SlideShare a Scribd company logo
1 of 16
Download to read offline
ASMEF’S increased yard
capacity
ASMEF
NEWSLETTER
June
Issue
2017
-Petrofac UZ750 project successful delivery
-Power Skids for TOZZI delivered as scheduled
-ASMEF HSE campaigns for 2017 Q1 & Q2
ASMEF’S increased yard
capacity
WHAT’SINSIDE
2
PAGE
3 | HSE - OSH Day for Safety at Work
4 | HSE - ASMEF Emergency Drills
5 | HSE - Hand & Finger Injury Campaign
6 | HSE - Eye Injury Prevention Campaign
7 | Successful Delivery of Structural Modules
for Petrofac - UZ 750 Project
7 | ASMEF receives an award from Petrofac
8 | Power Skids for Tozzi
9 | Ship Repair - Various Works for Ship Repair
10 | Rig Repair - Falcon Pear & Diamond at the ASMEF Yard
11 | General Updates - ASMEF Pursues Green Recycling Business
12 | General Updates - ASMEF Partners with Renowned OEMs
for its Workshop Activities
13 | General Updates - Bureau Veritas Internal Auditors’ Training
for ASMEF Staff
14 | General Updates - The First Soccer Tournament
for Ali & Sons Holding LLC
HSE
Ali & Sons Marine Engineering Factory (ASMEF) celebrated the Occupational Safety
Health Day (OSH) for Safety at Work in April 2017.
Everyone including subcontractors, clients and visitors were invited to grace the event in
the yard.
In the event, ASMEF HSSE Manager Supreeth Attavar discussed the significance of the the
celebration and the roles of the International Labor Organization (ILO) and Occupational
Safety Health Abu Dhabi (OSHAD) in making the lives of the workers better at all levels. He
discussed the rights of the workers, as well as their responsibilities towards health and
safety at work. He said, “This is a day to remember those who have lost their lives or
suffered injury at work. The learnings from such incidents have aided in the development of
health and safety standards, therefore we must always be indebted to them.”
OSH Day for Safety at Work
The workforce was then addressed by the General Manager Emad Elatreby, who spoke of
the importance of workers responsibilities and how the submission of Hazard Observation
cards helps in making the workplace safer. While he was happy at the increased contribution
of Hazard Observation cards, he encouraged the workers to contribute more, even offering
a personal cash award for the best Hazard Observation submitted.
3
HSE
ASMEF HSE emergency simulation drills
While our focus is geared towards the prevention of incidents and emergency situations,
at ASMEF we also believe in being fully prepared for all emergency situations that may occur
but also having documented plans and trained personnel to manage these emergency plans
at any time. To keep all personnel at site at a high level of preparedness, various drills are
conducted regularly. At these drills, different emergency situations are simulated, based on
the various emergencies that could arise. Lessons learned from these simulation exercises
help in continually improving our emergency response planning. Recent drills conducted include:
Fire and Emergency Evacuation of the Yard
4
Rescue from height and medical evacuation
Rescue from confined space and medical evacuation
HSE
HSE Campaigns
As part of the ASMEF continuous improvement in HSE, different campaigns are being launched
every quarter for the entire year along side all the other HSE programs of the company. The
objective of these campaigns is increased awareness in health and safety matters in general
and in the selected theme of the campaign in particular.
Other than announcements, prominent banners and displays to mark each individual campaign,
events based on the quarterly theme included training, focus during the daily toolbox talks and
weekly safety meetings, reviews of the risk assessments and safety controls, hand outs and
presentations, competitions, awards and the like.
Hand & Finger Injury Prevention Campaign - Q1 2017
Based on HSE performance of 2016, as well as in consideration of the common health and
safety risks of our operations, it was decided to kick start the year with a ‘Hand & Finger Injury
prevention campaign’ during the first quarter.
Prominent displays of banners and posters of the Hand & Finger Injury Prevention Campaign
were placed in the offices and the yard at the first day of the year.
Accordingly, A Hands & Finger Injury Prevention Poster Competition was held, which
pleasantly unearthed a number of talented artists amongst the workforce. Awards were also
given for various HSE Observations and suggestions based on the theme of the campaign.
5
The success of the campaign was judged by the number of incidents, inclusive of records
of minor complaints and consultations at the first aid clinic during the period. While there
were no hand & finger injuries through the campaign and even for the few months after, it
was noted that complaints at the site first aid clinic had also reduced dramatically, as shown
in the below table:
HSE
Hand & Finger Campaign Jan Feb Mar
No. of Injuries 0 0 0
Minor first aid cases 10 9 3
Eye Injury Prevention Campaign - Q2 2017
Eye Injury Prevention was the theme selected for the second campaign for the year. This was
based on the risks owing to the nature of our operations, particularly hot work, as well as
analysis of trends from the HSE Observation reports. The campaign also started in similar
manner as the preceding campaign, with prominent banners and displays and predominant
focus on eye safety at all HSE meetings.
Similar campaign competitions are in progress, with the winners to be announced early into
the 3rd quarter of the year. While the campaign is still progressing, results have been very
promising thus far with no injuries reported, and a sharp reduction of numbers of eye related
consultations in the first aid room, as shown in the table below:
Eye Injury Campaign Jan Feb Mar Apr May
No. of Injuries 0 0 0 0 0
Minor complaints at the first aid clinic 11 6 2 2 0
6
OIL&GAS
Successful Delivery of Structural Modules for Petrofac UZ750 Project
Ali & Sons Marine Engineering Factory successfully delivered 30 nos. of offshore platform modules
for Zakum Development Company ( ZADCO) in April 2017 as scheduled .
The project was awarded to ASMEF in 2016 by Petrofac Emirates where the end user is ZADCO
for its UZ750 Island Surface Facilities Project - EPC2. The project consists of supply of
Pre-Assembled Pipe Racks (PAR), Pre-assembled & fireproofed Modules (PAM), Pre-Assembled
& fireproofed Units (PAU) and other similar structures needed in the facilities.
ASMEF received an
achievement award
in April 2017 from
Petrofac - UZ 750 team
for the successful
support in the final
delivery of the UZ750
EPC2 Modules fabricated
in Ali & Sons Marine
Engineering Factory yard.
Achievement Award
7
OIL&GAS
Power Supply Skids for TOZZI Progressing as planned
25 Power Supply Skids (PSS) awarded by TOZZI to Ali & Sons Marine Engineering Factory are
progressing as planned. The first batch of four skids have been delivered in the last week of June 2017.
The next five skids have been delivered on 2nd week of July 2017. Remaining 16 PSS are progressing
well and will be delivered as planned.
The skids are to be installed in the Mender Fields. The end user is Abu Dhabi National Oil Company
(ADCO), a subsidiary of Abu Dhabi National Oil Company (ADNOC). ADCO is developing its marginal
fields by expanding sustainable crude oil production such as the Mender Field Project.
8
SHIPREPAIR
Various Ship Repair Works
Berthing & repairs on Esnaad Vessels
Berthing & general services -Vessel Falcon
Afloat repairs - Vessel MV Mary K
Drydocking & repair - Shark Bay (WJT1201)
Drydocking & repair - Al Jaber 31
Berthing & bulk tank cleaning -Bourbon Liberty
9
Other Ship Repair Works
-Bollard Pull test - Maridive 32 & 42
-Bollard Pull Test - AST 26
-Drydocking - LCT Hamdah 1
-Berthing - Esnaad 228
-Drydocking - Tug Lateer
-Drydocking - Bes Solar
-Emergency Drydocking - Maridive 35
-Drydocking - Tug Gogas 9
-Supply of Welders withe Equipment
-Supply of Manpower with Equipment
-Berthing & Sludge Disposal - Esnaad
-Extension of Platform & Installation of
FRC Davit - Vessel Crest Titan 2
-Blasting & Painting works - Barge DB 3601
-Berthing - Vessel BL 108
-Repair on Port Side - Dredger Kattouf
RIGREPAIR
Falcon Diamond
Falcon Pearl
Falcon Pearl and Diamond at the ASMEF Yard
Falcon Pearl and Falcon Diamond came to the ASMEF jetty on 8 February and 9 February 2017 for
various works. These included installation of new gear boxes for the jack up systems, renewal of
hydraulic cylinder for the main deck crane (capacity 200 tons) and renewal of the alternator having a
capacity of 2000 KVa for Falcon Pearl.
While Falcon Pearl is still undergoing works at the ASMEF quayside, Falcon Diamond left
on 23 May 2017.
10
11
ASMEF Pursues Green Recycling Business
In the aim to pursue its diversified
business lines that helps the company
to overcome the current market
challenges, ASMEF embarks to
the Green Recycling Business.
Green Recycling Business by ASMEF
involves dismantling where the ship is
broken down when its life tenure has
been completed.
As one of the ship disposal techniques,
ship dismantling involves retired ships
to be stripped off their machinery,
barring the value - adding materials
which can be reused for new ships or
other applications. The process of
taking the ship apart is mostly an
onshore operation.
It was noticed that a massive number
of offshore marine vessels, rigs and
jack ups are already old. There are also
restrictions being put on the age of t
hese vessels because of the outdated
technology especially in the safety
systems. Therefore, ASMEF has
embarked into green recycling
business.
The first vessel came for dismantling
in March and the second vessel came
in May 2017.
GENERALUPDATES
12
ASMEF partners with M/s Termomeccanica and
M/s Sulzer for the supervision support for overhauling
and refurbishment of pumps & compressors and
M/s AllRig for oil drilling equipment.
On 20th March, the ‘Approved Repair Partner’
agreement was signed between M/s Sulzer Pumps
Middle East FZCO and ASMEF. With this ASMEF
is now approved for refurbishment including
components repair, installation, commissioning,
in-situ servicing and trouble shooting of Sulzer pumps
nder Sulzer supervision.
Sulzer pumps have been overhauled
in this workshop for ZADCO, ALBA (Bahrain),
KOC (Kuwait), Samsung-Takreer, etc.
ASMEF’s One-Stop Shop has already similar
agreement with M/s Termomeccanica Pompe
S.p.A, Italy. It recently completed the overhauling
of 15 Termomeccanica pumps for DEWA Power
Plants and six refrigerant compressors for Abu
Dhabi Airport.
ASMEF Partners with Renowed
OEMs for its Workshop Activities
GENERALUPDATES
13
Internal Auditors’ Training for ASMEF Staff
by Bureau Veritas to the
ISO 9001:2015, OHSAS
18001:2007 and ISO 14001:2015
International Standards.
This has not only resulted in
more skilled auditors but also
emphasized the importance
of the continual improvement
of our Management Systems.
GENERALUPDATES
In the company’s effort for
continuous improvement a set
of selected staff from various
departments have been
nominated to undergo Integrated
Management System Auditor
training that has been facilitated
ASMEF wishes
everyone Eid Mubarak
14
BRACKET
A
BRACKET
B
BRACKET
C
BRACKET
D
Al Ain ASOS Porsche Contracting 2
Marine 1 Audi Eurostar Head Office 2
Volkswagen Head Office 1 Marine2 Contracting 1
The First Soccer Tournament for Ali & Sons Holding LLC
GENERALUPDATES
In the effort to promote teamwork, sportsmanship, work ethics and respect for every employee,
Ali & Sons Holding organized its first soccer event where all its subsidiaries are represented by
teams.
Each division of the company were grouped into 12 teams namely:
All players exerted their best efforts but only one team made it as a champion, the Porsche Team.
The tournament was held at Classic Playground Rental and Management, Abu Dhabi Gate, Abu
Dhabi for six days, 4 April - 11 April 2017.
15
A leading contractor in the Offshore & Onshore Oil & Gas, Rigs/ Jack Up Repair
& Upgrades, Ship Building & Ship Repair
An interdisciplinary facility offering one - stop shop services
QMS certified with API Spec Q1 & ISO 9001
HSE certified with ISO 14001, OHSAS 18001 & OSHAD
ASME certified with A, PP, S, U, & U2 stamps and NB & R stamps
280,000 sq. meters yard space and 345 meters water front
Oil & Gas Division specializes in a diverse range of services covering the Oil &
Gas industry operating both Offshore and Onshore. We maintain a dedicated, fully
qualified engineering team covering structural steel, piping, E&I and static
equipment. We also offer a full range of projects which covers process skid
packages, process modules, power supply skids (E-houses), offshore platforms
and topsides among others.
Ship Build Division offers a range of interdisciplinary services for its new build
projects such as Naval Architecture, Marine Engineering, Project Engineering and
Project Management. We have carried out number of new build and have
undertaken major conversion projects with high competence that involved building
new vessels, ships, crew boats, barges and cable lay ships.
Ship Repair Division operates in diversified facilities offering our clients a quick
turn-around for increasingly competitive shipping market where Quality and Safety
are the highest priority.
Rig & Jack Up Repair and Upgrades Division
With a proven track record of quality projects, we have rapidly gained a reputation
as a reliable and professional rigs & jack up repair/upgrade facility for both the
local and international market with capabilities that include: In-house & approved
3rd
party Engineering | reliable Procurement support | Modifications, Recertification,
Installation and Refurbishment of Machinery | experienced Project Management.
ALI & SONS MARINE ENGINEERING FACTORY (ASMEF)
P.O. BOX 133393
PLOT 354 MR2 INDUSTRIAL CITY OF ABU DHABI (ICAD) II
ABU DHABI, UNITED ARAB EMIRATES
T: +9712 551 2432 | F: +9712 551 2431
www.asme.ali-sons.com
The ASMEF newsletter is issued by Marketing Department
For any feedback, suggestions or queries, please email to:
asmef.marketing@ali-sons.com

More Related Content

Similar to Newsletter june 2017

Desocn HSE News Letter - 2nd Edition (July - December 2016)
Desocn HSE News Letter - 2nd Edition (July - December 2016)Desocn HSE News Letter - 2nd Edition (July - December 2016)
Desocn HSE News Letter - 2nd Edition (July - December 2016)
Farooq Liaqat
 
Resume of ARMANDO ILAGAN
Resume of ARMANDO  ILAGANResume of ARMANDO  ILAGAN
Resume of ARMANDO ILAGAN
Armando Ilagan
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady
 
Eduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdfEduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdf
Eduardo Haban
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
raafat sayed
 

Similar to Newsletter june 2017 (20)

ADMA-OPCO ‘Green Hands’ Program | DuPont Safety and Sustainability Awards 2013
ADMA-OPCO ‘Green Hands’ Program | DuPont Safety and Sustainability Awards 2013ADMA-OPCO ‘Green Hands’ Program | DuPont Safety and Sustainability Awards 2013
ADMA-OPCO ‘Green Hands’ Program | DuPont Safety and Sustainability Awards 2013
 
New base 1044 special 19 june 2017 energy news
New base 1044 special 19 june 2017 energy newsNew base 1044 special 19 june 2017 energy news
New base 1044 special 19 june 2017 energy news
 
Mohamed Abdelnaby. CV
Mohamed Abdelnaby. CVMohamed Abdelnaby. CV
Mohamed Abdelnaby. CV
 
Meo breeze issue7
Meo breeze issue7Meo breeze issue7
Meo breeze issue7
 
Desocn HSE News Letter - 2nd Edition (July - December 2016)
Desocn HSE News Letter - 2nd Edition (July - December 2016)Desocn HSE News Letter - 2nd Edition (July - December 2016)
Desocn HSE News Letter - 2nd Edition (July - December 2016)
 
Mohamed Hassan CV 2
Mohamed Hassan CV 2Mohamed Hassan CV 2
Mohamed Hassan CV 2
 
NAV9000 teaser
NAV9000 teaserNAV9000 teaser
NAV9000 teaser
 
SHARIN -Speedy new
SHARIN -Speedy newSHARIN -Speedy new
SHARIN -Speedy new
 
CLIMATIC_18_GB
CLIMATIC_18_GBCLIMATIC_18_GB
CLIMATIC_18_GB
 
ANOOP CV 2016 JUN
ANOOP CV 2016 JUNANOOP CV 2016 JUN
ANOOP CV 2016 JUN
 
New base 05 november 2017 energy news issue 1096 by khaled al awadi
New base 05 november 2017 energy news issue   1096  by khaled al awadiNew base 05 november 2017 energy news issue   1096  by khaled al awadi
New base 05 november 2017 energy news issue 1096 by khaled al awadi
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
Resume of ARMANDO ILAGAN
Resume of ARMANDO  ILAGANResume of ARMANDO  ILAGAN
Resume of ARMANDO ILAGAN
 
Eng.Hazem's CV
Eng.Hazem's CVEng.Hazem's CV
Eng.Hazem's CV
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
 
Yasser CV updated
Yasser CV updatedYasser CV updated
Yasser CV updated
 
cv updated (1)
cv updated (1)cv updated (1)
cv updated (1)
 
Eduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdfEduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdf
 
saudi_arabia_baixa
saudi_arabia_baixasaudi_arabia_baixa
saudi_arabia_baixa
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
 

Recently uploaded

Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Masudpur
Delhi  99530 vip 56974  Genuine Escort Service Call Girls in MasudpurDelhi  99530 vip 56974  Genuine Escort Service Call Girls in Masudpur
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Masudpur
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
anilsa9823
 
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service 👖
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service  👖CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service  👖
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service 👖
anilsa9823
 
DickinsonSlides teeeeeeeeeeessssssssssst.pptx
DickinsonSlides teeeeeeeeeeessssssssssst.pptxDickinsonSlides teeeeeeeeeeessssssssssst.pptx
DickinsonSlides teeeeeeeeeeessssssssssst.pptx
ednyonat
 

Recently uploaded (20)

Night 7k Call Girls Pari Chowk Escorts Call Me: 8448380779
Night 7k Call Girls Pari Chowk Escorts Call Me: 8448380779Night 7k Call Girls Pari Chowk Escorts Call Me: 8448380779
Night 7k Call Girls Pari Chowk Escorts Call Me: 8448380779
 
O9654467111 Call Girls In Dwarka Women Seeking Men
O9654467111 Call Girls In Dwarka Women Seeking MenO9654467111 Call Girls In Dwarka Women Seeking Men
O9654467111 Call Girls In Dwarka Women Seeking Men
 
BDSM⚡Call Girls in Sector 76 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 76 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 76 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 76 Noida Escorts >༒8448380779 Escort Service
 
Film show evaluation powerpoint for site
Film show evaluation powerpoint for siteFilm show evaluation powerpoint for site
Film show evaluation powerpoint for site
 
Night 7k Call Girls Noida Sector 120 Call Me: 8448380779
Night 7k Call Girls Noida Sector 120 Call Me: 8448380779Night 7k Call Girls Noida Sector 120 Call Me: 8448380779
Night 7k Call Girls Noida Sector 120 Call Me: 8448380779
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Masudpur
Delhi  99530 vip 56974  Genuine Escort Service Call Girls in MasudpurDelhi  99530 vip 56974  Genuine Escort Service Call Girls in Masudpur
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Masudpur
 
Call Girls In Gurgaon Dlf pHACE 2 Women Delhi ncr
Call Girls In Gurgaon Dlf pHACE 2 Women Delhi ncrCall Girls In Gurgaon Dlf pHACE 2 Women Delhi ncr
Call Girls In Gurgaon Dlf pHACE 2 Women Delhi ncr
 
Film show investigation powerpoint for the site
Film show investigation powerpoint for the siteFilm show investigation powerpoint for the site
Film show investigation powerpoint for the site
 
Night 7k Call Girls Noida New Ashok Nagar Escorts Call Me: 8448380779
Night 7k Call Girls Noida New Ashok Nagar Escorts Call Me: 8448380779Night 7k Call Girls Noida New Ashok Nagar Escorts Call Me: 8448380779
Night 7k Call Girls Noida New Ashok Nagar Escorts Call Me: 8448380779
 
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
CALL ON ➥8923113531 🔝Call Girls Ashiyana Colony Lucknow best sexual service O...
 
Interpreting the brief for the media IDY
Interpreting the brief for the media IDYInterpreting the brief for the media IDY
Interpreting the brief for the media IDY
 
Production diary Film the city powerpoint
Production diary Film the city powerpointProduction diary Film the city powerpoint
Production diary Film the city powerpoint
 
SELECTING A SOCIAL MEDIA MARKETING COMPANY
SELECTING A SOCIAL MEDIA MARKETING COMPANYSELECTING A SOCIAL MEDIA MARKETING COMPANY
SELECTING A SOCIAL MEDIA MARKETING COMPANY
 
Film show production powerpoint for site
Film show production powerpoint for siteFilm show production powerpoint for site
Film show production powerpoint for site
 
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service 👖
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service  👖CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service  👖
CALL ON ➥8923113531 🔝Call Girls Takrohi Lucknow best Female service 👖
 
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
 
Call Girls In South Ex. Delhi O9654467111 Women Seeking Men
Call Girls In South Ex. Delhi O9654467111 Women Seeking MenCall Girls In South Ex. Delhi O9654467111 Women Seeking Men
Call Girls In South Ex. Delhi O9654467111 Women Seeking Men
 
Website research Powerpoint for Bauer magazine
Website research Powerpoint for Bauer magazineWebsite research Powerpoint for Bauer magazine
Website research Powerpoint for Bauer magazine
 
Film the city investagation powerpoint :)
Film the city investagation powerpoint :)Film the city investagation powerpoint :)
Film the city investagation powerpoint :)
 
DickinsonSlides teeeeeeeeeeessssssssssst.pptx
DickinsonSlides teeeeeeeeeeessssssssssst.pptxDickinsonSlides teeeeeeeeeeessssssssssst.pptx
DickinsonSlides teeeeeeeeeeessssssssssst.pptx
 

Newsletter june 2017

  • 1. ASMEF’S increased yard capacity ASMEF NEWSLETTER June Issue 2017 -Petrofac UZ750 project successful delivery -Power Skids for TOZZI delivered as scheduled -ASMEF HSE campaigns for 2017 Q1 & Q2
  • 2. ASMEF’S increased yard capacity WHAT’SINSIDE 2 PAGE 3 | HSE - OSH Day for Safety at Work 4 | HSE - ASMEF Emergency Drills 5 | HSE - Hand & Finger Injury Campaign 6 | HSE - Eye Injury Prevention Campaign 7 | Successful Delivery of Structural Modules for Petrofac - UZ 750 Project 7 | ASMEF receives an award from Petrofac 8 | Power Skids for Tozzi 9 | Ship Repair - Various Works for Ship Repair 10 | Rig Repair - Falcon Pear & Diamond at the ASMEF Yard 11 | General Updates - ASMEF Pursues Green Recycling Business 12 | General Updates - ASMEF Partners with Renowned OEMs for its Workshop Activities 13 | General Updates - Bureau Veritas Internal Auditors’ Training for ASMEF Staff 14 | General Updates - The First Soccer Tournament for Ali & Sons Holding LLC
  • 3. HSE Ali & Sons Marine Engineering Factory (ASMEF) celebrated the Occupational Safety Health Day (OSH) for Safety at Work in April 2017. Everyone including subcontractors, clients and visitors were invited to grace the event in the yard. In the event, ASMEF HSSE Manager Supreeth Attavar discussed the significance of the the celebration and the roles of the International Labor Organization (ILO) and Occupational Safety Health Abu Dhabi (OSHAD) in making the lives of the workers better at all levels. He discussed the rights of the workers, as well as their responsibilities towards health and safety at work. He said, “This is a day to remember those who have lost their lives or suffered injury at work. The learnings from such incidents have aided in the development of health and safety standards, therefore we must always be indebted to them.” OSH Day for Safety at Work The workforce was then addressed by the General Manager Emad Elatreby, who spoke of the importance of workers responsibilities and how the submission of Hazard Observation cards helps in making the workplace safer. While he was happy at the increased contribution of Hazard Observation cards, he encouraged the workers to contribute more, even offering a personal cash award for the best Hazard Observation submitted. 3
  • 4. HSE ASMEF HSE emergency simulation drills While our focus is geared towards the prevention of incidents and emergency situations, at ASMEF we also believe in being fully prepared for all emergency situations that may occur but also having documented plans and trained personnel to manage these emergency plans at any time. To keep all personnel at site at a high level of preparedness, various drills are conducted regularly. At these drills, different emergency situations are simulated, based on the various emergencies that could arise. Lessons learned from these simulation exercises help in continually improving our emergency response planning. Recent drills conducted include: Fire and Emergency Evacuation of the Yard 4 Rescue from height and medical evacuation Rescue from confined space and medical evacuation
  • 5. HSE HSE Campaigns As part of the ASMEF continuous improvement in HSE, different campaigns are being launched every quarter for the entire year along side all the other HSE programs of the company. The objective of these campaigns is increased awareness in health and safety matters in general and in the selected theme of the campaign in particular. Other than announcements, prominent banners and displays to mark each individual campaign, events based on the quarterly theme included training, focus during the daily toolbox talks and weekly safety meetings, reviews of the risk assessments and safety controls, hand outs and presentations, competitions, awards and the like. Hand & Finger Injury Prevention Campaign - Q1 2017 Based on HSE performance of 2016, as well as in consideration of the common health and safety risks of our operations, it was decided to kick start the year with a ‘Hand & Finger Injury prevention campaign’ during the first quarter. Prominent displays of banners and posters of the Hand & Finger Injury Prevention Campaign were placed in the offices and the yard at the first day of the year. Accordingly, A Hands & Finger Injury Prevention Poster Competition was held, which pleasantly unearthed a number of talented artists amongst the workforce. Awards were also given for various HSE Observations and suggestions based on the theme of the campaign. 5
  • 6. The success of the campaign was judged by the number of incidents, inclusive of records of minor complaints and consultations at the first aid clinic during the period. While there were no hand & finger injuries through the campaign and even for the few months after, it was noted that complaints at the site first aid clinic had also reduced dramatically, as shown in the below table: HSE Hand & Finger Campaign Jan Feb Mar No. of Injuries 0 0 0 Minor first aid cases 10 9 3 Eye Injury Prevention Campaign - Q2 2017 Eye Injury Prevention was the theme selected for the second campaign for the year. This was based on the risks owing to the nature of our operations, particularly hot work, as well as analysis of trends from the HSE Observation reports. The campaign also started in similar manner as the preceding campaign, with prominent banners and displays and predominant focus on eye safety at all HSE meetings. Similar campaign competitions are in progress, with the winners to be announced early into the 3rd quarter of the year. While the campaign is still progressing, results have been very promising thus far with no injuries reported, and a sharp reduction of numbers of eye related consultations in the first aid room, as shown in the table below: Eye Injury Campaign Jan Feb Mar Apr May No. of Injuries 0 0 0 0 0 Minor complaints at the first aid clinic 11 6 2 2 0 6
  • 7. OIL&GAS Successful Delivery of Structural Modules for Petrofac UZ750 Project Ali & Sons Marine Engineering Factory successfully delivered 30 nos. of offshore platform modules for Zakum Development Company ( ZADCO) in April 2017 as scheduled . The project was awarded to ASMEF in 2016 by Petrofac Emirates where the end user is ZADCO for its UZ750 Island Surface Facilities Project - EPC2. The project consists of supply of Pre-Assembled Pipe Racks (PAR), Pre-assembled & fireproofed Modules (PAM), Pre-Assembled & fireproofed Units (PAU) and other similar structures needed in the facilities. ASMEF received an achievement award in April 2017 from Petrofac - UZ 750 team for the successful support in the final delivery of the UZ750 EPC2 Modules fabricated in Ali & Sons Marine Engineering Factory yard. Achievement Award 7
  • 8. OIL&GAS Power Supply Skids for TOZZI Progressing as planned 25 Power Supply Skids (PSS) awarded by TOZZI to Ali & Sons Marine Engineering Factory are progressing as planned. The first batch of four skids have been delivered in the last week of June 2017. The next five skids have been delivered on 2nd week of July 2017. Remaining 16 PSS are progressing well and will be delivered as planned. The skids are to be installed in the Mender Fields. The end user is Abu Dhabi National Oil Company (ADCO), a subsidiary of Abu Dhabi National Oil Company (ADNOC). ADCO is developing its marginal fields by expanding sustainable crude oil production such as the Mender Field Project. 8
  • 9. SHIPREPAIR Various Ship Repair Works Berthing & repairs on Esnaad Vessels Berthing & general services -Vessel Falcon Afloat repairs - Vessel MV Mary K Drydocking & repair - Shark Bay (WJT1201) Drydocking & repair - Al Jaber 31 Berthing & bulk tank cleaning -Bourbon Liberty 9 Other Ship Repair Works -Bollard Pull test - Maridive 32 & 42 -Bollard Pull Test - AST 26 -Drydocking - LCT Hamdah 1 -Berthing - Esnaad 228 -Drydocking - Tug Lateer -Drydocking - Bes Solar -Emergency Drydocking - Maridive 35 -Drydocking - Tug Gogas 9 -Supply of Welders withe Equipment -Supply of Manpower with Equipment -Berthing & Sludge Disposal - Esnaad -Extension of Platform & Installation of FRC Davit - Vessel Crest Titan 2 -Blasting & Painting works - Barge DB 3601 -Berthing - Vessel BL 108 -Repair on Port Side - Dredger Kattouf
  • 10. RIGREPAIR Falcon Diamond Falcon Pearl Falcon Pearl and Diamond at the ASMEF Yard Falcon Pearl and Falcon Diamond came to the ASMEF jetty on 8 February and 9 February 2017 for various works. These included installation of new gear boxes for the jack up systems, renewal of hydraulic cylinder for the main deck crane (capacity 200 tons) and renewal of the alternator having a capacity of 2000 KVa for Falcon Pearl. While Falcon Pearl is still undergoing works at the ASMEF quayside, Falcon Diamond left on 23 May 2017. 10
  • 11. 11 ASMEF Pursues Green Recycling Business In the aim to pursue its diversified business lines that helps the company to overcome the current market challenges, ASMEF embarks to the Green Recycling Business. Green Recycling Business by ASMEF involves dismantling where the ship is broken down when its life tenure has been completed. As one of the ship disposal techniques, ship dismantling involves retired ships to be stripped off their machinery, barring the value - adding materials which can be reused for new ships or other applications. The process of taking the ship apart is mostly an onshore operation. It was noticed that a massive number of offshore marine vessels, rigs and jack ups are already old. There are also restrictions being put on the age of t hese vessels because of the outdated technology especially in the safety systems. Therefore, ASMEF has embarked into green recycling business. The first vessel came for dismantling in March and the second vessel came in May 2017. GENERALUPDATES
  • 12. 12 ASMEF partners with M/s Termomeccanica and M/s Sulzer for the supervision support for overhauling and refurbishment of pumps & compressors and M/s AllRig for oil drilling equipment. On 20th March, the ‘Approved Repair Partner’ agreement was signed between M/s Sulzer Pumps Middle East FZCO and ASMEF. With this ASMEF is now approved for refurbishment including components repair, installation, commissioning, in-situ servicing and trouble shooting of Sulzer pumps nder Sulzer supervision. Sulzer pumps have been overhauled in this workshop for ZADCO, ALBA (Bahrain), KOC (Kuwait), Samsung-Takreer, etc. ASMEF’s One-Stop Shop has already similar agreement with M/s Termomeccanica Pompe S.p.A, Italy. It recently completed the overhauling of 15 Termomeccanica pumps for DEWA Power Plants and six refrigerant compressors for Abu Dhabi Airport. ASMEF Partners with Renowed OEMs for its Workshop Activities GENERALUPDATES
  • 13. 13 Internal Auditors’ Training for ASMEF Staff by Bureau Veritas to the ISO 9001:2015, OHSAS 18001:2007 and ISO 14001:2015 International Standards. This has not only resulted in more skilled auditors but also emphasized the importance of the continual improvement of our Management Systems. GENERALUPDATES In the company’s effort for continuous improvement a set of selected staff from various departments have been nominated to undergo Integrated Management System Auditor training that has been facilitated ASMEF wishes everyone Eid Mubarak
  • 14. 14 BRACKET A BRACKET B BRACKET C BRACKET D Al Ain ASOS Porsche Contracting 2 Marine 1 Audi Eurostar Head Office 2 Volkswagen Head Office 1 Marine2 Contracting 1 The First Soccer Tournament for Ali & Sons Holding LLC GENERALUPDATES In the effort to promote teamwork, sportsmanship, work ethics and respect for every employee, Ali & Sons Holding organized its first soccer event where all its subsidiaries are represented by teams. Each division of the company were grouped into 12 teams namely: All players exerted their best efforts but only one team made it as a champion, the Porsche Team. The tournament was held at Classic Playground Rental and Management, Abu Dhabi Gate, Abu Dhabi for six days, 4 April - 11 April 2017.
  • 15. 15 A leading contractor in the Offshore & Onshore Oil & Gas, Rigs/ Jack Up Repair & Upgrades, Ship Building & Ship Repair An interdisciplinary facility offering one - stop shop services QMS certified with API Spec Q1 & ISO 9001 HSE certified with ISO 14001, OHSAS 18001 & OSHAD ASME certified with A, PP, S, U, & U2 stamps and NB & R stamps 280,000 sq. meters yard space and 345 meters water front Oil & Gas Division specializes in a diverse range of services covering the Oil & Gas industry operating both Offshore and Onshore. We maintain a dedicated, fully qualified engineering team covering structural steel, piping, E&I and static equipment. We also offer a full range of projects which covers process skid packages, process modules, power supply skids (E-houses), offshore platforms and topsides among others. Ship Build Division offers a range of interdisciplinary services for its new build projects such as Naval Architecture, Marine Engineering, Project Engineering and Project Management. We have carried out number of new build and have undertaken major conversion projects with high competence that involved building new vessels, ships, crew boats, barges and cable lay ships. Ship Repair Division operates in diversified facilities offering our clients a quick turn-around for increasingly competitive shipping market where Quality and Safety are the highest priority. Rig & Jack Up Repair and Upgrades Division With a proven track record of quality projects, we have rapidly gained a reputation as a reliable and professional rigs & jack up repair/upgrade facility for both the local and international market with capabilities that include: In-house & approved 3rd party Engineering | reliable Procurement support | Modifications, Recertification, Installation and Refurbishment of Machinery | experienced Project Management.
  • 16. ALI & SONS MARINE ENGINEERING FACTORY (ASMEF) P.O. BOX 133393 PLOT 354 MR2 INDUSTRIAL CITY OF ABU DHABI (ICAD) II ABU DHABI, UNITED ARAB EMIRATES T: +9712 551 2432 | F: +9712 551 2431 www.asme.ali-sons.com The ASMEF newsletter is issued by Marketing Department For any feedback, suggestions or queries, please email to: asmef.marketing@ali-sons.com