1. Warehouse Management
Learn from the Leader - Real time SAP scenario’s
Level II Training
2. When managing the Inventory itself can be challenging,
imagine managing Inventory at a micro level! The WMS allows
you to map your entire Warehouse complex into detailed
storage bin level. If implemented in the right way, your
Warehouse can be simple & efficient.
Many clients are just too scared about Our discussion will never be complete
Warehouse Management. If only the without discussing some of the Special
consultants had implemented it in a right Warehouse Management Scenarios. So,
way first time… watch out for it…
Let us understand when we should stop at Inventory Controls in a Warehouse can be
Inventory Management, when we should quite challenging. Show you class to the
implement Full Warehouse Management & client by talking about some of the Mobile
when we should go for Lean Warehouse Data Entry like RF Device Picking, RF Device
Management. Put away…
Unless we understand the difference And the Reports the client will demand out
between Lean and Full WM, we can never of SAP can be the most challenging. Let us
convince our clients. So, let us get our be prepared for it too.
basics right.
We’ll cover all this & much more in our
Then we will look at the different “Warehouse Management – Real time
Warehouse Management Scenarios & how scenarios”.
our Warehouse will perform in each case.
Stock Placement & Stock Removal can be
done in different ways to meet your client
needs. Know your options before suggesting
a solution to the client.
2
3. Meetings…meetings…Non stop meetings…Blueprint Phase is generally the
most important (& boring) part of the project!
If you do not do sufficient prototyping during this phase, you will be
talking in the air and the client can only hope that the implementation will
go on well…
Even worse, you might not be able to make the system work in the way,
you had believed it would, by (mis) understanding the SAP help
documentation!! And mid-way into the realization phase, you will be
forced to re-design your solution.
We will avoid this scenario, once and for all!
This training on “Real time Project Scenario’s for Warehouse Management”
will replicate a blue-print phase of a project. The Shoubii Consultants
will play the dual role of the client Business Manager as well as a
Solution Architect of a project.
The Business Manager will explain the actual business scenarios. Then we
will get into some discussion to understand the requirement. Finally the
Solution Architect will give a direction on how it has to be mapped in SAP.
As future SAP consultants, you are expected to design it and present it to
the team! Can you see your SAP Dreams come true, already?
3
4. Sarva is an SAP Consultant who has over 10 years of
experience in the Manufacturing Industries &
implementing SAP solutions for different Industries.
He has been involved in the very initial stage of
Extended Warehouse Management project with SAP
Labs! Some of his projects are highlighted below…
Medical Equipment Mfg. Client (Germany / USA)
This was one of the world’s largest medical equipment
manufacturing companies. Sarva integrated the RFC device
with SAP Warehouse Management which improves the
Warehouse efficiency.
General Engineering Mfg Client (Germany / USA /
India)
This client is one of the pioneers in General Engineering
Manufacturing. Sarva was involved in the Logistics Roll Out to
Multiple Countries across the Globe.
PC Manufacturing Client (China / USA / India)
This project was for one of the world’s largest PC
manufacturing client. Sarva was involved in country roll out to
India in Logistics area.
EWM Pilot Project (India)
Sarva was one of the team members in the Extended
Warehouse Management Pilot Project Team with SAP Labs,
India.
4
5. Shoubii Consulting
Implementing your ERP Dreams
www.shoubii.com
Email us at Training.needs@shoubii.com to fix an
appointment to discuss your training needs