Seat No:_________________ Max Marks: 50
1. Draw a class diagram for the scenario given below.
This is an example that models University Courses. Assume three
classes’ such as course, lecturer, student and an interface person.
Each course objects maintains a list of student on that course and
lecturer who has been assigned to teach that course. The course
object has behavior that allows adding and removing student to and
from course, assigning the teacher and getting a list of currently
assigned student and currently assigned teacher. A teacher may
teach several courses but a course only has a single teacher .A
lecturer object maintains a list of courses that it teaches, course is
attended by 0 or more student and student may attend multiple
courses. A person interface will have getName() and
getEmailAddress () methods both lecturer and student are shown to
be the type of person.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a class diagram for the scenario given below.
This scenario is from system that models companies for a payroll or
reporting system. Company object has properties such as name and
employees_list and getName and getEmployees as its behavior.
Employee object includes employee no, name, salary and manager
as its properties getName (), getEmplyoeeNo () , getSalary() and
getManager() as its methods. getManager() accepts object of
manager. Company may have one or more employees. A manager
object keeps manages as list property and add
TeamMember(employee_list) and getTeamMember() as its
behaviors. One or more employee can be managed by manager
objects. Some employees are contractual employees who are within
a lieu of a contractor object. A contractor object may have length_
of _contract as its property and getLength() as its behavior.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Create a class diagram(Use Star UML) for “library management”
using the classes with their attributes and operation given below.
Also set the appropriate relationship between the classes using the
relationship tools from the toolbox following the overview of the
system given below.
Overview of the system:-
a) It has a class “Book”. Book has authors so it has an “Author”
class.
b) In order to collect book information it has “BookItem” class
which uses some of the properties from book class.
c) It needs an account for reserving book by the user so it has an
“Account class.”
d) In account class there is an attribute named state which uses an
enumeration named “AccountState”.
e) It also has a class “Library” to manage the account, user and the
books.
f) It has a user class to manage the user detail that has an account
in the library and he can borrow and return books to library.
g) The system also has an interface “Search” where the user
searches the book he needed from the “Catalog” class.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
Max Marks: 50
1.Q1 DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE
TEXT ON “BANK ATM MACHINE FOR WITHDRAWING
CASH”.
Summary:
An automated teller machine (ATM) or the automatic banking machine
(ABM) is a banking subsystem that provides bank customers with access
to financial transactions in a public space without the need for a cashier,
clerk or bank teller.
Customer uses bank ATM to check balances of his/her bank accounts,
deposit funds, withdraw cash and/or transfer funds which are the
generalization alternative of ATM transaction use case.
FOR WITHDRAWING CASH
On most bank ATMs, the customer is authenticated by inserting a plastic
ATM card and entering a personal identification number (PIN). Bank will
than authenticate the customer’s pin number. Only authenticated
customer can request the system for withdrawing money while the
unauthenticated customer will get back his ATM card as the system will
reject the card.
Then the system will request the authenticated customer to enter the
amount be de withdrawn. The bank will check the balance amount of the
customer if it is sufficient bank will provide the requested amount to the
customer and debit the respective amount from the balance. The customer
will collect or take the amount from the slot. In case of insufficient
amount the system will show the balance and reject the card. At the end
of all the process the customer will take back his ATM card.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE TEXT
ON “ONLINE PAPER SUBMISSION SYSTEM”.
SUMMARY
The author completes an online form that requests the user to
input author name, Correspondence address, email and, title of
paper. The system validates this data and, if correct, asks the
author to submit the paper. The author then browses to find the
correct paper on their system and submits it. Once received and
stored, the system returns to the author a reference number for the
paper. Authors may submit as many papers as they like to be
considered for acceptance to the conference up until the deadline
date for submissions. Papers are allocated to referees for
assessment. They review each paper and submit to the system
their decision. Once the program organizer has agreed the
decisions authors are informed by email. Accepted papers are then
schedule to be delivered at a conference. This involves allocating
a date, time and place for the presentation of the paper.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1.Q DRAW THE ACTIVITY DIAGRAM FOR THE GIVEN PROBLEM OF
USE CASE.
DESCRIPTION OF THE EXAMINATION PAPER PREPARATION
SUPPORT SYSTEM.
Use case name: submit question
Participant: lecturer
Entry conditions:
1. The question is ready and stored in a file
2. The lecturer is assigned to the module
Exit conditions:
1. The file is uploaded to the system
2. The module leader is notified of the availability of the question
3. The event is logged by the system
Flow of Events:
1. The lecturer logs into the system by entering his/her username and
password;
2. The system checks the username and password;
3. The system displays the list of modules of which he/she is the lecturer,
module leader
And/or internal examiner;
4. The lecturer selects a module and his/her role in the module as a lecturer;
5. The system prompts the user to enter the file name and location on his/her
computer, and Additional information if any;
Exceptional conditions and alternative flow of events:
When the username and password is not correct:
3.1: display error message, go back to step 1;
When the lecturer is not listed on the module:
4.1: quit the system;
Special requirements:
1. The file should be encrypted when transmitted from lecturer’s computer to
the server
2. The notification of success in uploading the file should be within 20
seconds
3. The event should be recorded in a log file to contain the following
information:
a) Name of the lecturer,
b) Date and time of the event,
c) The name of the event (upload exam question).
d) The file on the server that stores the questions.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW WORK BREAK DOWN STRUCTURE FOR THE TASK
OUTLINE GIVEN BELOW USING WBS CHART PRO TOOL.
TASK OUTLINE FOR A SOFTWARE DEVELOPMENT PROJECT
FOLLOWING WATERFALL MODEL: -
Project
1.1 requirements
1.1.1 Product investigation
1.1.2 Product survey
1.1.3 Assess product suitability
1.2. Design
1.2.1 Concept design
1.2.2 Final design
1.2.2.1 Detailed design
1.2.2.2 Drawing
1.2.2.3 Design review and approval
1.3 constructions
1.3.1 Purchase material
1.3.2 Building system
1.3.2.1 Mark out dimensions
1.3.2.2 Install foundation
1.3.2.3 Install superstructure
1.4 testing
1.4.1 Test functionality
1.4.1.1 Routine testing
1.4.1.2 Random investigation
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a use-case diagram using StarUML for the scenario given
below.
Web Customer actor uses some web site to make purchases online.
Top level use cases are View Items, Make Purchase and Client
Register. View Items use case could be used by customer as top
level use case if customer only wants to find and see some products.
This use case could also be used as a part of Make Purchase use case.
Client Register use case allows customer to register on the web site,
for example to get some coupons or be invited to private sales. Note
that Checkout use case is included use case not available by itself
- checkout is part of making purchase. Except for the Web
Customer actor there are several other actors which will be
described below with detailed use cases. View Items use case
is extended by several optional use cases - customer may search for
items, browse catalog, view items recommended for him/her, add
items to shopping cart or wish list. All these use cases are extending
use cases because they provide some optional functions allowing
customer to find item. Customer Authentication use case
is included in View Recommended Items and Add to Wish
List because both require customer to be authenticated. At the same
time, item could be added to the shopping cart without user
authentication. Checkout use case includes several required uses
cases. Web customer should be authenticated. It could be done
through user login page, user authentication cookie ("Remember
me") or Single Sign-On (SSO). Web site authentication service is
used in all these use cases, while SSO also requires participation of
external identity provider. Checkout use case also
includes Payment use case which could be done either by using
credit card and external credit payment service or with PayPal.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw an activity diagram using StarUML for the
Airport check-in and security screening system depicted below.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw an activity diagram using StarUML for the
Credit card processing system depicted below.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a use-case diagram using StarUML for the retail Point-of-
sale system depicted below.
A retail POS system typically includes a computer, monitor,
keyboard, barcode scanners, weight scale, receipt printer, credit card
processing system, etc. and POS terminal software.
Checkout use case involves Customer, Clerk and Credit Payment
Service actors and includes scanning items, calculating total and
taxes, payment use cases.
Checkout use case requires Customer actor, hence the 1 multiplicity
of Customer. Clerk can only participate in a single Checkout use
case. Credit Payment Service can participate with many Checkout
use cases at the same time. Checkout use case may not need Credit
Payment Service (for example, if payment is in cash), thus the 0..1
multiplicity.
Checkout use case is an example of a large and complex use case
split into several use cases each describing some logical unit of
behavior. Note, that including use case becomes incomplete by itself
and requires the included use cases to be complete. Payment use case
is represented using generalization relationship. It means that only
one specific type of payment is accepted - either by cash, or by
credit, debit, or with check. An alternative to such representation
could be to use include relationship so that not just single but
several forms of payment could be accepted from the same client
during checkout.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a class diagram using StarUML for the scenario given
below.
This scenario shows an inheritance hierarchy of a series of classes
and their subclasses. It’s for an imaginary application that must
model different kinds of vehicles such as bicycles, motor bike and
cars. All Vehicles have some common attributes (speed and color)
and common behavior (turnLeft, turnRight). Bicycle and
MotorVehicle are both kinds of Vehicle and are therefore shown to
inherit from Vehicle. To put another way, Vehicle is the superclass
of both Bicycle and MotorVehicle. In our model MotorVehicles
have engines and license plates. Attributes have been added
accordingly, along with some behavior that allows us to examine
those attributes. MotorVehicles is the base class of both MotorBike
and Car; therefore these classes not only inherit the speed and color
properties from Vehicle, but also the additional attributes and
behavior from MotorVehicle. Both MotorBike and Car have
additional attributes and behavior which are specific to those kinds
of object.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Explain the process of cost estimation using Basic COCOMO
model. (Refer phase distribution of effort and schedule tables for the
necessary values)
20
2. Explain the process of cost estimation using intermediate COCOMO
model. (Refer Project Characteristics, phase distribution of effort
and schedule tables for the necessary values)
20
3. Viva 5
4. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Using function point analysis technique, calculate the cost of effort
for application software “FPTacker” developed in java. The
application has following number of data functions and transaction
functions mentioned in the table given bellow. With TDI of 35. Note
that the application involves 2 average programmers. Each of them
is getting $150.00 per day including all benefits.
TABLE:-
Function type Complexity
low Average high
External inputs(EI) 3 4 6
External queries(EQ) 3 4 6
External outputs(EO) 4 5 7
Internal logical
file(ILF)
7 10 15
External Interface
file(EIF)
5 7 10
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Estimate effort and schedule, productivity and full time personnel
required for an MIS project having three programs with DSI of 1028,
using basic COCOMO1 model in organic mode and intermediate
COCOMO model in organic mode (rate all the cost drivers as law).
Also calculate the programming effort for the same application.
40
2. An initial study of application software has determined that the size
of the program will be roughly 62,000 delivered source instruction
for an “ABC” inventory. Using intermediate COCOMO1 model
equations to calculate the effort, duration and staffing required to
developing this application software.
Note that:-
This project is rated Very High for Complexity (Effort Multiplier of
1.30), and Low for Tools Use (Effort Multiplier of 1.10), and all of
the other cost drivers are rated to be Nominal. Use these two Effort
Multipliers to calculate the Effort Adjustment Factor (EAF).
3. Viva 5
4. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Using function point analysis technique, calculate the cost of effort
for application software “online shopping” developed in c# by three
programmers, which has the following number of data functions and
transaction functions mentioned in the table given bellow. With TDI
of 35. Note that in this project an average programmer is getting
$5,500 per month including all benefits.
Function Type Complexity
Low Average High
Inputs (EI) 2 4 6
Outputs (EO) 3 5 7
Files(ILF) 5 10 15
Inquiries(EQ) 2 4 6
Interfaces(EIF) 4 7 10
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW A CLASS DIAGRAM FOR THE SCENARIO GIVEN
BELOW:
This is an example that models “ORDER MANAGEMENT”. The
Customer object has properties such as CustomerId,
CustomerName, Address and Phone and methods such as
AddCustomer(),DeleteCustomer() and EditCustomer(). Order
object includes OrderId, CustomerId, CustomerName, ProductId,
Amount and OrderDate as its property and CreateOrder() and
EditOrder(OrderId) as its behavior. A customer can place one or
many orders. Further there are SpecialOrder object and
NormalOrder object which have same methods CreateOrder(),
confirm(), close(), dispatch() whereas the SpecialOrder object also
has one property named SpecialDiscount. SpecialOrder and
NormalOrder objects are both kinds of order and are therefore
shown to inherit from order entity. Moreover the system also has
Product entity having attributes such as ProductId, ProductPrice,
ProductType and methods such as AddProduct(), ModifyProduct()
and SelectProduct(ProductId). Stock object has properties like
ProductId, Quality and ShopNo and behavior such as addStock(),
ModifyStock(ProductId) and slectStockItem(ProductId). Note that
specialOrder and NormalOrder has 1 or more product whereas stock
has many products.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW A CLASS DIAGRAM FOR THE SCENARIO GIVEN
BELOW:
This is an example that models “Hospital Management”. The ward
object of this system has attributes such as name, patient-gender and
capacity. Note that patient-gender is a gender type which is an
enumeration containing enums male and female. The system also
has Patient entity with attributes such as patient_id, admitted,
sickness _history, prescriptions, special_reqs and allergies and
gender which is again a gender enumeration type. And operations
such as getPatient() and deletePatient(Patient_id).Ward is a division
of a hospital object having attributes such as name address and
phone number. In hospital there are number of wards each of which
may be empty or have one or more patient. Each ward has unique
name. This ward is shared by patients who need a similar kind of
care. Each patient is on a single ward. The system also has Doctor
entity which is further classified into Consultant Doctor and Junior
Doctor. The doctors in the hospital are organized into Teams entity
with attribute team_name. Each team can have two or more doctors.
Each patient is under the care of a single team of doctors. A patient
may be treated by any number of doctors but all the doctors must
belong to same team that cares for the patient. Note that team is own
by the hospital.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW A USE-CASE DIAGRAM USING STARUML FOR THE
“Hospital Reception Subsystem” explained below:
“Hospital Reception Subsystem” supports some of the many job
duties of hospital receptionist. Receptionist schedule patient’s
appointments with the doctor and also schedule patient hospital
admission. If doctor is available and admission to the hospital is
possible then receptionist can extend the service to patient
registration by collecting the patient information on patient arrival
or over the phone. Patient registration is an integral part of patient
Hospital Administration use case. Hospital administration use case
is further generalized into outpatient hospital admission and
inpatient hospital administration. Note that for the patient that will
stay in the hospital, he or she should have a bed allotted in a ward.
Receptionists might also receive patient’s payments, record them
in a database and provide receipts, file insurance claims and
medical reports.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW A USE-CASE DIAGRAM USING STARUML FOR
THE “MUSIC PORTAL SYSTEM” DEPICTED BELOW.
The following narration describes some of the use cases for “Music
Portal System”. This system has web user as its main actor. The
web user can perform first level uses cases namely SearchAlbum,
login, logout and ViewAccount. Registration use case extends
login i.e. if the user doesn’t have a login and wishes to create a new
one, he or she can register to get a login. Moreover the
ViewAlbumDetail use case is extending the SearchAlbum use case.
Further the ViewAlbumDetail use case is extended by two more
services viz. DownloadAlbum and BuyAlbum. Note that to
download or to buy an album the user must be a registered member.
Moreover the buyalbum and ViewAccount is further extended with
Recharge use case.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DERIVE AN ACTIVITY DIAGRAM FROM THE CASE
GIVEN BELOW ON “ORDER PROCESSING SUBSYSTEM“
Web Customer uses some web site to make purchases
online. Where customer can search item, View item, add item to
the cart, place order and make payment.For placing an order the
customer first searches the required items from the system. As and
when the customer finds the item available in the system he starts
adding item to the chart. The System provides facility to the
Customer to add any number of items to the chart. Customer can
also view his shopping chart containing items.Ones the customer
finishes his shopping he can place the order by requesting system to
confirm the order.The system will then check whether the order is
normal order or any special order and according to that the system
will generate the bill and request for payment.
After getting the bill the customer can make payment.The bank will
validate the credit card number. If the credit card number is valid the
system will confirm the order. Otherwise the process will get
terminated.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE
TEXT ON “TICKET VENDING MACHINE”
The scenario provided below describes the behavior of the purchase
ticket use case.
Activity is started by Commuter actor who needs to buy a ticket.
Ticket vending machine will request trip information from
Commuter. The commuter will provide trip information to the
machine. Based on the provided trip information, the ticket vending
machine will process the trip information and calculate payment
due by requesting payment. Commuter will provide payment
information to the machine. The machine will process the
payment on the basis of payment by cash or credit or debit card. If
payment by card was selected by Commuter, another actor, Bank
will participate in the activity by authorizing the payment. After
payment is complete, ticket is dispensed to the Commuter. And the
commuter will get the ticket.
Cash payment might result in some change due, so the change is
dispensed to the Commuter in this case by the machine. Ticket
vending machine will show some "Thank You" screen at the end of
all the activity.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Calculate Final Function Points, SLOC, Man-Months(MM) and total cost of
the project developed in Java. The scale value is given below:
Simple Average Complex
Inputs 2 5 1
Outputs - 5 3
Files - 1 3
Interface - 2 5
Inquires - 5 -
Assume nominal value for Degree of Influences except the following:
performance criteria (0.3),
ease of installation (3.2),
online update (0.8) &
maintainability (1.7)
The average Function Point of company is estimated as 14 .The average salary of a
programmer is Rs. 37000.
As per Universal Function Points, SLOC per FP for the technology java is 32.
20
2. An initial study has determined that the size of the program that ABC tele Industries
developed by their in-house expertise is 52,000.
Calculate Staff-Months(SM/effort), Time taken for development and productivity.
Also calculate Average Staffing requirement of project. Use COCOMO -I to calculate
the same.
20
3. Viva 5
4. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Calculate Final Function Points, SLOC, Man-Months(MM) and total cost of
the project developed in C#. The scale value is given below:
Simple Average Complex
Inputs 1 3 3
Outputs - 2 3
Files - 1 3
Interface - 2 4
Inquires - - 3
All the degree of influence factors remains nominal except the following:
portability (1.85),
On-line updation (1.15) ,
scalability(1.2) and
maintainability (0.5).
The average Function Point of company is estimated as 14 .The average salary of a
programmer is Rs. 28000.
As per Universal Function Points, SLOC per FP for the technology C# is 28.
20
2. An initial study has determined that the size of the program which was developed
with the help of high complexity hardware is 255 KLOC. Calculate Effort(man-
month), Productivity, time taken for development and average staffing requirement
(FSP) of the project.
20
3. Viva 5
4. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a use-case diagram using StarUML for the scenario given
below.
Customer actor uses some web site to book flight tickets on-line.
Sometimes they book tickets through agents and agents book tickets
on-line for them. Privileged customers and privileged agents get
special discount upon booking. Students, Senior citizens and Armed
forces customers are also given special discounts upon proper
authentication which is verified through security service of airline
company. Top level use cases are Book Tickets, deliver
tickets and Payment. When the customer or agent book tickets,
they may reserve their seats with the help of airline company and
they may choose priority booking with the help of the company.
Package tour agents plan the schedule and they deliver the tickets
along with the schedule if the customer opts for package tour. Note
that the package tour is always scheduled in align with the schedule
of the airline company. Note that payment use case includes
payment of agent and package tour operators (if applicable) as
well. Payment use case which could be done either by using debit
card, net banking, credit card and external credit payment service or
with PayPal.
40
2. Viva 5
3. Journal 5
UNIVERSITY OF MUMBAI
T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION
APRIL 2017
Project Management
Seat No:_________________ Max Marks: 50
1. Draw a use-case diagram using StarUML for the scenario given
below.
In “Akash Mercantile Bank” the customers open account to be the
members. The customers can open either saving account or current
account. Employees of the bank give induction to the customers towards
several utilities offered by the bank. When opens an account, the customers
should give referral accounts to prove their authentication. The customers
are to keep Rs. 5000 as the minimum balance. If the rule is violated, then
they have to pay the penalty of Rs. 250 which will be debited from their
account.
If the customer is more than 55 years old or if the deposit amount is more
than 25000 then the customers are allowed to deposit the amount in the FD
account of the bank. Upon successful transaction, the customers may
calculate the bonus. The customers can withdraw funds either from the
account balance or from the maturity amount of deposit. In either form of
withdrawal, the balance should be automatically updated.
NRI customer of the bank can convert currencies and do money transfer.
40
2. Viva 5
3. Journal 5

More Related Content

What's hot

Hotel Management System
Hotel Management SystemHotel Management System
Hotel Management SystemAdil Ayyaz
 
Apartment management system web application project
Apartment management system web application projectApartment management system web application project
Apartment management system web application projectFAKHRUN NISHA
 
Online furniture
Online furnitureOnline furniture
Online furnituregitika -
 
Test Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesTest Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesMurageppa-QA
 
COCOMO Model For Effort Estimation
COCOMO Model For Effort EstimationCOCOMO Model For Effort Estimation
COCOMO Model For Effort Estimationgrandhiprasuna
 
Emotion detection from text using data mining and text mining
Emotion detection from text using data mining and text miningEmotion detection from text using data mining and text mining
Emotion detection from text using data mining and text miningSakthi Dasans
 
02 well formed and valid documents
02 well formed and valid documents02 well formed and valid documents
02 well formed and valid documentsBaskarkncet
 
End to end testing - strategies
End to end testing - strategiesEnd to end testing - strategies
End to end testing - strategiesanuvip
 
Hotel management system
Hotel management systemHotel management system
Hotel management systemRoni Roy
 
SOFTWARE MANUAL TESTING SYLLABUS
SOFTWARE MANUAL TESTING SYLLABUSSOFTWARE MANUAL TESTING SYLLABUS
SOFTWARE MANUAL TESTING SYLLABUSSHPINE TECHNOLOGIES
 
User Interface Analysis and Design
User Interface Analysis and DesignUser Interface Analysis and Design
User Interface Analysis and Design Saqib Raza
 
Software project management requirements analysis
Software project management requirements analysisSoftware project management requirements analysis
Software project management requirements analysisAntony Alex
 
Fundamentals of Testing
Fundamentals of TestingFundamentals of Testing
Fundamentals of TestingCode95
 
tybsc it asp.net full unit 1,2,3,4,5,6 notes
tybsc it asp.net full unit 1,2,3,4,5,6 notestybsc it asp.net full unit 1,2,3,4,5,6 notes
tybsc it asp.net full unit 1,2,3,4,5,6 notesWE-IT TUTORIALS
 

What's hot (20)

Hotel Management System
Hotel Management SystemHotel Management System
Hotel Management System
 
Apartment management system web application project
Apartment management system web application projectApartment management system web application project
Apartment management system web application project
 
Online furniture
Online furnitureOnline furniture
Online furniture
 
Test Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesTest Planning and Test Estimation Techniques
Test Planning and Test Estimation Techniques
 
COCOMO Model For Effort Estimation
COCOMO Model For Effort EstimationCOCOMO Model For Effort Estimation
COCOMO Model For Effort Estimation
 
Cause effect graphing.ppt
Cause effect graphing.pptCause effect graphing.ppt
Cause effect graphing.ppt
 
Manual Testing.
Manual Testing.Manual Testing.
Manual Testing.
 
Emotion detection from text using data mining and text mining
Emotion detection from text using data mining and text miningEmotion detection from text using data mining and text mining
Emotion detection from text using data mining and text mining
 
Unit 5
Unit   5Unit   5
Unit 5
 
Tlc
TlcTlc
Tlc
 
02 well formed and valid documents
02 well formed and valid documents02 well formed and valid documents
02 well formed and valid documents
 
Sending Email
Sending EmailSending Email
Sending Email
 
End to end testing - strategies
End to end testing - strategiesEnd to end testing - strategies
End to end testing - strategies
 
Hotel management system
Hotel management systemHotel management system
Hotel management system
 
SOFTWARE MANUAL TESTING SYLLABUS
SOFTWARE MANUAL TESTING SYLLABUSSOFTWARE MANUAL TESTING SYLLABUS
SOFTWARE MANUAL TESTING SYLLABUS
 
User Interface Analysis and Design
User Interface Analysis and DesignUser Interface Analysis and Design
User Interface Analysis and Design
 
Software project management requirements analysis
Software project management requirements analysisSoftware project management requirements analysis
Software project management requirements analysis
 
Fundamentals of Testing
Fundamentals of TestingFundamentals of Testing
Fundamentals of Testing
 
Bug Tracking Java Project
Bug Tracking Java ProjectBug Tracking Java Project
Bug Tracking Java Project
 
tybsc it asp.net full unit 1,2,3,4,5,6 notes
tybsc it asp.net full unit 1,2,3,4,5,6 notestybsc it asp.net full unit 1,2,3,4,5,6 notes
tybsc it asp.net full unit 1,2,3,4,5,6 notes
 

Similar to Project Management (2017) slip question (MUM University)

Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Mumbai B.Sc.IT Study
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Mumbai B.Sc.IT Study
 
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docx
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docxIGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docx
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docxAnilVhatkar
 
Distributed Exam system
Distributed Exam systemDistributed Exam system
Distributed Exam systemGCWUF
 
Smart document sharing application presentation(stufac connect)
Smart document sharing application presentation(stufac connect)Smart document sharing application presentation(stufac connect)
Smart document sharing application presentation(stufac connect)priyanka747
 
Presentation of database management system
Presentation of database management systemPresentation of database management system
Presentation of database management systemMd. Touhidur Rahman
 
Student result mamagement
Student result mamagementStudent result mamagement
Student result mamagementMickey
 
IRJET - Online Seminar Hall Booking System
IRJET -  	  Online Seminar Hall Booking SystemIRJET -  	  Online Seminar Hall Booking System
IRJET - Online Seminar Hall Booking SystemIRJET Journal
 
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docx
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docxCIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docx
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docxclarebernice
 
COLLEGE PROJECT MANAGEMENT SYSTEM
COLLEGE PROJECT MANAGEMENT SYSTEMCOLLEGE PROJECT MANAGEMENT SYSTEM
COLLEGE PROJECT MANAGEMENT SYSTEMIRJET Journal
 
A_Research_Paper_on_College_Management_S.pdf
A_Research_Paper_on_College_Management_S.pdfA_Research_Paper_on_College_Management_S.pdf
A_Research_Paper_on_College_Management_S.pdfMUSHAMHARIKIRAN6737
 
A Research Paper On College Management System
A Research Paper On College Management SystemA Research Paper On College Management System
A Research Paper On College Management SystemTony Lisko
 
Student_result_management_system_project.doc
Student_result_management_system_project.docStudent_result_management_system_project.doc
Student_result_management_system_project.docAnshChhabra6
 
Lecture7 use case modeling
Lecture7 use case modelingLecture7 use case modeling
Lecture7 use case modelingShahid Riaz
 
Advanced Question Paper Generator Implemented using Fuzzy Logic
Advanced Question Paper Generator Implemented using Fuzzy LogicAdvanced Question Paper Generator Implemented using Fuzzy Logic
Advanced Question Paper Generator Implemented using Fuzzy LogicIRJET Journal
 

Similar to Project Management (2017) slip question (MUM University) (20)

Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {April -...
 
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docx
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docxIGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docx
IGNOU BCS-051 Software Engineering December 2022 - Exam Solutions.docx
 
Distributed Exam system
Distributed Exam systemDistributed Exam system
Distributed Exam system
 
Smart document sharing application presentation(stufac connect)
Smart document sharing application presentation(stufac connect)Smart document sharing application presentation(stufac connect)
Smart document sharing application presentation(stufac connect)
 
Presentation of database management system
Presentation of database management systemPresentation of database management system
Presentation of database management system
 
Student Result Mamagement
Student Result MamagementStudent Result Mamagement
Student Result Mamagement
 
c++
c++c++
c++
 
Student result mamagement
Student result mamagementStudent result mamagement
Student result mamagement
 
IRJET - Online Seminar Hall Booking System
IRJET -  	  Online Seminar Hall Booking SystemIRJET -  	  Online Seminar Hall Booking System
IRJET - Online Seminar Hall Booking System
 
YC
YCYC
YC
 
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docx
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docxCIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docx
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docx
 
COLLEGE PROJECT MANAGEMENT SYSTEM
COLLEGE PROJECT MANAGEMENT SYSTEMCOLLEGE PROJECT MANAGEMENT SYSTEM
COLLEGE PROJECT MANAGEMENT SYSTEM
 
A_Research_Paper_on_College_Management_S.pdf
A_Research_Paper_on_College_Management_S.pdfA_Research_Paper_on_College_Management_S.pdf
A_Research_Paper_on_College_Management_S.pdf
 
A Research Paper On College Management System
A Research Paper On College Management SystemA Research Paper On College Management System
A Research Paper On College Management System
 
Student_result_management_system_project.doc
Student_result_management_system_project.docStudent_result_management_system_project.doc
Student_result_management_system_project.doc
 
Lecture7 use case modeling
Lecture7 use case modelingLecture7 use case modeling
Lecture7 use case modeling
 
PORT FOLIO
PORT FOLIOPORT FOLIO
PORT FOLIO
 
Student acadamic system Final report
Student acadamic system Final reportStudent acadamic system Final report
Student acadamic system Final report
 
Advanced Question Paper Generator Implemented using Fuzzy Logic
Advanced Question Paper Generator Implemented using Fuzzy LogicAdvanced Question Paper Generator Implemented using Fuzzy Logic
Advanced Question Paper Generator Implemented using Fuzzy Logic
 

More from Satyendra Singh

Internet Technology Practical (Mumbai University) -2017
Internet Technology Practical  (Mumbai University) -2017Internet Technology Practical  (Mumbai University) -2017
Internet Technology Practical (Mumbai University) -2017Satyendra Singh
 
Project Management Practical 05 - 09 (Mumbai University)
Project Management Practical 05 - 09 (Mumbai University)Project Management Practical 05 - 09 (Mumbai University)
Project Management Practical 05 - 09 (Mumbai University)Satyendra Singh
 
Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)Satyendra Singh
 
Data warehosing (2017) New Practical slip --Mumbai University
Data warehosing (2017) New Practical slip --Mumbai UniversityData warehosing (2017) New Practical slip --Mumbai University
Data warehosing (2017) New Practical slip --Mumbai UniversitySatyendra Singh
 
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai University
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai UniversityGeographic Information sysytem (2017) PracticalNew Slip --Mumbai University
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai UniversitySatyendra Singh
 
Internet Technology (2017) Slip---Mumbai University
Internet Technology (2017) Slip---Mumbai University Internet Technology (2017) Slip---Mumbai University
Internet Technology (2017) Slip---Mumbai University Satyendra Singh
 
Data warehousing PRACTICAL (Sem - VI)
Data warehousing PRACTICAL (Sem - VI)Data warehousing PRACTICAL (Sem - VI)
Data warehousing PRACTICAL (Sem - VI)Satyendra Singh
 
Syllabus T.Y.Bsc. I.T. (SEM V & SEM VI)
Syllabus T.Y.Bsc. I.T. (SEM V  &  SEM VI)Syllabus T.Y.Bsc. I.T. (SEM V  &  SEM VI)
Syllabus T.Y.Bsc. I.T. (SEM V & SEM VI)Satyendra Singh
 
GIS Practical Slip Questions --2016
GIS Practical Slip Questions --2016GIS Practical Slip Questions --2016
GIS Practical Slip Questions --2016Satyendra Singh
 
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONS
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONSINFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONS
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONSSatyendra Singh
 

More from Satyendra Singh (10)

Internet Technology Practical (Mumbai University) -2017
Internet Technology Practical  (Mumbai University) -2017Internet Technology Practical  (Mumbai University) -2017
Internet Technology Practical (Mumbai University) -2017
 
Project Management Practical 05 - 09 (Mumbai University)
Project Management Practical 05 - 09 (Mumbai University)Project Management Practical 05 - 09 (Mumbai University)
Project Management Practical 05 - 09 (Mumbai University)
 
Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)
 
Data warehosing (2017) New Practical slip --Mumbai University
Data warehosing (2017) New Practical slip --Mumbai UniversityData warehosing (2017) New Practical slip --Mumbai University
Data warehosing (2017) New Practical slip --Mumbai University
 
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai University
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai UniversityGeographic Information sysytem (2017) PracticalNew Slip --Mumbai University
Geographic Information sysytem (2017) PracticalNew Slip --Mumbai University
 
Internet Technology (2017) Slip---Mumbai University
Internet Technology (2017) Slip---Mumbai University Internet Technology (2017) Slip---Mumbai University
Internet Technology (2017) Slip---Mumbai University
 
Data warehousing PRACTICAL (Sem - VI)
Data warehousing PRACTICAL (Sem - VI)Data warehousing PRACTICAL (Sem - VI)
Data warehousing PRACTICAL (Sem - VI)
 
Syllabus T.Y.Bsc. I.T. (SEM V & SEM VI)
Syllabus T.Y.Bsc. I.T. (SEM V  &  SEM VI)Syllabus T.Y.Bsc. I.T. (SEM V  &  SEM VI)
Syllabus T.Y.Bsc. I.T. (SEM V & SEM VI)
 
GIS Practical Slip Questions --2016
GIS Practical Slip Questions --2016GIS Practical Slip Questions --2016
GIS Practical Slip Questions --2016
 
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONS
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONSINFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONS
INFORMATION TECHNOLOGY (2016)- SEM_VI - PRACTICAL (SLIP) QUESTIONS
 

Recently uploaded

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 

Recently uploaded (20)

Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 

Project Management (2017) slip question (MUM University)

  • 1. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a class diagram for the scenario given below. This is an example that models University Courses. Assume three classes’ such as course, lecturer, student and an interface person. Each course objects maintains a list of student on that course and lecturer who has been assigned to teach that course. The course object has behavior that allows adding and removing student to and from course, assigning the teacher and getting a list of currently assigned student and currently assigned teacher. A teacher may teach several courses but a course only has a single teacher .A lecturer object maintains a list of courses that it teaches, course is attended by 0 or more student and student may attend multiple courses. A person interface will have getName() and getEmailAddress () methods both lecturer and student are shown to be the type of person. 40 2. Viva 5 3. Journal 5
  • 2. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a class diagram for the scenario given below. This scenario is from system that models companies for a payroll or reporting system. Company object has properties such as name and employees_list and getName and getEmployees as its behavior. Employee object includes employee no, name, salary and manager as its properties getName (), getEmplyoeeNo () , getSalary() and getManager() as its methods. getManager() accepts object of manager. Company may have one or more employees. A manager object keeps manages as list property and add TeamMember(employee_list) and getTeamMember() as its behaviors. One or more employee can be managed by manager objects. Some employees are contractual employees who are within a lieu of a contractor object. A contractor object may have length_ of _contract as its property and getLength() as its behavior. 40 2. Viva 5 3. Journal 5
  • 3. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Create a class diagram(Use Star UML) for “library management” using the classes with their attributes and operation given below. Also set the appropriate relationship between the classes using the relationship tools from the toolbox following the overview of the system given below. Overview of the system:- a) It has a class “Book”. Book has authors so it has an “Author” class. b) In order to collect book information it has “BookItem” class which uses some of the properties from book class. c) It needs an account for reserving book by the user so it has an “Account class.” d) In account class there is an attribute named state which uses an enumeration named “AccountState”. e) It also has a class “Library” to manage the account, user and the books. f) It has a user class to manage the user detail that has an account in the library and he can borrow and return books to library. g) The system also has an interface “Search” where the user searches the book he needed from the “Catalog” class. 40 2. Viva 5 3. Journal 5
  • 4. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 Max Marks: 50 1.Q1 DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE TEXT ON “BANK ATM MACHINE FOR WITHDRAWING CASH”. Summary: An automated teller machine (ATM) or the automatic banking machine (ABM) is a banking subsystem that provides bank customers with access to financial transactions in a public space without the need for a cashier, clerk or bank teller. Customer uses bank ATM to check balances of his/her bank accounts, deposit funds, withdraw cash and/or transfer funds which are the generalization alternative of ATM transaction use case. FOR WITHDRAWING CASH On most bank ATMs, the customer is authenticated by inserting a plastic ATM card and entering a personal identification number (PIN). Bank will than authenticate the customer’s pin number. Only authenticated customer can request the system for withdrawing money while the unauthenticated customer will get back his ATM card as the system will reject the card. Then the system will request the authenticated customer to enter the amount be de withdrawn. The bank will check the balance amount of the customer if it is sufficient bank will provide the requested amount to the customer and debit the respective amount from the balance. The customer will collect or take the amount from the slot. In case of insufficient amount the system will show the balance and reject the card. At the end of all the process the customer will take back his ATM card. 40 2. Viva 5 3. Journal 5
  • 5. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE TEXT ON “ONLINE PAPER SUBMISSION SYSTEM”. SUMMARY The author completes an online form that requests the user to input author name, Correspondence address, email and, title of paper. The system validates this data and, if correct, asks the author to submit the paper. The author then browses to find the correct paper on their system and submits it. Once received and stored, the system returns to the author a reference number for the paper. Authors may submit as many papers as they like to be considered for acceptance to the conference up until the deadline date for submissions. Papers are allocated to referees for assessment. They review each paper and submit to the system their decision. Once the program organizer has agreed the decisions authors are informed by email. Accepted papers are then schedule to be delivered at a conference. This involves allocating a date, time and place for the presentation of the paper. 40 2. Viva 5 3. Journal 5
  • 6. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1.Q DRAW THE ACTIVITY DIAGRAM FOR THE GIVEN PROBLEM OF USE CASE. DESCRIPTION OF THE EXAMINATION PAPER PREPARATION SUPPORT SYSTEM. Use case name: submit question Participant: lecturer Entry conditions: 1. The question is ready and stored in a file 2. The lecturer is assigned to the module Exit conditions: 1. The file is uploaded to the system 2. The module leader is notified of the availability of the question 3. The event is logged by the system Flow of Events: 1. The lecturer logs into the system by entering his/her username and password; 2. The system checks the username and password; 3. The system displays the list of modules of which he/she is the lecturer, module leader And/or internal examiner; 4. The lecturer selects a module and his/her role in the module as a lecturer; 5. The system prompts the user to enter the file name and location on his/her computer, and Additional information if any; Exceptional conditions and alternative flow of events: When the username and password is not correct: 3.1: display error message, go back to step 1; When the lecturer is not listed on the module: 4.1: quit the system; Special requirements: 1. The file should be encrypted when transmitted from lecturer’s computer to the server 2. The notification of success in uploading the file should be within 20 seconds 3. The event should be recorded in a log file to contain the following information: a) Name of the lecturer, b) Date and time of the event, c) The name of the event (upload exam question). d) The file on the server that stores the questions. 40 2. Viva 5 3. Journal 5
  • 7. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW WORK BREAK DOWN STRUCTURE FOR THE TASK OUTLINE GIVEN BELOW USING WBS CHART PRO TOOL. TASK OUTLINE FOR A SOFTWARE DEVELOPMENT PROJECT FOLLOWING WATERFALL MODEL: - Project 1.1 requirements 1.1.1 Product investigation 1.1.2 Product survey 1.1.3 Assess product suitability 1.2. Design 1.2.1 Concept design 1.2.2 Final design 1.2.2.1 Detailed design 1.2.2.2 Drawing 1.2.2.3 Design review and approval 1.3 constructions 1.3.1 Purchase material 1.3.2 Building system 1.3.2.1 Mark out dimensions 1.3.2.2 Install foundation 1.3.2.3 Install superstructure 1.4 testing 1.4.1 Test functionality 1.4.1.1 Routine testing 1.4.1.2 Random investigation 40 2. Viva 5 3. Journal 5
  • 8. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a use-case diagram using StarUML for the scenario given below. Web Customer actor uses some web site to make purchases online. Top level use cases are View Items, Make Purchase and Client Register. View Items use case could be used by customer as top level use case if customer only wants to find and see some products. This use case could also be used as a part of Make Purchase use case. Client Register use case allows customer to register on the web site, for example to get some coupons or be invited to private sales. Note that Checkout use case is included use case not available by itself - checkout is part of making purchase. Except for the Web Customer actor there are several other actors which will be described below with detailed use cases. View Items use case is extended by several optional use cases - customer may search for items, browse catalog, view items recommended for him/her, add items to shopping cart or wish list. All these use cases are extending use cases because they provide some optional functions allowing customer to find item. Customer Authentication use case is included in View Recommended Items and Add to Wish List because both require customer to be authenticated. At the same time, item could be added to the shopping cart without user authentication. Checkout use case includes several required uses cases. Web customer should be authenticated. It could be done through user login page, user authentication cookie ("Remember me") or Single Sign-On (SSO). Web site authentication service is used in all these use cases, while SSO also requires participation of external identity provider. Checkout use case also includes Payment use case which could be done either by using credit card and external credit payment service or with PayPal. 40 2. Viva 5 3. Journal 5
  • 9. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw an activity diagram using StarUML for the Airport check-in and security screening system depicted below. 40 2. Viva 5 3. Journal 5
  • 10. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw an activity diagram using StarUML for the Credit card processing system depicted below. 40 2. Viva 5 3. Journal 5
  • 11. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a use-case diagram using StarUML for the retail Point-of- sale system depicted below. A retail POS system typically includes a computer, monitor, keyboard, barcode scanners, weight scale, receipt printer, credit card processing system, etc. and POS terminal software. Checkout use case involves Customer, Clerk and Credit Payment Service actors and includes scanning items, calculating total and taxes, payment use cases. Checkout use case requires Customer actor, hence the 1 multiplicity of Customer. Clerk can only participate in a single Checkout use case. Credit Payment Service can participate with many Checkout use cases at the same time. Checkout use case may not need Credit Payment Service (for example, if payment is in cash), thus the 0..1 multiplicity. Checkout use case is an example of a large and complex use case split into several use cases each describing some logical unit of behavior. Note, that including use case becomes incomplete by itself and requires the included use cases to be complete. Payment use case is represented using generalization relationship. It means that only one specific type of payment is accepted - either by cash, or by credit, debit, or with check. An alternative to such representation could be to use include relationship so that not just single but several forms of payment could be accepted from the same client during checkout. 40 2. Viva 5 3. Journal 5
  • 12. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a class diagram using StarUML for the scenario given below. This scenario shows an inheritance hierarchy of a series of classes and their subclasses. It’s for an imaginary application that must model different kinds of vehicles such as bicycles, motor bike and cars. All Vehicles have some common attributes (speed and color) and common behavior (turnLeft, turnRight). Bicycle and MotorVehicle are both kinds of Vehicle and are therefore shown to inherit from Vehicle. To put another way, Vehicle is the superclass of both Bicycle and MotorVehicle. In our model MotorVehicles have engines and license plates. Attributes have been added accordingly, along with some behavior that allows us to examine those attributes. MotorVehicles is the base class of both MotorBike and Car; therefore these classes not only inherit the speed and color properties from Vehicle, but also the additional attributes and behavior from MotorVehicle. Both MotorBike and Car have additional attributes and behavior which are specific to those kinds of object. 40 2. Viva 5 3. Journal 5
  • 13. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Explain the process of cost estimation using Basic COCOMO model. (Refer phase distribution of effort and schedule tables for the necessary values) 20 2. Explain the process of cost estimation using intermediate COCOMO model. (Refer Project Characteristics, phase distribution of effort and schedule tables for the necessary values) 20 3. Viva 5 4. Journal 5
  • 14. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Using function point analysis technique, calculate the cost of effort for application software “FPTacker” developed in java. The application has following number of data functions and transaction functions mentioned in the table given bellow. With TDI of 35. Note that the application involves 2 average programmers. Each of them is getting $150.00 per day including all benefits. TABLE:- Function type Complexity low Average high External inputs(EI) 3 4 6 External queries(EQ) 3 4 6 External outputs(EO) 4 5 7 Internal logical file(ILF) 7 10 15 External Interface file(EIF) 5 7 10 40 2. Viva 5 3. Journal 5
  • 15. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Estimate effort and schedule, productivity and full time personnel required for an MIS project having three programs with DSI of 1028, using basic COCOMO1 model in organic mode and intermediate COCOMO model in organic mode (rate all the cost drivers as law). Also calculate the programming effort for the same application. 40 2. An initial study of application software has determined that the size of the program will be roughly 62,000 delivered source instruction for an “ABC” inventory. Using intermediate COCOMO1 model equations to calculate the effort, duration and staffing required to developing this application software. Note that:- This project is rated Very High for Complexity (Effort Multiplier of 1.30), and Low for Tools Use (Effort Multiplier of 1.10), and all of the other cost drivers are rated to be Nominal. Use these two Effort Multipliers to calculate the Effort Adjustment Factor (EAF). 3. Viva 5 4. Journal 5
  • 16. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Using function point analysis technique, calculate the cost of effort for application software “online shopping” developed in c# by three programmers, which has the following number of data functions and transaction functions mentioned in the table given bellow. With TDI of 35. Note that in this project an average programmer is getting $5,500 per month including all benefits. Function Type Complexity Low Average High Inputs (EI) 2 4 6 Outputs (EO) 3 5 7 Files(ILF) 5 10 15 Inquiries(EQ) 2 4 6 Interfaces(EIF) 4 7 10 40 2. Viva 5 3. Journal 5
  • 17. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW A CLASS DIAGRAM FOR THE SCENARIO GIVEN BELOW: This is an example that models “ORDER MANAGEMENT”. The Customer object has properties such as CustomerId, CustomerName, Address and Phone and methods such as AddCustomer(),DeleteCustomer() and EditCustomer(). Order object includes OrderId, CustomerId, CustomerName, ProductId, Amount and OrderDate as its property and CreateOrder() and EditOrder(OrderId) as its behavior. A customer can place one or many orders. Further there are SpecialOrder object and NormalOrder object which have same methods CreateOrder(), confirm(), close(), dispatch() whereas the SpecialOrder object also has one property named SpecialDiscount. SpecialOrder and NormalOrder objects are both kinds of order and are therefore shown to inherit from order entity. Moreover the system also has Product entity having attributes such as ProductId, ProductPrice, ProductType and methods such as AddProduct(), ModifyProduct() and SelectProduct(ProductId). Stock object has properties like ProductId, Quality and ShopNo and behavior such as addStock(), ModifyStock(ProductId) and slectStockItem(ProductId). Note that specialOrder and NormalOrder has 1 or more product whereas stock has many products. 40 2. Viva 5 3. Journal 5
  • 18. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW A CLASS DIAGRAM FOR THE SCENARIO GIVEN BELOW: This is an example that models “Hospital Management”. The ward object of this system has attributes such as name, patient-gender and capacity. Note that patient-gender is a gender type which is an enumeration containing enums male and female. The system also has Patient entity with attributes such as patient_id, admitted, sickness _history, prescriptions, special_reqs and allergies and gender which is again a gender enumeration type. And operations such as getPatient() and deletePatient(Patient_id).Ward is a division of a hospital object having attributes such as name address and phone number. In hospital there are number of wards each of which may be empty or have one or more patient. Each ward has unique name. This ward is shared by patients who need a similar kind of care. Each patient is on a single ward. The system also has Doctor entity which is further classified into Consultant Doctor and Junior Doctor. The doctors in the hospital are organized into Teams entity with attribute team_name. Each team can have two or more doctors. Each patient is under the care of a single team of doctors. A patient may be treated by any number of doctors but all the doctors must belong to same team that cares for the patient. Note that team is own by the hospital. 40 2. Viva 5 3. Journal 5
  • 19. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW A USE-CASE DIAGRAM USING STARUML FOR THE “Hospital Reception Subsystem” explained below: “Hospital Reception Subsystem” supports some of the many job duties of hospital receptionist. Receptionist schedule patient’s appointments with the doctor and also schedule patient hospital admission. If doctor is available and admission to the hospital is possible then receptionist can extend the service to patient registration by collecting the patient information on patient arrival or over the phone. Patient registration is an integral part of patient Hospital Administration use case. Hospital administration use case is further generalized into outpatient hospital admission and inpatient hospital administration. Note that for the patient that will stay in the hospital, he or she should have a bed allotted in a ward. Receptionists might also receive patient’s payments, record them in a database and provide receipts, file insurance claims and medical reports. 40 2. Viva 5 3. Journal 5
  • 20. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW A USE-CASE DIAGRAM USING STARUML FOR THE “MUSIC PORTAL SYSTEM” DEPICTED BELOW. The following narration describes some of the use cases for “Music Portal System”. This system has web user as its main actor. The web user can perform first level uses cases namely SearchAlbum, login, logout and ViewAccount. Registration use case extends login i.e. if the user doesn’t have a login and wishes to create a new one, he or she can register to get a login. Moreover the ViewAlbumDetail use case is extending the SearchAlbum use case. Further the ViewAlbumDetail use case is extended by two more services viz. DownloadAlbum and BuyAlbum. Note that to download or to buy an album the user must be a registered member. Moreover the buyalbum and ViewAccount is further extended with Recharge use case. 40 2. Viva 5 3. Journal 5
  • 21. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DERIVE AN ACTIVITY DIAGRAM FROM THE CASE GIVEN BELOW ON “ORDER PROCESSING SUBSYSTEM“ Web Customer uses some web site to make purchases online. Where customer can search item, View item, add item to the cart, place order and make payment.For placing an order the customer first searches the required items from the system. As and when the customer finds the item available in the system he starts adding item to the chart. The System provides facility to the Customer to add any number of items to the chart. Customer can also view his shopping chart containing items.Ones the customer finishes his shopping he can place the order by requesting system to confirm the order.The system will then check whether the order is normal order or any special order and according to that the system will generate the bill and request for payment. After getting the bill the customer can make payment.The bank will validate the credit card number. If the credit card number is valid the system will confirm the order. Otherwise the process will get terminated. 40 2. Viva 5 3. Journal 5
  • 22. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. DRAW AN ACTIVITY DIAGRAM FROM THE NARRATIVE TEXT ON “TICKET VENDING MACHINE” The scenario provided below describes the behavior of the purchase ticket use case. Activity is started by Commuter actor who needs to buy a ticket. Ticket vending machine will request trip information from Commuter. The commuter will provide trip information to the machine. Based on the provided trip information, the ticket vending machine will process the trip information and calculate payment due by requesting payment. Commuter will provide payment information to the machine. The machine will process the payment on the basis of payment by cash or credit or debit card. If payment by card was selected by Commuter, another actor, Bank will participate in the activity by authorizing the payment. After payment is complete, ticket is dispensed to the Commuter. And the commuter will get the ticket. Cash payment might result in some change due, so the change is dispensed to the Commuter in this case by the machine. Ticket vending machine will show some "Thank You" screen at the end of all the activity. 40 2. Viva 5 3. Journal 5
  • 23. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Calculate Final Function Points, SLOC, Man-Months(MM) and total cost of the project developed in Java. The scale value is given below: Simple Average Complex Inputs 2 5 1 Outputs - 5 3 Files - 1 3 Interface - 2 5 Inquires - 5 - Assume nominal value for Degree of Influences except the following: performance criteria (0.3), ease of installation (3.2), online update (0.8) & maintainability (1.7) The average Function Point of company is estimated as 14 .The average salary of a programmer is Rs. 37000. As per Universal Function Points, SLOC per FP for the technology java is 32. 20 2. An initial study has determined that the size of the program that ABC tele Industries developed by their in-house expertise is 52,000. Calculate Staff-Months(SM/effort), Time taken for development and productivity. Also calculate Average Staffing requirement of project. Use COCOMO -I to calculate the same. 20 3. Viva 5 4. Journal 5
  • 24. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Calculate Final Function Points, SLOC, Man-Months(MM) and total cost of the project developed in C#. The scale value is given below: Simple Average Complex Inputs 1 3 3 Outputs - 2 3 Files - 1 3 Interface - 2 4 Inquires - - 3 All the degree of influence factors remains nominal except the following: portability (1.85), On-line updation (1.15) , scalability(1.2) and maintainability (0.5). The average Function Point of company is estimated as 14 .The average salary of a programmer is Rs. 28000. As per Universal Function Points, SLOC per FP for the technology C# is 28. 20 2. An initial study has determined that the size of the program which was developed with the help of high complexity hardware is 255 KLOC. Calculate Effort(man- month), Productivity, time taken for development and average staffing requirement (FSP) of the project. 20 3. Viva 5 4. Journal 5
  • 25. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a use-case diagram using StarUML for the scenario given below. Customer actor uses some web site to book flight tickets on-line. Sometimes they book tickets through agents and agents book tickets on-line for them. Privileged customers and privileged agents get special discount upon booking. Students, Senior citizens and Armed forces customers are also given special discounts upon proper authentication which is verified through security service of airline company. Top level use cases are Book Tickets, deliver tickets and Payment. When the customer or agent book tickets, they may reserve their seats with the help of airline company and they may choose priority booking with the help of the company. Package tour agents plan the schedule and they deliver the tickets along with the schedule if the customer opts for package tour. Note that the package tour is always scheduled in align with the schedule of the airline company. Note that payment use case includes payment of agent and package tour operators (if applicable) as well. Payment use case which could be done either by using debit card, net banking, credit card and external credit payment service or with PayPal. 40 2. Viva 5 3. Journal 5
  • 26. UNIVERSITY OF MUMBAI T.Y.B.Sc. INFORMATION TECHNOLOGY (Semester VI) (Practical) EXAMINATION APRIL 2017 Project Management Seat No:_________________ Max Marks: 50 1. Draw a use-case diagram using StarUML for the scenario given below. In “Akash Mercantile Bank” the customers open account to be the members. The customers can open either saving account or current account. Employees of the bank give induction to the customers towards several utilities offered by the bank. When opens an account, the customers should give referral accounts to prove their authentication. The customers are to keep Rs. 5000 as the minimum balance. If the rule is violated, then they have to pay the penalty of Rs. 250 which will be debited from their account. If the customer is more than 55 years old or if the deposit amount is more than 25000 then the customers are allowed to deposit the amount in the FD account of the bank. Upon successful transaction, the customers may calculate the bonus. The customers can withdraw funds either from the account balance or from the maturity amount of deposit. In either form of withdrawal, the balance should be automatically updated. NRI customer of the bank can convert currencies and do money transfer. 40 2. Viva 5 3. Journal 5