A REVOLUTIONARY ADD ON
for assimilating the earned value in all the organization’s projects
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
to produce indices & reports of the
earned VALUE earned SCHEDULE
all in one work environment
built AUTOMATICALLY
ADD-ONs for
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
A DRILL DOWN SYSTEM
SCHENARIO :
 LATE FINISH
 BEHIND SCHEDULE
 EXCEDED OF BUDGET
earned VALUE earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
Loading of all
monthly data (AC),
all projects in the organization
in "ONE click"
earned VALUE earned SCHEDULE
Infographics & tabular
views using a
drop-down table
Drill down
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
 Indicator displays
for all levels
in the organization
earned VALUE earned SCHEDULE
 All projects & views
in ONE workspace
 Metrics displays
for all project
levels
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
Project management in a development environment
of infrastructure and/or construction projects is
becoming more and more complex due to the
intensification of competition, the changes in
business culture & the requirement to meet stricter
standards.
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
A necessary and inseparable part of this is the need
for continuous control of the project and the
disclosure of the budget and schedule indicators
against what was originally planned, which will allow
maximum understanding of the developing
processes in the project.
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
The effective and well-known method among
those involved in the matter
(the project management body PMBOK),
the US Department of Defense and others.
It confirm that control using
the Earned value method
is the most effective
method for performing
reliable control, more than
any other method.
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Principle of the method :
Uploading
partial or percentage
done Project’s Bills,
as an input of the ADD-ON,
using an Excel file (one click)
ENTREPRENEUR
SYSTEM
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Alternatively :
Uploading
monthly expenses according
to budget chapters
from the company's PRF system
in an Excel file (single click)
MAIN
CONTRACTOR
SYSTEM
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
The resulting output :
 Detailed Drill Down report
at research level at all
levels of the project
 Schedule & budget metrics
PDF file - PPT Presentation
A web system
for displaying all
tabular products,
infographics.
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
EASYWAY
BUDGET
CONTROL
v/s
SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Background
At the center of the method is the ability to make a
comparison between the work actually performed
against the original work plan in terms of schedule
and budget based on financial terms, with the aim
of measuring the progress of the project, the
efficiency of the work and the forecast of the cost
and schedule for its completion.
copyright © 2023 MOSHE LEVI all rights reserved
Background
The Monthly Project Indicators are presented in
text (story), dashboards and tables so that they
correspond to the rule of hierarchy in the project.
The result - the ability to control the progress of
the project against the original planning in the
dimensions of the schedule and budget in one
work environment and receive regular forecasts
copyright © 2023 MOSHE LEVI all rights reserved
Methodology
The implementation of the method is based on a
detailed planning of the project plans
Resource allocations and schedule for each activity
in the work plan in the planning phase
(in the body of the schedule)
earned VALUE
earned SCHEDULE
ADD-ONs
copyright © 2023 MOSHE LEVI all rights reserved
or alternatively,
Export to an Excel file and performing the
assignments in the file
And subsequently periodic and
frequent progress Reporting against
the original work plans, including
Regulated change management processes to
Maintain the original plan as a
basis for Comparison
earned VALUE
earned SCHEDULE
Export to
copyright © 2023 MOSHE LEVI all rights reserved
Benefits of the ADD-ON
 Access control to basket type of
project in each budget
 Automatically built-in views for all
projects in one workspace
 Eliminating the need for
individual development of
indicators in the POWER BI system
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Comparison
Interactive display of the indicators and
infographic displays in one work environment for
all projects in the organization.
ADD ON
v/s
CURRENT
STATUS
1
ADD-ONs FULLY Implemented
NOT feasible
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Comparison
Upload of monthly data for all projects with a "single click"
ADD ON
v/s
CURRENT
STATUS
2
ADD-ONs
FULLY Implemented
All the projects in the organization are
entered with ONE click of a button
SINGLE DATA ENTRY PER WORK UNIT (WBS)
Large projects can contain hundreds of
work packages...
NOT feasible
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
APPLIED IN EVALUATION ONLY
A work package contains more than
one work section - pre-calculation is
necessary
Comparison
Accuracy of the performance percentage of
the work in relation to the planned work.
ADD ON
v/s
CURRENT
STATUS
3
ADD-ONs
Performed automatically and
simultaneously on each work item
in the BOQ
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Uploading monthly data for all projects
Accuracy of the performance percentage of
the work in relation to the planned work.
ADD ON
v/s
CURRENT
STATUS
4
ADD-ONs
CANNOT BE DONEIN ONE “SHOT”
It is necessary to open each project
separately to enter the monthly data
separately for each line of data
All data is entered with one click of a
button, all projects in the organization
and all work units.
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
ADD-ONs
The analysis is performed and
prevents inconsistencies in the
data output
Preliminary analysis to identify all the
details in the project whose content
was not included in the basic plan.
NOT feasible
Uploading monthly data for all projects
Accuracy of the performance percentage of
the work in relation to the planned work.
ADD ON
v/s
CURRENT
STATUS
5
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
ADD ON
v/s
CURRENT
STATUS
6
ADD-ONs
Ability to drill down to all hierarchies
in the project (structure-chapter- sub
chapter-milestones-critical path)
NOT feasible
FULLY performed
Selecting the project hierarchy from a
drop-down table
earned VALUE
earned SCHEDULE Comparison
copyright © 2023 MOSHE LEVI all rights reserved
Interchangeable infographic and tabular views
ADD ON
v/s
CURRENT
STATUS
7
ADD-ONs
It is necessary to manually perform a
single view in the Power BI system for
each project component (without Drill
Down)
NOT feasible
Everything is performed on a
single screen with optional
alternating views
Comparison
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Infographic views and
the ability to drill down to
each view
ADD ON
v/s
CURRENT
STATUS
8
Comparison
ADD-ONs FULLY Implemented
NOT applicable
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
A panoramic view of all the projects in the
organization (including the possibility
of moving from project to project
in one work environment)
Infographics & tabular displays
ADD ON
v/s
CURRENT
STATUS
9
Comparison
ADD-ONs
NOT applicable
Everything is performed on a single
screen with optional alternating views
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Consolidation of all projects for the
purpose of financial estimates
Financial Manager Views
ADD ON
v/s
CURRENT
STATUS
10
ADD-ONs FULLY Implemented
NOT applicable
Comparison
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Accurate calculation of ES (Earned Schedule) value
ADD-ONs
The current method is not accurate for
advanced stages of the project
NOT feasible
Accurate calculation for each activity
using proven formulas including
verification in dedicated models.
Comparison
ADD ON
v/s
CURRENT
STATUS
11
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Schedule Tracking & Control
ADD ON
v/s
CURRENT
STATUS
12
ADD-ONs
The current method is not
accurate for advanced stages
of the project
Performed using a proven scientific
method in light of the problems
discovered with the old method.
Comparison
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Availability of the Earned Value, Earned Schedule
For any type and scope of project.
ADD ON
v/s
CURRENT
STATUS
13
Comparison
ADD-ONs
Only 599$ for a comprehensive
monthly report at all levels
(Outsourcing)
LIMITED AVAILABILITY
Application only by expert engineers
at a high cost - not every project has a
budget to work with this method.
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Unlimited distribution accessibility through a website.
ADD ON
v/s
CURRENT
STATUS
14
Comparison
The presence of an EVM expert
is mandatory during the
budget and schedule meetings
ADD-ONs
 Assigning a password to the different
users for independent reference
 Independent of all reports by without
any limitations.
earned VALUE
earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
Examples of monthly views
that are applied to each level
in the project
PRIMAVERA MS-PROJECT add-on
earned VALUE earned SCHEDULE
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
A panoramic view of all the projects in the organization according to
the selection of the project component
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
EXAMPLES OF
MONTHLY VIEWS
THAT ARE APPLIED
TO EACH LEVEL
IN THE PROJECT
copyright © 2023 MOSHE LEVI all rights reserved
‫העוסקים‬ ‫על‬
‫בדבר‬
:
‫כצנלסון‬ ‫בני‬
‫רב‬ ‫ניסיון‬ ‫בעל‬ ‫וניהול‬ ‫תעשייה‬ ‫מהנדס‬
‫בתכנון‬
‫פרויקטים‬ ‫פרויקטים‬ ‫של‬ ‫ובקרה‬
:
•
‫פרויקטים‬
‫וביטחוניים‬ ‫צבאיים‬
.
•
‫כבישים‬ ‫תשתיות‬
,
‫רכבות‬
,
‫נמלים‬
,
‫תעופה‬ ‫שדות‬
,
‫מים‬
.
•
‫כוח‬ ‫תחנות‬ ‫הקמת‬
(
‫גז‬
,
‫סולר‬
,
‫השמש‬ ‫אנרגיית‬
)
‫שדרוג‬
‫מפעלי‬ ‫של‬ ‫ובנייה‬
‫תעשיה‬
‫נוספים‬ ‫לפרטים‬
052-2737772
‫משה‬ ‫לוי‬
‫בכיר‬ ‫פרויקטים‬ ‫אנליסט‬
,
‫מוסמך‬ ‫בניה‬ ‫הנדסאי‬
,
‫התמחות‬ ‫תחום‬
-
‫פרויקטים‬ ‫כלכלת‬
,
‫וביצוע‬ ‫תכן‬ ‫בקר‬
‫מוסמך‬
.(RICS)
•
‫פרויקטים‬
‫וביטחוניים‬ ‫צבאיים‬
.
•
‫כבישים‬ ‫תשתיות‬
,
‫רכבות‬
,
‫נמלים‬
,
‫תעופה‬ ‫שדות‬
,
‫מים‬
.
•
‫כוח‬ ‫תחנות‬ ‫הקמת‬
(
‫גז‬
,
‫סולר‬
,
‫השמש‬ ‫אנרגיית‬
)
‫שדרוג‬
‫מפעלי‬ ‫של‬ ‫ובנייה‬
‫תעשיה‬
‫לפרטים‬
‫נוספים‬
053-9691075 | mosplast@walla.co.il
‫תודה‬
copyright © 2023 MOSHE LEVI all rights reserved
‫העוסקים‬ ‫על‬
‫בדבר‬
:
‫כצנלסון‬ ‫בני‬
‫רב‬ ‫ניסיון‬ ‫בעל‬ ‫וניהול‬ ‫תעשייה‬ ‫מהנדס‬
‫בתכנון‬
‫פרויקטים‬ ‫פרויקטים‬ ‫של‬ ‫ובקרה‬
:
•
‫פרויקטים‬
‫וביטחוניים‬ ‫צבאיים‬
.
•
‫כבישים‬ ‫תשתיות‬
,
‫רכבות‬
,
‫נמלים‬
,
‫תעופה‬ ‫שדות‬
,
‫מים‬
.
•
‫כוח‬ ‫תחנות‬ ‫הקמת‬
(
‫גז‬
,
‫סולר‬
,
‫השמש‬ ‫אנרגיית‬
)
‫שדרוג‬
‫מפעלי‬ ‫של‬ ‫ובנייה‬
‫תעשיה‬
‫נוספים‬ ‫לפרטים‬
052-2737772
‫תודה‬
copyright © 2023 MOSHE LEVI all rights reserved
‫העוסקים‬ ‫על‬
‫בדבר‬
:
‫תודה‬
‫משה‬ ‫לוי‬
‫בכיר‬ ‫פרויקטים‬ ‫אנליסט‬
,
‫מוסמך‬ ‫בניה‬ ‫הנדסאי‬
,
‫התמחות‬ ‫תחום‬
-
‫פרויקטים‬ ‫כלכלת‬
,
‫וביצוע‬ ‫תכן‬ ‫בקר‬
‫מוסמך‬
.(RICS)
‫לפרטים‬
‫נוספים‬
053-9691075 | mosplast@walla.co.il

More Related Content

Similar to Primavera - MS Project Add-on.pptx

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
ecosys-brochure-digital
ecosys-brochure-digitalecosys-brochure-digital
ecosys-brochure-digitalZoe MacDonald
 
Project management
Project managementProject management
Project managementervinod
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdfAmrishTyagi8
 
PlaceTech Trend Talk London - eviFile
PlaceTech Trend Talk London - eviFilePlaceTech Trend Talk London - eviFile
PlaceTech Trend Talk London - eviFilePlaceTech
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleGlen Alleman
 
Chapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and EvaluChapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and EvaluJinElias52
 
Data flow between p6 and cm white paper
Data flow between p6 and cm white paperData flow between p6 and cm white paper
Data flow between p6 and cm white paperp6academy
 
Project Share Feature List - MS Project Services
Project Share Feature List - MS Project ServicesProject Share Feature List - MS Project Services
Project Share Feature List - MS Project Servicesmahyars
 
PS Module Overview
PS Module OverviewPS Module Overview
PS Module Overviewitplant
 
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6IRJET Journal
 
SMB260: Service Manager: Portfolio and Project Management (PPM)
SMB260: Service Manager: Portfolio and Project Management (PPM)SMB260: Service Manager: Portfolio and Project Management (PPM)
SMB260: Service Manager: Portfolio and Project Management (PPM)Ivanti
 
Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Glen Alleman
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysGlen Alleman
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogsVenu Vemula
 
Filemaker Project Tool_by TPerrelli
Filemaker Project Tool_by TPerrelliFilemaker Project Tool_by TPerrelli
Filemaker Project Tool_by TPerrelliThomas Perrelli
 
The PMO's Modern Workplace - Benefits of Moving to Project Online
The PMO's Modern Workplace - Benefits of Moving to Project Online The PMO's Modern Workplace - Benefits of Moving to Project Online
The PMO's Modern Workplace - Benefits of Moving to Project Online Mike Otranto
 
Microsoft Project and Portfolio Management
Microsoft Project and Portfolio ManagementMicrosoft Project and Portfolio Management
Microsoft Project and Portfolio ManagementDavid J Rosenthal
 

Similar to Primavera - MS Project Add-on.pptx (20)

Automated budget management system
Automated budget management systemAutomated budget management system
Automated budget management system
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
ecosys-brochure-digital
ecosys-brochure-digitalecosys-brochure-digital
ecosys-brochure-digital
 
Project management
Project managementProject management
Project management
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdf
 
PlaceTech Trend Talk London - eviFile
PlaceTech Trend Talk London - eviFilePlaceTech Trend Talk London - eviFile
PlaceTech Trend Talk London - eviFile
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master schedule
 
Chapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and EvaluChapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and Evalu
 
Data flow between p6 and cm white paper
Data flow between p6 and cm white paperData flow between p6 and cm white paper
Data flow between p6 and cm white paper
 
Project Share Feature List - MS Project Services
Project Share Feature List - MS Project ServicesProject Share Feature List - MS Project Services
Project Share Feature List - MS Project Services
 
Project cost control
Project cost controlProject cost control
Project cost control
 
PS Module Overview
PS Module OverviewPS Module Overview
PS Module Overview
 
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6
 
SMB260: Service Manager: Portfolio and Project Management (PPM)
SMB260: Service Manager: Portfolio and Project Management (PPM)SMB260: Service Manager: Portfolio and Project Management (PPM)
SMB260: Service Manager: Portfolio and Project Management (PPM)
 
Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogs
 
Filemaker Project Tool_by TPerrelli
Filemaker Project Tool_by TPerrelliFilemaker Project Tool_by TPerrelli
Filemaker Project Tool_by TPerrelli
 
The PMO's Modern Workplace - Benefits of Moving to Project Online
The PMO's Modern Workplace - Benefits of Moving to Project Online The PMO's Modern Workplace - Benefits of Moving to Project Online
The PMO's Modern Workplace - Benefits of Moving to Project Online
 
Microsoft Project and Portfolio Management
Microsoft Project and Portfolio ManagementMicrosoft Project and Portfolio Management
Microsoft Project and Portfolio Management
 

Recently uploaded

VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 

Recently uploaded (20)

VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 

Primavera - MS Project Add-on.pptx

  • 1. A REVOLUTIONARY ADD ON for assimilating the earned value in all the organization’s projects
  • 2. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on to produce indices & reports of the earned VALUE earned SCHEDULE all in one work environment built AUTOMATICALLY ADD-ONs for EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 3. copyright © 2023 MOSHE LEVI all rights reserved A DRILL DOWN SYSTEM SCHENARIO :  LATE FINISH  BEHIND SCHEDULE  EXCEDED OF BUDGET earned VALUE earned SCHEDULE
  • 4. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on Loading of all monthly data (AC), all projects in the organization in "ONE click" earned VALUE earned SCHEDULE Infographics & tabular views using a drop-down table Drill down EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 5. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on  Indicator displays for all levels in the organization earned VALUE earned SCHEDULE  All projects & views in ONE workspace  Metrics displays for all project levels EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 6. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE Project management in a development environment of infrastructure and/or construction projects is becoming more and more complex due to the intensification of competition, the changes in business culture & the requirement to meet stricter standards. EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 7. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE A necessary and inseparable part of this is the need for continuous control of the project and the disclosure of the budget and schedule indicators against what was originally planned, which will allow maximum understanding of the developing processes in the project. EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 8. copyright © 2023 MOSHE LEVI all rights reserved PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE The effective and well-known method among those involved in the matter (the project management body PMBOK), the US Department of Defense and others. It confirm that control using the Earned value method is the most effective method for performing reliable control, more than any other method. EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 9. copyright © 2023 MOSHE LEVI all rights reserved Principle of the method : Uploading partial or percentage done Project’s Bills, as an input of the ADD-ON, using an Excel file (one click) ENTREPRENEUR SYSTEM PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 10. copyright © 2023 MOSHE LEVI all rights reserved Alternatively : Uploading monthly expenses according to budget chapters from the company's PRF system in an Excel file (single click) MAIN CONTRACTOR SYSTEM PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 11. copyright © 2023 MOSHE LEVI all rights reserved The resulting output :  Detailed Drill Down report at research level at all levels of the project  Schedule & budget metrics PDF file - PPT Presentation A web system for displaying all tabular products, infographics. PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE EASYWAY BUDGET CONTROL v/s SCHEDULE
  • 12. copyright © 2023 MOSHE LEVI all rights reserved Background At the center of the method is the ability to make a comparison between the work actually performed against the original work plan in terms of schedule and budget based on financial terms, with the aim of measuring the progress of the project, the efficiency of the work and the forecast of the cost and schedule for its completion.
  • 13. copyright © 2023 MOSHE LEVI all rights reserved Background The Monthly Project Indicators are presented in text (story), dashboards and tables so that they correspond to the rule of hierarchy in the project. The result - the ability to control the progress of the project against the original planning in the dimensions of the schedule and budget in one work environment and receive regular forecasts
  • 14. copyright © 2023 MOSHE LEVI all rights reserved Methodology The implementation of the method is based on a detailed planning of the project plans Resource allocations and schedule for each activity in the work plan in the planning phase (in the body of the schedule) earned VALUE earned SCHEDULE ADD-ONs
  • 15. copyright © 2023 MOSHE LEVI all rights reserved or alternatively, Export to an Excel file and performing the assignments in the file And subsequently periodic and frequent progress Reporting against the original work plans, including Regulated change management processes to Maintain the original plan as a basis for Comparison earned VALUE earned SCHEDULE Export to
  • 16. copyright © 2023 MOSHE LEVI all rights reserved Benefits of the ADD-ON  Access control to basket type of project in each budget  Automatically built-in views for all projects in one workspace  Eliminating the need for individual development of indicators in the POWER BI system earned VALUE earned SCHEDULE
  • 17. copyright © 2023 MOSHE LEVI all rights reserved Comparison Interactive display of the indicators and infographic displays in one work environment for all projects in the organization. ADD ON v/s CURRENT STATUS 1 ADD-ONs FULLY Implemented NOT feasible earned VALUE earned SCHEDULE
  • 18. copyright © 2023 MOSHE LEVI all rights reserved Comparison Upload of monthly data for all projects with a "single click" ADD ON v/s CURRENT STATUS 2 ADD-ONs FULLY Implemented All the projects in the organization are entered with ONE click of a button SINGLE DATA ENTRY PER WORK UNIT (WBS) Large projects can contain hundreds of work packages... NOT feasible earned VALUE earned SCHEDULE
  • 19. copyright © 2023 MOSHE LEVI all rights reserved APPLIED IN EVALUATION ONLY A work package contains more than one work section - pre-calculation is necessary Comparison Accuracy of the performance percentage of the work in relation to the planned work. ADD ON v/s CURRENT STATUS 3 ADD-ONs Performed automatically and simultaneously on each work item in the BOQ earned VALUE earned SCHEDULE
  • 20. copyright © 2023 MOSHE LEVI all rights reserved Uploading monthly data for all projects Accuracy of the performance percentage of the work in relation to the planned work. ADD ON v/s CURRENT STATUS 4 ADD-ONs CANNOT BE DONEIN ONE “SHOT” It is necessary to open each project separately to enter the monthly data separately for each line of data All data is entered with one click of a button, all projects in the organization and all work units. earned VALUE earned SCHEDULE
  • 21. copyright © 2023 MOSHE LEVI all rights reserved ADD-ONs The analysis is performed and prevents inconsistencies in the data output Preliminary analysis to identify all the details in the project whose content was not included in the basic plan. NOT feasible Uploading monthly data for all projects Accuracy of the performance percentage of the work in relation to the planned work. ADD ON v/s CURRENT STATUS 5 earned VALUE earned SCHEDULE
  • 22. copyright © 2023 MOSHE LEVI all rights reserved ADD ON v/s CURRENT STATUS 6 ADD-ONs Ability to drill down to all hierarchies in the project (structure-chapter- sub chapter-milestones-critical path) NOT feasible FULLY performed Selecting the project hierarchy from a drop-down table earned VALUE earned SCHEDULE Comparison
  • 23. copyright © 2023 MOSHE LEVI all rights reserved Interchangeable infographic and tabular views ADD ON v/s CURRENT STATUS 7 ADD-ONs It is necessary to manually perform a single view in the Power BI system for each project component (without Drill Down) NOT feasible Everything is performed on a single screen with optional alternating views Comparison earned VALUE earned SCHEDULE
  • 24. copyright © 2023 MOSHE LEVI all rights reserved Infographic views and the ability to drill down to each view ADD ON v/s CURRENT STATUS 8 Comparison ADD-ONs FULLY Implemented NOT applicable earned VALUE earned SCHEDULE
  • 25. copyright © 2023 MOSHE LEVI all rights reserved A panoramic view of all the projects in the organization (including the possibility of moving from project to project in one work environment) Infographics & tabular displays ADD ON v/s CURRENT STATUS 9 Comparison ADD-ONs NOT applicable Everything is performed on a single screen with optional alternating views earned VALUE earned SCHEDULE
  • 26. copyright © 2023 MOSHE LEVI all rights reserved Consolidation of all projects for the purpose of financial estimates Financial Manager Views ADD ON v/s CURRENT STATUS 10 ADD-ONs FULLY Implemented NOT applicable Comparison earned VALUE earned SCHEDULE
  • 27. copyright © 2023 MOSHE LEVI all rights reserved Accurate calculation of ES (Earned Schedule) value ADD-ONs The current method is not accurate for advanced stages of the project NOT feasible Accurate calculation for each activity using proven formulas including verification in dedicated models. Comparison ADD ON v/s CURRENT STATUS 11 earned VALUE earned SCHEDULE
  • 28. copyright © 2023 MOSHE LEVI all rights reserved Schedule Tracking & Control ADD ON v/s CURRENT STATUS 12 ADD-ONs The current method is not accurate for advanced stages of the project Performed using a proven scientific method in light of the problems discovered with the old method. Comparison earned VALUE earned SCHEDULE
  • 29. copyright © 2023 MOSHE LEVI all rights reserved Availability of the Earned Value, Earned Schedule For any type and scope of project. ADD ON v/s CURRENT STATUS 13 Comparison ADD-ONs Only 599$ for a comprehensive monthly report at all levels (Outsourcing) LIMITED AVAILABILITY Application only by expert engineers at a high cost - not every project has a budget to work with this method. earned VALUE earned SCHEDULE
  • 30. copyright © 2023 MOSHE LEVI all rights reserved Unlimited distribution accessibility through a website. ADD ON v/s CURRENT STATUS 14 Comparison The presence of an EVM expert is mandatory during the budget and schedule meetings ADD-ONs  Assigning a password to the different users for independent reference  Independent of all reports by without any limitations. earned VALUE earned SCHEDULE
  • 31. copyright © 2023 MOSHE LEVI all rights reserved Examples of monthly views that are applied to each level in the project PRIMAVERA MS-PROJECT add-on earned VALUE earned SCHEDULE
  • 32. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 33. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 34. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 35. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 36. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 37. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 38. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 39. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 40. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 41. copyright © 2023 MOSHE LEVI all rights reserved A panoramic view of all the projects in the organization according to the selection of the project component EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 42. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 43. copyright © 2023 MOSHE LEVI all rights reserved EXAMPLES OF MONTHLY VIEWS THAT ARE APPLIED TO EACH LEVEL IN THE PROJECT
  • 44. copyright © 2023 MOSHE LEVI all rights reserved ‫העוסקים‬ ‫על‬ ‫בדבר‬ : ‫כצנלסון‬ ‫בני‬ ‫רב‬ ‫ניסיון‬ ‫בעל‬ ‫וניהול‬ ‫תעשייה‬ ‫מהנדס‬ ‫בתכנון‬ ‫פרויקטים‬ ‫פרויקטים‬ ‫של‬ ‫ובקרה‬ : • ‫פרויקטים‬ ‫וביטחוניים‬ ‫צבאיים‬ . • ‫כבישים‬ ‫תשתיות‬ , ‫רכבות‬ , ‫נמלים‬ , ‫תעופה‬ ‫שדות‬ , ‫מים‬ . • ‫כוח‬ ‫תחנות‬ ‫הקמת‬ ( ‫גז‬ , ‫סולר‬ , ‫השמש‬ ‫אנרגיית‬ ) ‫שדרוג‬ ‫מפעלי‬ ‫של‬ ‫ובנייה‬ ‫תעשיה‬ ‫נוספים‬ ‫לפרטים‬ 052-2737772 ‫משה‬ ‫לוי‬ ‫בכיר‬ ‫פרויקטים‬ ‫אנליסט‬ , ‫מוסמך‬ ‫בניה‬ ‫הנדסאי‬ , ‫התמחות‬ ‫תחום‬ - ‫פרויקטים‬ ‫כלכלת‬ , ‫וביצוע‬ ‫תכן‬ ‫בקר‬ ‫מוסמך‬ .(RICS) • ‫פרויקטים‬ ‫וביטחוניים‬ ‫צבאיים‬ . • ‫כבישים‬ ‫תשתיות‬ , ‫רכבות‬ , ‫נמלים‬ , ‫תעופה‬ ‫שדות‬ , ‫מים‬ . • ‫כוח‬ ‫תחנות‬ ‫הקמת‬ ( ‫גז‬ , ‫סולר‬ , ‫השמש‬ ‫אנרגיית‬ ) ‫שדרוג‬ ‫מפעלי‬ ‫של‬ ‫ובנייה‬ ‫תעשיה‬ ‫לפרטים‬ ‫נוספים‬ 053-9691075 | mosplast@walla.co.il ‫תודה‬
  • 45. copyright © 2023 MOSHE LEVI all rights reserved ‫העוסקים‬ ‫על‬ ‫בדבר‬ : ‫כצנלסון‬ ‫בני‬ ‫רב‬ ‫ניסיון‬ ‫בעל‬ ‫וניהול‬ ‫תעשייה‬ ‫מהנדס‬ ‫בתכנון‬ ‫פרויקטים‬ ‫פרויקטים‬ ‫של‬ ‫ובקרה‬ : • ‫פרויקטים‬ ‫וביטחוניים‬ ‫צבאיים‬ . • ‫כבישים‬ ‫תשתיות‬ , ‫רכבות‬ , ‫נמלים‬ , ‫תעופה‬ ‫שדות‬ , ‫מים‬ . • ‫כוח‬ ‫תחנות‬ ‫הקמת‬ ( ‫גז‬ , ‫סולר‬ , ‫השמש‬ ‫אנרגיית‬ ) ‫שדרוג‬ ‫מפעלי‬ ‫של‬ ‫ובנייה‬ ‫תעשיה‬ ‫נוספים‬ ‫לפרטים‬ 052-2737772 ‫תודה‬
  • 46. copyright © 2023 MOSHE LEVI all rights reserved ‫העוסקים‬ ‫על‬ ‫בדבר‬ : ‫תודה‬ ‫משה‬ ‫לוי‬ ‫בכיר‬ ‫פרויקטים‬ ‫אנליסט‬ , ‫מוסמך‬ ‫בניה‬ ‫הנדסאי‬ , ‫התמחות‬ ‫תחום‬ - ‫פרויקטים‬ ‫כלכלת‬ , ‫וביצוע‬ ‫תכן‬ ‫בקר‬ ‫מוסמך‬ .(RICS) ‫לפרטים‬ ‫נוספים‬ 053-9691075 | mosplast@walla.co.il