2. Handling Unit Management (HUM) is one of the challenging
modules in SAP. Implementing Handling Units can challenge
the entire implementation if it is not implemented in the right
way. We’ll see how we can do it right, the first time & every
time…
Handling Unit is tightly integrated across And the reports the client will demand out
the supply chain and it can be implemented of SAP can be the most challenging. Let us
in several ways – Only for Outbound, Only be prepared for that too.
for Inbound or across the Supply Chain.
We at Shoubii Consulting will explain you
Many clients scrap the idea of implementing how to implement the HUM and the
Handling Units during the Integration challenges of HUM. We’ll guide you on how
Testing (Half way through the project!) to solve the real time problems and how to
because of its negative impact on other make a positive impact on the
modules. implementation in our training “Handling
Unit Management – Real time scenarios”.
This will not only affect the project
schedule but will also affect your credibility
& capability. We’ll ensure that we will
never be in such a situation.
Handling Unit can be used in a Supply Chain
environment with or without Batch
Management & Storage Unit Management
to ensure better tracability & detailed
quality inspection.
Did you know that Handling Unit covers a lot
more than just packing material in a box?
2
3. Meetings…meetings…Non stop meetings…Blueprint Phase is generally the
most important (& boring) part of the project!
If you do not do sufficient prototyping during this phase, you will be
talking in the air and the client can only hope that the implementation will
go on well…
Even worse, you might not be able to make the system work in the way,
you had believed it would, by (mis) understanding the SAP help
documentation!! And mid-way into the realization phase, you will be
forced to re-design your solution.
We will avoid this scenario, once and for all!
This training on “Real time Project Scenario’s for Handling Unit
Management” will replicate a blue-print phase of a project. The Shoubii
Consultants will play the dual role of the client Business Manager as
well as a Solution Architect of a project.
The Business Manager will explain the actual business scenarios. Then we
will get into some discussion to understand the requirement. Finally the
Solution Architect will give a direction on how it has to be mapped in SAP.
As future SAP consultants, you are expected to design it and present it to
the team! Can you see your SAP Dreams come true, already?
3
4. Godwin has over 13 years of consultancy experience
& has worked in a variety of Industries like Retail,
Food, Utility, Hi-Tech, Chemicals & Textiles.
Godwin has completed 10 implementations in SAP!!!
Some of his SAP projects are highlighted below...
Utility Client (USA)
This is one of the largest Utility service supply company in
Florida, USA. Godwin worked as the lead consultant in the
areas of Extended Warehouse Management & Handling Unit
Management.
Semi-conductor Client (USA)
This is one of the largest computer chips designing company in
the world. Godwin worked as the Sr. Consultant in the areas of
Handling Units across the Supply Chain.
Retail Client (Kuwait)
This client is a well known retailer and leading 12 different
businesses in Kuwait. Godwin worked as Senior Logistics
Consultant in the Supply Chain Area.
Chemical Client (USA / Europe)
Godwin worked as the lead consultant in the Logistics &
Handling Units area and rolled out 3 implementations & 1
Upgrade project in both Europe & USA.
Textile Client (USA / China)
Godwin worked as the Manager in the Logistics area where he
implemented Handling Units Management for Outbound,
Inbound, and Production & interfaced with IM, QM, PP,
Shipping and WM.
4
5. Shoubii Consulting
Implementing your ERP Dreams
www.shoubii.com
Email us at Training.needs@shoubii.com to fix an
appointment to discuss your training needs