shear bond VS conventional cement  More flexible/not brittle/ Gas tight/ Good bonding to steel  Will penetrate deeper into formations  Significantly reduced WOC /rig time – Saving cost  Qualified to the Norwegian NORSOK STANDARD D-010, as a permanent P&A material  Easy to prepare and handle on location 28 Tubular integrity Plug & Abandonment Comprehensiverunrecord
  • 10. Copyright © Wellcem AS 2015 CASE HISTORIES  Plug & Abandonment  Lost Circulation  Sustained Casing pressure  Sand Consolidation  Gas/Water shut-off
  • 11. Copyright © Wellcem AS 2015 Pre-Placement Post-Placement Operation • Temporary P&A Well • Oil • Depleted reservoir • Parted tubing at 8496ft MD • Perfs – 10850 – 11050ft MD Plug • Resin 28 m3 Result • 100% Isolation Hod Field The North Sea / Norwegian Continental Shelf
  • 12. Copyright © Wellcem AS 2015 Pre-Placement Post-PlacementOperation • Temporary P&A Well • Gas • Depleted reservoir Plug • 26 m3 of ThermaSet® Results • 100% isolation West Sole The North Sea / UK Sector
  • 13. Copyright © Wellcem AS 2015 Challenge: Solution: Conclusion: Karan Field Middle East • While drilling the 12½ hole section of a high pressure gas well, the operator encoutered a theif zone at 10,753’ MD. • Mud losses were in excess of 480 BPH. • A 250 Bbl conventional LCM pill was pumped with no success. • 55 Bbls. of ThermaSet® was pumped through the bit above the thief zone and allowed to flow into the loss zone • Once ThermaSet® was allowed to cure, the rig was able to circulate at 400 BPH. • Top of the ThermaSet® plug was tagged at 10,705’ MD • The pill was drilled out at 100 fph without any further losses.
  • 14. Copyright © Wellcem AS 2015 Pre-Placement Post-Placement Operation • Remediation of Gas Communication to Surface. Well • Gas observed on sea bed around BOP • Gas-cut mud observed in returns Plug • Squeeze 5 m3 of neat ThermaSet® Results • 100% isolation • Negligible Gas Traces Goliat The North Sea
  • 15. Copyright © Wellcem AS 2015 Challenge: Solution: Conclusion: Norwegian Continental Shelf • The candidate well was a multi-lateral horizontal oil producer. • One of the lateral junctions was positioned in an unconsolidated reservoir sand where stability was a major concern. • Fracture strength of the formation was evaluated to be 580 psi. • When the well was completed, ThermaSet® was injected into the sand formation at the junction. • The lateral was completed with a liner and a screen. • After ThermaSet® cured, applied pressure to the formation was increased to 2,610 psi (180 bar). • ThermaSet® treatment resulted in no sand production from the later junction formation.
  • 16. Copyright © Wellcem AS 2015 Challenge: Solution: Conclusion: Troll Well E-6 Norway • The candidate well was completed as a horizontal oil producer. • After two days of production a large gas flux borke through. • The well was sht down prior to ThermaSet® treatment • Logging of the well indicated that the majority (70%) of the gas was being produced from the last 600’ to 4200’ of the horizontal section. • A 2400’ crack in the well was also noted dictating that complete isolation was not the primary objective. • A ThermaSet® plug was designed to penetrate the sand screen in the completion assembly and plug the 600’ hole section at the toe. • Following ThermaSet® treatment the well resumed oil production. • Some gas was still being produced as anticipated, however at a considerably lower rate.
  • 17. Copyright © Wellcem AS 2015 Thank you for your attention !

Editor's Notes

  1. What differentiates this product from other solutions on the market is the reactionary mechanism. MECHANICAL PROPERTIES Low Young’s Modulus High Poisson’s Ratio The thermal activated resin is a particle free , multi component polymer resin based liquid plugging material with a curing process activated by temperatur. The initiation of curing process and curing time can be adjusted in a way to suit the pre-determined temp of formation or the location of the plug to be placed in the well. Due to its adjustable density and viscosity, it is easy pumpable and can be placed with precision in the well.
  2. The thermal activated resin is a low viscosity system which by far exceeds the compressive and tensile strength found in traditional cement systems. AND ageing test conclude that , unlike cement , the mechanical properties are not diminished over time. Other preferable ThermaSet® properties are good bonding to steel, compatible with most fluids and cements, and extremely tolerable to contamination. ThermaSet® cures into a strong and flexible material that can withstand the thermal expansion of the casing without cracking. Curing is temperature based, allowing material placement and curing to be accurately regulated according to customer requirements for each and every well. Pure ThermaSet® is particle free. Flexural Strength (psi) Youngs Modulus (ksi) , also known as the tensile modulus or modulus of elasticity, is a mechanical property of linear elastic solid materials. It measures the force (per unit area) that is needed to stretch (or compress) a material sample. It is not to be confused with 'elastic modulus' which is the geometric property of a cross-sectional area. Elastisitetsmodulen (forkortet E-modul; også kjent som fjærkonstant og Youngs modul) er i et materiale forholdet mellom fasthet og forlengelse. Denne er beskrivende for et materiales motstandsevne mot elastisk deformasjon. Jo høyere E-modulen er desto stivere er materialet. Rupture Elongation (%) The thermal activated resin is a low viscosity system which by far exceeds the compressive and tensile strength found in traditional cement systems. AND ageing test conclude that ,unlike cement , the mechanical properties are not diminished over time.
  3. Highlight ThermaSet(R) Advantages vs. Conventional Cement -Tight Annular Geometries of Side Pocket Mandrel -Aqueous environment and immiscibility of ThermaSet(R) -Fast Setting -Designed to well fluid density due to low hydrostatics of formation