Worked Experience with “Ballarpur Industries Limited(BILT)” Paper Mills:‐
Worked with “Ballarpur Industries Limited” for 3 years, from14th June, 06 to 3rd
March,
2008 as an Assistant Manager (Instrumentation) in Unit: Ballarpur & from 3rd
March to
28th
June 2009 in Unit: Ashti as Instrument Department in charge.
 BILT‐Ballarpur is an ISO 9001‐1‐2000 Certified Company having 450 TPD Pulp & Paper
Production with 27 MW Captive Power Plant.
 BILT ‐ Ashti is an ISO 9001‐2002 Certified Company having 210 TPD Paper writing and
Printing Paper Production having sophisticated A4 line of ECH Wills and PEMCO Machinery.
Job Profile in Ballarpur Unit:
I was looking after Instrumentation and Automation having ABB DCS in Pulp Mill with capacity of 450 Tons/Day.
Responsible for manpower Management, Preventive & Predictive maintenance, Spare Parts Maintenance, Modification
& Implementation, Planning for Expansions Jobs.
Additional Responsibilities:
 Coordination with 6 Paper Machines of capacity of 450 Tons/day as a second engineer in paper machines.
 ISO and safety Internal Auditor.
 Department ISO 9001‐2000 Documentation controller, Conducting Monthly Safety Meeting, Total Quality
Management(TQM), Conducting Assessment & Training on Skill Enhancement for the GETs and Workmen.
 Attended 7 & 8 nos. Boiler and Turbine 1, 2 & 3 breakdowns and shutdown work for carrying out the
Instrumentation maintenance works.
Automation System Worked with:
 Familiar with Configuration and Maintenance of interlocks and loops in fully‐fledged Automation at Pulp Mill with
Distributed Control System (DCS) of ABB with C, SC & AC460 Controllers with S800 I/Os on Advent Stations with
MOD 300 Software.
 Working with 2 ABB Make Quality Control systems (QCS) of model SP1200 and SP700 in Paper Machine #3 and 6.
And also worked with JASCH Make QCS in Paper Machine 4.
 Working with Allen Bradely PLC Flex Logix (1794‐P32) for Blow Heat Recovery at Digester House and Allen
Bradely PLC of Model Compac Logic (PLC5/30) at Pm#3, 4 & 6 Stock Preparations.
Project Experience:
 Erection and commissioning of Blow Heat Recovery Plant Instrumentation and Automation through AB PLC in
Digester House.
 Erection and commissioning of PM4 & 6 stock preparation automation through AB PLC.
 Worked only in Erection new ODL and ECF pulp mill project by modifying existing traditional chlorine bleaching
plant.
Trainings Attended:
 Attended ABB DCS for AC 460 controller on Advent Station with MOD 300 software at Bangalore in India.
 In house TQM & TPM trainings and ISO & Safety auditor trainings.
Job Profile in Ashti Unit:
I had been leading instrumentation Department for one & half year. The BILT‐Ashti plant having capacity of 210
Tons/day, Winder , sophisticated A3 & A4 sheet cutter & Packing machines and also responsible for Instrumentation &
automation for Three Sack Machines(the machine makes cement bags). Responsible for Manpower Management,
Preventive & Predictive Maintenance, Spare Parts Maintenance and its follow‐ups, Modification & Implementations,
Planning for Expansion Jobs. Responsible to Provide targets & revise appraisal of engineer working under.
Additional Responsibilities:
 Plant 5S coordinator & ISO Internal Auditor.
 Department ISO 9001‐2000 Documentation, Conducting Monthly Safety Meeting, Planning Total Quality
Management(TQM) Plans, Conducting Assessments & Training on Skill Enhancement for the GETs and Workmen.
Automation Systems Involved:
 Eurotherm DCS having 740 controllers with wander ware SCADA software in Paper Machine.
 Working with Honeywell QCS of Devanci workstation with Lab View 7 software having 4022 scanner frame at PMC
with CD caliper control interlocks through GE fonuc.
 Paper reel automatic reel turn up system of make IBS‐JUD through Siemens PLC.
 Fully automated A4 sheet cutting line with Siemens Simatic S7 with controllers 200, 300 & 400 PLCs.

More Related Content

What's hot (9)

Soyingbe Bamidele.cover letter
Soyingbe Bamidele.cover letterSoyingbe Bamidele.cover letter
Soyingbe Bamidele.cover letter
 
zeeshan
zeeshanzeeshan
zeeshan
 
Resume
ResumeResume
Resume
 
jitendra resume 2016
jitendra resume 2016jitendra resume 2016
jitendra resume 2016
 
1.prakash resume
1.prakash resume1.prakash resume
1.prakash resume
 
Spinning Mill Project Presentation
Spinning Mill Project PresentationSpinning Mill Project Presentation
Spinning Mill Project Presentation
 
MOHAN
MOHANMOHAN
MOHAN
 
trentgreen_resume_v1
trentgreen_resume_v1trentgreen_resume_v1
trentgreen_resume_v1
 
CV-Gurmit Singh
CV-Gurmit SinghCV-Gurmit Singh
CV-Gurmit Singh
 

Viewers also liked

Urban Co-operative Bank
 Urban Co-operative Bank Urban Co-operative Bank
Urban Co-operative BankDona Sara Jacob
 
PROJECT - TRAINING AND DEVELOPMENT
PROJECT - TRAINING AND DEVELOPMENTPROJECT - TRAINING AND DEVELOPMENT
PROJECT - TRAINING AND DEVELOPMENTMuzaffar Mohammed
 
A PROJECT REPORT ON BGPPL BALARPUR
A PROJECT REPORT ON BGPPL BALARPURA PROJECT REPORT ON BGPPL BALARPUR
A PROJECT REPORT ON BGPPL BALARPURUday Wankar
 
Indian Paper Industry
Indian Paper IndustryIndian Paper Industry
Indian Paper IndustryJaspal Singh
 
Pulp and Paper industry
Pulp and Paper industryPulp and Paper industry
Pulp and Paper industryArun Sarasan
 
Co-operative Credit Society
Co-operative Credit SocietyCo-operative Credit Society
Co-operative Credit Societynusratsharmin
 
employee turnover
employee turnoveremployee turnover
employee turnoveramul
 
7 Companies Give Their #1 Tip For Reducing Employee Turnover
7 Companies Give Their #1 Tip For Reducing Employee Turnover7 Companies Give Their #1 Tip For Reducing Employee Turnover
7 Companies Give Their #1 Tip For Reducing Employee TurnoverUrbanBound
 

Viewers also liked (12)

Industry Visit
Industry VisitIndustry Visit
Industry Visit
 
BGPPL REPORT
BGPPL REPORTBGPPL REPORT
BGPPL REPORT
 
Urban Co-operative Bank
 Urban Co-operative Bank Urban Co-operative Bank
Urban Co-operative Bank
 
PROJECT - TRAINING AND DEVELOPMENT
PROJECT - TRAINING AND DEVELOPMENTPROJECT - TRAINING AND DEVELOPMENT
PROJECT - TRAINING AND DEVELOPMENT
 
A PROJECT REPORT ON BGPPL BALARPUR
A PROJECT REPORT ON BGPPL BALARPURA PROJECT REPORT ON BGPPL BALARPUR
A PROJECT REPORT ON BGPPL BALARPUR
 
Indian Paper Industry
Indian Paper IndustryIndian Paper Industry
Indian Paper Industry
 
Paper n pulp industries
Paper n pulp industries Paper n pulp industries
Paper n pulp industries
 
co-operative bank
co-operative bankco-operative bank
co-operative bank
 
Pulp and Paper industry
Pulp and Paper industryPulp and Paper industry
Pulp and Paper industry
 
Co-operative Credit Society
Co-operative Credit SocietyCo-operative Credit Society
Co-operative Credit Society
 
employee turnover
employee turnoveremployee turnover
employee turnover
 
7 Companies Give Their #1 Tip For Reducing Employee Turnover
7 Companies Give Their #1 Tip For Reducing Employee Turnover7 Companies Give Their #1 Tip For Reducing Employee Turnover
7 Companies Give Their #1 Tip For Reducing Employee Turnover
 

Similar to BILT (20)

Pardeep Resume
Pardeep ResumePardeep Resume
Pardeep Resume
 
aswin resume (1) (1) (1)
aswin resume (1) (1) (1)aswin resume (1) (1) (1)
aswin resume (1) (1) (1)
 
Baldev CV
Baldev CVBaldev CV
Baldev CV
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
ashi new
ashi newashi new
ashi new
 
Manjunath Resume1
Manjunath Resume1 Manjunath Resume1
Manjunath Resume1
 
Raghu _CV_07012017docx
Raghu _CV_07012017docxRaghu _CV_07012017docx
Raghu _CV_07012017docx
 
APW President Systems Ltd
APW President Systems LtdAPW President Systems Ltd
APW President Systems Ltd
 
Vikrant Resume
Vikrant ResumeVikrant Resume
Vikrant Resume
 
Vikrant Resume
Vikrant ResumeVikrant Resume
Vikrant Resume
 
Cv ajay parikh
Cv ajay parikhCv ajay parikh
Cv ajay parikh
 
Resume to I EC
Resume to I ECResume to I EC
Resume to I EC
 
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
STUDY & ANALYSIS OF MODERN INSTRUMENTS FOR PROCESS AUTOMATION & CONTROL- 6 mo...
 
sourav_cv
sourav_cvsourav_cv
sourav_cv
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15
 
kk
kkkk
kk
 
Babu Resune
Babu ResuneBabu Resune
Babu Resune
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Cv hardik chauhan
Cv hardik chauhanCv hardik chauhan
Cv hardik chauhan
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
 

More from Sri Rama Kishore (6)

APPM-Apprentice Trainee
APPM-Apprentice TraineeAPPM-Apprentice Trainee
APPM-Apprentice Trainee
 
NFCL
NFCLNFCL
NFCL
 
ITC
ITCITC
ITC
 
TECH MASTERS
TECH MASTERSTECH MASTERS
TECH MASTERS
 
ITC
ITCITC
ITC
 
APPM-CP
APPM-CPAPPM-CP
APPM-CP
 

BILT

  • 1. Worked Experience with “Ballarpur Industries Limited(BILT)” Paper Mills:‐ Worked with “Ballarpur Industries Limited” for 3 years, from14th June, 06 to 3rd March, 2008 as an Assistant Manager (Instrumentation) in Unit: Ballarpur & from 3rd March to 28th June 2009 in Unit: Ashti as Instrument Department in charge.  BILT‐Ballarpur is an ISO 9001‐1‐2000 Certified Company having 450 TPD Pulp & Paper Production with 27 MW Captive Power Plant.  BILT ‐ Ashti is an ISO 9001‐2002 Certified Company having 210 TPD Paper writing and Printing Paper Production having sophisticated A4 line of ECH Wills and PEMCO Machinery. Job Profile in Ballarpur Unit: I was looking after Instrumentation and Automation having ABB DCS in Pulp Mill with capacity of 450 Tons/Day. Responsible for manpower Management, Preventive & Predictive maintenance, Spare Parts Maintenance, Modification & Implementation, Planning for Expansions Jobs. Additional Responsibilities:  Coordination with 6 Paper Machines of capacity of 450 Tons/day as a second engineer in paper machines.  ISO and safety Internal Auditor.  Department ISO 9001‐2000 Documentation controller, Conducting Monthly Safety Meeting, Total Quality Management(TQM), Conducting Assessment & Training on Skill Enhancement for the GETs and Workmen.  Attended 7 & 8 nos. Boiler and Turbine 1, 2 & 3 breakdowns and shutdown work for carrying out the Instrumentation maintenance works. Automation System Worked with:  Familiar with Configuration and Maintenance of interlocks and loops in fully‐fledged Automation at Pulp Mill with Distributed Control System (DCS) of ABB with C, SC & AC460 Controllers with S800 I/Os on Advent Stations with MOD 300 Software.  Working with 2 ABB Make Quality Control systems (QCS) of model SP1200 and SP700 in Paper Machine #3 and 6. And also worked with JASCH Make QCS in Paper Machine 4.  Working with Allen Bradely PLC Flex Logix (1794‐P32) for Blow Heat Recovery at Digester House and Allen Bradely PLC of Model Compac Logic (PLC5/30) at Pm#3, 4 & 6 Stock Preparations. Project Experience:  Erection and commissioning of Blow Heat Recovery Plant Instrumentation and Automation through AB PLC in Digester House.  Erection and commissioning of PM4 & 6 stock preparation automation through AB PLC.  Worked only in Erection new ODL and ECF pulp mill project by modifying existing traditional chlorine bleaching plant. Trainings Attended:  Attended ABB DCS for AC 460 controller on Advent Station with MOD 300 software at Bangalore in India.  In house TQM & TPM trainings and ISO & Safety auditor trainings. Job Profile in Ashti Unit: I had been leading instrumentation Department for one & half year. The BILT‐Ashti plant having capacity of 210 Tons/day, Winder , sophisticated A3 & A4 sheet cutter & Packing machines and also responsible for Instrumentation & automation for Three Sack Machines(the machine makes cement bags). Responsible for Manpower Management, Preventive & Predictive Maintenance, Spare Parts Maintenance and its follow‐ups, Modification & Implementations, Planning for Expansion Jobs. Responsible to Provide targets & revise appraisal of engineer working under. Additional Responsibilities:  Plant 5S coordinator & ISO Internal Auditor.  Department ISO 9001‐2000 Documentation, Conducting Monthly Safety Meeting, Planning Total Quality Management(TQM) Plans, Conducting Assessments & Training on Skill Enhancement for the GETs and Workmen. Automation Systems Involved:  Eurotherm DCS having 740 controllers with wander ware SCADA software in Paper Machine.  Working with Honeywell QCS of Devanci workstation with Lab View 7 software having 4022 scanner frame at PMC with CD caliper control interlocks through GE fonuc.  Paper reel automatic reel turn up system of make IBS‐JUD through Siemens PLC.  Fully automated A4 sheet cutting line with Siemens Simatic S7 with controllers 200, 300 & 400 PLCs.