SlideShare a Scribd company logo
1 of 6
Ilic, Serba, M.Arch.
Page 1 of 6
PERSONAL INFORMATION
Name: Serba
Surname: Ilic
Address: 702-1434 Burnaby Street,
Vancouver, BC, V6G 1W8, Canada
Phone: +1.778.990.4542
Email: srbailic@me.com
Web: www.forestudio.rs
SUMMARY
After graduating from Belgrade’s University, I started to pursue a career in the design-build field and joined
one of the most recognized design-build companies in Belgrade - Studio Urosevic. After two years of
several leading roles, I founded my own company, FOR-E-STUDIO with a primary focus on the design-
build process. Over the next three years, this profitable company grew and expanded to 10 employees.
Upon arriving in Canada, I have continued my professional development on several industrial and
commercial projects.
In addition, I am continuing my academic development through enrollment in PhD Studies at the
Architectural Faculty in the University of Belgrade with a thesis on: “Management of Zero Energy
Refurbishments of Existing Multi-Residential Projects”.
PROFESSIONAL EXPERIENCE
NATIONAL FORMING SYSTEMS/ VANAGAN ARCHITECTS, Vancouver, BC 2014-
ongoing
Project Manager
Projects:
- Surrey Residence, Design/Build: As a Project Manager and designer, responsible for
coordinating and delivering design for high end residential project in Surrey. After obtaining
Building Permit, continue to work on Construction Management Plan. Construction scheduled for
the mid of June.
- East Boulevard residential project (Serbian Consulate) BUILD: Working as a project manager
responsible for whole construction process. Scope of work includes coordinating the trades,
tracking changes, procurement management, performance control, implementation of design and
quality control on site, etc. Also, responsible for key deliverables in form of different inspection
approvals (concrete, plumbing, framing, etc.).
- East Boulevard residential project (Serbian Consulate) DESIGN: Working as a project
coordinator for design delivery of the building permit. Includes cross-functional work between the
investor, consultants and city authorities, and preparing documentation for quotes and working with
the investor on revising contracts.
- National Opazni Warehouse (National forming systems’ Europe branch): Worked as a senior
designer and project coordinator for design delivery of tilt-up warehouse in Slovenia. Worked with
Slovenian engineers and City officials to adapt the design according local building code. Worked
Ilic, Serba, M.Arch.
Page 2 of 6
on procurement management and international shipping of specialized materials and hardware for
tilt-up.
Ilic, Serba, M.Arch.
Page 3 of 6
FOR-E-STUDIO Inc., Belgrade, Serbia
2011-2014
Founder, Project Manager, Architect
Projects:
- Zepter Hotel, Belgrade (http://www.hotelzepter.rs/en): Total renovation of approximately 4.500 m²
(48.500 ft²) of old office space into a 5-star hotel. As a member of the project management team, I
was responsible for scheduling and monitoring day to day activities on site. Coordinated between
the investor, Architect, City officials as well as other contractors. Supervision and quality control of
interior works. Responsible for tendering and awarding contracts for interior trades.
- TechnologyEuras, regional leader in water sealing: Consulting services, hired by the general
contractor (Technology Euras). Involved in negotiations with the investor (Electric Power Industry
of Serbia). Dealt with contracts, quotes, scope of work. Led a team of 21 people in resolution of
water seal issues. Coordinated the daily schedules and oversaw the quality of work done by the
general contractor. Correspondence between general contractor, inspector and investor. Worked
on first use of the patented product for water sealing (Euras Gel and mortar).
- Annex of Zepter Museum(http://www.zeptermuseum.rs/en/node/680): Annex of Zepter museum
was project of converting existing office space of heritage building in most prominent part of
Belgrade, into Museum’s daily exhibition. Author of design, and as a founder and CEO of FOR-E-
STUDIO, involved in whole design-build process from designing and negotiating, trough
development of project, up to occupation permit. Worked directly with museum founder- Ms.
Zepter, museum director- prof.dr. Ivana Celic, City Hall’s institutions (design department,
inspection department, etc.).
- Zepter Creative Studio (http://www.zepter.rs/zepter/pages/article.php?id=36): Redesign and
redevelopment of Zepter International AV studio. Complete refit of existing commercial offices in
heritage building in down town Belgrade. Author of interior design, and project manager of design-
build process. Worked on making and controlling project’s scope, time baseline, procurement and
financial plans. In close correspondence with investor, studio director and city authorities.
STUDIO UROSEVIC Inc., Belgrade, Serbia
2009-2011
Assistant Project Manager, Project Manager, Architect
Projects:
- Zepter Museum (http://www.zeptermuseum.rs/en/node/680): First private and most advanced
museum in Serbia. Heritage building (Built in 1920s.) in heart of Belgrade’s most important
area – Knez Mihailova street, first served as a bank. After complete interior renovation, Zepter
museum got 1.500 m² (16.145 ft²) of exhibition floor space, with state of the art services
(including HVAC, lightening, security, etc.). Co-author of interior design. In that period worked
as a project manager, organizing design team (3 architects, 2 draftspersons), on-site building
trades and contractors. Also worked close with main architect/author, investor/owner, director,
inspection and city authorities. Project had wide public appearance and positive critics.
(http://www.vreme.com/cms/view.php?id=939770)
Ilic, Serba, M.Arch.
Page 4 of 6
- International competition for “Radnicka” interchange of new bridge over Sava river in
Belgrade:Competition was on international level, where most recognized companies from
region, participated (CIP institute, PONTING, Hidroprojekt-saobracaj, etc.). Studio Urosevic
won 3rd
prize. On this project worked as coauthor and project’s team leader. Team consisted of
10 members including: three engineers, one university professor, two architects, three graphic
designers and three draftspersons. Responsible for organizing schedule, budget, scope
baseline and project milestones. Corresponding and coordinating on daily basis with all team
members assuring on-time project delivery.
- Ada Mall, shopping center preliminary design: Worked as a assistant project manager on
designing 50.000 m² (538.000 ft²) of prime retail space for international real estate company
GTC.
- High-end interior renovations for residential projects: Worked as designer, assistant
project manager or site superintendent, monitoring on-site implementation of design and quality
control.
EDUCATION
● 2009: Enrolled in PhD studies on Architectural Faculty of Belgrade University, course: Architectural
technologies, management, green building and environmental design, with thesis on:
“Management of Zero Energy refurbishments of existing multi-residential objects”.
● 2008: Master Degree (M. Arch.), graduated on final thesis in Architectural Technologies on
Architectural Faculty of Belgrade University, with the maximum grade 10. GPA during master
studies 8, 88/10.
● 2006: Enrolled in Master studies on Architectural Faculty of Belgrade University, course
Architectural Technologies (AT)
● 2006: Bachelor Degree (B. Arch.) on Architectural Faculty of Belgrade University.
● 2003-2006: Bachelor Studies on Architectural Faculty of Belgrade University. GPA 8.09/10.
AWARDS AND HONORS
● 2010: Positive critics and public recognition for Zepter Museum project.
● 2009: 3rd
prize on international competition “Radnicka” interchange.
● 2008: Publication in magazine “Ambijenti”, article on industrial design.
PROFESSIONAL DEVELOPMENT
● April 14th
, 2016: Project Management Professional (PMP number: 191975)
● November 8th
, 2012: License (400 H 117 12) for Responsible Contracting Engineer (In Serbia)
● November 1st
, 2012: License (300 L 662 12) for Responsible Designer (In Serbia)
AFFILIATIONS
January 31st
. 2016: Member of Project Management Institute, Canadian West Coast Chapter
November 1st
, 2012: Member of Serbian Chamber of Engineers
LANGUAGES
Serbian: native
English: excellent speaking and writing
Ilic, Serba, M.Arch.
Page 5 of 6
COMPUTER SKILLS
AutoCAD Photoshop MS Office ArtCAM
3D Studio Max MS Project Mach4
Ilic, Serba, M.Arch.
Page 6 of 6
PERSONAL RECOMMENDATIONS
1. Rocko Andrejevic, Operation Manager of National Forming Systems
rocko@nationalforming.com
604-761-5164
2. Venelin Kokalov, Principal, Bing Thom Architects
vkokalov@bingthomarchitects.com
604-682-1881
3. Kyle Pringle, Project Coordinator , Planning & Development Services - City of Vancouver
Kyle.Pringle@vancouver.ca
604-873-7088
4. Paul Xiong, Project Manager, Intracorp Projects Ltd.
Paulxiong83@hotmail.com
604-551-7833

More Related Content

What's hot

Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolioKhaled Essam
 
A L A A K H A W A N D I
A L A A    K H A W A N D I A L A A    K H A W A N D I
A L A A K H A W A N D I Alaa Khawandi
 
Abdullah Qadry - Senior Site Architect
Abdullah Qadry - Senior Site ArchitectAbdullah Qadry - Senior Site Architect
Abdullah Qadry - Senior Site ArchitectAbdullah Qadry
 
Portfolio paschy publication 150
Portfolio paschy publication 150Portfolio paschy publication 150
Portfolio paschy publication 150Paschy K.Karibaye
 
Resume_Heidi Hamed_copy
Resume_Heidi Hamed_copyResume_Heidi Hamed_copy
Resume_Heidi Hamed_copyHeidi Hamed
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan
 
HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15Henry Appleby
 
HAVINHNAM-E.JOB
HAVINHNAM-E.JOBHAVINHNAM-E.JOB
HAVINHNAM-E.JOBH V?nh Nam
 
Curriculum vitae yura dm
Curriculum vitae  yura dmCurriculum vitae  yura dm
Curriculum vitae yura dmYura Dmytruk
 
CV JasnaMaksimovic-march2015
CV JasnaMaksimovic-march2015CV JasnaMaksimovic-march2015
CV JasnaMaksimovic-march2015Jasna Maksimovic
 
Svetislav_Janac_Architect_CV2015
Svetislav_Janac_Architect_CV2015Svetislav_Janac_Architect_CV2015
Svetislav_Janac_Architect_CV2015Svetislav Janac
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016Mohammed Salah
 

What's hot (20)

CV + WORK SAMPLES
CV + WORK SAMPLESCV + WORK SAMPLES
CV + WORK SAMPLES
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolio
 
A L A A K H A W A N D I
A L A A    K H A W A N D I A L A A    K H A W A N D I
A L A A K H A W A N D I
 
Abdullah Qadry - Senior Site Architect
Abdullah Qadry - Senior Site ArchitectAbdullah Qadry - Senior Site Architect
Abdullah Qadry - Senior Site Architect
 
Portfolio paschy publication 150
Portfolio paschy publication 150Portfolio paschy publication 150
Portfolio paschy publication 150
 
Resume_Heidi Hamed_copy
Resume_Heidi Hamed_copyResume_Heidi Hamed_copy
Resume_Heidi Hamed_copy
 
CV_Kotsona D
CV_Kotsona DCV_Kotsona D
CV_Kotsona D
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
 
Yasmeen juma
Yasmeen jumaYasmeen juma
Yasmeen juma
 
HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15
 
HAVINHNAM-E.JOB
HAVINHNAM-E.JOBHAVINHNAM-E.JOB
HAVINHNAM-E.JOB
 
Portfolio_DirujiDugarte2016_opt
Portfolio_DirujiDugarte2016_optPortfolio_DirujiDugarte2016_opt
Portfolio_DirujiDugarte2016_opt
 
Resume JSACLADIOS_2016b
Resume JSACLADIOS_2016bResume JSACLADIOS_2016b
Resume JSACLADIOS_2016b
 
Curriculum vitae yura dm
Curriculum vitae  yura dmCurriculum vitae  yura dm
Curriculum vitae yura dm
 
Hesham Farran - CV june 2016
Hesham Farran - CV june 2016Hesham Farran - CV june 2016
Hesham Farran - CV june 2016
 
CV JasnaMaksimovic-march2015
CV JasnaMaksimovic-march2015CV JasnaMaksimovic-march2015
CV JasnaMaksimovic-march2015
 
AKANLAR 2015
AKANLAR 2015AKANLAR 2015
AKANLAR 2015
 
Svetislav_Janac_Architect_CV2015
Svetislav_Janac_Architect_CV2015Svetislav_Janac_Architect_CV2015
Svetislav_Janac_Architect_CV2015
 
ANASCV
ANASCVANASCV
ANASCV
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 

Viewers also liked (19)

21C Organization Presentation
21C Organization Presentation21C Organization Presentation
21C Organization Presentation
 
1.1 Input devices
1.1 Input devices1.1 Input devices
1.1 Input devices
 
Reporte aplicación aamtic 02
Reporte aplicación aamtic 02Reporte aplicación aamtic 02
Reporte aplicación aamtic 02
 
نقل عفش الزهراء 65512014 ابورقيه داخل الكويت
نقل عفش الزهراء 65512014 ابورقيه داخل الكويتنقل عفش الزهراء 65512014 ابورقيه داخل الكويت
نقل عفش الزهراء 65512014 ابورقيه داخل الكويت
 
BLUEJAY ARDLEY
BLUEJAY ARDLEYBLUEJAY ARDLEY
BLUEJAY ARDLEY
 
Projekt forandringer
Projekt forandringerProjekt forandringer
Projekt forandringer
 
RED LAN
RED LAN RED LAN
RED LAN
 
CURSO de VERÃO: Empreendedorismo
CURSO de VERÃO: EmpreendedorismoCURSO de VERÃO: Empreendedorismo
CURSO de VERÃO: Empreendedorismo
 
Reporte aplicación aamtic 03
Reporte aplicación aamtic 03Reporte aplicación aamtic 03
Reporte aplicación aamtic 03
 
Ffffff
FfffffFfffff
Ffffff
 
OHPLAN!
OHPLAN!OHPLAN!
OHPLAN!
 
Earthquakes
EarthquakesEarthquakes
Earthquakes
 
Corporate Profile - English
Corporate Profile - EnglishCorporate Profile - English
Corporate Profile - English
 
مستند نصي جديد ‫(2)‬
مستند نصي جديد ‫(2)‬مستند نصي جديد ‫(2)‬
مستند نصي جديد ‫(2)‬
 
Aayush evs
Aayush evsAayush evs
Aayush evs
 
IPB 2016
IPB 2016IPB 2016
IPB 2016
 
2.6 use of ict in time management
2.6 use of ict in time management2.6 use of ict in time management
2.6 use of ict in time management
 
IIMB-Alumni_Authors_new
IIMB-Alumni_Authors_newIIMB-Alumni_Authors_new
IIMB-Alumni_Authors_new
 
Plágio e tecnologias antiplágio
Plágio e tecnologias antiplágioPlágio e tecnologias antiplágio
Plágio e tecnologias antiplágio
 

Similar to Serba_Ilic CV

JOVIC GORAN arch CV
JOVIC GORAN arch CVJOVIC GORAN arch CV
JOVIC GORAN arch CVGoran Jovic
 
Ljubica Perisic_Portfolio
Ljubica Perisic_PortfolioLjubica Perisic_Portfolio
Ljubica Perisic_PortfolioLjubica Peri?i?
 
Milan Kapetanovic Architectural Portfolio
Milan Kapetanovic   Architectural PortfolioMilan Kapetanovic   Architectural Portfolio
Milan Kapetanovic Architectural PortfolioMilan Kapetanovic
 
Anna Bazant CV 2015.06.09
Anna Bazant CV 2015.06.09Anna Bazant CV 2015.06.09
Anna Bazant CV 2015.06.09anna bazant
 
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013Faidon (Phé-thon) Nikiforiadis
 
Dr faidon nikiforiadis examples of work from design portfolio november 2013
Dr faidon nikiforiadis    examples of work from design portfolio november 2013Dr faidon nikiforiadis    examples of work from design portfolio november 2013
Dr faidon nikiforiadis examples of work from design portfolio november 2013Faidon (Phé-thon) Nikiforiadis
 
Søren Aagaard_CV_Portfolio_A
Søren Aagaard_CV_Portfolio_ASøren Aagaard_CV_Portfolio_A
Søren Aagaard_CV_Portfolio_ASøren Aagaard
 
Portfolio by Stefan Stepanovic
Portfolio by Stefan StepanovicPortfolio by Stefan Stepanovic
Portfolio by Stefan StepanovicStefan Stepanovic
 
Curriculum_Vitae_Knezevic_Jelena
Curriculum_Vitae_Knezevic_JelenaCurriculum_Vitae_Knezevic_Jelena
Curriculum_Vitae_Knezevic_JelenaJelena Knezevic
 
Online information 2012 arkitekturbilleder.dk final version
Online information 2012 arkitekturbilleder.dk final versionOnline information 2012 arkitekturbilleder.dk final version
Online information 2012 arkitekturbilleder.dk final versionDaniel Gunnarsson
 
Launching an App - Daniel Gunnarsson
Launching an App - Daniel GunnarssonLaunching an App - Daniel Gunnarsson
Launching an App - Daniel GunnarssonIncisive_Events
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-SamplesMichael Lyon
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalAhmed Yehia
 

Similar to Serba_Ilic CV (20)

JOVIC GORAN arch CV
JOVIC GORAN arch CVJOVIC GORAN arch CV
JOVIC GORAN arch CV
 
Mc cv updated 2017
Mc cv   updated 2017Mc cv   updated 2017
Mc cv updated 2017
 
Ljubica Perisic_Portfolio
Ljubica Perisic_PortfolioLjubica Perisic_Portfolio
Ljubica Perisic_Portfolio
 
robert_rochanski_resume
robert_rochanski_resumerobert_rochanski_resume
robert_rochanski_resume
 
Milan Kapetanovic Architectural Portfolio
Milan Kapetanovic   Architectural PortfolioMilan Kapetanovic   Architectural Portfolio
Milan Kapetanovic Architectural Portfolio
 
Anna Bazant CV 2015.06.09
Anna Bazant CV 2015.06.09Anna Bazant CV 2015.06.09
Anna Bazant CV 2015.06.09
 
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
 
Dr faidon nikiforiadis examples of work from design portfolio november 2013
Dr faidon nikiforiadis    examples of work from design portfolio november 2013Dr faidon nikiforiadis    examples of work from design portfolio november 2013
Dr faidon nikiforiadis examples of work from design portfolio november 2013
 
Søren Aagaard_CV_Portfolio_A
Søren Aagaard_CV_Portfolio_ASøren Aagaard_CV_Portfolio_A
Søren Aagaard_CV_Portfolio_A
 
CV Veljko Stevanovic EN.pdf
CV Veljko Stevanovic EN.pdfCV Veljko Stevanovic EN.pdf
CV Veljko Stevanovic EN.pdf
 
CV Veljko Stevanovic EN.pdf
CV Veljko Stevanovic EN.pdfCV Veljko Stevanovic EN.pdf
CV Veljko Stevanovic EN.pdf
 
Portfolio by Stefan Stepanovic
Portfolio by Stefan StepanovicPortfolio by Stefan Stepanovic
Portfolio by Stefan Stepanovic
 
Curriculum_Vitae_Knezevic_Jelena
Curriculum_Vitae_Knezevic_JelenaCurriculum_Vitae_Knezevic_Jelena
Curriculum_Vitae_Knezevic_Jelena
 
Online information 2012 arkitekturbilleder.dk final version
Online information 2012 arkitekturbilleder.dk final versionOnline information 2012 arkitekturbilleder.dk final version
Online information 2012 arkitekturbilleder.dk final version
 
Aleksander Gumos - CV
Aleksander Gumos - CVAleksander Gumos - CV
Aleksander Gumos - CV
 
Launching an App - Daniel Gunnarsson
Launching an App - Daniel GunnarssonLaunching an App - Daniel Gunnarsson
Launching an App - Daniel Gunnarsson
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-Samples
 
Arunava Sarkar Cv
Arunava Sarkar  CvArunava Sarkar  Cv
Arunava Sarkar Cv
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 Final
 
cv-portfolio 10-10-2015
cv-portfolio 10-10-2015cv-portfolio 10-10-2015
cv-portfolio 10-10-2015
 

Serba_Ilic CV

  • 1. Ilic, Serba, M.Arch. Page 1 of 6 PERSONAL INFORMATION Name: Serba Surname: Ilic Address: 702-1434 Burnaby Street, Vancouver, BC, V6G 1W8, Canada Phone: +1.778.990.4542 Email: srbailic@me.com Web: www.forestudio.rs SUMMARY After graduating from Belgrade’s University, I started to pursue a career in the design-build field and joined one of the most recognized design-build companies in Belgrade - Studio Urosevic. After two years of several leading roles, I founded my own company, FOR-E-STUDIO with a primary focus on the design- build process. Over the next three years, this profitable company grew and expanded to 10 employees. Upon arriving in Canada, I have continued my professional development on several industrial and commercial projects. In addition, I am continuing my academic development through enrollment in PhD Studies at the Architectural Faculty in the University of Belgrade with a thesis on: “Management of Zero Energy Refurbishments of Existing Multi-Residential Projects”. PROFESSIONAL EXPERIENCE NATIONAL FORMING SYSTEMS/ VANAGAN ARCHITECTS, Vancouver, BC 2014- ongoing Project Manager Projects: - Surrey Residence, Design/Build: As a Project Manager and designer, responsible for coordinating and delivering design for high end residential project in Surrey. After obtaining Building Permit, continue to work on Construction Management Plan. Construction scheduled for the mid of June. - East Boulevard residential project (Serbian Consulate) BUILD: Working as a project manager responsible for whole construction process. Scope of work includes coordinating the trades, tracking changes, procurement management, performance control, implementation of design and quality control on site, etc. Also, responsible for key deliverables in form of different inspection approvals (concrete, plumbing, framing, etc.). - East Boulevard residential project (Serbian Consulate) DESIGN: Working as a project coordinator for design delivery of the building permit. Includes cross-functional work between the investor, consultants and city authorities, and preparing documentation for quotes and working with the investor on revising contracts. - National Opazni Warehouse (National forming systems’ Europe branch): Worked as a senior designer and project coordinator for design delivery of tilt-up warehouse in Slovenia. Worked with Slovenian engineers and City officials to adapt the design according local building code. Worked
  • 2. Ilic, Serba, M.Arch. Page 2 of 6 on procurement management and international shipping of specialized materials and hardware for tilt-up.
  • 3. Ilic, Serba, M.Arch. Page 3 of 6 FOR-E-STUDIO Inc., Belgrade, Serbia 2011-2014 Founder, Project Manager, Architect Projects: - Zepter Hotel, Belgrade (http://www.hotelzepter.rs/en): Total renovation of approximately 4.500 m² (48.500 ft²) of old office space into a 5-star hotel. As a member of the project management team, I was responsible for scheduling and monitoring day to day activities on site. Coordinated between the investor, Architect, City officials as well as other contractors. Supervision and quality control of interior works. Responsible for tendering and awarding contracts for interior trades. - TechnologyEuras, regional leader in water sealing: Consulting services, hired by the general contractor (Technology Euras). Involved in negotiations with the investor (Electric Power Industry of Serbia). Dealt with contracts, quotes, scope of work. Led a team of 21 people in resolution of water seal issues. Coordinated the daily schedules and oversaw the quality of work done by the general contractor. Correspondence between general contractor, inspector and investor. Worked on first use of the patented product for water sealing (Euras Gel and mortar). - Annex of Zepter Museum(http://www.zeptermuseum.rs/en/node/680): Annex of Zepter museum was project of converting existing office space of heritage building in most prominent part of Belgrade, into Museum’s daily exhibition. Author of design, and as a founder and CEO of FOR-E- STUDIO, involved in whole design-build process from designing and negotiating, trough development of project, up to occupation permit. Worked directly with museum founder- Ms. Zepter, museum director- prof.dr. Ivana Celic, City Hall’s institutions (design department, inspection department, etc.). - Zepter Creative Studio (http://www.zepter.rs/zepter/pages/article.php?id=36): Redesign and redevelopment of Zepter International AV studio. Complete refit of existing commercial offices in heritage building in down town Belgrade. Author of interior design, and project manager of design- build process. Worked on making and controlling project’s scope, time baseline, procurement and financial plans. In close correspondence with investor, studio director and city authorities. STUDIO UROSEVIC Inc., Belgrade, Serbia 2009-2011 Assistant Project Manager, Project Manager, Architect Projects: - Zepter Museum (http://www.zeptermuseum.rs/en/node/680): First private and most advanced museum in Serbia. Heritage building (Built in 1920s.) in heart of Belgrade’s most important area – Knez Mihailova street, first served as a bank. After complete interior renovation, Zepter museum got 1.500 m² (16.145 ft²) of exhibition floor space, with state of the art services (including HVAC, lightening, security, etc.). Co-author of interior design. In that period worked as a project manager, organizing design team (3 architects, 2 draftspersons), on-site building trades and contractors. Also worked close with main architect/author, investor/owner, director, inspection and city authorities. Project had wide public appearance and positive critics. (http://www.vreme.com/cms/view.php?id=939770)
  • 4. Ilic, Serba, M.Arch. Page 4 of 6 - International competition for “Radnicka” interchange of new bridge over Sava river in Belgrade:Competition was on international level, where most recognized companies from region, participated (CIP institute, PONTING, Hidroprojekt-saobracaj, etc.). Studio Urosevic won 3rd prize. On this project worked as coauthor and project’s team leader. Team consisted of 10 members including: three engineers, one university professor, two architects, three graphic designers and three draftspersons. Responsible for organizing schedule, budget, scope baseline and project milestones. Corresponding and coordinating on daily basis with all team members assuring on-time project delivery. - Ada Mall, shopping center preliminary design: Worked as a assistant project manager on designing 50.000 m² (538.000 ft²) of prime retail space for international real estate company GTC. - High-end interior renovations for residential projects: Worked as designer, assistant project manager or site superintendent, monitoring on-site implementation of design and quality control. EDUCATION ● 2009: Enrolled in PhD studies on Architectural Faculty of Belgrade University, course: Architectural technologies, management, green building and environmental design, with thesis on: “Management of Zero Energy refurbishments of existing multi-residential objects”. ● 2008: Master Degree (M. Arch.), graduated on final thesis in Architectural Technologies on Architectural Faculty of Belgrade University, with the maximum grade 10. GPA during master studies 8, 88/10. ● 2006: Enrolled in Master studies on Architectural Faculty of Belgrade University, course Architectural Technologies (AT) ● 2006: Bachelor Degree (B. Arch.) on Architectural Faculty of Belgrade University. ● 2003-2006: Bachelor Studies on Architectural Faculty of Belgrade University. GPA 8.09/10. AWARDS AND HONORS ● 2010: Positive critics and public recognition for Zepter Museum project. ● 2009: 3rd prize on international competition “Radnicka” interchange. ● 2008: Publication in magazine “Ambijenti”, article on industrial design. PROFESSIONAL DEVELOPMENT ● April 14th , 2016: Project Management Professional (PMP number: 191975) ● November 8th , 2012: License (400 H 117 12) for Responsible Contracting Engineer (In Serbia) ● November 1st , 2012: License (300 L 662 12) for Responsible Designer (In Serbia) AFFILIATIONS January 31st . 2016: Member of Project Management Institute, Canadian West Coast Chapter November 1st , 2012: Member of Serbian Chamber of Engineers LANGUAGES Serbian: native English: excellent speaking and writing
  • 5. Ilic, Serba, M.Arch. Page 5 of 6 COMPUTER SKILLS AutoCAD Photoshop MS Office ArtCAM 3D Studio Max MS Project Mach4
  • 6. Ilic, Serba, M.Arch. Page 6 of 6 PERSONAL RECOMMENDATIONS 1. Rocko Andrejevic, Operation Manager of National Forming Systems rocko@nationalforming.com 604-761-5164 2. Venelin Kokalov, Principal, Bing Thom Architects vkokalov@bingthomarchitects.com 604-682-1881 3. Kyle Pringle, Project Coordinator , Planning & Development Services - City of Vancouver Kyle.Pringle@vancouver.ca 604-873-7088 4. Paul Xiong, Project Manager, Intracorp Projects Ltd. Paulxiong83@hotmail.com 604-551-7833