Ronald Mongillo Project List Electrical Substation Experience
1. Project List Ronald Mongillo
Job Name City/State Employer (Name of
company you worked for
during this project)
Role (i.e. Superintendent,
Rough Foreman, Electrician,
etc.)
G
e
n
e
r
a
l
Duration
(in months)
Constructio
n Type (i.e.
Tunnel,
Frame, Block)
Product Use
1 Allings Crossing Sub West Haven United Illuminating Project Manager 18 Block 115 KV Bulk Substation
2 Goffe Street Sub New Haven United Illuminating Construction Supervisor 18 Block 115 KV Bulk Substation
3 115 KV Capacitors Multiple United Illuminating Project Manager 6 Steel Capacitor Banks
4 115 KV Reactor Banks Multiple United Illuminating Project Manager 6 Steel 115 KV Current Limiting
5 Mix/Glenn Re-conductor Hamden United Illuminating Project Manager 2 Aluminum 115 KV Transmission
6 5 KV Sub Demolition Multiple United Illuminating Project Manager 12 Block Demo of old Substations
7 115 KV Sub Demo New Haven United Illuminating Project Manager 6 Steel Scrap transformers and Steel
8 Substation Security Multiple United Illuminating Project Manager 12 Secure all access to Substations
9 DC Power Supplies Multiple United Illuminating Project Manager 12 Battery Upgrade/replacements
10 Mix Ave PDS Installation Hamden United Illuminating Project Manager 12 steel 15 KV PDS Substation
11 15 KV Capacitor Banks Multiple United Illuminating Project Manager 16 Steel 15 KV Capacitor Banks
12 Substation Ground Grids Multiple United Illuminating Project Manager 24 Upgrade Substation Ground Grid
13 NESC Safety Multiple United Illuminating Project Manager 12 Upgrade to NESC standards
14 115 KV line inspections Multiple United Illuminating Project Manager 2 check status of each tower
15 Equipment Standards Multiple United Illuminating Project Engineer 6 Update Equipment Standards
16 345 KV Switch upgrade New Haven United Illuminating Project Manager 6 Upgrade 345 KV Disconnect
17 Remote Breaker Racking Multiple United Illuminating Project Manager 12 Remote Breaker Racking Mech.
18 Lightning Mast Upgrades Multiple United Illuminating Project Manager 18 Calculate Lightning Protection
19 Service Changes Multiple RTM Electric, Inc. Electrician Service Upgrades
20 New House Wiring Multiple RTM Electric, Inc. Electrician Wire new Construction
21 Backup Generators Multiple RTM Electric, Inc. Electrician Install Backup Generators
22 House Rewiring Multiple RTM Electric, Inc. Electrician Demo Knob and Tube
23 Addition Wiring Multiple RTM Electric, Inc. Electrician Wire new Home Additions
24 Diversified Electric Inc. Seymour RTM Electric, Inc. Electrician 18 Wire 120K sq. ft. Factory 3 phase
25 CCVT Installations Seymour RTM Electric, Inc. Electrician 18 Wire 97 Camera Surveillance
26 Fire Alarm Installation Seymour RTM Electric, Inc. Electrician 18 install 120 point Fire Alarm
27 Keypad Door locks Seymour RTM Electric, Inc. Electrician 18 Install Wired door key fob locks
3/27/2016 Page 1