Case Study
213 A Bath Road, Cheltenham
Two-storey infill apartment block comprising three flats
213 A Bath Road, Cheltenham, is a 2-storey infill development, L-shaped on plan, and presented PRO Structures
with several interesting sub-structure and structural design issues. To one side of the building there is an existing
structure with a basement, so our new foundations had to be carefully designed and stepped down in order not to
overstress the neighbouring basement building. On the other side, the neighbouring shop, located in the snug of the
‘L’, also had to have its foundations underpinned for our scheme to be built. Hence we were working in constrained
circumstances, and needed to find innovative solutions while also endeavouring to cause minimum disruption to the
surrounding buildings. This project was completed in autumn 2011.
PRO Structures’ work involved:
 Feasibility report in relation to substructure issues, with site visits
 Structural design
 Structural viability reporting
Client:
P&E Homes Ltd
Location:
Cheltenham
Project value:
£175,000
Scope:
1,450 sq ft, two-storey infill
development, incorporating three
residential apartments.
Services provided:
Feasibility reporting; structural
design; structural scheme
reporting for budget purposes;
liaison with team and contractor.
Architect:
DZ Architecture, Bristol
Contractor:
P&E Homes Ltd

More Related Content

What's hot

i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CVDave Arkell
 
Previous Projects
Previous ProjectsPrevious Projects
Previous Projectsguest1a7281
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre PointMatthew Warr
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008WhitneyWilson
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
CHENXIANG XU_Resume
CHENXIANG XU_ResumeCHENXIANG XU_Resume
CHENXIANG XU_ResumeChenxiang Xu
 
Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17stephen parish
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsPostTensioningInstitute
 
BUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileBUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileSreenivas Butla
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House SlidesCrosstown TO
 
walls construction
walls constructionwalls construction
walls constructionGary Elliott
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14kristinemassey
 
Rob Hearne 8 Projects 2011
Rob Hearne 8  Projects 2011Rob Hearne 8  Projects 2011
Rob Hearne 8 Projects 2011robhearne
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1Stewart Cardon
 

What's hot (20)

i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
Previous Projects
Previous ProjectsPrevious Projects
Previous Projects
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre Point
 
Alanwood work project
Alanwood work projectAlanwood work project
Alanwood work project
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
CHENXIANG XU_Resume
CHENXIANG XU_ResumeCHENXIANG XU_Resume
CHENXIANG XU_Resume
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
 
BUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - ProfileBUTLAS Consulting Engineers - Profile
BUTLAS Consulting Engineers - Profile
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
walls construction
walls constructionwalls construction
walls construction
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14
 
Rob Hearne 8 Projects 2011
Rob Hearne 8  Projects 2011Rob Hearne 8  Projects 2011
Rob Hearne 8 Projects 2011
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 

Similar to 213A Bath Rd Cheltenham project sheet_July 15

Brade Drive project sheet_July15
Brade Drive project sheet_July15Brade Drive project sheet_July15
Brade Drive project sheet_July15Ron O'Connor
 
Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Ron O'Connor
 
1 Malmesbury Close_Mar13
1 Malmesbury Close_Mar131 Malmesbury Close_Mar13
1 Malmesbury Close_Mar13Ron O'Connor
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_AyaAya Irin
 
Newsletter oct dec 2013
Newsletter oct   dec 2013Newsletter oct   dec 2013
Newsletter oct dec 2013Lauren Poston
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
BUX-Building - Ioan Preda
BUX-Building - Ioan PredaBUX-Building - Ioan Preda
BUX-Building - Ioan PredaIoan Preda
 
Hawkins Brown, London
Hawkins Brown, LondonHawkins Brown, London
Hawkins Brown, Londonclive yorath
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 

Similar to 213A Bath Rd Cheltenham project sheet_July 15 (20)

Brade Drive project sheet_July15
Brade Drive project sheet_July15Brade Drive project sheet_July15
Brade Drive project sheet_July15
 
Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13
 
1 Malmesbury Close_Mar13
1 Malmesbury Close_Mar131 Malmesbury Close_Mar13
1 Malmesbury Close_Mar13
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya
 
PROJECT EXPERIENCE 2016
PROJECT EXPERIENCE 2016PROJECT EXPERIENCE 2016
PROJECT EXPERIENCE 2016
 
Newsletter oct dec 2013
Newsletter oct   dec 2013Newsletter oct   dec 2013
Newsletter oct dec 2013
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
CV OG Jan 2016
CV OG Jan 2016CV OG Jan 2016
CV OG Jan 2016
 
Appendices
AppendicesAppendices
Appendices
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
Practice Profile
Practice ProfilePractice Profile
Practice Profile
 
BUX-Building - Ioan Preda
BUX-Building - Ioan PredaBUX-Building - Ioan Preda
BUX-Building - Ioan Preda
 
Hawkins Brown, London
Hawkins Brown, LondonHawkins Brown, London
Hawkins Brown, London
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
CV LM de Clercq 2017
CV  LM de Clercq 2017CV  LM de Clercq 2017
CV LM de Clercq 2017
 
Adrian Johnson CV
Adrian Johnson CVAdrian Johnson CV
Adrian Johnson CV
 
newestcv
newestcvnewestcv
newestcv
 

213A Bath Rd Cheltenham project sheet_July 15

  • 1. PRO Structures Ltd, 1 Harbury Road, Henleaze, Bristol BS9 4PN Tel: 0117 923 8777 / Fax: 0117 372 1863. Email: info@prostructures.co.uk Case Study 213 A Bath Road, Cheltenham Two-storey infill apartment block comprising three flats 213 A Bath Road, Cheltenham, is a 2-storey infill development, L-shaped on plan, and presented PRO Structures with several interesting sub-structure and structural design issues. To one side of the building there is an existing structure with a basement, so our new foundations had to be carefully designed and stepped down in order not to overstress the neighbouring basement building. On the other side, the neighbouring shop, located in the snug of the ‘L’, also had to have its foundations underpinned for our scheme to be built. Hence we were working in constrained circumstances, and needed to find innovative solutions while also endeavouring to cause minimum disruption to the surrounding buildings. This project was completed in autumn 2011. PRO Structures’ work involved:  Feasibility report in relation to substructure issues, with site visits  Structural design  Structural viability reporting Client: P&E Homes Ltd Location: Cheltenham Project value: £175,000 Scope: 1,450 sq ft, two-storey infill development, incorporating three residential apartments. Services provided: Feasibility reporting; structural design; structural scheme reporting for budget purposes; liaison with team and contractor. Architect: DZ Architecture, Bristol Contractor: P&E Homes Ltd