Gassco-operated systems at 2014
PIPELINE	 FROM	 TO	 LENGTH	 DIAMETER	 CAPACITY
	 	 	 	 	 	 (Mscm/d)
	 Haltenpipe	 Heidrun  	 Tjeldbergodden 	 250 km	 16”	 7.0 mill
	 Norne Gas Transport (NGTS)	 Norne  	 Heidrun 	 128 km 	 16” 	 7.0 mill
	 Åsgard Transport	 Åsgard 	 Kårstø  	 707 km	 42”	 70.4 mill
	 Kvitebjørn Pipeline	 Kvitebjørn 	 Kollsnes  	 147 km	 30”	 26.5 mill
	 Statpipe rich gas	 Statfjord 	 Kårstø    	 308 km	 30”	 25.6 mill	
	 Statpipe 	 Kårstø 	 Draupner S	 228 km	 28”	 21.1 mill
	 Statpipe 	 Draupner S 	 Ekofisk Y	 203 km	 36”  	 44.4 mill
	 Statpipe	 Heimdal 	 Draupner S	 155 km	 36”  	 30.7 mill
	 Zeepipe	 Sleipner 	 Zeebrugge 	 813 km	 40”  	 42,2 mill
	 Zeepipe	 Sleipner 	 Draupner S	 38 km 	 30”  	 55.0 mill
	 Zeepipe IIA	 Kollsnes 	 Sleipner 	 299 km	 40”  	 77.0 mill
	 Zeepipe IIB	 Kollsnes 	 Draupner E	 301 km 	 40”  	 75.0 mill
	 Europipe	 Draupner E 	 Dornum/Emden	 620 km	 40” 	 45.7 mill
	 Europipe II	 Kårstø 	 Dornum 	 658 km	 42”  	 71.9 mill
	 Franpipe	 Draupner E 	 Dunkerque 	 840 km 	 42”  	 54.8 mill
	 Norpipe	 Ekofisk 	 Emden 	 440 km	 36”  	 32.4 mill
	 Vesterled    	 Heimdal  	 St Fergus	 360 km	 32”  	 38.9 mill
	 Oseberg Gas Transport (OGT)	 Oseberg 	 Heimdal 	 109 km 	 36”  	 35.0 mill
	 Langeled North (LLN)	 Nyhamna 	 Sleipner	 627 km	 42”  	 74.7 mill
	 Langeled South (LLS)	 Sleipner 	 Easington	 543 km	 44”  	 72.1 mill
	 Tampen Link 	 Statfjord  	 FLAGS	 23 km	 32”  	 25.0 mill
	 Gjøa Gas Pipe	 Gjøa  	 FLAGS 	 131 km	 28”	 17.8 mill
	 Total			 7928 km		
Onshore facilities:
Kårstø gas processing plant, Norway
Kollsnes gas processing plant, Norway
Emden receiving terminal, Germany
Dornum receiving terminal, Germany
Dunkerque receiving terminal, France
Zeebrugge receiving terminal, Belgium
St Fergus receiving terminal, UK
Easington receiving terminal, UK
Riser/compressor platforms:
Draupner S/E
Heimdal Riser
Zones and tarrifs
Gassled is divided into areas, with fixed tariffs for
transport and/or processing within each of these.
Gassled area A: 	 Statpipe rich gas  
Gassled area B: 	 Åsgard Transport rich gas
Gassled area C:	 Kårstø processing plant
Gassled area D:	 Dry gas, including platforms
	 	 and receiving terminals
Gassled area E: 	 Kollsnes processing plant
Gassled area F: 	 Tampen Link Pipeline
Gassled area G: 	 Kvitebjørn Pipeline
Gassled area H: 	 Norne Gas Transport System	
Gassled area I: 	 Gjøa Gas Pipe
designbycolours.no
Gassco operates one of the world’s most extensive and integrated transport systems for natural gas. This includes 7928 kilometres of pipelines as well as platforms,processing plants
and receiving terminals. Gassco works to ensure the best possible utilisation of the  gas transport system. It also coordinates efforts to expand Norwegian gas transport capacity
through the planning and development of new infrastructure.
The integrated gas transport system is owned by the Gassled joint venture. Please scan the QR-code for an interactive version of the map.

More Related Content

What's hot

Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2Haziq1511
 
Car door manufacturing in Real Industries
Car door manufacturing in Real IndustriesCar door manufacturing in Real Industries
Car door manufacturing in Real IndustriesShivam Padmani
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
Plastic moulding
Plastic mouldingPlastic moulding
Plastic mouldingKonal Singh
 
Piston manufacturing process
Piston manufacturing processPiston manufacturing process
Piston manufacturing processKowshigan S V
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Bp oil spill case study
Bp oil spill case studyBp oil spill case study
Bp oil spill case studyRanjeet Singh
 
Green community centre final
Green community centre finalGreen community centre final
Green community centre finalSushant Uniyal
 
Guide to Tort in Construction
Guide to Tort in ConstructionGuide to Tort in Construction
Guide to Tort in ConstructionSarah Fox
 
Thermoforming
ThermoformingThermoforming
ThermoformingFahad jee
 
Analysis of property bubble
Analysis of property bubbleAnalysis of property bubble
Analysis of property bubbleChia Yuen Woo
 

What's hot (20)

Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
 
Car door manufacturing in Real Industries
Car door manufacturing in Real IndustriesCar door manufacturing in Real Industries
Car door manufacturing in Real Industries
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bq floor
Bq floorBq floor
Bq floor
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Plastic moulding
Plastic mouldingPlastic moulding
Plastic moulding
 
Piston manufacturing process
Piston manufacturing processPiston manufacturing process
Piston manufacturing process
 
Non metallic materials
Non metallic materialsNon metallic materials
Non metallic materials
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
U2 p2 moulds & moulding materials
U2 p2 moulds & moulding materialsU2 p2 moulds & moulding materials
U2 p2 moulds & moulding materials
 
Bp oil spill case study
Bp oil spill case studyBp oil spill case study
Bp oil spill case study
 
Compression molding
Compression moldingCompression molding
Compression molding
 
Green community centre final
Green community centre finalGreen community centre final
Green community centre final
 
Guide to Tort in Construction
Guide to Tort in ConstructionGuide to Tort in Construction
Guide to Tort in Construction
 
Bot contracts
Bot contractsBot contracts
Bot contracts
 
HS2 - Engine for growth
HS2 - Engine for growthHS2 - Engine for growth
HS2 - Engine for growth
 
Thermoforming
ThermoformingThermoforming
Thermoforming
 
Seals.pptx
Seals.pptxSeals.pptx
Seals.pptx
 
Piling Mandrels for the Installation of Plastic Sheet Piling
Piling Mandrels for the Installation of Plastic Sheet PilingPiling Mandrels for the Installation of Plastic Sheet Piling
Piling Mandrels for the Installation of Plastic Sheet Piling
 
Analysis of property bubble
Analysis of property bubbleAnalysis of property bubble
Analysis of property bubble
 

Similar to gassco_kart

CNG Carrier Project
CNG Carrier ProjectCNG Carrier Project
CNG Carrier ProjectM H
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutionsAndy Varoshiotis
 
The Gjøa project
The Gjøa projectThe Gjøa project
The Gjøa projectStatoil
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016Skare Sigbjørn
 
Industrial_Gas_Turbines_EN
Industrial_Gas_Turbines_ENIndustrial_Gas_Turbines_EN
Industrial_Gas_Turbines_ENFran Dubois
 
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...Lloyd's Register
 

Similar to gassco_kart (11)

Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
 
CNG Carrier Project
CNG Carrier ProjectCNG Carrier Project
CNG Carrier Project
 
xxx113658 EDK Egtved folderUK
xxx113658 EDK Egtved folderUKxxx113658 EDK Egtved folderUK
xxx113658 EDK Egtved folderUK
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutions
 
fluido
fluidofluido
fluido
 
The Gjøa project
The Gjøa projectThe Gjøa project
The Gjøa project
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
 
Industrial_Gas_Turbines_EN
Industrial_Gas_Turbines_ENIndustrial_Gas_Turbines_EN
Industrial_Gas_Turbines_EN
 
Siemens Industrial Gas Turbines
Siemens Industrial Gas TurbinesSiemens Industrial Gas Turbines
Siemens Industrial Gas Turbines
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...
Eksplosjonshendelser og eksperimenter v/ Professor Dag Bjerketvedt, Høyskolen...
 

gassco_kart

  • 1. Zidane Linnorm Njord Gjøa Skarv TAMPEN LINK LANGELED NORTH LANGELED SOUTH Valemon NORNE GAS TRANSPORT SYSTEM Bringing Norwegian gas to Europe www.gassco.no Gassco-operated systems at 2014 PIPELINE FROM TO LENGTH DIAMETER CAPACITY (Mscm/d) Haltenpipe Heidrun Tjeldbergodden 250 km 16” 7.0 mill Norne Gas Transport (NGTS) Norne Heidrun 128 km 16” 7.0 mill Åsgard Transport Åsgard Kårstø 707 km 42” 70.4 mill Kvitebjørn Pipeline Kvitebjørn Kollsnes 147 km 30” 26.5 mill Statpipe rich gas Statfjord Kårstø 308 km 30” 25.6 mill Statpipe Kårstø Draupner S 228 km 28” 21.1 mill Statpipe Draupner S Ekofisk Y 203 km 36” 44.4 mill Statpipe Heimdal Draupner S 155 km 36” 30.7 mill Zeepipe Sleipner Zeebrugge 813 km 40” 42,2 mill Zeepipe Sleipner Draupner S 38 km 30” 55.0 mill Zeepipe IIA Kollsnes Sleipner 299 km 40” 77.0 mill Zeepipe IIB Kollsnes Draupner E 301 km 40” 75.0 mill Europipe Draupner E Dornum/Emden 620 km 40” 45.7 mill Europipe II Kårstø Dornum 658 km 42” 71.9 mill Franpipe Draupner E Dunkerque 840 km 42” 54.8 mill Norpipe Ekofisk Emden 440 km 36” 32.4 mill Vesterled Heimdal St Fergus 360 km 32” 38.9 mill Oseberg Gas Transport (OGT) Oseberg Heimdal 109 km 36” 35.0 mill Langeled North (LLN) Nyhamna Sleipner 627 km 42” 74.7 mill Langeled South (LLS) Sleipner Easington 543 km 44” 72.1 mill Tampen Link Statfjord FLAGS 23 km 32” 25.0 mill Gjøa Gas Pipe Gjøa FLAGS 131 km 28” 17.8 mill Total 7928 km Onshore facilities: Kårstø gas processing plant, Norway Kollsnes gas processing plant, Norway Emden receiving terminal, Germany Dornum receiving terminal, Germany Dunkerque receiving terminal, France Zeebrugge receiving terminal, Belgium St Fergus receiving terminal, UK Easington receiving terminal, UK Riser/compressor platforms: Draupner S/E Heimdal Riser Zones and tarrifs Gassled is divided into areas, with fixed tariffs for transport and/or processing within each of these. Gassled area A: Statpipe rich gas Gassled area B: Åsgard Transport rich gas Gassled area C: Kårstø processing plant Gassled area D: Dry gas, including platforms and receiving terminals Gassled area E: Kollsnes processing plant Gassled area F: Tampen Link Pipeline Gassled area G: Kvitebjørn Pipeline Gassled area H: Norne Gas Transport System Gassled area I: Gjøa Gas Pipe designbycolours.no Gassco operates one of the world’s most extensive and integrated transport systems for natural gas. This includes 7928 kilometres of pipelines as well as platforms,processing plants and receiving terminals. Gassco works to ensure the best possible utilisation of the gas transport system. It also coordinates efforts to expand Norwegian gas transport capacity through the planning and development of new infrastructure. The integrated gas transport system is owned by the Gassled joint venture. Please scan the QR-code for an interactive version of the map.