Comparative Analysis of Text Summarization Techniques
Final Year Mechanical Project
1. PES’S MODERN COLLEGE
OF ENGINEERING
DEPARTMENT OF MECHANICAL
ENGINEERING
FINAL YEAR PROJECT
GROUP 12
PROJECT PROPOSED BY :
1. Akshay shinde 43289
2. Sanjeev Sutar 43290
3. Yogesh Vagre 43292
2. INDEX
SR.NO TOPIC
1 PROPOSED TITLE & SPONSORING COMPANY
2 LITERATURE SURVEY
3 NEED OF THE PROJECT
4 PROBLEM DEFINITION
5 OBJECTIVE
6 SCOPE OF THE PROJECT
7 WORKING
8 SCHEDULE FOR COMPLETION
9 Conclusion
3. PROPOSED TITLE:
STUDY, DESIGN & DEVELOPMENT OF
AUTOMATIC WET TISSUE PAPER PACKING
MACHIN
SPONSORING COMPANY:
JKC Automobile
Engineering
5. PROBLEM DEFINITION:
Currently in many small packaging company packing of wet
tissue paper is done by semi automatic machines.
Our aim is to design a machine that will automated tissue paper
packaging process in order to increase efficiency of their
operation.
6. OBJECTIVE
Increase the production rate by
atomization , maintaining production with
minimum errors
7. SCOPE OF THIS PROJECT
Our project is based on a Mechatronics system. The research shall entail study of:
Mechanical Components such as
Shafts and Bearings.
Electronic Components such as
Sensors & Microcontroller.
The Study of the following subjects covered for the completion of the project
Mechatronics
Design of Machine Elements
Manufacturing Processes
CAD/CAM and Automation
Dynamics of Machinery
8. WORKING:
Main structure adopts full servo control
Opens the roll of raw material & tension control automatically
Chemical sprinkler system
Adopt double folding & double packaging system
the packaging film punches & labelling automatically
The stacking pieces & the position of packing film’s punching &
labelling can be set on touch screen
9. SCHEDULE FOR COMPLETION
Task Month of Completion
Problem identification and
requirement.
August
Problem modeling September
System analysis and specifications August-September
Design(CAD) September-October
Virtual Testing(Software and
analytical)
October
Module implementation and
integration
November-December-January
System test and evaluation January-February
Documentation and management February-March
10. CONCLUSION
The concept borders on innovation and will bring Exemplary Change in the Test
Facility in terms of:
High Production rate
Time efficient