Brief Overview
EMERGYS SOFTWARE PRIVATE LIMITED
Greeta Towers, 2nd Floor, Phase I, Phone : (044) 24507507
Plot No- 98-114, Developed Plot, Fax : (044) 24963696
Perungudi, Chennai - 600 096. INDIA. Web : www.emergys.com
Variant Configuration
2. 2
Agenda
Introduction to Variant Configurations
• Introduction
• Integration
• Terms Used
• Classification System
• Object Dependencies
• Material Variants
• MTO with VC(CTO)
• Questions ???
3. 3
Introduction
Variant configuration in R/3 lets you check the following as soon as you create a sales order:
whether the required variant can be produced (only variants that are technically possible
can be ordered)
what price you can quote for the product
whether the customer’s specifications can be covered from stock and so on...
5. 5
Integration
Variant configuration is integrated with the following
applications:
• CA Classification
• LO Material Master
• PP Bill of Material
• PP Routings
• PP Material Requirements Planning (MRP)
• PP Production Orders
• PP–PI Master Recipes
• CO Costing
• SD Sales
• SD Conditions
• MM Purchasing
20. 20
MTO with VC_Step 3
The sales order will now be converted into a planned order. Planned Orders
represent the first step toward an actual production schedule for the Shop
Floor.
21. 21
MTO with VC_Step 4
•Planned Orders are a result of MRP run and serve to provide an initial Production Schedule.
•Production Orders contain comprehensive information to support a shop floor schedule and provide a
method to confirm operations performed.
• Production orders can be created with reference to a Planned Order.
22. 22
MTO with VC_Step 4
Object Dependency:
Routing Selection Condition ensures only necessary operations are taken.x`
24. 24
MTO with VC_Step 6
From the Production Control node, choose Period-End Closing Settlement
Individual Processing (KO88)
Perform order settlement to transfer the costs of the production order to sales order.
Analyze the current cost situation for the Production Order