2. Q1. WHAT IS A SOFTWARE ?
1. Software is documentation and configuration of data
2. Software is set of programs
3. Software is set of programs, documentation & configuration of data
4. None of the mentioned
3. Q2. WHAT IS DESCRIBED BY MEANS OF DFD?
1. Data flow
2. Data storage
3. Data Structures
4. Data elements
4. Q3. WHAT ARE THE CHARACTERISTICS OF
SOFTWARE?
1. Software is developed or engineered; it is not manufactured in the classical sense.
2. Software doesn’t “ wear out ”.
3. Software can be custom built or custom build.
4. All mentioned above
8. Q7. WHICH IS NOT A STEP OF REQUIREMENT
ENGINEERING?
1. Requirements elicitation
2. Requirements analysis
3. Requirements design
4. Requirements documentation
10. Q9. BUILD AND FIX MODEL HAS?
1. 1 Phases
2. 2 Phases
3. 3 Phases
4. 4 Phases
11. Q10. IN A UNIVERSITY, STUDENTS ARE ASKED TO DEVELOP
SOFTWARE. WHICH MODEL WOULD BE PREFERABLE
1. Waterfall model
2. Spiral model
3. Agile model
4. Code and fix model
12. Q11. THE SPIRAL MODEL IS COMBINATION OF _________
1. Build & FIX Model & Waterfall
2. Linear Model & RAD
3. Waterfall & Prototyping
4. Waterfall Model & RAD
13. Q12. ADVANTAGE OF USING AN INCREMENTAL MODEL.
1. Customers can respond to each increment
2. Easier to test and debug
3. When there is a need to get a product to the market early
4. Both b & c
14. Q13. WHICH OF THE OPTIONS IS CORRECT FOR THE
PROTOTYPING MODEL OF SOFTWARE DEVELOPMENT?
1. For projects with large development teams.
2. When requirements are well defined.
3. When a customer cannot define requirements clearly.
4. both a & b
15. Q14.FIRST LEVEL OF PROTOTYPE IS EVALUATED BY _____ .
1. Developer
2. Tester
3. User
4. System Analyst
16. Q15. SPIRAL MODEL WAS PROPOSED BY ?
1. Barry Boehm
2. Pearson
3. Royce
4. Pressman
17. Q16. THE SPIRAL MODEL HAS TWO DIMENSIONS NAMELY
__ AND __
1. diagonal, perpendicular
2. radial, perpendicular
3. radial, angular
4. diagonal, angular
18. Q17. PROJECTRISKFACTOR IS CONSIDEREDIN WHICH MODEL?
1. Spiral model.
2. Waterfall model.
3. Prototyping model
4. None of the above.
19. 1. Only statement 1 is correct.
2. Statement 1 and statement 2 are correct.
3. Only statement 3 is correct.
4. Statement 1 and statement 3 are correct.
Statement 1: Umbrella activities are independent of any one framework activity and occur
throughout the process.
Statement 2: software quality assurance, software configuration management are umbrella
activity.
Statement 3: software quality assurance, software configuration management are not
umbrella activity.
Q18. Choose the correct option according to given below statement :
21. Q20. EFFECTIVE SOFTWARE PROJECT MANAGEMENT
FOCUSES ON THE FOUR P’S. WHAT ARE THOSE FOUR P’S?
1. People, performance, payment, product
2. People, product, process, project
3. People, product, performance, project
22. Q21. WHICH OF THESE ARE THE 5 GENERIC SOFTWARE
ENGINEERING FRAMEWORK ACTIVITIES?
1. communication, planning, modeling, construction, deployment
2. communication, risk management, measurement, production, reviewing
3. analysis, designing, programming, debugging, maintenance
4. analysis, planning, designing, programming, testing