SlideShare a Scribd company logo
1 of 32
1
Lean Six Sigma Project
To Reduce Specific steam consumption in MUW
Green Belt: Satyendra Kumar Yadav
Define Tollgate Date: 17 Jan 2016
Class C
2
2
Agenda
• Project Charter Review
• Executive Summary
• Value Stream Map
• Operational Definitions
• Data Collection Plan
• MSA
• Baseline Data
• Process Capability
• Measure Tools Summary
• Lessons learned
• Next Steps
• Measure Storyboard
• Measure Signoff
3
3
Reduction of Specific Steam Consumption in MUW Plant
Business Case Opportunity or Problem Statement
•Day by day energy cost is increasing. Energy cost is 60%
of Salt variable cost. Improvement in energy
consumption will help us to maintain our leadership
position in competitive market .
•Contribution Rs.3.25 Crore
•Specific steam consumption in FY 2014-15 was 1.40
Gcal/MT .
•For the H1 2015-16 it has increased to 1.44 Gcal/MT
Goal Statements Project Scope
•Reduce specific steam consumption from 1.40 Gcal/MT
to 1.34 Gcal/MT
•Scope : Steam consumption for MUW 1&2, 3 and 4
•Out of scope : MUW 1&2, 3 and 4 power consumption
Project Plan Team Selection
Green Belt: : Satyendra Kumar Yadav
Project Sponsor : PM Patel
Black belt guide : Jayendra Jadega
Deployment director : Mahesh deshpande
Master black belt : Ashok muthuswamy
Team : Mayur gandhi , Vimal patel ,
Karan patel, Jignesh mandora
Bhargav patel
D M A I C
20-Nov 17-Jan
4
4
Specific Steam Consumption
1.54
1.58 1.58
1.45
1.49
1.51
1.52
1.4
1.3
1.34
1.38
1.42
1.46
1.5
1.54
1.58
1.62
2011-12 2012-13 2013-14 2014-15
With power Without power
TARGET 1.34
5
5
MUW-1/2 Value Stream Mapping
MUW-1/2 Plant Value Stream Mapping
Supplier Process Customer
Solar Salt
Saturated
Brine
Steam &
Power
Chemicals
& Packing
Materials
Power Plant
Store &
Purchase
Brine SSD operation
for Brine
enrichmentin
monsoon only
Settlingof
brine in
Thickenerin
Monsoon
only
Evaporato
rs for
Brine
Evaporati
on
Magma
Handling (10to
15% solid)
Decantation
(solidLiquid
separation)
Outlet 50%
Wetsolid
Settlingof
Liquor overflow
(solidrecovery)
Screeningwith
10 mesh size
De-superheating
Condensation
Centrifugingof
50% solid
Iodisation
(30<=Iodine<50
ppm)
Drying
(WetSalt 2-3%
moisture)
Solar SaltOffice
Quality of Raw Brine:
(1) Density -25 Be
(2) Nacl 260-265 gpl
(3) Ca <0.4 gpl
(4) Mg < 11 gpl
Quality of steam & Power:
(1) 50# steam 50-55 TPH
with 45-50 psi pressure and
150 C
(2) 120 # steam 35 TPH
and 190 C to 200 C
Power plant
Control
Store & Purchase Office
Kyar Brine
Pumpman
MUW-3 Control
room
Circulator
attendant
Pumpman/
condensate
Bad Condensate
GoodCondensate
Dryer/
Centrifuge
Quality : In Dry Salt:
Iodine 30 to 80 PPM,
Ca-0.1% max,Mg - 0.15% max,
Non Caking Agent- 10PPM
Product
Storage/ Silo
Packing
Packing
supervisor
Packing/Weighing/
Restiching/iodisation/
lump rework
Product
Inspectorate
Loading
Bittern
Salt
Solar Salt
Supply Chain
Water Softening
SCM Office
Water Softening
Control room
MST
Tank
Quality :
Draw from body:
Slurry Density: 27 to 28 °Be,
Solid: 10 to 15%
Pre-
heaters
Capacity of Major Equipments
Sr. No. Equipment Capacity Unit Total
1 Evaporator-1 145 TPD
2 Evaporator-2 145 TPD
3 Evaporator-3 145 TPD
4 Evaporator-4 145 TPD
5 Evaporator-5 145 TPD
6 Evaporator-6 145 TPD
7 Centrifuge (2Nos) 30 TPH 60
8 FBD-4 900 TPD
10 Silo 50 T
11 Packing Machines 950 TPD
870
6
6
MUW-3 Value Stream Mapping
Process
Supplier
MUW-3 Plant Value Stream Mapping
Customer
Solar Salt
Saturated
Brine
Steam &
Power
Chemicals
& Packing
Materials
Power Plant
Store &
Purchase
Brine SSD operation
for Brine
enrichmentin
monsoon only
Settling of
brine in
Thickenerin
Monsoon
only
Evaporato
rs for
Brine
Evaporati
on
Magma
Handling (10to
15% solid)
Decantation
(solid Liquid
separation)
Outlet 50%
Wetsolid
Settling of
Liquor overflow
(solid recovery)
Screening with
10 mesh size
De-superheating
Condensation
Centrifuging of
50% solid
Iodisation
(30<=Iodine<50
ppm)
Drying
(WetSalt 2-3%
moisture)
Solar SaltOffice
Quality of Raw Brine:
(1) Density -25 Be
(2) Nacl 260-265 gpl
(3) Ca <0.4 gpl
(4) Mg < 11 gpl
Quality of steam & Power:
(1) 20# steam 75-80 TPH
with 14-18 psi pressure
(2) 120 # steam 70 TPH
and 190 C to 200 C
Power plant
Control
Store & Purchase Office
Kyar Brine
Pumpman
MUW-3 Control
room
Circulator
attendant
Pumpman/
condensate
Bad Condensate
Good Condensate
Dryer/
Centrifuge
Quality : In Dry Salt:
Iodine 30 to 80 PPM,
Ca-0.1% max,Mg - 0.15% max,
Non Caking Agent- 10PPM
Product
Storage/ Silo
Packing
Packing
supervisor
Packing/Weighing/
Restiching/iodisation/
lump rework
Product
Inspectorate
Loading
Bittern
Salt
Solar Salt
Supply Chain
Water Softening
SCM Office
Water Softening
Control room
MST
Tank
Quality :
Draw from body:
Slurry Density: 27 to 28 °Be,
Solid: 10 to 15%
Pre-
heaters
Capacity of Major Equipments
Sr. No. Equipment CapacityUnit Total
1 Evaporator-1 150 TPD
2 Evaporator-2 150 TPD
3 Evaporator-3 150 TPD
4 Evaporator-4 150 TPD
5 Evaporator-5 175 TPD
6 Evaporator-6 175 TPD
7 Centrifuge (2Nos) 30 TPH 90
8 FBD-6 900 TPD
10 Silo 90 T
11 Packing Machines 1000 TPD
950
7
7
MUW-4 Value Stream Mapping
MUW-4 Plant Value Stream Mapping
Supplier Process Customer
Solar Salt
Saturated
Brine
Steam &
Power
Chemicals
& Packing
Materials
Power Plant
Store &
Purchase
Brine SSD operation
for Brine
enrichment in
monsoon only
Settling of
brine in
Thickenerin
Monsoon
only
Evaporato
rs for
Brine
Evaporati
on
Magma
Handling (10to
15% solid)
Decantation
(solid Liquid
separation)
Outlet 50%
Wet solid
Settling of
Liquor overflow
(solid recovery)
Screening with
10 mesh size
De-superheating
Condensation
Centrifuging of
50% solid
Iodisation
(30<=Iodine<50
ppm)
Drying
(Wet Salt 2-3%
moisture)
Solar Salt Office
Quality of Raw Brine:
(1) Density -25 Be
(2) Nacl 260-265 gpl
(3) Ca <0.4 gpl
(4) Mg < 11 gpl
Quality of steam & Power:
(1) 20# steam 75-80 TPH
with 14-18 psi pressure
(2) 120 # steam 55 TPH
and 190 C to 200 C
Power plant
Control
Store & Purchase Office
Kyar Brine
Pumpman
MUW-3 Control
room
Circulator
attendant
Pumpman/
condensate
Bad Condensate
Good Condensate
Dryer/
Centrifuge
Quality : In Dry Salt:
Iodine 30 to 80 PPM,
Ca-0.1% max,Mg - 0.15% max,
Non Caking Agent- 10PPM
Product
Storage/ Silo
Packing
Packing
supervisor
Packing/Weighing/
Restiching/iodisation/
lump rework
Product
Inspectorate
Loading
Bittern
Salt
Solar Salt
Supply Chain
Water Softening
SCM Office
Water Softening
Control room
MST
Tank
Quality :
Draw from body:
Slurry Density: 27 to 28 °Be,
Solid: 10 to 15%
Pre-
heaters
Capacity of Major Equipments
Sr. No. Equipment Capacity Unit Total
1 Evaporator-1 150 TPD
2 Evaporator-2 150 TPD
3 Evaporator-3 150 TPD
4 Evaporator-4 150 TPD
5 Evaporator-5 150 TPD
6 Evaporator-6 150 TPD
7 Centrifuge (2Nos) 30 TPH 90
8 FBD-6 900 TPD
10 Silo 90 T
11 Packing Machines 1000 TPD
900
8
8
Input Process & Output Metrics
8
Finished Product + Waste Salt to SSD in MT Condensate in KL (Good /Bad),Bittern KL
Evaporation- decantation-centrifuging-drying-product packing-cooling , Body & Cal Pre,
Temp, Cooling sea water temp ,Vacuum in Condenser, Total salt in MT, Condensate , Bittern
20# St T/Prod T (Steam Ratio)
Brine Quantity KL/Hr &
Quality – Ca , Mg, NaCl GPL,Ph
Steam 20# -Flow ,Pressure &Temp
9
9
Operational Definitions
Metrics Performance Measure Type Units Operational Definition
Y
20#, 50# Steam Ratio
Continuous MT/MT
20#&50#Steam Ratio is the ratio of 20#&50#Steam consumed
and Total Salt Prouction. Normal Ratio for 20#&50#should beless
than or equal to 1.95&1.5respectively .
X1
Steam Flow
Continuous TPH
Steam is used in MUWplant for evaporation.The flow of steam in
TPHis measured by differential flow transmitter which is displayed
in control room . 20#steam is used in MUW-3&4, while 50#is used
in MUW-1/2.
X2
Brine Concentration
Continuous
Be,%Ca ,Mg,Nacl
content
A laboratory report is generated wrt Ca,Mg,Nacl and pH measured
at central Lab. Ca,Mg,Nacl in GPLand Brine specificgravity in Baume
is called Brine concentration.
X3
Vaccum of Condensor
Continuous In Inch Hg
The differential pressure below atmosphere in main body in Inch of
Hg is known as vacuum.
X4
Body Top Pressure /
Vaccum Continuous
Vacuum in Inch
Hg,Pressure in psi
The differential pressure above atmosphere in body is known as
pressure while the differential pressure below atmosphere is
known as vacuum.This is digitally displayed in DCS.
X5
Body Liqour Temperature
Continuous In Deg C
The absolute temperatue ,at a given pressure,of a liq/vapour which
is measured by thermocouple and displayed digitaly in DCS panel.
10
10
Operational Definitions
Metrics Performance Measure Type Units Operational Definition
X6
Body Vapour
Temperature Continuous In Deg C
The absolute temperatue ,at a given pressure,of a liq/vapour which
is measured by thermocouple and displayed digitally in DCS/panel.
X7
Calendria Pressure /
Vaccum
Continuous
Vacuum in Inch
Hg,Pressure in psi
The differential pressure above atmosphere in calendria is known
as pressure while the differential pressure below atmosphere is
known as vacuum.This is digitally displayed in DCS panel.
X8
Desuperheater DA water
flow rate Continuous TPH
Amount of DA water required in desuperheater depends on the I/L
steam temperature , its flow rate and temperature of DA water .
X9
Cooling Tower SW I/L
Temp
Continuous In Deg C
Sea Water is used as a cooling media in across TCL . Cooling water
from condenser goes to cooling tower and gets cooled. The cooling
water from cooling tower is again fed to condenser as a cooling
media.The temperature of sea water entering cooling tower for
cooling is known as sea water I/L temperature.
X10
Cooling Tower SW O/L
Temp
Continuous In Deg C
Sea Water is used as a cooling media in across TCL .Cooling water
from condenser goes to cooling tower and gets cooled. The cooling
water from cooling tower is again fed to condenser as a cooling
media.The temperature of sea water coming out from cooling
tower for cooling is known as sea water O/L temperature.
X11
Cooling Tower Temp.
Range
Continuous In Deg C
The difference of cooling water outlet and inlet temperature is
known as temperature range.
11
11
Operational Definitions
Metrics Performance Measure Type Units Operational Definition
X13
Shut-Off Vaccum
Discrete In Inch Hg
When any ejector is started vacuum is observed on vacuum gauge.
Ejector is taken in line by opening sea water valve or cooler and
120# steam valve for ejector vacuum system. The vacuum in line
without taking vapour load on ejector system is known as shutoff
vacuum.Normally Shut off vacuum should be 24'' Hg.
X14
Magma Draw Density and
Solid Content Continuous
Baume, %Solid Magma Draw is Concentrated Brine O/l from body and solid content
is the amount of solid in % present in magma draw. Solid content
should be around 10-15% in magma draw ideal condition.
X15
Salt Production
Continuous MT
V-Salt production is the sum of total salt dispatched from MUW-3
plant to SCMand solar salt MT .It is the sum of waste salt and
finished Product.
X16
Condensate
Continuous KL
The condensate is the water produced in MUW-3 plant due to
cooling of vapour or steam.It is classified as good and bad
condensate depending on its conductivity. If conductivity is less
than 40 µs/Cm2 it is good condensate and sent to MST tank in power
plant and from there finally to water treatment plant via pump.
Rest condensate having conductivity greater than 40 µs/Cm2 is bad
condensate and it is taken in bad condensate tank and from there
sent to water treatment plant via pump.
X17
Bittern
Continuous KL
Bittern is liquid residue in a MUW plant after taking out salt from
brine by evaporation and decantation which is also known as
Mother liquor and it is partly recycled.
12
12
Data Collection Plan
Metric
Performance
Measure
Type Units
Data Source
& Location
How Will Data
Be Collected
Who Will Collect
Data
When Will
Data Be
collected
Sample Size
Stratification
Factors
How Will Data
Be Used
Y
20#, 50# Steam
Ratio
Continuous MT/MT MUW-
1/2,3&4Plant
Total 20#&50#
Steam Consumed/
Total Production
of MUW-1/2,3&4
Shift Engineer Everyday &
Every Shift
End
7Months Data
from April-2015
to October-2015
To Measure
Steam at MUW-
1/2,3&4Plant
To Find 20#&50#
Steam Ratio
X1
Steam Flow Continuous TPH Steam of
MUW-
1/2,3&4Plant
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
To Measure
Production Rate
To Check Impact
of Same on
Production
X2
Brine
Concentration
Continuous Baume,
%Ca,Mg,
NaCl
content
MUW-
1/2,3&4Plant
Brine Inlet
Line/ Brine
Tank
In a sample bottle
afterflushing
sample line .
Sample Boy Daily at 8:00
A.M. except
Holidays
7Months Data
from April-2015
to October-2015
To Measure
Brine Quality
To Check Impact
of Same on
Production
X3
Vaccum of
Condensor
Continuous Inch Hg MUW-
1/2,3&4Main
Condensors
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check Vaccum
Condition in Plant
X4
Body Top
Pressure /
Vaccum
Continuous Pressure in
PSI,
Vaccum in
Inch Hg
At Body Top
in Each Body
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Pressure/ Vaccum
Condition in Plant
X5
Body Liqour
Temperature
Continuous Deg C At Body
Middle in
Each Body
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Temperature
Condition in Body
13
13
Data Collection Plan
Metric
Performance
Measure
Type Units
Data Source
& Location
How Will Data
Be Collected
Who Will Collect
Data
When Will
Data Be
collected
Sample Size
Stratification
Factors
How Will Data
Be Used
X6
Body Vapour
Temperature
Continuous Deg C At Body Top
in Each Body
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Temperature
Condition in Body
X7
Calendria
Pressure /
Vaccum
Continuous Pressure in
PSI,
Vaccum in
Inch Hg
At Each Body
Calendria
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Pressure/ Vaccum
Condition in Body
x8
Desuperheater
DA water flow
rate
Continuous TPH MUW-4Plant From Logsheet MUW-4DCS Operator Every Shift 7Months Data
from April-2015
to October-2015
To know the
proper
Desuperheating
of the steam
To Check Impact
of Same on
Production
X9
Cooling Tower
SW I/L Temp
Continuous Deg C At Main
Condensors
O/L
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Temperature in
Cooling Water
X10
Cooling Tower
SW O/L Temp
Continuous Deg C At Main
Condensors
I/L
From Logsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Temperature
Range in Cooling
Water
X11
Cooling Tower
Temp. Range
Continuous Deg C At Main
Condensors
I/L & O/l
By Difference of
I/L & O/L Temp.
MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check
Temperature in
Cooling Water
X12
Nos. of Dilution Descrete Nos. At MUW-
1/2,3&4
Control Room
From Shift
Engineer Report
Book
Shift Engineer Every Shift 7Months Data
from April-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check Impact
of Same on
Production
14
14
Data Collection Plan
Metric
Performance
Measure
Type Units
Data Source
& Location
How Will Data
Be Collected
Who Will Collect
Data
When Will
Data Be
collected
Sample Size
Stratification
Factors
How Will Data
Be Used
X13
Shut-Off
Vaccum
Descrete Inch Hg AtMUW-
1/2,3&4
Control Room
FromShift
EngineerReport
Book
ShiftEngineer Once in Six
Month
- In MUW-1/2,3&4
Plant
To Check Ejector
Performance and
it's impacton
Vaccum
X14
MagmaDraw
Density and
Solid Content
Continuous Baume,
%Solid
AtMUW-
1/2,3&4
Control Room
FromLogsheet MUW-1/2,3&4DCS
Operator
Every Two
Hours
7Months Data
fromApril-2015
to October-2015
In MUW-1/2,3&4
Plant
To Check Impact
of Same on
Production
X15
SaltProduction Continuous MT MUW-
1/2,3&4Plant
PackingArea
Every Shift Talleyman AfterFillingof
Each Truck/
Tractorand at
the End of
Each Shift
7Months Data
fromApril-2015
to October-2015
MUW-1/2,3&4
Production Shift-
wise
ForPerformance
Measure &
Identify Losses
X16
Condensate Continuous KL MUW-
1/2,3&4Plant
Every Shift MUW-1/2,3&4DCS
Operator
Every Shift 7Months Data
fromApril-2015
to October-2015
MUW-1/2,3&4
Good &Bad
Condensate
To Check the Ratio
of Good to Bad
Condensate
X17
Bittern Continuous KL MUW-
1/2,3&4Plant
Every Shift No Measurement,
DataCollected based
on SaltProduction
Ratio Which is
Normally 3.1KL/Tof
Salt
Every Day 7Months Data
fromApril-2015
to October-2015
To Check the
Quantity
Produced from
MUW-1/2,3&4
Plant
To Check
Efficiency of Plant
15
15
Measurement System Validation
Purpose:
To validate that the base line calculated does not have measurement
system error .
Process Steps:
Identified key process parameters for the measurement system
1.Done calibration for 50# steam flow at MUW 4
2.50# & 20 # Steam flow Zero checked for MUW-1/2,3 & 4
16
16
MUW-1/2 STEAM RATIO
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15
Steam ratio : muw-1/2
Steam
ratio
Target : 1.45
17
17
Process Capability : MUW-1/2 Steam Ratio: - 0.22
18
18
MUW 3 STEAM RATIO
0
1
2
3
4
5
6
1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15
Steam ratio : MUW-3
Steam
ratio
Target : 1.97
19
19
Process Capability : MUW-3 Steam Ratio: - 0.17
20
20
MUW-4 STEAM RATIO
0
0.5
1
1.5
2
2.5
3
3.5
1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15
Steam ratio
Steam
ratio
Target : 1.94
21
21
Process Capability :MUW-4 Steam Ratio: - 0.43
22
22
Measurement System Validation
Purpose:
To validate that the base line calculated for repeats does not have measurement system error
Process Steps:
Identified key process parameters for the measurement system
1. Zero checked for 20# steam flow at MUW-3 plant.
Performed reproducibility study for measurement system validation
23
23
Gage Study – % Solid in Magma Draw
24
24
Gage Study –Magma Draw Baume
25
25
Measurement System Validation
Purpose:
To validate that the base line calculated for repeats does not have measurement system error
Process Steps:
Identified key process parameters for the measurement system
1. Zero checked for 20# steam flow at MUW-3 plant.
Performed reproducibility study for measurement system validation
26
26
27
27
28
28
Measure Phase Executive Summary
• Calibration for 50# steam flow and Desuperheater DA water
flow in MUW-4 is done and found OK.
• Zero checked for 50# steam flow measurement for MUW -1/2
unit 1 & 2 and found ok.
• Zero checked for 20# steam flow measurement for MUW 3&4
unit 1, 2 & 3 and found ok.
• Calibration for 50# steam flow will be done whenever stoppage
is available.
• Process capability test done for MUW-1/2 , 3 & 4 Concetti
stitching machine and found OK .
29
29
Next Steps
• Activities for Analyze Phase
– Identify Critical X’s
– Identify Potential Root Causes Affecting Critical X’s
– Reducing the List of Potential Root Causes
– Root Cause Analysis
– Impact of Root Causes on Key Outputs (Y)
– Prioritized Root Causes
– Analyze Summary
• Planned Lean Six Sigma Tool use
– Basic statistical analysis
– Basic graphing tools
30
30
Measure Storyboard
Measure Toll Gate
31
31
Define Signoff
• I concur that the Define Phase was successfully completed on 17/01/2015
• I concur the project is ready to proceed to next phase: Analyse
Jayendra Jadeja
Black belt guide
Mahesh Deshpande
Deployment Director
Satyendra Kumar Yadav
Green Belt
Ashok Muthuswamy
MBB/Consultant
P M Patel
Project Sponsor
32
32
32
Thank You

More Related Content

Similar to Lean Six Sigma Project.pptx

Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Refrigeration and air conditioning system
Refrigeration and air conditioning systemRefrigeration and air conditioning system
Refrigeration and air conditioning systembikramstalion
 
Catalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsCatalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsGerard B. Hawkins
 
Case study Energy Audit for Chiller Plant
Case study Energy Audit for Chiller PlantCase study Energy Audit for Chiller Plant
Case study Energy Audit for Chiller PlantHina Gupta
 
Experimental investigate to obtain the effectiveness of regenerator using Air.
Experimental investigate to obtain the effectiveness of regenerator using Air.Experimental investigate to obtain the effectiveness of regenerator using Air.
Experimental investigate to obtain the effectiveness of regenerator using Air.IJESFT
 
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...Centro Studi Galileo
 
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...IRJET Journal
 
Training presentation
Training presentation Training presentation
Training presentation Keyur Patel
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)PRAN-RFL Group
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSGerard B. Hawkins
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
Deyab a. aspen hysys 2013 workbook
Deyab a.  aspen hysys 2013   workbookDeyab a.  aspen hysys 2013   workbook
Deyab a. aspen hysys 2013 workbookLito Aguirre
 
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power EquipmentWaste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power EquipmentRonakSharma83
 
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDS
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDSSYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDS
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDSGerard B. Hawkins
 
Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsSURESHKUMAR MUTHURAMALINGAM
 

Similar to Lean Six Sigma Project.pptx (20)

Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Refrigeration and air conditioning system
Refrigeration and air conditioning systemRefrigeration and air conditioning system
Refrigeration and air conditioning system
 
Cement-thermocouple
Cement-thermocoupleCement-thermocouple
Cement-thermocouple
 
Catalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsCatalytic Reforming Technology - Infographics
Catalytic Reforming Technology - Infographics
 
Case study Energy Audit for Chiller Plant
Case study Energy Audit for Chiller PlantCase study Energy Audit for Chiller Plant
Case study Energy Audit for Chiller Plant
 
Experimental investigate to obtain the effectiveness of regenerator using Air.
Experimental investigate to obtain the effectiveness of regenerator using Air.Experimental investigate to obtain the effectiveness of regenerator using Air.
Experimental investigate to obtain the effectiveness of regenerator using Air.
 
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...
Bachir Bella - Emerson Climate Technologies - REFRIGERANTI A BASSO GWP IN APP...
 
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
 
Training presentation
Training presentation Training presentation
Training presentation
 
ammoniautility operator
ammoniautility operatorammoniautility operator
ammoniautility operator
 
ammonia&utility operator
ammonia&utility operatorammonia&utility operator
ammonia&utility operator
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Deyab a. aspen hysys 2013 workbook
Deyab a.  aspen hysys 2013   workbookDeyab a.  aspen hysys 2013   workbook
Deyab a. aspen hysys 2013 workbook
 
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power EquipmentWaste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
 
Chlor alkali 2016
Chlor alkali 2016Chlor alkali 2016
Chlor alkali 2016
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDS
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDSSYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDS
SYNGAS CONDITIONING UNIT FEASIBILITY CASE STUDY: COAL-TO-LIQUIDS
 
Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant Operations
 

Recently uploaded

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Lean Six Sigma Project.pptx

  • 1. 1 Lean Six Sigma Project To Reduce Specific steam consumption in MUW Green Belt: Satyendra Kumar Yadav Define Tollgate Date: 17 Jan 2016 Class C
  • 2. 2 2 Agenda • Project Charter Review • Executive Summary • Value Stream Map • Operational Definitions • Data Collection Plan • MSA • Baseline Data • Process Capability • Measure Tools Summary • Lessons learned • Next Steps • Measure Storyboard • Measure Signoff
  • 3. 3 3 Reduction of Specific Steam Consumption in MUW Plant Business Case Opportunity or Problem Statement •Day by day energy cost is increasing. Energy cost is 60% of Salt variable cost. Improvement in energy consumption will help us to maintain our leadership position in competitive market . •Contribution Rs.3.25 Crore •Specific steam consumption in FY 2014-15 was 1.40 Gcal/MT . •For the H1 2015-16 it has increased to 1.44 Gcal/MT Goal Statements Project Scope •Reduce specific steam consumption from 1.40 Gcal/MT to 1.34 Gcal/MT •Scope : Steam consumption for MUW 1&2, 3 and 4 •Out of scope : MUW 1&2, 3 and 4 power consumption Project Plan Team Selection Green Belt: : Satyendra Kumar Yadav Project Sponsor : PM Patel Black belt guide : Jayendra Jadega Deployment director : Mahesh deshpande Master black belt : Ashok muthuswamy Team : Mayur gandhi , Vimal patel , Karan patel, Jignesh mandora Bhargav patel D M A I C 20-Nov 17-Jan
  • 4. 4 4 Specific Steam Consumption 1.54 1.58 1.58 1.45 1.49 1.51 1.52 1.4 1.3 1.34 1.38 1.42 1.46 1.5 1.54 1.58 1.62 2011-12 2012-13 2013-14 2014-15 With power Without power TARGET 1.34
  • 5. 5 5 MUW-1/2 Value Stream Mapping MUW-1/2 Plant Value Stream Mapping Supplier Process Customer Solar Salt Saturated Brine Steam & Power Chemicals & Packing Materials Power Plant Store & Purchase Brine SSD operation for Brine enrichmentin monsoon only Settlingof brine in Thickenerin Monsoon only Evaporato rs for Brine Evaporati on Magma Handling (10to 15% solid) Decantation (solidLiquid separation) Outlet 50% Wetsolid Settlingof Liquor overflow (solidrecovery) Screeningwith 10 mesh size De-superheating Condensation Centrifugingof 50% solid Iodisation (30<=Iodine<50 ppm) Drying (WetSalt 2-3% moisture) Solar SaltOffice Quality of Raw Brine: (1) Density -25 Be (2) Nacl 260-265 gpl (3) Ca <0.4 gpl (4) Mg < 11 gpl Quality of steam & Power: (1) 50# steam 50-55 TPH with 45-50 psi pressure and 150 C (2) 120 # steam 35 TPH and 190 C to 200 C Power plant Control Store & Purchase Office Kyar Brine Pumpman MUW-3 Control room Circulator attendant Pumpman/ condensate Bad Condensate GoodCondensate Dryer/ Centrifuge Quality : In Dry Salt: Iodine 30 to 80 PPM, Ca-0.1% max,Mg - 0.15% max, Non Caking Agent- 10PPM Product Storage/ Silo Packing Packing supervisor Packing/Weighing/ Restiching/iodisation/ lump rework Product Inspectorate Loading Bittern Salt Solar Salt Supply Chain Water Softening SCM Office Water Softening Control room MST Tank Quality : Draw from body: Slurry Density: 27 to 28 °Be, Solid: 10 to 15% Pre- heaters Capacity of Major Equipments Sr. No. Equipment Capacity Unit Total 1 Evaporator-1 145 TPD 2 Evaporator-2 145 TPD 3 Evaporator-3 145 TPD 4 Evaporator-4 145 TPD 5 Evaporator-5 145 TPD 6 Evaporator-6 145 TPD 7 Centrifuge (2Nos) 30 TPH 60 8 FBD-4 900 TPD 10 Silo 50 T 11 Packing Machines 950 TPD 870
  • 6. 6 6 MUW-3 Value Stream Mapping Process Supplier MUW-3 Plant Value Stream Mapping Customer Solar Salt Saturated Brine Steam & Power Chemicals & Packing Materials Power Plant Store & Purchase Brine SSD operation for Brine enrichmentin monsoon only Settling of brine in Thickenerin Monsoon only Evaporato rs for Brine Evaporati on Magma Handling (10to 15% solid) Decantation (solid Liquid separation) Outlet 50% Wetsolid Settling of Liquor overflow (solid recovery) Screening with 10 mesh size De-superheating Condensation Centrifuging of 50% solid Iodisation (30<=Iodine<50 ppm) Drying (WetSalt 2-3% moisture) Solar SaltOffice Quality of Raw Brine: (1) Density -25 Be (2) Nacl 260-265 gpl (3) Ca <0.4 gpl (4) Mg < 11 gpl Quality of steam & Power: (1) 20# steam 75-80 TPH with 14-18 psi pressure (2) 120 # steam 70 TPH and 190 C to 200 C Power plant Control Store & Purchase Office Kyar Brine Pumpman MUW-3 Control room Circulator attendant Pumpman/ condensate Bad Condensate Good Condensate Dryer/ Centrifuge Quality : In Dry Salt: Iodine 30 to 80 PPM, Ca-0.1% max,Mg - 0.15% max, Non Caking Agent- 10PPM Product Storage/ Silo Packing Packing supervisor Packing/Weighing/ Restiching/iodisation/ lump rework Product Inspectorate Loading Bittern Salt Solar Salt Supply Chain Water Softening SCM Office Water Softening Control room MST Tank Quality : Draw from body: Slurry Density: 27 to 28 °Be, Solid: 10 to 15% Pre- heaters Capacity of Major Equipments Sr. No. Equipment CapacityUnit Total 1 Evaporator-1 150 TPD 2 Evaporator-2 150 TPD 3 Evaporator-3 150 TPD 4 Evaporator-4 150 TPD 5 Evaporator-5 175 TPD 6 Evaporator-6 175 TPD 7 Centrifuge (2Nos) 30 TPH 90 8 FBD-6 900 TPD 10 Silo 90 T 11 Packing Machines 1000 TPD 950
  • 7. 7 7 MUW-4 Value Stream Mapping MUW-4 Plant Value Stream Mapping Supplier Process Customer Solar Salt Saturated Brine Steam & Power Chemicals & Packing Materials Power Plant Store & Purchase Brine SSD operation for Brine enrichment in monsoon only Settling of brine in Thickenerin Monsoon only Evaporato rs for Brine Evaporati on Magma Handling (10to 15% solid) Decantation (solid Liquid separation) Outlet 50% Wet solid Settling of Liquor overflow (solid recovery) Screening with 10 mesh size De-superheating Condensation Centrifuging of 50% solid Iodisation (30<=Iodine<50 ppm) Drying (Wet Salt 2-3% moisture) Solar Salt Office Quality of Raw Brine: (1) Density -25 Be (2) Nacl 260-265 gpl (3) Ca <0.4 gpl (4) Mg < 11 gpl Quality of steam & Power: (1) 20# steam 75-80 TPH with 14-18 psi pressure (2) 120 # steam 55 TPH and 190 C to 200 C Power plant Control Store & Purchase Office Kyar Brine Pumpman MUW-3 Control room Circulator attendant Pumpman/ condensate Bad Condensate Good Condensate Dryer/ Centrifuge Quality : In Dry Salt: Iodine 30 to 80 PPM, Ca-0.1% max,Mg - 0.15% max, Non Caking Agent- 10PPM Product Storage/ Silo Packing Packing supervisor Packing/Weighing/ Restiching/iodisation/ lump rework Product Inspectorate Loading Bittern Salt Solar Salt Supply Chain Water Softening SCM Office Water Softening Control room MST Tank Quality : Draw from body: Slurry Density: 27 to 28 °Be, Solid: 10 to 15% Pre- heaters Capacity of Major Equipments Sr. No. Equipment Capacity Unit Total 1 Evaporator-1 150 TPD 2 Evaporator-2 150 TPD 3 Evaporator-3 150 TPD 4 Evaporator-4 150 TPD 5 Evaporator-5 150 TPD 6 Evaporator-6 150 TPD 7 Centrifuge (2Nos) 30 TPH 90 8 FBD-6 900 TPD 10 Silo 90 T 11 Packing Machines 1000 TPD 900
  • 8. 8 8 Input Process & Output Metrics 8 Finished Product + Waste Salt to SSD in MT Condensate in KL (Good /Bad),Bittern KL Evaporation- decantation-centrifuging-drying-product packing-cooling , Body & Cal Pre, Temp, Cooling sea water temp ,Vacuum in Condenser, Total salt in MT, Condensate , Bittern 20# St T/Prod T (Steam Ratio) Brine Quantity KL/Hr & Quality – Ca , Mg, NaCl GPL,Ph Steam 20# -Flow ,Pressure &Temp
  • 9. 9 9 Operational Definitions Metrics Performance Measure Type Units Operational Definition Y 20#, 50# Steam Ratio Continuous MT/MT 20#&50#Steam Ratio is the ratio of 20#&50#Steam consumed and Total Salt Prouction. Normal Ratio for 20#&50#should beless than or equal to 1.95&1.5respectively . X1 Steam Flow Continuous TPH Steam is used in MUWplant for evaporation.The flow of steam in TPHis measured by differential flow transmitter which is displayed in control room . 20#steam is used in MUW-3&4, while 50#is used in MUW-1/2. X2 Brine Concentration Continuous Be,%Ca ,Mg,Nacl content A laboratory report is generated wrt Ca,Mg,Nacl and pH measured at central Lab. Ca,Mg,Nacl in GPLand Brine specificgravity in Baume is called Brine concentration. X3 Vaccum of Condensor Continuous In Inch Hg The differential pressure below atmosphere in main body in Inch of Hg is known as vacuum. X4 Body Top Pressure / Vaccum Continuous Vacuum in Inch Hg,Pressure in psi The differential pressure above atmosphere in body is known as pressure while the differential pressure below atmosphere is known as vacuum.This is digitally displayed in DCS. X5 Body Liqour Temperature Continuous In Deg C The absolute temperatue ,at a given pressure,of a liq/vapour which is measured by thermocouple and displayed digitaly in DCS panel.
  • 10. 10 10 Operational Definitions Metrics Performance Measure Type Units Operational Definition X6 Body Vapour Temperature Continuous In Deg C The absolute temperatue ,at a given pressure,of a liq/vapour which is measured by thermocouple and displayed digitally in DCS/panel. X7 Calendria Pressure / Vaccum Continuous Vacuum in Inch Hg,Pressure in psi The differential pressure above atmosphere in calendria is known as pressure while the differential pressure below atmosphere is known as vacuum.This is digitally displayed in DCS panel. X8 Desuperheater DA water flow rate Continuous TPH Amount of DA water required in desuperheater depends on the I/L steam temperature , its flow rate and temperature of DA water . X9 Cooling Tower SW I/L Temp Continuous In Deg C Sea Water is used as a cooling media in across TCL . Cooling water from condenser goes to cooling tower and gets cooled. The cooling water from cooling tower is again fed to condenser as a cooling media.The temperature of sea water entering cooling tower for cooling is known as sea water I/L temperature. X10 Cooling Tower SW O/L Temp Continuous In Deg C Sea Water is used as a cooling media in across TCL .Cooling water from condenser goes to cooling tower and gets cooled. The cooling water from cooling tower is again fed to condenser as a cooling media.The temperature of sea water coming out from cooling tower for cooling is known as sea water O/L temperature. X11 Cooling Tower Temp. Range Continuous In Deg C The difference of cooling water outlet and inlet temperature is known as temperature range.
  • 11. 11 11 Operational Definitions Metrics Performance Measure Type Units Operational Definition X13 Shut-Off Vaccum Discrete In Inch Hg When any ejector is started vacuum is observed on vacuum gauge. Ejector is taken in line by opening sea water valve or cooler and 120# steam valve for ejector vacuum system. The vacuum in line without taking vapour load on ejector system is known as shutoff vacuum.Normally Shut off vacuum should be 24'' Hg. X14 Magma Draw Density and Solid Content Continuous Baume, %Solid Magma Draw is Concentrated Brine O/l from body and solid content is the amount of solid in % present in magma draw. Solid content should be around 10-15% in magma draw ideal condition. X15 Salt Production Continuous MT V-Salt production is the sum of total salt dispatched from MUW-3 plant to SCMand solar salt MT .It is the sum of waste salt and finished Product. X16 Condensate Continuous KL The condensate is the water produced in MUW-3 plant due to cooling of vapour or steam.It is classified as good and bad condensate depending on its conductivity. If conductivity is less than 40 µs/Cm2 it is good condensate and sent to MST tank in power plant and from there finally to water treatment plant via pump. Rest condensate having conductivity greater than 40 µs/Cm2 is bad condensate and it is taken in bad condensate tank and from there sent to water treatment plant via pump. X17 Bittern Continuous KL Bittern is liquid residue in a MUW plant after taking out salt from brine by evaporation and decantation which is also known as Mother liquor and it is partly recycled.
  • 12. 12 12 Data Collection Plan Metric Performance Measure Type Units Data Source & Location How Will Data Be Collected Who Will Collect Data When Will Data Be collected Sample Size Stratification Factors How Will Data Be Used Y 20#, 50# Steam Ratio Continuous MT/MT MUW- 1/2,3&4Plant Total 20#&50# Steam Consumed/ Total Production of MUW-1/2,3&4 Shift Engineer Everyday & Every Shift End 7Months Data from April-2015 to October-2015 To Measure Steam at MUW- 1/2,3&4Plant To Find 20#&50# Steam Ratio X1 Steam Flow Continuous TPH Steam of MUW- 1/2,3&4Plant From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 To Measure Production Rate To Check Impact of Same on Production X2 Brine Concentration Continuous Baume, %Ca,Mg, NaCl content MUW- 1/2,3&4Plant Brine Inlet Line/ Brine Tank In a sample bottle afterflushing sample line . Sample Boy Daily at 8:00 A.M. except Holidays 7Months Data from April-2015 to October-2015 To Measure Brine Quality To Check Impact of Same on Production X3 Vaccum of Condensor Continuous Inch Hg MUW- 1/2,3&4Main Condensors From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Vaccum Condition in Plant X4 Body Top Pressure / Vaccum Continuous Pressure in PSI, Vaccum in Inch Hg At Body Top in Each Body From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Pressure/ Vaccum Condition in Plant X5 Body Liqour Temperature Continuous Deg C At Body Middle in Each Body From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Temperature Condition in Body
  • 13. 13 13 Data Collection Plan Metric Performance Measure Type Units Data Source & Location How Will Data Be Collected Who Will Collect Data When Will Data Be collected Sample Size Stratification Factors How Will Data Be Used X6 Body Vapour Temperature Continuous Deg C At Body Top in Each Body From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Temperature Condition in Body X7 Calendria Pressure / Vaccum Continuous Pressure in PSI, Vaccum in Inch Hg At Each Body Calendria From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Pressure/ Vaccum Condition in Body x8 Desuperheater DA water flow rate Continuous TPH MUW-4Plant From Logsheet MUW-4DCS Operator Every Shift 7Months Data from April-2015 to October-2015 To know the proper Desuperheating of the steam To Check Impact of Same on Production X9 Cooling Tower SW I/L Temp Continuous Deg C At Main Condensors O/L From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Temperature in Cooling Water X10 Cooling Tower SW O/L Temp Continuous Deg C At Main Condensors I/L From Logsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Temperature Range in Cooling Water X11 Cooling Tower Temp. Range Continuous Deg C At Main Condensors I/L & O/l By Difference of I/L & O/L Temp. MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Temperature in Cooling Water X12 Nos. of Dilution Descrete Nos. At MUW- 1/2,3&4 Control Room From Shift Engineer Report Book Shift Engineer Every Shift 7Months Data from April-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Impact of Same on Production
  • 14. 14 14 Data Collection Plan Metric Performance Measure Type Units Data Source & Location How Will Data Be Collected Who Will Collect Data When Will Data Be collected Sample Size Stratification Factors How Will Data Be Used X13 Shut-Off Vaccum Descrete Inch Hg AtMUW- 1/2,3&4 Control Room FromShift EngineerReport Book ShiftEngineer Once in Six Month - In MUW-1/2,3&4 Plant To Check Ejector Performance and it's impacton Vaccum X14 MagmaDraw Density and Solid Content Continuous Baume, %Solid AtMUW- 1/2,3&4 Control Room FromLogsheet MUW-1/2,3&4DCS Operator Every Two Hours 7Months Data fromApril-2015 to October-2015 In MUW-1/2,3&4 Plant To Check Impact of Same on Production X15 SaltProduction Continuous MT MUW- 1/2,3&4Plant PackingArea Every Shift Talleyman AfterFillingof Each Truck/ Tractorand at the End of Each Shift 7Months Data fromApril-2015 to October-2015 MUW-1/2,3&4 Production Shift- wise ForPerformance Measure & Identify Losses X16 Condensate Continuous KL MUW- 1/2,3&4Plant Every Shift MUW-1/2,3&4DCS Operator Every Shift 7Months Data fromApril-2015 to October-2015 MUW-1/2,3&4 Good &Bad Condensate To Check the Ratio of Good to Bad Condensate X17 Bittern Continuous KL MUW- 1/2,3&4Plant Every Shift No Measurement, DataCollected based on SaltProduction Ratio Which is Normally 3.1KL/Tof Salt Every Day 7Months Data fromApril-2015 to October-2015 To Check the Quantity Produced from MUW-1/2,3&4 Plant To Check Efficiency of Plant
  • 15. 15 15 Measurement System Validation Purpose: To validate that the base line calculated does not have measurement system error . Process Steps: Identified key process parameters for the measurement system 1.Done calibration for 50# steam flow at MUW 4 2.50# & 20 # Steam flow Zero checked for MUW-1/2,3 & 4
  • 16. 16 16 MUW-1/2 STEAM RATIO 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15 Steam ratio : muw-1/2 Steam ratio Target : 1.45
  • 17. 17 17 Process Capability : MUW-1/2 Steam Ratio: - 0.22
  • 18. 18 18 MUW 3 STEAM RATIO 0 1 2 3 4 5 6 1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15 Steam ratio : MUW-3 Steam ratio Target : 1.97
  • 19. 19 19 Process Capability : MUW-3 Steam Ratio: - 0.17
  • 20. 20 20 MUW-4 STEAM RATIO 0 0.5 1 1.5 2 2.5 3 3.5 1-Apr-15 1-May-15 1-Jun-15 1-Jul-15 1-Aug-15 1-Sep-15 Steam ratio Steam ratio Target : 1.94
  • 21. 21 21 Process Capability :MUW-4 Steam Ratio: - 0.43
  • 22. 22 22 Measurement System Validation Purpose: To validate that the base line calculated for repeats does not have measurement system error Process Steps: Identified key process parameters for the measurement system 1. Zero checked for 20# steam flow at MUW-3 plant. Performed reproducibility study for measurement system validation
  • 23. 23 23 Gage Study – % Solid in Magma Draw
  • 25. 25 25 Measurement System Validation Purpose: To validate that the base line calculated for repeats does not have measurement system error Process Steps: Identified key process parameters for the measurement system 1. Zero checked for 20# steam flow at MUW-3 plant. Performed reproducibility study for measurement system validation
  • 26. 26 26
  • 27. 27 27
  • 28. 28 28 Measure Phase Executive Summary • Calibration for 50# steam flow and Desuperheater DA water flow in MUW-4 is done and found OK. • Zero checked for 50# steam flow measurement for MUW -1/2 unit 1 & 2 and found ok. • Zero checked for 20# steam flow measurement for MUW 3&4 unit 1, 2 & 3 and found ok. • Calibration for 50# steam flow will be done whenever stoppage is available. • Process capability test done for MUW-1/2 , 3 & 4 Concetti stitching machine and found OK .
  • 29. 29 29 Next Steps • Activities for Analyze Phase – Identify Critical X’s – Identify Potential Root Causes Affecting Critical X’s – Reducing the List of Potential Root Causes – Root Cause Analysis – Impact of Root Causes on Key Outputs (Y) – Prioritized Root Causes – Analyze Summary • Planned Lean Six Sigma Tool use – Basic statistical analysis – Basic graphing tools
  • 31. 31 31 Define Signoff • I concur that the Define Phase was successfully completed on 17/01/2015 • I concur the project is ready to proceed to next phase: Analyse Jayendra Jadeja Black belt guide Mahesh Deshpande Deployment Director Satyendra Kumar Yadav Green Belt Ashok Muthuswamy MBB/Consultant P M Patel Project Sponsor