SlideShare a Scribd company logo
1 of 3
SABIR AHMED KHAN
Organization : Mitel
Designation : Technical Lead
Current Location : Bangalore
Total Experience :7.7 years
Highest Qualification : B-Tech [Electronics & Instrumentation]
Date of Birth : 29/08/1984
Phone : 919916894951
Email : ksabir190@yahoo.co.in
CAREER OBJECTIVE
Accomplishing the success in this arena and to be in a position where efficiency and technical acumen can be
best utilized for the enhancement of name and fame of my company.
SKILLS
• Testing Protocols: SIP, ISUP, SS7, TCAP, SCCP, MSRP,DIAMETER
• Technologies: IMS, VOIP, NGN, PSTN, GSM
• Platforms : Windows98/XP/2000, Linux
• Testing Tools: EAST, SIPp, MGTS
• Tools: Wireshirk, Winscp, XShell4, Putty, Bugzilla
• Scripting Languages : Perl, Shell
PROFESSIONAL ABRIDGEMENT
RMS testing | System Testing | Mitel Systems Pvt. Ltd. | August'14 – Till Now :-
RMS 9.3 Support CPM based feature delivery of RCS 5.1 features for page mode, large mode, session mode 1-
1/1-N chat and 1-1/1-N file transfer.Also Support IMS to Legacy SMS/MMS interworking for all the above
defined features for CPM mode.
Key Responsibilities:
 RMS environment set-up in our Test bed.
 Testing Features, sanity & regression of all product series of RMS.
 Testing of various chat scenario-such as IM-instant messaging 1-1 message, 1-N message, SF-Store Forward
Functionality-1-1 SF, 1-N SF, File Transfer 1-1 , FT 1-N,
 Testing of Legacy Interworking towards SMSC/MMSC.
 Testing of HTTP FT.
 Acquired knowledge of various IMS protocol.
 Regression for New Release/Patch Testing;
 Identifying defect & raising bugs using Bugzilla & tracking them to close the defects.
 Root cause analysis;
RMS |Antispam Feature Testing | MITEL :- Jan'14 – Aug’14
In the Anti-Spam solution, Adaptive Security Platform acts as the Policy Detection Point for Spam prevention
and RMS serving as the RCS IM Application Server acts as the Policy Enforcement Point for Spam prevention.
RMS is expected to be interface to ASP over HTTP/HTTPS protocol via load balancers (primary and secondary)
for deployment
Key Responsibilities:
 RMS environment set-up with ASP node in our Test bed.
 Intergrade RMS with all other nodes CSCF, EAST, HSS.
 Review the FRS, Prepared test plan, shared with concern team for review.
 Compliance Testing for HTTP POST from RMS to ASP Node.
 Feature Testing for antispam check on 1-1 Chat/1-N Chat/1-1 FT/1-N FT/PM/LM
 Acquired knowledge of various IMS protocol.
 Regression for New Release/Patch Testing.
 Identifying defect & raising bugs using Bugzilla & tracking them to close the defects.
 Root cause analysis;
IMS AS TESTING | Feature Testing / Regression testing / Automation testing | Bangalore(R & D Centre):-
Mavenir System | Sep'12 – Dec’13
RCSe system is designed for the IMS Network with layered and open architecture, which incorporates standard
interfaces to communicate between core layers. Like S-CSCF, the application layer device in Mavenir Systems
IMS architecture implements functions such as IM-instant messaging, 1-1 message,1- N message, SF-Store &
Forward Functionality-1-1 SF,1-n SF, File Transfer 1-1 ,FT 1-n,Content Storing ,Camel & Diameter charging.
Key Responsibilities:
 Environment set-up for East Simulation tool to RCSe.
 Testing sanity & regression of all product series of RCSe(RMS).
 Testing of various chat scenario-such as IM-instant messaging 1-1 message,1-n message,SF-Store Forward
Functionality-1-1 SF,1-n SF, File Transfer 1-1 ,FT 1-n,Content Storing ,Camel & Diameter online-offline
charging.
 Support for UDP,TCP,TLS
 Creating Number-7 signaling links, SIGTRAN Links (m3ua), configuring CAMEL configuration for charging.
 Acquired knowledge of various IMS protocol.
 Regression for New Release/Patch Testing;
 Identifying defect & raising bugs using Bugzilla & tracking them to close the defects.
Root cause analysis
NGN testing | Feature Testing / Regression testing / Automation testing | Bangalore(R & D Centre):-ZTE
Telecom India
ZTE Softswitch system is designed for the Next Generation Network with layered and open architecture, which
incorporates standard interfaces to communicate between layers. ZXSS10 SS1b, the core device in ZTE’s Softswitch
architecture implements functions such as call control, media gateway access, routing, protocol processing, accounting,
etc., The system supports integrated media gateways, terminal devices, and can interwork with the legacy PSTN/ISDN,
PLMN and IN.
Key Responsibilities:
 Prepare test cases for various SS7/ISUP scenarios possible with ITU-T document;
 Environment set-up for SIP–SIP, SIP-ISUP interworking with PSTN & MAP interworking with HLR;
 Testing of various Call forwarding scenarios [CFU, NDUB, UDUB, CFNRy, CFNRc];
 Support for SIP-I;
 Creating Number-7 signaling links, Sigtran Links (m3ua), configuring SCCP-GTT towards HLR;
 Acquired knowledge of various NGN protocols;
 Regression for New Release/Patch Testing;
 IOT test for ZXSS10 SS1b with other vendors (MSC, HLR & PSTN);
 Root cause analysis;
NLD/ILD Switch (NGN) | Aircel India Pvt. Ltd. | NOC Team Lead | Kolkata:-ZTE Telecom India
The project is designed for AIRCEL for employing the NGN Technology for Commercial Activities. The project involved from
the starting of Testing, Validation, and installation and commissioning of the equipment. Taken the responsibility for
connectivity with service providers, E1 augmentation, Daily Traffic report analysis, KPI Report analysis, Uptime Report
analysis and solving several types of problems being raised during maintenance from both software and hardware caused
in MSG and Soft-switch.
Key Responsibilities:
 Ensuring that all circles should route the commercial traffic towards our NLD switch;
 E1 augmentation, rearrangement of ckts and carrier growth to avoid congestion and complaint free
Telecom Network;
 Software up-gradation & patch administration for ZTE SS & MGW;
 Establishment of association between MGW-SOFTSWITCH, MGC-SG and MG-SG, SOFTSWITCH-
SOFTSWITCH;
 Use of proper codec for compression of voice so that quality as well as efficient utilization of bandwidth can
be maintained.;
 Routing administration (DAS and Route list creation);
 SIP connectivity with other GSM operator;
 Analysis of ISUP/SIP traces between MGC to MGC calls;
 Customer call complains resolution, analyzing its root cause;
 Monitoring of hardware fault and all POI fault related alarms;
 Daily reports (NLD Traffic report, KPI report, UP time report, TG Report, etc.
 Responsible for Aircel NLD Network fault management;
 Daily Traffic report analysis to ensure all intended traffic is routed towards us.s
SCHOLASTICS
2007: B-Tech [Electronics & Instrumentation] from West Bengal University of Technology | First Class
2002: Higher Secondary from West Bengal Council of Higher Secondary Education | First Class
2000: Secondary from West Bengal Board of Secondary Education | First Class
PROFESSIONAL ACHIEVEMENTS AND AWARDS
 Got Advance Training in China for 3 weeks.
 Awarded as BEST EMPLOYEE for the year 2010-2011 in ZTE.
 Awarded for MONTHLY CONTRIBUTION for the year 2014-2015 in Mavenir.
 Acquired GOOD in Probation Appraisal.
 Learned man power managing and time management in achieving some target within due date.
 Establishing quality of works as per client specifics & achieved customer appreciation.
I hereby declare that the above information are true to the best of my knowledge.
Place: Bangalore
Date: 04.08.15 Sabir Ahmed Khan

More Related Content

What's hot

3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15Samer Sammour
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay Sharma
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]picaraza9
 
Top 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsTop 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsAbdul Muin
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umtsEkwere Udoh
 
RCS Service Monitoring - 1-to-1 Chat
RCS Service Monitoring - 1-to-1 ChatRCS Service Monitoring - 1-to-1 Chat
RCS Service Monitoring - 1-to-1 ChatJose Gonzalez
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Mashaal322
 
Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Ray O'Connell
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra singh jadon
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisationAnto Radde
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance Mehmet Beyaz
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationYogender Singh Rana
 

What's hot (20)

3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Asif
AsifAsif
Asif
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]
 
Top 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsTop 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation Actions
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umts
 
RCS Service Monitoring - 1-to-1 Chat
RCS Service Monitoring - 1-to-1 ChatRCS Service Monitoring - 1-to-1 Chat
RCS Service Monitoring - 1-to-1 Chat
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1
 
GCI Presentation(Asep GCI-0573)
GCI Presentation(Asep GCI-0573)GCI Presentation(Asep GCI-0573)
GCI Presentation(Asep GCI-0573)
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE Optimization
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance
 
Resume shahul rcs
Resume shahul rcsResume shahul rcs
Resume shahul rcs
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 

Similar to Sabir Ahmed Khan_Tech_Lead_Updated

Similar to Sabir Ahmed Khan_Tech_Lead_Updated (20)

Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Resume_Kavita
Resume_KavitaResume_Kavita
Resume_Kavita
 
Abhilash resume
Abhilash resumeAbhilash resume
Abhilash resume
 
Jishan update Resume
Jishan update ResumeJishan update Resume
Jishan update Resume
 
Resume
ResumeResume
Resume
 
Portfolio
PortfolioPortfolio
Portfolio
 
Resume 8 Yrs.Exp. c c++,Telecom
Resume 8 Yrs.Exp. c c++,TelecomResume 8 Yrs.Exp. c c++,Telecom
Resume 8 Yrs.Exp. c c++,Telecom
 
sks
skssks
sks
 
Nagaraju - 10 Yrs
Nagaraju - 10 YrsNagaraju - 10 Yrs
Nagaraju - 10 Yrs
 
Resume_Gajendrasharma
Resume_GajendrasharmaResume_Gajendrasharma
Resume_Gajendrasharma
 
Hitender Sharma Resume
Hitender Sharma ResumeHitender Sharma Resume
Hitender Sharma Resume
 
navin_CV
navin_CVnavin_CV
navin_CV
 
Ramesh S CV
Ramesh S CVRamesh S CV
Ramesh S CV
 
Resume_santosh
Resume_santoshResume_santosh
Resume_santosh
 
Geetika_Prasher_Resume
Geetika_Prasher_ResumeGeetika_Prasher_Resume
Geetika_Prasher_Resume
 
Santhi Vinnakota_Resume
Santhi Vinnakota_ResumeSanthi Vinnakota_Resume
Santhi Vinnakota_Resume
 
ASHISH CV
ASHISH CVASHISH CV
ASHISH CV
 
Partha cv111 latest
Partha cv111 latestPartha cv111 latest
Partha cv111 latest
 
telecom engineer
telecom engineertelecom engineer
telecom engineer
 
Jishan update resume
Jishan update resumeJishan update resume
Jishan update resume
 

Sabir Ahmed Khan_Tech_Lead_Updated

  • 1. SABIR AHMED KHAN Organization : Mitel Designation : Technical Lead Current Location : Bangalore Total Experience :7.7 years Highest Qualification : B-Tech [Electronics & Instrumentation] Date of Birth : 29/08/1984 Phone : 919916894951 Email : ksabir190@yahoo.co.in CAREER OBJECTIVE Accomplishing the success in this arena and to be in a position where efficiency and technical acumen can be best utilized for the enhancement of name and fame of my company. SKILLS • Testing Protocols: SIP, ISUP, SS7, TCAP, SCCP, MSRP,DIAMETER • Technologies: IMS, VOIP, NGN, PSTN, GSM • Platforms : Windows98/XP/2000, Linux • Testing Tools: EAST, SIPp, MGTS • Tools: Wireshirk, Winscp, XShell4, Putty, Bugzilla • Scripting Languages : Perl, Shell PROFESSIONAL ABRIDGEMENT RMS testing | System Testing | Mitel Systems Pvt. Ltd. | August'14 – Till Now :- RMS 9.3 Support CPM based feature delivery of RCS 5.1 features for page mode, large mode, session mode 1- 1/1-N chat and 1-1/1-N file transfer.Also Support IMS to Legacy SMS/MMS interworking for all the above defined features for CPM mode. Key Responsibilities:  RMS environment set-up in our Test bed.  Testing Features, sanity & regression of all product series of RMS.  Testing of various chat scenario-such as IM-instant messaging 1-1 message, 1-N message, SF-Store Forward Functionality-1-1 SF, 1-N SF, File Transfer 1-1 , FT 1-N,  Testing of Legacy Interworking towards SMSC/MMSC.  Testing of HTTP FT.  Acquired knowledge of various IMS protocol.  Regression for New Release/Patch Testing;  Identifying defect & raising bugs using Bugzilla & tracking them to close the defects.  Root cause analysis; RMS |Antispam Feature Testing | MITEL :- Jan'14 – Aug’14 In the Anti-Spam solution, Adaptive Security Platform acts as the Policy Detection Point for Spam prevention and RMS serving as the RCS IM Application Server acts as the Policy Enforcement Point for Spam prevention. RMS is expected to be interface to ASP over HTTP/HTTPS protocol via load balancers (primary and secondary) for deployment
  • 2. Key Responsibilities:  RMS environment set-up with ASP node in our Test bed.  Intergrade RMS with all other nodes CSCF, EAST, HSS.  Review the FRS, Prepared test plan, shared with concern team for review.  Compliance Testing for HTTP POST from RMS to ASP Node.  Feature Testing for antispam check on 1-1 Chat/1-N Chat/1-1 FT/1-N FT/PM/LM  Acquired knowledge of various IMS protocol.  Regression for New Release/Patch Testing.  Identifying defect & raising bugs using Bugzilla & tracking them to close the defects.  Root cause analysis; IMS AS TESTING | Feature Testing / Regression testing / Automation testing | Bangalore(R & D Centre):- Mavenir System | Sep'12 – Dec’13 RCSe system is designed for the IMS Network with layered and open architecture, which incorporates standard interfaces to communicate between core layers. Like S-CSCF, the application layer device in Mavenir Systems IMS architecture implements functions such as IM-instant messaging, 1-1 message,1- N message, SF-Store & Forward Functionality-1-1 SF,1-n SF, File Transfer 1-1 ,FT 1-n,Content Storing ,Camel & Diameter charging. Key Responsibilities:  Environment set-up for East Simulation tool to RCSe.  Testing sanity & regression of all product series of RCSe(RMS).  Testing of various chat scenario-such as IM-instant messaging 1-1 message,1-n message,SF-Store Forward Functionality-1-1 SF,1-n SF, File Transfer 1-1 ,FT 1-n,Content Storing ,Camel & Diameter online-offline charging.  Support for UDP,TCP,TLS  Creating Number-7 signaling links, SIGTRAN Links (m3ua), configuring CAMEL configuration for charging.  Acquired knowledge of various IMS protocol.  Regression for New Release/Patch Testing;  Identifying defect & raising bugs using Bugzilla & tracking them to close the defects. Root cause analysis NGN testing | Feature Testing / Regression testing / Automation testing | Bangalore(R & D Centre):-ZTE Telecom India ZTE Softswitch system is designed for the Next Generation Network with layered and open architecture, which incorporates standard interfaces to communicate between layers. ZXSS10 SS1b, the core device in ZTE’s Softswitch architecture implements functions such as call control, media gateway access, routing, protocol processing, accounting, etc., The system supports integrated media gateways, terminal devices, and can interwork with the legacy PSTN/ISDN, PLMN and IN. Key Responsibilities:  Prepare test cases for various SS7/ISUP scenarios possible with ITU-T document;  Environment set-up for SIP–SIP, SIP-ISUP interworking with PSTN & MAP interworking with HLR;  Testing of various Call forwarding scenarios [CFU, NDUB, UDUB, CFNRy, CFNRc];  Support for SIP-I;  Creating Number-7 signaling links, Sigtran Links (m3ua), configuring SCCP-GTT towards HLR;  Acquired knowledge of various NGN protocols;  Regression for New Release/Patch Testing;  IOT test for ZXSS10 SS1b with other vendors (MSC, HLR & PSTN);
  • 3.  Root cause analysis; NLD/ILD Switch (NGN) | Aircel India Pvt. Ltd. | NOC Team Lead | Kolkata:-ZTE Telecom India The project is designed for AIRCEL for employing the NGN Technology for Commercial Activities. The project involved from the starting of Testing, Validation, and installation and commissioning of the equipment. Taken the responsibility for connectivity with service providers, E1 augmentation, Daily Traffic report analysis, KPI Report analysis, Uptime Report analysis and solving several types of problems being raised during maintenance from both software and hardware caused in MSG and Soft-switch. Key Responsibilities:  Ensuring that all circles should route the commercial traffic towards our NLD switch;  E1 augmentation, rearrangement of ckts and carrier growth to avoid congestion and complaint free Telecom Network;  Software up-gradation & patch administration for ZTE SS & MGW;  Establishment of association between MGW-SOFTSWITCH, MGC-SG and MG-SG, SOFTSWITCH- SOFTSWITCH;  Use of proper codec for compression of voice so that quality as well as efficient utilization of bandwidth can be maintained.;  Routing administration (DAS and Route list creation);  SIP connectivity with other GSM operator;  Analysis of ISUP/SIP traces between MGC to MGC calls;  Customer call complains resolution, analyzing its root cause;  Monitoring of hardware fault and all POI fault related alarms;  Daily reports (NLD Traffic report, KPI report, UP time report, TG Report, etc.  Responsible for Aircel NLD Network fault management;  Daily Traffic report analysis to ensure all intended traffic is routed towards us.s SCHOLASTICS 2007: B-Tech [Electronics & Instrumentation] from West Bengal University of Technology | First Class 2002: Higher Secondary from West Bengal Council of Higher Secondary Education | First Class 2000: Secondary from West Bengal Board of Secondary Education | First Class PROFESSIONAL ACHIEVEMENTS AND AWARDS  Got Advance Training in China for 3 weeks.  Awarded as BEST EMPLOYEE for the year 2010-2011 in ZTE.  Awarded for MONTHLY CONTRIBUTION for the year 2014-2015 in Mavenir.  Acquired GOOD in Probation Appraisal.  Learned man power managing and time management in achieving some target within due date.  Establishing quality of works as per client specifics & achieved customer appreciation. I hereby declare that the above information are true to the best of my knowledge. Place: Bangalore Date: 04.08.15 Sabir Ahmed Khan