SlideShare a Scribd company logo
1 of 23
Download to read offline
1
© SRK Consulting (UK) Ltd 2014. All rights reserved.
Presenter:
Location:
1
© SRK Consulting (UK) Ltd 2014. All rights reserved.
Technical Due Diligence on
Oil Shale Mining Projects
Dr Sergei Sabanov
Golden, Colorado School of Mines, 15/10/2014
2
© SRK Consulting (UK) Ltd 2014. All rights reserved.
Table of Contents
• WHAT IS DUE DILIGENCE
• TECHNICAL VALUATIONS
• RESOURCES AND RESERVES ESTIMATION
• DUE DILIGENCE ISSUES, CAUSES AND IMPACTS
• KEY FEATURES OF QUALITY TECHNICAL STUDIES
• CONCLUSION
34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014
Dr Sergei Sabanov ssabanov@srk.co.uk
3
© SRK Consulting (UK) Ltd 2014. All rights reserved.
WHATIS DUE DILIGENCE?
Definition of Due Diligence :
‘An investigation or audit of a potential
investment. Due diligence serves to confirm all
material facts in regards to a sale’
Technical Due Diligence – concerned with the
technical and operational aspects of a mine or
project
Legal Due Diligence – concerned with the legal
aspects of a project eg company status, licence
validity, security of tenure, permitting, liabilities,
obligations etc
Technical Due Diligence is the focus of this talk
4
© SRK Consulting (UK) Ltd 2014. All rights reserved.
WHATIS TECHNICALDUE DILIGENCE NECESSARY FOR?
• Support Project Finance – when banks lend
money the credit committee needs to assess the
technical risk, will I lose my shirt ?
• A pre-cursor to a listing document – before a CPR
is prepared a consultant will review the assets
• Mergers – need to determine what are the assets
you are merging with, must assess risk, value?
• Acquisitions – it is a good purchase, how much
should be paid for it?
• Investments – should we purchase shares?
You could be on thin ice!
5
© SRK Consulting (UK) Ltd 2014. All rights reserved.
PROJECTFUNDING OPTIONS
All of these require some kind of technical due diligence
Source: Ernst & Young, Mining Journal, Global Mining Finance Guide 2014
There are
many ways
projects get
funding
6
© SRK Consulting (UK) Ltd 2014. All rights reserved.
WHAT DOESTECHNICALDUE DILIGENCE PROCESS INVOLVE ?
• Collation of information about the project /
operation / group of assets
• Visit to the project site by a team: mining
engineer, geologist, process engineer, E+S
specialist plus other experts as required
• Review of the information – what is available
and what does it tell us?
• Analysis - what are the impacts / effects, what is
going on?
• Conclusions – what do we think? Eg marginal
asset, poor technical work, unknowns
• Recommendations – how to fix key issues,
adjusted production profiles, capital and
operating costs, lead times
Effective TDD is a process resulting in some practical advice
7
© SRK Consulting (UK) Ltd 2014. All rights reserved.
TECHNICALFOUNDATIONS–ASSETTYPES SUBJECTTO DUE DILIGENCE
• Exploration Property
• Oil content may or may not be identified
• No Mineral Resource
• Advanced Exploration Property
• Considerable exploration undertaken
• Specific targets identified that warrant
further detailed investigation by drilling,
trenching or other detailed geological
sampling
• May or may not have a Mineral resource
Estimate.
• Sufficient work on at least one prospect to
provide good geological understanding
and encourage further work to elevate to
Mineral Resource Category
Similar approach, different assets
• Pre-Development Property
• Mineral Resources identified and their extent
(possibly incomplete)
• Decision to proceed with development has not
been made
• Early Assessment stage
• Also includes Resources with a plan not to
develop and those on ‘Care & Maintenance’
• Development Property
• Decision has been made to proceed with
construction and/or production but not
commissioned or operating at design levels
• Operating Mines
• Mineral Properties, particularly mines and
process plants that have been commissioned
and in production
MINERAL ASSET DEVELOPMENT STAGES
8
© SRK Consulting (UK) Ltd 2014. All rights reserved.
TECHNICALFOUNDATIONS
• Classification of Mineral Resources
• Study objectives
• Site specific technical Information
• Degree of engineering completed (%)
• Design basis and Cost estimation
methodology
• Cost estimation accuracy (Capital and
Operating)
• Cashflow analysis & valuation
• Level of contingency
All disciplines must be considered
KEY FEATURES OF TECHNICAL STUDIES
9
© SRK Consulting (UK) Ltd 2014. All rights reserved.
TECHNICALFOUNDATIONS
This is a key issue
ENVIRONMENTAL AND SOCIAL
• The International Finance Corporation
(“IFC”) Performance Standards on Social
and Environmental Sustainability (2006;
updated January 2012).
• The Equator Principles (“EPs”) is a risk
management framework adopted by
financial institutions.
National legislation and international standards require that an environmental and social impact
assessment (“ESIA”) is undertaken for a mining project, during the planning of the project.
Complemented by an environmental and social management plan (“ESMP”). The ESIA and ESMP are
often used to set legally binding conditions of environmental approval.
Implementation of ESMP/s requires an environmental and social management system (“ESMS”).
The IFC Performance Standards are complemented by the World
Bank Group Environmental, Health and Safety (“EHS”) Guidelines
(April 2007), comprising a series of General EHS Guidelines and
Industry Sector EHS Guidelines.
The EPs require that the mining projects (Category A projects)
undertake an ESIA, produce an ESIA report, develop an ESMP,
establish and maintain an ESMS and undertake effective
stakeholder engagement. Address compliance with host country
legislation and observe the relevant IFC Performance Standards
and the World Bank Group EHS guidelines.
10
© SRK Consulting (UK) Ltd 2014. All rights reserved.
TECHNICALFOUNDATIONS
• Many banks and financial institutions (78 so far) in 35
countries have adopted the EP’s. This covers 70% of
international project finance debt in emerging
economies.
• Environmental liabilities of borrower can affect lenders
by (i) reducing borrowers ability to pay (ii) reducing
value of security (iii) raising potential for direct liability.
• Lenders will try to protect themselves by carrying out
thorough due diligence prior to entering into a loan
agreement.
• Due diligence may include an assessment covering,
for example, whether land is contaminated, whether
hazardous materials are stored on site, waste
disposal at the site, whether necessary environmental
permits are in place and whether any legal
proceedings have been made or are pending.
For many banks this is the key issue
FINANCING VIEWPOINT
ENVIRONMENTAL AND SOCIAL
11
© SRK Consulting (UK) Ltd 2014. All rights reserved.
RESOURCESAND RESERVES ESTIMATION
1. Mining
2. Beneficiation/Processing
3. Economic
4. Marketing
5. Legal
6. Environmental
7. Social and Governmental
1. Dilution, mining losses and extraction ratios, grade adjustment factors, Geotechnical and hydrogeological,
Minimum mining width, interbedded waste, mineralised thickness, stripping ratio, grade/stratigraphic continuity
2. Bulk sample and sizing selection for plant design, representative of planned plant feed, grade variability, Product
recoveries, Material hardness (Bond work index), Bulk density, Presence and distribution of deleterious elements
(sulphur, etc.), Sales specifications, Plant capacity versus production rate, Stockpiling requirements/capacity.
Can all of the deposit be processed using proposed processing technology?
3. Links production schedule to costs and revenues, Should use realistic, long-term price, Used to demonstrate
economic viability, Traditionally uses discounted cash flow methods (NPV, IRR, etc.), Sensitivity analysis on
inputs should be understood. Verify cut-off grade: average, marginal, operational; strip ratio limits; is UG
development justified?
4. Saleable product; Availability of market for the product; Capacity affect production rate? Is there a market for the
product? Is the production rate constrained by market capacity?
5. Mining legislation, Other land users (native title, etc.) Does the client have uncontested title for the mineral
deposit? Is the licence likely to be granted / extended?
6. May restrict mine or infrastructure footprint, Stakeholder engagement/ESIA. Is mining restricted on any portion of
the deposit? Will the community support the project?
7. Licensing and permitting; Government energy policy. Is there any doubt that the government may not grant the
necessary permits?
34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014
Dr Sergei Sabanov ssabanov@srk.co.uk
MODIFYING FACTORS
12
© SRK Consulting (UK) Ltd 2014. All rights reserved.
RESERVES ESTIMATION
1. Factor 17%
2. Factor 18%
3. Factor 20%
34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014
Dr Sergei Sabanov ssabanov@srk.co.uk
Geotechnical Unit Value
Overall slope angle (Deg) 45
Mining Dilution thickness (cm) 10
Mining recovery (%) 95
Processing Recovery (%) 85
Operating Mining costs (US$/trock) 3
Incremental Mining Cost (US$/10m) 0.05
G&A (US$/tROM) 3
Oil Price (US$/bbl) 100
OPTIMISATION PARAMETERS
Example of parameters
13
© SRK Consulting (UK) Ltd 2014. All rights reserved.
RESERVES ESTIMATION
• Validation of capacity & Production schedule
 What equipment is required?
 If in operation, are the forecast
efficiencies/productivities consistent with historical
achievements?
 Are the projected productivities consistent with
benchmarks?
 Are inferred resources used in the production
schedule? What % used in each year? Is this
reasonable?
• Verification of opex forecasts. How will opex
change as workload changes?
• Verification of capex forecast
 OP – sustaining equipment required for changes in
Strip ratio / changes in pit depth / haul length
 UG – development
 Replacement
• Any material constraints
 Manpower?
 Seasonal access?
 Maintenance practice?
• Risks & opportunities:
 What issues could have a material impact and what
would need to be done to manage them?
 Are there any assumptions / judgements or areas of
uncertainty which should be highlighted?
34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014
Dr Sergei Sabanov ssabanov@srk.co.uk
MINING PRODUCTION
14
© SRK Consulting (UK) Ltd 2014. All rights reserved.
RESERVES ESTIMATION
34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014
Dr Sergei Sabanov ssabanov@srk.co.uk
Newslopelengthdistance
Slopelengthdistance
Volumedifference
20degslice
Overburden
SlopeangleM SlopeangleS
Oilshale
Modifiedslope(M)
• NPV can be increased by minimising
the stripping ratio in early years.
• The reduction in capital expenditure
early in the mine life has been shown
to improve project economics.
NPV MAXIMISING
15
© SRK Consulting (UK) Ltd 2014. All rights reserved.
COMMON DUE DILIGENCE ISSUES, CAUSESAND IMPACTS (1 of 2)
• Non compliance with International Reporting
Codes.
• Insufficient Drilling for development of Mineral
Resources.
• Mineral Resources are often presented as Ore
Reserves.
• The modifying factors used in Ore Reserves are
not sufficiently justified. Dilution is under
estimated – planned grade is too high
• Deposits can be structurally and geochemically
complex and hence have issues with
geotechnical, processing and environmental
engineering.
Key aim of due diligence is to assess the quality of technical work
Root cause:
Poor quality of
underlying technical
work
Impacts:
Poor Project
performance
16
© SRK Consulting (UK) Ltd 2014. All rights reserved.
COMMON ISSUESAND IMPACTS (2 of 2)
• Insufficient Long Term Mine Planning and examples
of ‘hand to mouth’ style operations.
• Underinvestment in quality technical work
• Technical specialists lack knowledge of best
international practices.
• Large investments in infrastructure and projects
without adequate supporting technical work.
• Safety culture requires improvement.
• Environmental Concerns are restricted to obtaining
and complying with relevant permits only. No
proactive environmental management or monitoring.
• No or insufficient Closure provisions
Many operations are not well run
Root cause:
Poor quality of underlying
technical work
Ineffective management
Impacts:
Poor Project performance
Increased risk
17
© SRK Consulting (UK) Ltd 2014. All rights reserved.
FAILING OPERATIONS- THE SAME OLD STORIES
Issue:
Planned grade is not
being achieved
(not enough oil is
recovered in the plant
to pay the bills)
Too many operations don’t have a good plan
Why?
• Poor plan, unrealistic ?
• There is no plan
• Plan not followed
• Too much dilution caused by
poor grade control, blasting
practices, ‘tonnes’ culture, poor
reconciliation, don’t know why
• Oil not there in first place – poor
geological model not validated
Root causes:
• Operations
• Poor quality of
underlying
technical work
18
© SRK Consulting (UK) Ltd 2014. All rights reserved.
THE INGREDIENTS OF PROJECTFAILURE
Poor due diligence can compound poor technical work
Underlying Technical
Studies are poor –
standards not
followed, hours not put
in, inexperienced or
under qualified staff
Technical Due
diligence exercise is
not completed or
carried out by
inexperienced or under
qualified staff who
don’t follow standards,
hours not put in
• Risks too high
• Many unknowns
• Targets not
reached
• Delays
• Cost overruns
• Losses
• Project finance
issues
19
© SRK Consulting (UK) Ltd 2014. All rights reserved.
IMPORTANCE OF INDEPENDENCE:WHAT CAN BE DONE ?
• Be careful how you engage consultants, contractors and advisors to deal with
project development and acquisitions.
• Conflict of Interest
• Fees are linked to the deal going ahead
• The likelihood of future consulting, supply services or construction contracts
• Companies or individuals who have an interest or shares in the project
• An Independent Consultant will provide due diligence feedback that the
Finance Institution does want to hear but the Company may not.
• Identify gaps in the Project Study or Development prior to seeking finance.
Warren Buffet Quote
“Every large deal should have a consultant working on the deal who
only gets paid or gets a bonus if the deal doesn’t go through”
20
© SRK Consulting (UK) Ltd 2014. All rights reserved.
KEY FEATURES OF QUALITYTECHNICALSTUDIES
A quality technical study has the following attributes:
• The study is prepared by independent, qualified specialists,
following the standards and reporting codes, putting in the
hours
• Site specific technical work must be completed
commensurate with project status or type
• The study has considered all the infrastructure required for
the project
• Environmental and social issues are usually more important
than the technical work – these issues commonly delay or
cause suspension of Projects, in most cases satisfying local
rules is not enough
• Public consultation commenced early in the Project life
21
© SRK Consulting (UK) Ltd 2014. All rights reserved.
KEY FEATURES OF QUALITYTECHNICALDUE DILIGENCE
A quality due diligence study is carried out by
independent, qualified specialists, following the
standards and reporting codes, putting in the hours –
just like the technical studies
Beware of the following shortcuts:
• ‘I can do it all, you don’t need that specialist in X and
Y and Z’
• ‘You don’t need us to visit site’
• ‘it will only take a week’
• ‘We don’t need all that background data’
• ‘The answers are simple’
22
© SRK Consulting (UK) Ltd 2014. All rights reserved.
CONCLUSION
Key Considerations
• Strategic planning can be multi-disciplinary with conflicting objectives
• Majority of projects are not properly optimised for the key study objectives
• Strategic planning is a dynamic process, objectives and policies change throughout
the project life cycle
• The available mine planning software allows for quick evaluation of strategic planning
scenarios
• Technical due diligence analyses the risks & opportunities to ensure that risks are
suitably quantified and mitigation plans put in place where necessary. A thorough due
diligence will also advise the client if projections are unlikely to be achieved. This
approach can be applied for oil shale mining projects producing oil, electricity, thermal
energy and chemical products to demonstrate financial viability different scenarios.
23
© SRK Consulting (UK) Ltd 2014. All rights reserved.
Copyright (and any other applicable intellectual property rights) in this document and any accompanying data or models which are created
by SRK Consulting (UK) Limited ("SRK") is reserved by SRK and is protected by international copyright and other laws. Copyright in any
component parts of this document such as images is owned and reserved by the copyright owner so noted within the document.
This document may not be utilised or relied upon for any purpose other than that for which it is stated within and SRK shall not be liable for
any loss or damage caused by such use or reliance. In the event that the recipient of this document wishes to use the content of this
document in support of any purpose beyond or outside that which it is expressly stated or for the raising of any finance from a third party
where the document is not being utilised in its full form for this purpose, the recipient shall, prior to such use, present a draft of any report
or document produced by it that may incorporate any of the content of this document to SRK for review so that SRK may ensure that this
is presented in a manner which accurately and reasonably reflects any results or conclusions produced by SRK.
The use of this document is strictly subject to terms licensed by SRK to its Client as the recipient of this document and unless otherwise
agreed by SRK, this does not grant rights to any third party. This document shall only be distributed to any third party in full as provided
by SRK and may not be reproduced or circulated in the public domain (in whole or in part) or in any edited, abridged or otherwise
amended form unless expressly agreed in writing by SRK. Any other copyright owner’s work may not be separated from this document,
used or reproduced for any other purpose other than with the document in full as licensed by SRK. In the event that this document is
disclosed or distributed to any third party, no such third party shall be entitled to place reliance upon any information, warranties or
representations which may be contained within this document and the recipient of this document shall indemnify SRK against all and any
claims, losses and costs which may be incurred by SRK relating to such third parties.
© SRK Consulting (UK) Limited 2014
Copyright and disclaimer

More Related Content

What's hot

Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Joe Gray
 
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceGlobal CCS Institute
 
Sevan Marine Q3 2012 results presentation
Sevan Marine Q3 2012 results presentationSevan Marine Q3 2012 results presentation
Sevan Marine Q3 2012 results presentationTradeWindsnews
 
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...Facing the Challenges of Exploring and Developing Projects in Remote Mining E...
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...Mining Network marcus evans
 
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationCarpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationSymposium
 
49 North Investor Conference
49 North Investor Conference49 North Investor Conference
49 North Investor ConferenceLake Shore Gold
 
Energold Drilling Corp. - Presentation
Energold Drilling Corp. - PresentationEnergold Drilling Corp. - Presentation
Energold Drilling Corp. - PresentationAdnet Communications
 
Eor oilfield review
Eor oilfield reviewEor oilfield review
Eor oilfield reviewUmmu Muadz
 
Energold Corporate Presentation April 2019
Energold Corporate Presentation April 2019Energold Corporate Presentation April 2019
Energold Corporate Presentation April 2019Adnet Communications
 
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...Canada Mining Innovation Council
 
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...Canada Mining Innovation Council
 
Gis Company Introduction Presentation
Gis Company Introduction PresentationGis Company Introduction Presentation
Gis Company Introduction Presentationthien2002
 
Mineworx Technologies Corporate Presentation
Mineworx Technologies Corporate PresentationMineworx Technologies Corporate Presentation
Mineworx Technologies Corporate PresentationThe Howard Group Inc.
 
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...CMIC's Exploration Innovation Consortium, presented by François Robert and Al...
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...Canada Mining Innovation Council
 

What's hot (20)

EGD April 2017
EGD April 2017EGD April 2017
EGD April 2017
 
Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021
 
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experience
 
Energold Corporate Presentation
Energold Corporate PresentationEnergold Corporate Presentation
Energold Corporate Presentation
 
2018 06-22-cp egd
2018 06-22-cp egd2018 06-22-cp egd
2018 06-22-cp egd
 
Sevan Marine Q3 2012 results presentation
Sevan Marine Q3 2012 results presentationSevan Marine Q3 2012 results presentation
Sevan Marine Q3 2012 results presentation
 
Sept2018 egd
Sept2018 egdSept2018 egd
Sept2018 egd
 
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...Facing the Challenges of Exploring and Developing Projects in Remote Mining E...
Facing the Challenges of Exploring and Developing Projects in Remote Mining E...
 
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationCarpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
 
49 North Investor Conference
49 North Investor Conference49 North Investor Conference
49 North Investor Conference
 
Energold Drilling Corp. - Presentation
Energold Drilling Corp. - PresentationEnergold Drilling Corp. - Presentation
Energold Drilling Corp. - Presentation
 
Eor oilfield review
Eor oilfield reviewEor oilfield review
Eor oilfield review
 
Energold Corporate Presentation April 2019
Energold Corporate Presentation April 2019Energold Corporate Presentation April 2019
Energold Corporate Presentation April 2019
 
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...
Opportunities for Innovation, presented by John Thompson at 2013 CMIC Signatu...
 
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...
Technology Initiatives - A Highway to the Future, presented by Peter Kondos a...
 
Gis Company Introduction Presentation
Gis Company Introduction PresentationGis Company Introduction Presentation
Gis Company Introduction Presentation
 
Mineworx Technologies Corporate Presentation
Mineworx Technologies Corporate PresentationMineworx Technologies Corporate Presentation
Mineworx Technologies Corporate Presentation
 
Energold Presentation - May 2016
Energold Presentation - May 2016Energold Presentation - May 2016
Energold Presentation - May 2016
 
CEMATRIX Presentation, June 2021
CEMATRIX Presentation, June 2021CEMATRIX Presentation, June 2021
CEMATRIX Presentation, June 2021
 
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...CMIC's Exploration Innovation Consortium, presented by François Robert and Al...
CMIC's Exploration Innovation Consortium, presented by François Robert and Al...
 

Viewers also liked

Phosphate mining
Phosphate miningPhosphate mining
Phosphate miningjmocherman
 
Geomodelling work samples of June, 2012. Pls wait...
Geomodelling work samples of June, 2012. Pls wait...Geomodelling work samples of June, 2012. Pls wait...
Geomodelling work samples of June, 2012. Pls wait...superivy
 
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...John Sykes
 
Due diligence reviews of mineral resource estimates
Due diligence reviews of mineral resource estimatesDue diligence reviews of mineral resource estimates
Due diligence reviews of mineral resource estimatesPeter Ravenscroft
 
Geomodelling, resource & reserve estimation using mining software
Geomodelling, resource & reserve estimation using mining softwareGeomodelling, resource & reserve estimation using mining software
Geomodelling, resource & reserve estimation using mining softwareChandra Bose
 
Mineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real WorldMineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real WorldMarcelo Godoy
 
Modern mining
Modern miningModern mining
Modern miningarabnubia
 

Viewers also liked (8)

Project Presentation
Project PresentationProject Presentation
Project Presentation
 
Phosphate mining
Phosphate miningPhosphate mining
Phosphate mining
 
Geomodelling work samples of June, 2012. Pls wait...
Geomodelling work samples of June, 2012. Pls wait...Geomodelling work samples of June, 2012. Pls wait...
Geomodelling work samples of June, 2012. Pls wait...
 
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...
Resources versus Reserves - Sykes & Trench - Aug 2014 - Centre For Exploratio...
 
Due diligence reviews of mineral resource estimates
Due diligence reviews of mineral resource estimatesDue diligence reviews of mineral resource estimates
Due diligence reviews of mineral resource estimates
 
Geomodelling, resource & reserve estimation using mining software
Geomodelling, resource & reserve estimation using mining softwareGeomodelling, resource & reserve estimation using mining software
Geomodelling, resource & reserve estimation using mining software
 
Mineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real WorldMineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real World
 
Modern mining
Modern miningModern mining
Modern mining
 

Similar to Due Dilligence_Oil Shale_Colorado 2014_Sabanov

Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund
 
Waste generation: reduce, reuse, recycle and the role of collaboration
Waste generation: reduce, reuse, recycle and the role of collaborationWaste generation: reduce, reuse, recycle and the role of collaboration
Waste generation: reduce, reuse, recycle and the role of collaborationPlataforma R3 Mineral
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01ImageRes
 
Energold Corporate Presentation - September 2015
Energold Corporate Presentation - September 2015Energold Corporate Presentation - September 2015
Energold Corporate Presentation - September 2015Adnet Communications
 
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesEIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesMakrisMontejoMalinam
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017SCOTT SITTNER
 
Determinstic petrophysics factsheet 2017
Determinstic petrophysics factsheet 2017Determinstic petrophysics factsheet 2017
Determinstic petrophysics factsheet 2017Jurgis 'Jogi' Klaudius
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015Atef Farouk
 
EOA Kakinada -50000+ cr investment & Returns.___.pdf
EOA Kakinada -50000+ cr investment & Returns.___.pdfEOA Kakinada -50000+ cr investment & Returns.___.pdf
EOA Kakinada -50000+ cr investment & Returns.___.pdfparaggoyal32
 
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSFUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSJefMichaelLDahuyla
 
CHC357 Offshore Asset Integrity Final Agenda
CHC357 Offshore Asset Integrity Final AgendaCHC357 Offshore Asset Integrity Final Agenda
CHC357 Offshore Asset Integrity Final AgendaStephanie Rasmussen
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018Marcep Inc.
 
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Tim Alch
 
Getting AD Projects to a Financial Close
Getting AD Projects to a Financial CloseGetting AD Projects to a Financial Close
Getting AD Projects to a Financial CloseIona Capital
 

Similar to Due Dilligence_Oil Shale_Colorado 2014_Sabanov (20)

Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015
 
Waste generation: reduce, reuse, recycle and the role of collaboration
Waste generation: reduce, reuse, recycle and the role of collaborationWaste generation: reduce, reuse, recycle and the role of collaboration
Waste generation: reduce, reuse, recycle and the role of collaboration
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01
 
Energold Corporate Presentation - September 2015
Energold Corporate Presentation - September 2015Energold Corporate Presentation - September 2015
Energold Corporate Presentation - September 2015
 
CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesEIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
 
Egd dec2015
Egd dec2015Egd dec2015
Egd dec2015
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017
 
Aa ggold presentation
Aa ggold presentationAa ggold presentation
Aa ggold presentation
 
July2016
July2016July2016
July2016
 
Determinstic petrophysics factsheet 2017
Determinstic petrophysics factsheet 2017Determinstic petrophysics factsheet 2017
Determinstic petrophysics factsheet 2017
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015
 
EOA Kakinada -50000+ cr investment & Returns.___.pdf
EOA Kakinada -50000+ cr investment & Returns.___.pdfEOA Kakinada -50000+ cr investment & Returns.___.pdf
EOA Kakinada -50000+ cr investment & Returns.___.pdf
 
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSFUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
 
CHC357 Offshore Asset Integrity Final Agenda
CHC357 Offshore Asset Integrity Final AgendaCHC357 Offshore Asset Integrity Final Agenda
CHC357 Offshore Asset Integrity Final Agenda
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
 
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
 
CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
Getting AD Projects to a Financial Close
Getting AD Projects to a Financial CloseGetting AD Projects to a Financial Close
Getting AD Projects to a Financial Close
 

Due Dilligence_Oil Shale_Colorado 2014_Sabanov

  • 1. 1 © SRK Consulting (UK) Ltd 2014. All rights reserved. Presenter: Location: 1 © SRK Consulting (UK) Ltd 2014. All rights reserved. Technical Due Diligence on Oil Shale Mining Projects Dr Sergei Sabanov Golden, Colorado School of Mines, 15/10/2014
  • 2. 2 © SRK Consulting (UK) Ltd 2014. All rights reserved. Table of Contents • WHAT IS DUE DILIGENCE • TECHNICAL VALUATIONS • RESOURCES AND RESERVES ESTIMATION • DUE DILIGENCE ISSUES, CAUSES AND IMPACTS • KEY FEATURES OF QUALITY TECHNICAL STUDIES • CONCLUSION 34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014 Dr Sergei Sabanov ssabanov@srk.co.uk
  • 3. 3 © SRK Consulting (UK) Ltd 2014. All rights reserved. WHATIS DUE DILIGENCE? Definition of Due Diligence : ‘An investigation or audit of a potential investment. Due diligence serves to confirm all material facts in regards to a sale’ Technical Due Diligence – concerned with the technical and operational aspects of a mine or project Legal Due Diligence – concerned with the legal aspects of a project eg company status, licence validity, security of tenure, permitting, liabilities, obligations etc Technical Due Diligence is the focus of this talk
  • 4. 4 © SRK Consulting (UK) Ltd 2014. All rights reserved. WHATIS TECHNICALDUE DILIGENCE NECESSARY FOR? • Support Project Finance – when banks lend money the credit committee needs to assess the technical risk, will I lose my shirt ? • A pre-cursor to a listing document – before a CPR is prepared a consultant will review the assets • Mergers – need to determine what are the assets you are merging with, must assess risk, value? • Acquisitions – it is a good purchase, how much should be paid for it? • Investments – should we purchase shares? You could be on thin ice!
  • 5. 5 © SRK Consulting (UK) Ltd 2014. All rights reserved. PROJECTFUNDING OPTIONS All of these require some kind of technical due diligence Source: Ernst & Young, Mining Journal, Global Mining Finance Guide 2014 There are many ways projects get funding
  • 6. 6 © SRK Consulting (UK) Ltd 2014. All rights reserved. WHAT DOESTECHNICALDUE DILIGENCE PROCESS INVOLVE ? • Collation of information about the project / operation / group of assets • Visit to the project site by a team: mining engineer, geologist, process engineer, E+S specialist plus other experts as required • Review of the information – what is available and what does it tell us? • Analysis - what are the impacts / effects, what is going on? • Conclusions – what do we think? Eg marginal asset, poor technical work, unknowns • Recommendations – how to fix key issues, adjusted production profiles, capital and operating costs, lead times Effective TDD is a process resulting in some practical advice
  • 7. 7 © SRK Consulting (UK) Ltd 2014. All rights reserved. TECHNICALFOUNDATIONS–ASSETTYPES SUBJECTTO DUE DILIGENCE • Exploration Property • Oil content may or may not be identified • No Mineral Resource • Advanced Exploration Property • Considerable exploration undertaken • Specific targets identified that warrant further detailed investigation by drilling, trenching or other detailed geological sampling • May or may not have a Mineral resource Estimate. • Sufficient work on at least one prospect to provide good geological understanding and encourage further work to elevate to Mineral Resource Category Similar approach, different assets • Pre-Development Property • Mineral Resources identified and their extent (possibly incomplete) • Decision to proceed with development has not been made • Early Assessment stage • Also includes Resources with a plan not to develop and those on ‘Care & Maintenance’ • Development Property • Decision has been made to proceed with construction and/or production but not commissioned or operating at design levels • Operating Mines • Mineral Properties, particularly mines and process plants that have been commissioned and in production MINERAL ASSET DEVELOPMENT STAGES
  • 8. 8 © SRK Consulting (UK) Ltd 2014. All rights reserved. TECHNICALFOUNDATIONS • Classification of Mineral Resources • Study objectives • Site specific technical Information • Degree of engineering completed (%) • Design basis and Cost estimation methodology • Cost estimation accuracy (Capital and Operating) • Cashflow analysis & valuation • Level of contingency All disciplines must be considered KEY FEATURES OF TECHNICAL STUDIES
  • 9. 9 © SRK Consulting (UK) Ltd 2014. All rights reserved. TECHNICALFOUNDATIONS This is a key issue ENVIRONMENTAL AND SOCIAL • The International Finance Corporation (“IFC”) Performance Standards on Social and Environmental Sustainability (2006; updated January 2012). • The Equator Principles (“EPs”) is a risk management framework adopted by financial institutions. National legislation and international standards require that an environmental and social impact assessment (“ESIA”) is undertaken for a mining project, during the planning of the project. Complemented by an environmental and social management plan (“ESMP”). The ESIA and ESMP are often used to set legally binding conditions of environmental approval. Implementation of ESMP/s requires an environmental and social management system (“ESMS”). The IFC Performance Standards are complemented by the World Bank Group Environmental, Health and Safety (“EHS”) Guidelines (April 2007), comprising a series of General EHS Guidelines and Industry Sector EHS Guidelines. The EPs require that the mining projects (Category A projects) undertake an ESIA, produce an ESIA report, develop an ESMP, establish and maintain an ESMS and undertake effective stakeholder engagement. Address compliance with host country legislation and observe the relevant IFC Performance Standards and the World Bank Group EHS guidelines.
  • 10. 10 © SRK Consulting (UK) Ltd 2014. All rights reserved. TECHNICALFOUNDATIONS • Many banks and financial institutions (78 so far) in 35 countries have adopted the EP’s. This covers 70% of international project finance debt in emerging economies. • Environmental liabilities of borrower can affect lenders by (i) reducing borrowers ability to pay (ii) reducing value of security (iii) raising potential for direct liability. • Lenders will try to protect themselves by carrying out thorough due diligence prior to entering into a loan agreement. • Due diligence may include an assessment covering, for example, whether land is contaminated, whether hazardous materials are stored on site, waste disposal at the site, whether necessary environmental permits are in place and whether any legal proceedings have been made or are pending. For many banks this is the key issue FINANCING VIEWPOINT ENVIRONMENTAL AND SOCIAL
  • 11. 11 © SRK Consulting (UK) Ltd 2014. All rights reserved. RESOURCESAND RESERVES ESTIMATION 1. Mining 2. Beneficiation/Processing 3. Economic 4. Marketing 5. Legal 6. Environmental 7. Social and Governmental 1. Dilution, mining losses and extraction ratios, grade adjustment factors, Geotechnical and hydrogeological, Minimum mining width, interbedded waste, mineralised thickness, stripping ratio, grade/stratigraphic continuity 2. Bulk sample and sizing selection for plant design, representative of planned plant feed, grade variability, Product recoveries, Material hardness (Bond work index), Bulk density, Presence and distribution of deleterious elements (sulphur, etc.), Sales specifications, Plant capacity versus production rate, Stockpiling requirements/capacity. Can all of the deposit be processed using proposed processing technology? 3. Links production schedule to costs and revenues, Should use realistic, long-term price, Used to demonstrate economic viability, Traditionally uses discounted cash flow methods (NPV, IRR, etc.), Sensitivity analysis on inputs should be understood. Verify cut-off grade: average, marginal, operational; strip ratio limits; is UG development justified? 4. Saleable product; Availability of market for the product; Capacity affect production rate? Is there a market for the product? Is the production rate constrained by market capacity? 5. Mining legislation, Other land users (native title, etc.) Does the client have uncontested title for the mineral deposit? Is the licence likely to be granted / extended? 6. May restrict mine or infrastructure footprint, Stakeholder engagement/ESIA. Is mining restricted on any portion of the deposit? Will the community support the project? 7. Licensing and permitting; Government energy policy. Is there any doubt that the government may not grant the necessary permits? 34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014 Dr Sergei Sabanov ssabanov@srk.co.uk MODIFYING FACTORS
  • 12. 12 © SRK Consulting (UK) Ltd 2014. All rights reserved. RESERVES ESTIMATION 1. Factor 17% 2. Factor 18% 3. Factor 20% 34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014 Dr Sergei Sabanov ssabanov@srk.co.uk Geotechnical Unit Value Overall slope angle (Deg) 45 Mining Dilution thickness (cm) 10 Mining recovery (%) 95 Processing Recovery (%) 85 Operating Mining costs (US$/trock) 3 Incremental Mining Cost (US$/10m) 0.05 G&A (US$/tROM) 3 Oil Price (US$/bbl) 100 OPTIMISATION PARAMETERS Example of parameters
  • 13. 13 © SRK Consulting (UK) Ltd 2014. All rights reserved. RESERVES ESTIMATION • Validation of capacity & Production schedule  What equipment is required?  If in operation, are the forecast efficiencies/productivities consistent with historical achievements?  Are the projected productivities consistent with benchmarks?  Are inferred resources used in the production schedule? What % used in each year? Is this reasonable? • Verification of opex forecasts. How will opex change as workload changes? • Verification of capex forecast  OP – sustaining equipment required for changes in Strip ratio / changes in pit depth / haul length  UG – development  Replacement • Any material constraints  Manpower?  Seasonal access?  Maintenance practice? • Risks & opportunities:  What issues could have a material impact and what would need to be done to manage them?  Are there any assumptions / judgements or areas of uncertainty which should be highlighted? 34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014 Dr Sergei Sabanov ssabanov@srk.co.uk MINING PRODUCTION
  • 14. 14 © SRK Consulting (UK) Ltd 2014. All rights reserved. RESERVES ESTIMATION 34th Oil Shale Symposium, Colorado School of Mines, 15/10/2014 Dr Sergei Sabanov ssabanov@srk.co.uk Newslopelengthdistance Slopelengthdistance Volumedifference 20degslice Overburden SlopeangleM SlopeangleS Oilshale Modifiedslope(M) • NPV can be increased by minimising the stripping ratio in early years. • The reduction in capital expenditure early in the mine life has been shown to improve project economics. NPV MAXIMISING
  • 15. 15 © SRK Consulting (UK) Ltd 2014. All rights reserved. COMMON DUE DILIGENCE ISSUES, CAUSESAND IMPACTS (1 of 2) • Non compliance with International Reporting Codes. • Insufficient Drilling for development of Mineral Resources. • Mineral Resources are often presented as Ore Reserves. • The modifying factors used in Ore Reserves are not sufficiently justified. Dilution is under estimated – planned grade is too high • Deposits can be structurally and geochemically complex and hence have issues with geotechnical, processing and environmental engineering. Key aim of due diligence is to assess the quality of technical work Root cause: Poor quality of underlying technical work Impacts: Poor Project performance
  • 16. 16 © SRK Consulting (UK) Ltd 2014. All rights reserved. COMMON ISSUESAND IMPACTS (2 of 2) • Insufficient Long Term Mine Planning and examples of ‘hand to mouth’ style operations. • Underinvestment in quality technical work • Technical specialists lack knowledge of best international practices. • Large investments in infrastructure and projects without adequate supporting technical work. • Safety culture requires improvement. • Environmental Concerns are restricted to obtaining and complying with relevant permits only. No proactive environmental management or monitoring. • No or insufficient Closure provisions Many operations are not well run Root cause: Poor quality of underlying technical work Ineffective management Impacts: Poor Project performance Increased risk
  • 17. 17 © SRK Consulting (UK) Ltd 2014. All rights reserved. FAILING OPERATIONS- THE SAME OLD STORIES Issue: Planned grade is not being achieved (not enough oil is recovered in the plant to pay the bills) Too many operations don’t have a good plan Why? • Poor plan, unrealistic ? • There is no plan • Plan not followed • Too much dilution caused by poor grade control, blasting practices, ‘tonnes’ culture, poor reconciliation, don’t know why • Oil not there in first place – poor geological model not validated Root causes: • Operations • Poor quality of underlying technical work
  • 18. 18 © SRK Consulting (UK) Ltd 2014. All rights reserved. THE INGREDIENTS OF PROJECTFAILURE Poor due diligence can compound poor technical work Underlying Technical Studies are poor – standards not followed, hours not put in, inexperienced or under qualified staff Technical Due diligence exercise is not completed or carried out by inexperienced or under qualified staff who don’t follow standards, hours not put in • Risks too high • Many unknowns • Targets not reached • Delays • Cost overruns • Losses • Project finance issues
  • 19. 19 © SRK Consulting (UK) Ltd 2014. All rights reserved. IMPORTANCE OF INDEPENDENCE:WHAT CAN BE DONE ? • Be careful how you engage consultants, contractors and advisors to deal with project development and acquisitions. • Conflict of Interest • Fees are linked to the deal going ahead • The likelihood of future consulting, supply services or construction contracts • Companies or individuals who have an interest or shares in the project • An Independent Consultant will provide due diligence feedback that the Finance Institution does want to hear but the Company may not. • Identify gaps in the Project Study or Development prior to seeking finance. Warren Buffet Quote “Every large deal should have a consultant working on the deal who only gets paid or gets a bonus if the deal doesn’t go through”
  • 20. 20 © SRK Consulting (UK) Ltd 2014. All rights reserved. KEY FEATURES OF QUALITYTECHNICALSTUDIES A quality technical study has the following attributes: • The study is prepared by independent, qualified specialists, following the standards and reporting codes, putting in the hours • Site specific technical work must be completed commensurate with project status or type • The study has considered all the infrastructure required for the project • Environmental and social issues are usually more important than the technical work – these issues commonly delay or cause suspension of Projects, in most cases satisfying local rules is not enough • Public consultation commenced early in the Project life
  • 21. 21 © SRK Consulting (UK) Ltd 2014. All rights reserved. KEY FEATURES OF QUALITYTECHNICALDUE DILIGENCE A quality due diligence study is carried out by independent, qualified specialists, following the standards and reporting codes, putting in the hours – just like the technical studies Beware of the following shortcuts: • ‘I can do it all, you don’t need that specialist in X and Y and Z’ • ‘You don’t need us to visit site’ • ‘it will only take a week’ • ‘We don’t need all that background data’ • ‘The answers are simple’
  • 22. 22 © SRK Consulting (UK) Ltd 2014. All rights reserved. CONCLUSION Key Considerations • Strategic planning can be multi-disciplinary with conflicting objectives • Majority of projects are not properly optimised for the key study objectives • Strategic planning is a dynamic process, objectives and policies change throughout the project life cycle • The available mine planning software allows for quick evaluation of strategic planning scenarios • Technical due diligence analyses the risks & opportunities to ensure that risks are suitably quantified and mitigation plans put in place where necessary. A thorough due diligence will also advise the client if projections are unlikely to be achieved. This approach can be applied for oil shale mining projects producing oil, electricity, thermal energy and chemical products to demonstrate financial viability different scenarios.
  • 23. 23 © SRK Consulting (UK) Ltd 2014. All rights reserved. Copyright (and any other applicable intellectual property rights) in this document and any accompanying data or models which are created by SRK Consulting (UK) Limited ("SRK") is reserved by SRK and is protected by international copyright and other laws. Copyright in any component parts of this document such as images is owned and reserved by the copyright owner so noted within the document. This document may not be utilised or relied upon for any purpose other than that for which it is stated within and SRK shall not be liable for any loss or damage caused by such use or reliance. In the event that the recipient of this document wishes to use the content of this document in support of any purpose beyond or outside that which it is expressly stated or for the raising of any finance from a third party where the document is not being utilised in its full form for this purpose, the recipient shall, prior to such use, present a draft of any report or document produced by it that may incorporate any of the content of this document to SRK for review so that SRK may ensure that this is presented in a manner which accurately and reasonably reflects any results or conclusions produced by SRK. The use of this document is strictly subject to terms licensed by SRK to its Client as the recipient of this document and unless otherwise agreed by SRK, this does not grant rights to any third party. This document shall only be distributed to any third party in full as provided by SRK and may not be reproduced or circulated in the public domain (in whole or in part) or in any edited, abridged or otherwise amended form unless expressly agreed in writing by SRK. Any other copyright owner’s work may not be separated from this document, used or reproduced for any other purpose other than with the document in full as licensed by SRK. In the event that this document is disclosed or distributed to any third party, no such third party shall be entitled to place reliance upon any information, warranties or representations which may be contained within this document and the recipient of this document shall indemnify SRK against all and any claims, losses and costs which may be incurred by SRK relating to such third parties. © SRK Consulting (UK) Limited 2014 Copyright and disclaimer