Sam Brittingham is a licensed architect in Virginia with over 30 years of experience designing and overseeing construction projects for hospitals and medical facilities. He has a Bachelor's degree in Architecture and is proficient in AutoCAD and Microsoft Office software. His experience includes roles as an architect for the Navy Medical Center in Portsmouth, VA where he managed projects from $25k to $35 million, and for the Navy Public Works Center in Portsmouth managing projects from $25k to $1.5 million. He has also worked as an architect inspector for a subway construction project in Los Angeles.
1. S a m B r i t t i n g h a m , A r c h i t e c t
Licensed Architect in Virginia
EDUCATION
Southern Illinois University, Bachelor of Science degree, Major: Architecture.
Graduated: May of 1981.
Personal computer experience
AutoCAD, Microsoft Word, Excel, Outlook, Powerpoint, Project and Access for
Windows
EXPERIENCE
Architect 5/2002 to
Present
Navy Medical Center, Portsmouth, VA
Responsible for hospital planning, design & construction. Hospital is 3.4
million square feet/licensed for 320 beds. Project budgets range from $25K
to $35M. Advise Medical center staff & provide appropriate direction to
A&E’s, Builders, Construction Managers & Vendors. Establish budgets,
monitor schedules, administer contracts, review materials & methods.
Liason with staff in support of normal operations during construction.
Architect 10/95 to 5/2002
Navy Public Works Center, Portsmouth, VA
Responsible for design of new buildings, renovations & additions to existing
buildings. Provide drawings, technical specifications, detailed cost
estimates. Projects ranged from $25,000 to $1.5 million. Team leader for
engineers i.e., staff civil/structural, mechanical & electrical. Routinely advise
staff, evaluated contractor proposals & qualifications, administer
construction contracts, conduct field inspections, complie punch lists &
closed out contracts.
Architect Inspector
Jenkins Gales, Martinez Architects, Los Angeles, CA. 9/90 to 10/95
METRO RAIL Subway Stations construction. Cost exceeded $1.5 billion.
Conducted daily inspections & created detailed daily records documenting
compliance to contract drawings, specifications, schedule, cost changes,
safety, etc.
Facilities Architect
CITICORP/ Quotron Systems, Los Angeles, CA. 9/89 to
9/90
Design and construction administration for building alterations within
computer development facilities. Budgets ranged from roughly $25,000 to
$1.5M. Converted a 25,000 square feet warehouse into offices for software
engineers. Upgraded building electrical, telecommunications & network
capabilities,
444 West Chickasaw Road, Virginia Beach,VA 23462 757- 408- 2111; sbrittin@cox.net
2. S a m B r i t t i n g h a m , A r c h i t e c t
Architect
RTK Architects, Los Angeles, CA. 4/88 to
9/89
Design for hospitals located throughout California, primarily Kaiser
Permanente Hospitals. Team leader for Civil, Structural, Mechanical,
Plumbing & Electrical Engineering. Responsible for planning, researching,
writing project feasibility reports, creating design drawings & writing
technical specifications. Department renovations to radiology, pediatrics
and behavioral medicine.
Architect
Rochlin, Baran & Balbona Architects, Los Angeles, CA. 9/85
to 3/88
Design for private hospitals located throughout California. Team leader for
Civil, Structural, Mechanical, Plumbing, Electrical, Acoustical Engineering.
Projects included a medical office building, a new nursing tower, an
outpatient surgery center, a drug rehabilitation center and a psychiatric
rehabilitation center.
Architect
HMC Architects, Ontario, CA. 9/84 to 9/85
Design of hospitals located throughout California. Projects included
renovations to obstetrics and surgery..
444 West Chickasaw Road, Virginia Beach,VA 23462 757- 408- 2111; sbrittin@cox.net