My Name is Ramy Edrees. I am a construction engineer
working as a construction project manager with a successful
16 years track record in mainly the construction of hospitality
projects. My domain is primarily the hotels and resorts. As
for me, I am a highly motivated, dedicated and responsible
Construction / Project Manager. Extremely technically astute,
adept at project management, project engineering, material
procurement, cost estimations, consultations, contract man-
agement, MOM preparations, Building information modelling
(BIM), supervision and management. Positive and proactive,
experienced in the construction, refurbishing and design of
hospitality projects, residential compounds and high-rise,
commercial projects, finishing works and concrete structures.
Passionate about ensuring exceptional quality control, oper-
ational efficiency and project success.
In this portfolio I am highlighting few of my hospitality projects. I am dividing the projects
into 3 groups: Resorts, Boutique hotels and Hotels.
• Resorts
◊ Banana Island Resort 3
◊ Hilton Beach Resort 5
◊ Millennium golf Resort 7
• Boutique Hotels
◊ Al Jasra Boutique Hotel 9
◊ Al Bidda Boutique Hotel 11
◊ Musheireb Boutique Hotel 13
◊ Souq Waqif Boutique Hotel 15
• Hotels
◊ Rotana Centro Hotel - Sharjah Airport 17
◊ Mozoon Towers 19
2222
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Consultant:
♦ Engineering Consultancy
Group ECG
Contractor:
♦ Urbacon UCC
Operator:
♦ Anantara
Current Stage:
♦ Operational
Role:
Project Manager (Client Side)
Budget:
411,000,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
3333
About the Project:
• Anantara Banana Island Resort is a serene, picturesque offshore island situated approximately 3.5
kilometers from Doha’s new international airport, the closest mainland point, and 11 kilometers
East of Doha city. The project is to constructed following the Maldivian type of resorts
• Plot area: 129,000 m2
• Built Up Area: 67,727 m2
• Ultra luxury 141 rooms, suites, pool
villas and
• 11 over water villas.
• 800 metre beach
• 100-metre-long lagoon pool
• World class Spa
• 9 F&B outlets
• Two lane surf pool
• Fitness centre
• Tennis court
• Private marina for up to 30 boats
• Children’s pool with water slides
• Indoor botanical garden
• Reef conservation centre
• Fully equipped diving centre
• Library and business centre
• 9-hole golf putting course
• Eight pin bowling alley
• Cinema theatre
• Helicopter pad
Hotel Web site:
http://Doha.anantara.com
4444
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Designer:
♦ IDCC
Consultant:
♦ Dar El Handasa
Contractor:
♦ Contraco
♦ Al Ali Engineering
Operator:
♦ Hilton International
Current Stage:
♦ Under Construction
Role:
Project Manager (Client Side)
Budget:
1,100,000,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
5555
About the Project:
• Salwa Resort is a 5* destination resort hotel targeted at local GCC families, regional visitors and
Saudi Arabia, at nearby border crossing as well as International guests. The Hotel’s architectural
style is based on Qatar Architecture with fusion of Tunisian style.
• The resort has 246 hotel keys
• 32 Arabic Villas
• 84 Beach Villas comprising of four types of various mix unit lay-
outs
• 2 Royal Villas
• World class Water Park
• Shopping Mall
• 6 Cinemas
• Spa – Eforea (Hilton)
• Specialty Restaurants
• Sports Centre
• Conference Facilities
• Large Marina Berthing
6666
Stakeholders
Client:
♦ Al Ain Equestrian, Shooting
and Golf club
Consultant:
♦ Architectural Consultants
Group (ACG)
Contractor:
♦ Emirates Belbadi Contracting
Operator:
♦ Millennium Hotels and Resorts
Current Stage:
♦ Under Construction
Role:
Project Manager (Main Contractor Side)
Budget:
82,000,000 USD
Tasks and Responsibilities:
• Carefully monitored daily site works operations, i.e. concreting, excavation,
preparation of shop drawings
• Accurately conducted tendering and procurement duties
• Managed clients, consultants and various government authorities
• Successfully handed projects to clients
• Provided exceptional project management for design-build project of the 5
stars hotel in Al Ain, UAE
• Dedicatedly prioritised and oversaw quality control
• Day to Day supervision and monitoring on site
7777
About the Project:
• A unique resort in the heart of Al Ain city in United Arab Emirates. Only 1 hour driving either from
Abu Dhabi or Dubai. Plans were meticulously shaped to give this architectural marvel an expres-
sion of exquisite opulence within the lushly green carpeted environment of Al Ain Equestrian,
Shooting & Golf Club
• The resort has 220 hotel keys
• 60 semi attached villas
• 1 bedroom , 2 bedroom and 3 bedroom villas
• 2 tennis court
• Unique swimming pool with pool bar
• World Class Spa
• 2 Ultra fine dinning among other 8 F&B out-
lets around the resort
8888
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Consultant:
♦ Lusail consulting
Contractor:
♦ Al Ali Engineering
Operator:
♦ Souq Waqif Boutique Hotels
Current Stage:
♦ Operational
Role:
Project Manager (Client Side)
Budget:
63,000,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
9999
About the Project:
• An extraordinary jewel in the crown of Souq Waqif Boutique Hotels. Its ultra-modern designs are
overflowing with state-of-the-art amenities, whilst trendy fixtures and furnishings exude more than
a subtle hint of Arabesque heritage.
• Truly an iconic 5-star architectural creation.
• Al Jasra’s art-inspired lobby and avant-garde surroundings take
you on a journey beyond merely its destination.
• The beauty of this hotel is the mix of contemporary design with
some traditional Arabic décor touches.
• This retreat presents 20 rooms and 4 suites which have been
styled and furnished with the best furniture.
• The character and soul of the space is directly related to the
character and soul of tradition, heritage and
the things you put into it.
Hotel Web site:
http://www.souqwaqifresort.com
11110000
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Consultant:
♦ MZ and partners
Contractor:
♦ Generic Engineering Technolo-
gies
Operator:
♦ Souq Waqif Boutique Hotels
Current Stage:
♦ Operational
Role:
Project Manager (Client Side)
Budget:
48,000,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
11111111
About the Project:
• An extraordinary jewel in the crown of Souq Waqif Boutique Hotels. Its ultra-modern de-
signs are overflowing with state-of-the-art amenities, whilst trendy fixtures and furnish-
ings exude more than a subtle hint of Arabesque heritage.
• Al Bidda Boutique Hotel is a chic sanctuary that blends comfort hospitality and 5 star lux-
ury hotel facilities with an atmosphere of innovative cultured style
and contemporary flair.
• It is a 5 star hotel in Doha (Qatar) is evidently renowned for its
intensive custom of nature’s wood through its fine intricate interior
design details inspired from true Qatari heritage ranging from ar-
chitectural designs and applied colours flagship.
• As a collection of the Souq Waqif Boutique Hotels, Al Bidda Bou-
tique Hotel offers its guests unlimited access to the luxury hotel
collection’s full range of culinary experiences,
unique corporate experience and leisure facil-
ities extending to an in-house high-end local
boutique fashion experience.
• With a calligraphy multi-coloured glass sky-
line dome embracing a modern twist to its
main hall across all floors and the evident
infrastructural arch theme statement, here is
where "Simple Details Done Charmingly" add
lasting impressions of the ultimate personal-
ized luxury.
• Al Bidda Souq Waqif Boutique Hotel is home to 32 bedrooms. All
are tastefully furnished and many even provide such comforts as
closet, towels, carpeting, television LCD/plasma screen, sofa.
Hotel Web site:
http://www.souqwaqifresort.com
11112222
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Consultant:
♦ Consulting Engineering Group
Contractor:
♦ Al Ali Engineering
Operator:
♦ Souq Waqif Boutique Hotels
Current Stage:
♦ Operational
Role:
Project Manager (Client Side)
Budget:
28,750,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
11113333
About the Project:
• An alluring, quaint haven from the hustle and bustle of the city,
Musheireb’s impressive interior and exterior radiates Arabian tradition
in design, look and feel.
• Immediately adjacent to Al Jasra Boutique Hotel and the Modern Art
Gallery, it is a boutique hotel in every respect, and has been the
focal point of several photo shoots.
• With 9 elegantly-appointed rooms, 5 breathtaking suites and a
superior level of service which often sets our hotels apart from
others, Musheireb is ideal for families and business trips alike
• Extraordinary location in the heart of Souq Waqif, the old market
of Doha.
Hotel Web site:
http://www.souqwaqifresort.com
11114444
Stakeholders
Client:
♦ The Private Engineering Office
of H.H. Amir of Qatar
Consultant:
♦ Engineering Consulting Group
Contractor:
♦ Urbacon
Operator:
♦ Souq Waqif Boutique Hotels
Current Stage:
♦ Operational
Role:
Project Manager (Client Side)
Budget:
25,000,000 USD
Tasks and Responsibilities:
• Effectively oversaw daily coordination with the main contractors and the
consultants
• Conducted in depth follow-ups on design development issues with the de-
signers
• Actively coordinated daily with the top management, operators and gov-
ernmental authorities
• Conducted extensive daily inspections of site activities including excava-
tion, concreting, fit-out and MEP
• Diligently monitored progress versus the plan daily and prepare progress
reports
• Thoroughly reviewed weekly / monthly progress reports, contracts, budg-
ets, and plans
• Executed and ensured high standard quality control, and followed up HSE
plans
• Provided extraordinary coordination skills among all the projects in hand
ranging from design, construction, refurbishing and operational
11115555
About the Project:
• The Souq Waqif Hotel was originally a complex of old traditional build-
ings consisting of retail stores and restaurants. After undergoing modi-
fications and changes, the area was renovated into a hotel site, reflect-
ing Arab infused designs and architecture.
• The Project is located at Souq Wakif Historical area in front of al
Merqab Hotel, The total keys allocated in the Hotel is 16 keys, the
roof top is occupied with an open air restaurant.
• Its interior design and the souq ambiance gives this property a
unique flavor.
• A total of 16 rooms and suites
Hotel Web site:
http://www.souqwaqifresort.com
11116666
Stakeholders
Client:
♦ Sharjah Airport
Consultant:
♦ GHD
Contractor:
♦ Gustav Pegel and Sohn
Operator:
♦ Rotana
Current Stage:
♦ Operational
Role:
Project Manager (Main Contractor Side)
Budget:
50,000,000 USD
Tasks and Responsibilities:
• Provided vital daily supervision of site activities, including concreting, car-
pentry, form-works and finishing works
• Successfully handed over the project to the client representative and su-
pervision consultant
• Participated in effective daily coordinated with the construction manager,
site engineers and subcontractors
• Conducted in depth material inspections, and quality control
• Proactively monitored the progress on site and administration of the cost
plus contract (NEC)
• Efficaciously monitored the work progress and compared Actual percent-
ages Vs Planned percentages
• Developed successfully KPIs and monitored them along the project life
cycle
11117777
About the Project:
• Rotana Centro Sharjah is uniquely located in close proximity to Sharjah Internation-
al Airport, Saif Zone business district and University city.
• The hotel is just 15 minutes away from the city centre. With chic looks and slick de-
livery underlying its service offering, Centro Sharjah is an inspired philosophy and
sets an unparalleled benchmark for the budget conscious busi-
ness traveller.
• Centro Sharjah features 306 rooms and suites which are meticu-
lously designed to maximize space, light and efficiency, providing
our guests with the latest technology and a selection of contem-
porary classic furniture where comfort and aesthetics are the
keys.
• The hotel features an all day dining restaurant serving a wide ar-
ray of international cuisine called c.taste and a
24 hour take away dining concept
called c.deli.
• Three well equipped meeting rooms and Link
( the business center) are designed to appeal
to those, who value effective solutions and
efficient amenities.
• Guests looking to keep fit during their stay can
make the most of the modern gym or rejuve-
nate with a swim in the outdoor temperature
controlled swimming pool, surrounded by lush
gardens.
Hotel Web site:
https://www.rotana.com/centrohotels/
unitedarabemirates/sharjah/centrosharjah
11118888
Role:
Project Manager (Consultant Side)
Budget:
1,000,000,000 USD
Tasks and Responsibilities:
• Provided vital daily supervision of site activities, including concreting, carpentry, form-works and
finishing works
• Successfully executing numerous duties –project manager, supervision consultant representative
• Proficiently overseeing substructure package, supervising progress, structural construction team,
quality control and the design team
• Thoroughly reviewing method statements, shop drawings, material submittals, and pre-qualifications
• Collaborating effectively with the main contractor, client, end users and government authorities on a
daily basis regarding the construction of 4 high-rise Hotels in Qatar
• Attentively managing the design and the Hotel operator input
• Reporting responsibly to the Head of supervision and PMCD
• Meticulously reviewing budget and effectively controlling budget
• Proactively present value engineering proposals and implement them for the stakeholders benefits
Stakeholders
Client:
♦ Qatar General Insurance and
Re insurance Company
Consultant:
♦ MZ and Partners
Contractor:
♦ Orientals Enterprises
Operator:
♦ Marriott
♦ Radisson Blu
♦ Oberoi
Current Stage:
♦ Design and Construction
11119999
About the Project:
• 4 High Rise towers in the heart of West Bay area, Doha,
Qatar
• 2 Towers will hotel apartments
• 2 Towers will 5 5-stars hotels
• Shopping mall & retail area will be hosted at ground lev-
el and level one
• 5 Basements will host the Back of house and parking
• Total number of keys will be 1600
• Highest tower will be 47 floors
• Lowest tower will be 25 floors
• The other 2 towers will be 32 floors and 39 floors
• As of Septamber 2016:
• Substructure construction work is ongoing.
• Interior design is on going
Hotel Web site:
http://www.qgirco.com/mozoon-towers-1/
22220000

More Related Content

Viewers also liked

Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016
Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016
Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016jano231054
 
tops super store brouchure (26 ต.ค - 8 พ.ย )
tops super store brouchure (26 ต.ค - 8 พ.ย )tops super store brouchure (26 ต.ค - 8 พ.ย )
tops super store brouchure (26 ต.ค - 8 พ.ย )topsshoponline
 
2016台灣新景點.pptx
2016台灣新景點.pptx2016台灣新景點.pptx
2016台灣新景點.pptxyong khayeng
 
Health and PE Workshop Introduction
Health and PE Workshop IntroductionHealth and PE Workshop Introduction
Health and PE Workshop IntroductionMark Verbeek
 
WW2 Mood board for Coursework
WW2 Mood board for Coursework WW2 Mood board for Coursework
WW2 Mood board for Coursework izzi_wilkins
 
Portada pedagogia
Portada  pedagogiaPortada  pedagogia
Portada pedagogiaDaysi Valle
 
Partes del gabinete jeyber qdocx
Partes del gabinete jeyber qdocxPartes del gabinete jeyber qdocx
Partes del gabinete jeyber qdocxJeyber Quiguanas
 

Viewers also liked (10)

Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016
Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016
Mbe unidad 4. lectura comprensiva estadistica 13 octubre2016
 
cv khalil FINAL
cv khalil FINALcv khalil FINAL
cv khalil FINAL
 
tops super store brouchure (26 ต.ค - 8 พ.ย )
tops super store brouchure (26 ต.ค - 8 พ.ย )tops super store brouchure (26 ต.ค - 8 พ.ย )
tops super store brouchure (26 ต.ค - 8 พ.ย )
 
2016台灣新景點.pptx
2016台灣新景點.pptx2016台灣新景點.pptx
2016台灣新景點.pptx
 
Health and PE Workshop Introduction
Health and PE Workshop IntroductionHealth and PE Workshop Introduction
Health and PE Workshop Introduction
 
WW2 Mood board for Coursework
WW2 Mood board for Coursework WW2 Mood board for Coursework
WW2 Mood board for Coursework
 
Portada pedagogia
Portada  pedagogiaPortada  pedagogia
Portada pedagogia
 
Glass hookah catalogue from Zhan Wang Industiry & Trading Company
Glass hookah catalogue from Zhan Wang Industiry & Trading CompanyGlass hookah catalogue from Zhan Wang Industiry & Trading Company
Glass hookah catalogue from Zhan Wang Industiry & Trading Company
 
Partes del gabinete jeyber qdocx
Partes del gabinete jeyber qdocxPartes del gabinete jeyber qdocx
Partes del gabinete jeyber qdocx
 
codes and conventions
codes and conventions codes and conventions
codes and conventions
 

Similar to Ramy Edrees - Hospitality Portfolio - 092016.compressed

Luca Tentellini major developments summary
Luca Tentellini major developments summaryLuca Tentellini major developments summary
Luca Tentellini major developments summaryLuca Tentellini
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyMustapha Jubeily
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyMustapha Jubeily
 
Agent Partnership Program at The Coral
Agent Partnership Program at The CoralAgent Partnership Program at The Coral
Agent Partnership Program at The Coralzoltankovacs85
 
Landmark international hotels company profile final
Landmark international hotels company profile finalLandmark international hotels company profile final
Landmark international hotels company profile finalZoulfikar Kobeissi
 
J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015Jesse Pena
 
ZPC Group Presentation - Turn Key 13062016
ZPC Group Presentation - Turn Key 13062016ZPC Group Presentation - Turn Key 13062016
ZPC Group Presentation - Turn Key 13062016Alastair Welsh
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Hotel and lodges company brochure beglinwoods architects
Hotel and lodges company brochure beglinwoods architectsHotel and lodges company brochure beglinwoods architects
Hotel and lodges company brochure beglinwoods architectsSimon Woods
 
Hospitality Projects updated
Hospitality Projects updatedHospitality Projects updated
Hospitality Projects updatedMohammed Teama
 
Luxury Resort Hotel Project in Turkey
Luxury Resort Hotel Project in TurkeyLuxury Resort Hotel Project in Turkey
Luxury Resort Hotel Project in TurkeyMustafa Celepoglu
 
CV Husain al rammah jul. 2019
CV   Husain al rammah jul. 2019CV   Husain al rammah jul. 2019
CV Husain al rammah jul. 2019Husain Al-Rammah
 

Similar to Ramy Edrees - Hospitality Portfolio - 092016.compressed (20)

GLL-CV JAN 2017
GLL-CV JAN 2017GLL-CV JAN 2017
GLL-CV JAN 2017
 
Luca Tentellini major developments summary
Luca Tentellini major developments summaryLuca Tentellini major developments summary
Luca Tentellini major developments summary
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
Khaja Shameem_CV.
Khaja Shameem_CV.Khaja Shameem_CV.
Khaja Shameem_CV.
 
Agent Partnership Program at The Coral
Agent Partnership Program at The CoralAgent Partnership Program at The Coral
Agent Partnership Program at The Coral
 
Hannes strydom cv
Hannes strydom cvHannes strydom cv
Hannes strydom cv
 
HOTEL PROJECT
HOTEL PROJECTHOTEL PROJECT
HOTEL PROJECT
 
Landmark international hotels company profile final
Landmark international hotels company profile finalLandmark international hotels company profile final
Landmark international hotels company profile final
 
Hannes strydom CV
Hannes strydom CVHannes strydom CV
Hannes strydom CV
 
J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015
 
ZPC Group Presentation - Turn Key 13062016
ZPC Group Presentation - Turn Key 13062016ZPC Group Presentation - Turn Key 13062016
ZPC Group Presentation - Turn Key 13062016
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Hotel and lodges company brochure beglinwoods architects
Hotel and lodges company brochure beglinwoods architectsHotel and lodges company brochure beglinwoods architects
Hotel and lodges company brochure beglinwoods architects
 
Hospitality Projects updated
Hospitality Projects updatedHospitality Projects updated
Hospitality Projects updated
 
Luxury Resort Hotel Project in Turkey
Luxury Resort Hotel Project in TurkeyLuxury Resort Hotel Project in Turkey
Luxury Resort Hotel Project in Turkey
 
zk resume
zk resumezk resume
zk resume
 
CV OF MR. PRAKASH
CV OF MR. PRAKASHCV OF MR. PRAKASH
CV OF MR. PRAKASH
 
CV Husain al rammah jul. 2019
CV   Husain al rammah jul. 2019CV   Husain al rammah jul. 2019
CV Husain al rammah jul. 2019
 
CV Husain Al-Rammah
CV Husain Al-Rammah CV Husain Al-Rammah
CV Husain Al-Rammah
 

Ramy Edrees - Hospitality Portfolio - 092016.compressed

  • 1.
  • 2. My Name is Ramy Edrees. I am a construction engineer working as a construction project manager with a successful 16 years track record in mainly the construction of hospitality projects. My domain is primarily the hotels and resorts. As for me, I am a highly motivated, dedicated and responsible Construction / Project Manager. Extremely technically astute, adept at project management, project engineering, material procurement, cost estimations, consultations, contract man- agement, MOM preparations, Building information modelling (BIM), supervision and management. Positive and proactive, experienced in the construction, refurbishing and design of hospitality projects, residential compounds and high-rise, commercial projects, finishing works and concrete structures. Passionate about ensuring exceptional quality control, oper- ational efficiency and project success. In this portfolio I am highlighting few of my hospitality projects. I am dividing the projects into 3 groups: Resorts, Boutique hotels and Hotels. • Resorts ◊ Banana Island Resort 3 ◊ Hilton Beach Resort 5 ◊ Millennium golf Resort 7 • Boutique Hotels ◊ Al Jasra Boutique Hotel 9 ◊ Al Bidda Boutique Hotel 11 ◊ Musheireb Boutique Hotel 13 ◊ Souq Waqif Boutique Hotel 15 • Hotels ◊ Rotana Centro Hotel - Sharjah Airport 17 ◊ Mozoon Towers 19 2222
  • 3. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Consultant: ♦ Engineering Consultancy Group ECG Contractor: ♦ Urbacon UCC Operator: ♦ Anantara Current Stage: ♦ Operational Role: Project Manager (Client Side) Budget: 411,000,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 3333
  • 4. About the Project: • Anantara Banana Island Resort is a serene, picturesque offshore island situated approximately 3.5 kilometers from Doha’s new international airport, the closest mainland point, and 11 kilometers East of Doha city. The project is to constructed following the Maldivian type of resorts • Plot area: 129,000 m2 • Built Up Area: 67,727 m2 • Ultra luxury 141 rooms, suites, pool villas and • 11 over water villas. • 800 metre beach • 100-metre-long lagoon pool • World class Spa • 9 F&B outlets • Two lane surf pool • Fitness centre • Tennis court • Private marina for up to 30 boats • Children’s pool with water slides • Indoor botanical garden • Reef conservation centre • Fully equipped diving centre • Library and business centre • 9-hole golf putting course • Eight pin bowling alley • Cinema theatre • Helicopter pad Hotel Web site: http://Doha.anantara.com 4444
  • 5. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Designer: ♦ IDCC Consultant: ♦ Dar El Handasa Contractor: ♦ Contraco ♦ Al Ali Engineering Operator: ♦ Hilton International Current Stage: ♦ Under Construction Role: Project Manager (Client Side) Budget: 1,100,000,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 5555
  • 6. About the Project: • Salwa Resort is a 5* destination resort hotel targeted at local GCC families, regional visitors and Saudi Arabia, at nearby border crossing as well as International guests. The Hotel’s architectural style is based on Qatar Architecture with fusion of Tunisian style. • The resort has 246 hotel keys • 32 Arabic Villas • 84 Beach Villas comprising of four types of various mix unit lay- outs • 2 Royal Villas • World class Water Park • Shopping Mall • 6 Cinemas • Spa – Eforea (Hilton) • Specialty Restaurants • Sports Centre • Conference Facilities • Large Marina Berthing 6666
  • 7. Stakeholders Client: ♦ Al Ain Equestrian, Shooting and Golf club Consultant: ♦ Architectural Consultants Group (ACG) Contractor: ♦ Emirates Belbadi Contracting Operator: ♦ Millennium Hotels and Resorts Current Stage: ♦ Under Construction Role: Project Manager (Main Contractor Side) Budget: 82,000,000 USD Tasks and Responsibilities: • Carefully monitored daily site works operations, i.e. concreting, excavation, preparation of shop drawings • Accurately conducted tendering and procurement duties • Managed clients, consultants and various government authorities • Successfully handed projects to clients • Provided exceptional project management for design-build project of the 5 stars hotel in Al Ain, UAE • Dedicatedly prioritised and oversaw quality control • Day to Day supervision and monitoring on site 7777
  • 8. About the Project: • A unique resort in the heart of Al Ain city in United Arab Emirates. Only 1 hour driving either from Abu Dhabi or Dubai. Plans were meticulously shaped to give this architectural marvel an expres- sion of exquisite opulence within the lushly green carpeted environment of Al Ain Equestrian, Shooting & Golf Club • The resort has 220 hotel keys • 60 semi attached villas • 1 bedroom , 2 bedroom and 3 bedroom villas • 2 tennis court • Unique swimming pool with pool bar • World Class Spa • 2 Ultra fine dinning among other 8 F&B out- lets around the resort 8888
  • 9. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Consultant: ♦ Lusail consulting Contractor: ♦ Al Ali Engineering Operator: ♦ Souq Waqif Boutique Hotels Current Stage: ♦ Operational Role: Project Manager (Client Side) Budget: 63,000,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 9999
  • 10. About the Project: • An extraordinary jewel in the crown of Souq Waqif Boutique Hotels. Its ultra-modern designs are overflowing with state-of-the-art amenities, whilst trendy fixtures and furnishings exude more than a subtle hint of Arabesque heritage. • Truly an iconic 5-star architectural creation. • Al Jasra’s art-inspired lobby and avant-garde surroundings take you on a journey beyond merely its destination. • The beauty of this hotel is the mix of contemporary design with some traditional Arabic décor touches. • This retreat presents 20 rooms and 4 suites which have been styled and furnished with the best furniture. • The character and soul of the space is directly related to the character and soul of tradition, heritage and the things you put into it. Hotel Web site: http://www.souqwaqifresort.com 11110000
  • 11. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Consultant: ♦ MZ and partners Contractor: ♦ Generic Engineering Technolo- gies Operator: ♦ Souq Waqif Boutique Hotels Current Stage: ♦ Operational Role: Project Manager (Client Side) Budget: 48,000,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 11111111
  • 12. About the Project: • An extraordinary jewel in the crown of Souq Waqif Boutique Hotels. Its ultra-modern de- signs are overflowing with state-of-the-art amenities, whilst trendy fixtures and furnish- ings exude more than a subtle hint of Arabesque heritage. • Al Bidda Boutique Hotel is a chic sanctuary that blends comfort hospitality and 5 star lux- ury hotel facilities with an atmosphere of innovative cultured style and contemporary flair. • It is a 5 star hotel in Doha (Qatar) is evidently renowned for its intensive custom of nature’s wood through its fine intricate interior design details inspired from true Qatari heritage ranging from ar- chitectural designs and applied colours flagship. • As a collection of the Souq Waqif Boutique Hotels, Al Bidda Bou- tique Hotel offers its guests unlimited access to the luxury hotel collection’s full range of culinary experiences, unique corporate experience and leisure facil- ities extending to an in-house high-end local boutique fashion experience. • With a calligraphy multi-coloured glass sky- line dome embracing a modern twist to its main hall across all floors and the evident infrastructural arch theme statement, here is where "Simple Details Done Charmingly" add lasting impressions of the ultimate personal- ized luxury. • Al Bidda Souq Waqif Boutique Hotel is home to 32 bedrooms. All are tastefully furnished and many even provide such comforts as closet, towels, carpeting, television LCD/plasma screen, sofa. Hotel Web site: http://www.souqwaqifresort.com 11112222
  • 13. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Consultant: ♦ Consulting Engineering Group Contractor: ♦ Al Ali Engineering Operator: ♦ Souq Waqif Boutique Hotels Current Stage: ♦ Operational Role: Project Manager (Client Side) Budget: 28,750,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 11113333
  • 14. About the Project: • An alluring, quaint haven from the hustle and bustle of the city, Musheireb’s impressive interior and exterior radiates Arabian tradition in design, look and feel. • Immediately adjacent to Al Jasra Boutique Hotel and the Modern Art Gallery, it is a boutique hotel in every respect, and has been the focal point of several photo shoots. • With 9 elegantly-appointed rooms, 5 breathtaking suites and a superior level of service which often sets our hotels apart from others, Musheireb is ideal for families and business trips alike • Extraordinary location in the heart of Souq Waqif, the old market of Doha. Hotel Web site: http://www.souqwaqifresort.com 11114444
  • 15. Stakeholders Client: ♦ The Private Engineering Office of H.H. Amir of Qatar Consultant: ♦ Engineering Consulting Group Contractor: ♦ Urbacon Operator: ♦ Souq Waqif Boutique Hotels Current Stage: ♦ Operational Role: Project Manager (Client Side) Budget: 25,000,000 USD Tasks and Responsibilities: • Effectively oversaw daily coordination with the main contractors and the consultants • Conducted in depth follow-ups on design development issues with the de- signers • Actively coordinated daily with the top management, operators and gov- ernmental authorities • Conducted extensive daily inspections of site activities including excava- tion, concreting, fit-out and MEP • Diligently monitored progress versus the plan daily and prepare progress reports • Thoroughly reviewed weekly / monthly progress reports, contracts, budg- ets, and plans • Executed and ensured high standard quality control, and followed up HSE plans • Provided extraordinary coordination skills among all the projects in hand ranging from design, construction, refurbishing and operational 11115555
  • 16. About the Project: • The Souq Waqif Hotel was originally a complex of old traditional build- ings consisting of retail stores and restaurants. After undergoing modi- fications and changes, the area was renovated into a hotel site, reflect- ing Arab infused designs and architecture. • The Project is located at Souq Wakif Historical area in front of al Merqab Hotel, The total keys allocated in the Hotel is 16 keys, the roof top is occupied with an open air restaurant. • Its interior design and the souq ambiance gives this property a unique flavor. • A total of 16 rooms and suites Hotel Web site: http://www.souqwaqifresort.com 11116666
  • 17. Stakeholders Client: ♦ Sharjah Airport Consultant: ♦ GHD Contractor: ♦ Gustav Pegel and Sohn Operator: ♦ Rotana Current Stage: ♦ Operational Role: Project Manager (Main Contractor Side) Budget: 50,000,000 USD Tasks and Responsibilities: • Provided vital daily supervision of site activities, including concreting, car- pentry, form-works and finishing works • Successfully handed over the project to the client representative and su- pervision consultant • Participated in effective daily coordinated with the construction manager, site engineers and subcontractors • Conducted in depth material inspections, and quality control • Proactively monitored the progress on site and administration of the cost plus contract (NEC) • Efficaciously monitored the work progress and compared Actual percent- ages Vs Planned percentages • Developed successfully KPIs and monitored them along the project life cycle 11117777
  • 18. About the Project: • Rotana Centro Sharjah is uniquely located in close proximity to Sharjah Internation- al Airport, Saif Zone business district and University city. • The hotel is just 15 minutes away from the city centre. With chic looks and slick de- livery underlying its service offering, Centro Sharjah is an inspired philosophy and sets an unparalleled benchmark for the budget conscious busi- ness traveller. • Centro Sharjah features 306 rooms and suites which are meticu- lously designed to maximize space, light and efficiency, providing our guests with the latest technology and a selection of contem- porary classic furniture where comfort and aesthetics are the keys. • The hotel features an all day dining restaurant serving a wide ar- ray of international cuisine called c.taste and a 24 hour take away dining concept called c.deli. • Three well equipped meeting rooms and Link ( the business center) are designed to appeal to those, who value effective solutions and efficient amenities. • Guests looking to keep fit during their stay can make the most of the modern gym or rejuve- nate with a swim in the outdoor temperature controlled swimming pool, surrounded by lush gardens. Hotel Web site: https://www.rotana.com/centrohotels/ unitedarabemirates/sharjah/centrosharjah 11118888
  • 19. Role: Project Manager (Consultant Side) Budget: 1,000,000,000 USD Tasks and Responsibilities: • Provided vital daily supervision of site activities, including concreting, carpentry, form-works and finishing works • Successfully executing numerous duties –project manager, supervision consultant representative • Proficiently overseeing substructure package, supervising progress, structural construction team, quality control and the design team • Thoroughly reviewing method statements, shop drawings, material submittals, and pre-qualifications • Collaborating effectively with the main contractor, client, end users and government authorities on a daily basis regarding the construction of 4 high-rise Hotels in Qatar • Attentively managing the design and the Hotel operator input • Reporting responsibly to the Head of supervision and PMCD • Meticulously reviewing budget and effectively controlling budget • Proactively present value engineering proposals and implement them for the stakeholders benefits Stakeholders Client: ♦ Qatar General Insurance and Re insurance Company Consultant: ♦ MZ and Partners Contractor: ♦ Orientals Enterprises Operator: ♦ Marriott ♦ Radisson Blu ♦ Oberoi Current Stage: ♦ Design and Construction 11119999
  • 20. About the Project: • 4 High Rise towers in the heart of West Bay area, Doha, Qatar • 2 Towers will hotel apartments • 2 Towers will 5 5-stars hotels • Shopping mall & retail area will be hosted at ground lev- el and level one • 5 Basements will host the Back of house and parking • Total number of keys will be 1600 • Highest tower will be 47 floors • Lowest tower will be 25 floors • The other 2 towers will be 32 floors and 39 floors • As of Septamber 2016: • Substructure construction work is ongoing. • Interior design is on going Hotel Web site: http://www.qgirco.com/mozoon-towers-1/ 22220000