GOVERNM ENT OF TELANGANA
ABSTRACT
Irrigation & CAD Department - Tender Procedures and Registration of
Contractors Rules - Enhancing the monetary limits of works for different
class of contractors - Amendment - Accorded -Orders -Issued.
IRRIGATION & CAD (REFORMS) DEPARTMENT
G.O.MS.No. 66. Dated: 2O-04-20L5
Read the following:
1. G.O.Ms.No.94, I&CAD (PW-COD) Department, Dt. 01.07.2003.
2. G.O. Ms. N o.742, I&CAD (Reforms) Depa rtment, Dt. 2O-L2-2004.
3. G. O. Ms. No, 1 3 0, I&CAD(PW : REFORMS ) Departme nt, dt: 22.05.2007
4. G.O.Ms.No.28,I&CAD(PW:REFORMS) Depaftment, dt: 30-04-2012
5. G.O.Ms.No.14, I&CAD(Reforms) Department, dt: 31-01-2015
6. From the President, Builders Association of India, Representation
dt: 13-01-2015
7. From the ENC (IW), I&CAD & Chairman, BOCE's, Hyderabad, Lr.No.
ENC/IW P&M /EE. I/DEE. I/AEE. I/ 14lI, Dated : 16.72.20L4
B. From Engineer-in-Chief (Irrigation), I&CAD Depaftment, Hyderabad
Lr. No. ENC(I ) / DCET/ OT 3 / AEEZO/ BOCEs/ 20t4, Dt. 23. 02. 2 0 1 5.
Order:-
In the reference 1tt cited, Government issued comprehensive
instructions relating to simplification of procurement procedure, achieving
greater transparency, reducing delay in procurement process etc. In the
referencer 2nd read above, amendment orders were issued to para 12 of
Annexure-I to G.O. 1't cited with regards to qualification criteria fcr y,,orks.
In the reference 3'd cited, amendment orders were issued to Annexure -III
of G.O. 1't cited regarding changes in monetary limits, registration fee,
solvency certificate and past experience certificate and other requirements.
In the reference 4th read above, amendment orders were issued to enlarge
the experience gained during the last 10 years for registration instead of
limiting the experience to last 5 years only as per G.O.Ms.No,94,
I&CAD(PWCOD) Department, dt: 01-07-2003 para 3 in respect of I&CAD
Department. In the reference 5th cited, amendments were made to
Annexure-Il para- I (h) of G.O. 1't cited in respect of Class of contractors
and further modification of monetary limits.
2. After formation of Telangana State, Builders Association of India,
Telangana State chapter have represented to Government vide reference 6th
cited for certain reforms to the present norms of the tendering system duly
enhancing the monetary limits of the works for various category of
contractors.
3. In the reference 7th read above, the Engineer-in-Chief (IW), Hyderabad,
for the reasons stated in his letter has sought for modification to
G.O.Ms.No.130, I&CAD (PW:REFORMS) Department, dt: 22.05.2007,
regarding the monetary limits of past experience of civil category for value
of group of works and for value of single work that have been executed in
any one year during the last five financial years. He also sought for
modification to G.O.Ms.No.142, I&CAD (Reforms) Department,
Dt. 20-72-2004 regarding qualification criteria for works.
(P.r.o)
4. In the reference 8th read above, the Engineer-in-Chief (Irrigation),
Hyderabad further sought for modification to G.O.Ms.No.14, I&CAD
(Reforms) Department, dt: 31-01-2015, regarding the monetary limits of
works for different class of contractors.
5, In order to encourage local entrepreneurship, to enhance transparency
and competition in procurement works, the Government after careful
consideration of various aspects based on the recommendations of Engineer-
in-Chief & Board of Chief Engineers, hereby issue amendments to
G.O.Ms.No.130, I&CAD (PW:REFORMS) Department, dt:22.05.2007,
G.O.Ms.No. 742, I&CAD (Reforms) Department, Dt. 2O-L2-2004,
G.O.Ms.No.14, I&CAD (Reforms) Department, dt: 31-01-2015 as shown in
the Annexure-I, Annexure-II and Annexure-III respectively of this order.
These modifications will come in to effect from the date of issue of the
orde rs.
6. The Engineer-in-Chief (Irrigation), Hyderabad shall take further
necessary action accordingly. This order issues with the concurrence of
Finance Department vide their Dy.No.265/PFS/2015, dt: 12-03-2015.
(BY ORDER AND IN THE NAME OFTHE GOVERNOR OF TELANGANA)
DT, SHAILENDRA KUMAR ]OSHI
PRINCIPAL SECRETARY TO GOVERNMENT
TO)
The Engineer-in-Chief (Irrig.ation Wing), I & CAD, Hyderabad.
All the Engineers-in-Chief & Chief Engineers of I&CAD Dept.
The Commissioner, Commissionerate of Tenders, Hyderabad
The Engineer-in-Chief (R&B), Admn, Hyderabad.
The Engineer-in-Chief, Admn,PR&RD Department, Hyderabad
The Engineer-in-Chief, PH Department, Hyderabad
Copy to:
The P.S. to Hon'ble Chief Minister
The Prl.Secy. R&B Department
The Prl. Secy. PR&RD Department. .*
The Prl, Secy. MA&UD Department
The P.S. to Hon'ble Minister, Irrigation
The P.S. to Hon'ble Minister, R&B
The P.S, to Hon'ble Minister, PR
The P.S. to Hon'ble Minister, MA&UD
The P.S. to Prl.Secy. I&CAD Department.
SF/SC
//FORWARDED : : BY ORDER//
SECTION OFFICER
II.
Annexure -I
Amendment to Annexure of G.O.Ms.No. 130, I&CAD(PW:REFORMS)
Department, dt: 22.05.2007
I,
Amount in Rs. lakhs
Sl.No Descript
ion of
Item
Special
Class
Class-I Class-II Class-
III
Class-
IV
Class-V
1 2 3 4 5 6 7 I
For
V(A) Certificate of past experience (Value of Group of work to have been
executed in any one year durinq the last five financial years)
i)
Civil 500.00 100.00 40.00 20.00 8.00
No
monetary
limit
READ AS
V(A) Certificate of Financial Turn over in Civil Engineering works in any one
year during the last ten financial years duly certified by charted
accountants as filed in their income tax returns,
i)
Civil 250.00 50.00 20.00 10.00 4.00 No
monetary
limit
Amount in Rs. Lakhs
Sl.No
Descript
iorl of
Item
Special
Class
Class-I Class-II Class-
III
Class-
IV
Class-V
1 2 3 4 5 6 7 8
For
V(B) Certificate of past experience (Value of Single work to have been
executed in anv one vear durinq the last five financial years)
i)
Civil 250.00 50.0
0
20.00 10.00 4,00 No
monetary
limit
READ AS
V(B) Certificate of Financial Turn over in eivil Engineering works in any one
year during the last ten financial years duly certified by charted
accountants as filed in their income tax returns.
i)
Civil 250,00 50.00 20.00 10.00 4.00 No monetary
limit
Note: The changes is in the monetary limits of Civil Works. For other
categories such as Public Health Engineering, Furniture, Electrical
Transport & Fabrication and erection of structural steel the monetary
limits mentioned in G.O.Ms.No.130, I&CAD (PW:Reforms) Department,
DL.22-O5-2O07 holds good.
DT. SHAILENDRA KUMAR JOSHI
PRINCIPAL SECRETARY TO GOVERNMENT
Annexure -II
Amend ment to G.O. Ms. No. 142, I&CAD ( Reforms) Depa rtment, Dt.zO- l2-2OO4.
For Read as
Para (12) Qualification Criteria
works costing Rs.50 lakhs
below:
for
and
Para (12) Qualification
Criteria for works costing
Rs.1000 lakhs and below:
The qualification criteria at
para.10 of as well as modified
procedure of collecting EMD in the
shape of Bank Guarantee will not
be made applicable for the works
costing Rs.50 lakhs (ECV) and
below. For above works single
cover system shall be followed
and the EMD shall be submitted
along with the completed Tender
Schedule.
(i). The qualification criteria
at para.lO (A) will not be
made applicable for the
works costing Rs.1000.00
lakhs (ECV) and below. for
Civil works in all
State/Central Government
Departments, State/
Central Government
undertakings/ Public sector
undertakings/
Corporations.
(ii). However for civil works
costing Rs.50.00 lakhs
(ECV) and below,
collection of EMD only in
the shape of D.D. will
continue.
DT. SHAILENDRA KUMAR ]OSHI
PRINCIPAL SECRETARY TO GOVERNMENT
Annexure-III
Amendment to Annexure of G.O.Ms.No.14, I&CAD(Reforms) Department,
dt:31-01-2015
Cateqory of Contractor: Financial limits
1 Special Class Uo to anv amount
2 Class- I Uo to Rs.30.00 Crores
Class -II Uo to Rs.10.00 Crores
A Class -III Uo to Rs.4.00 Crores
Class - IV Uo to Rs.1.00 Crore
€ Class - V Up to Rs.50.00 Lakhs
DT. SHAILENDRA KUMAR JOSHI
PRINCIPAL SECRETARY TO GOVERNMENT

More Related Content

Similar to go ms no 66 ,2015.pdf

So r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivSo r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivKishore Ch
 
So r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivSo r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivPtpg Stuc
 
DOP 758-mines Procedure
DOP 758-mines Procedure DOP 758-mines Procedure
DOP 758-mines Procedure vivekrajbhilai
 
WRD Schedule of rates 2018 19
WRD Schedule of rates 2018 19WRD Schedule of rates 2018 19
WRD Schedule of rates 2018 19kbjnl
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Changes-and-Updates-in-Budget-Preparation.pptx
Changes-and-Updates-in-Budget-Preparation.pptxChanges-and-Updates-in-Budget-Preparation.pptx
Changes-and-Updates-in-Budget-Preparation.pptxBinibiningQueenita
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spceirkportal
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxArshadMahmood155695
 
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECT
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECTEFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECT
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECTIRJET Journal
 
Submitted reg databook, sor, and lmr justification ii
Submitted reg databook, sor, and lmr justification  iiSubmitted reg databook, sor, and lmr justification  ii
Submitted reg databook, sor, and lmr justification iiSreekumar Pillai
 
Construction management
Construction managementConstruction management
Construction managementvhjadhav
 

Similar to go ms no 66 ,2015.pdf (20)

So r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivSo r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partiv
 
So r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partivSo r 2014 15 -part-i_n_partiv
So r 2014 15 -part-i_n_partiv
 
DOP 758-mines Procedure
DOP 758-mines Procedure DOP 758-mines Procedure
DOP 758-mines Procedure
 
WRD Schedule of rates 2018 19
WRD Schedule of rates 2018 19WRD Schedule of rates 2018 19
WRD Schedule of rates 2018 19
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Ashok Kumar Das-Biodata
Ashok Kumar Das-BiodataAshok Kumar Das-Biodata
Ashok Kumar Das-Biodata
 
Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)
 
Changes-and-Updates-in-Budget-Preparation.pptx
Changes-and-Updates-in-Budget-Preparation.pptxChanges-and-Updates-in-Budget-Preparation.pptx
Changes-and-Updates-in-Budget-Preparation.pptx
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 
4851
48514851
4851
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docx
 
1200 14
1200 141200 14
1200 14
 
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECT
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECTEFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECT
EFFECT OF PRICE ESCALATION CLAUSE IN HIGHWAY CONSTRUCTION PROJECT
 
Submitted reg databook, sor, and lmr justification ii
Submitted reg databook, sor, and lmr justification  iiSubmitted reg databook, sor, and lmr justification  ii
Submitted reg databook, sor, and lmr justification ii
 
Final tender chp
Final tender chpFinal tender chp
Final tender chp
 
Rizwan CV
Rizwan CV  Rizwan CV
Rizwan CV
 
Construction management
Construction managementConstruction management
Construction management
 
72
7272
72
 
AK-Samanta CV-31-03-16
AK-Samanta CV-31-03-16AK-Samanta CV-31-03-16
AK-Samanta CV-31-03-16
 

Recently uploaded

Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological universityMohd Saifudeen
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUankushspencer015
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 

Recently uploaded (20)

Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 

go ms no 66 ,2015.pdf

  • 1. GOVERNM ENT OF TELANGANA ABSTRACT Irrigation & CAD Department - Tender Procedures and Registration of Contractors Rules - Enhancing the monetary limits of works for different class of contractors - Amendment - Accorded -Orders -Issued. IRRIGATION & CAD (REFORMS) DEPARTMENT G.O.MS.No. 66. Dated: 2O-04-20L5 Read the following: 1. G.O.Ms.No.94, I&CAD (PW-COD) Department, Dt. 01.07.2003. 2. G.O. Ms. N o.742, I&CAD (Reforms) Depa rtment, Dt. 2O-L2-2004. 3. G. O. Ms. No, 1 3 0, I&CAD(PW : REFORMS ) Departme nt, dt: 22.05.2007 4. G.O.Ms.No.28,I&CAD(PW:REFORMS) Depaftment, dt: 30-04-2012 5. G.O.Ms.No.14, I&CAD(Reforms) Department, dt: 31-01-2015 6. From the President, Builders Association of India, Representation dt: 13-01-2015 7. From the ENC (IW), I&CAD & Chairman, BOCE's, Hyderabad, Lr.No. ENC/IW P&M /EE. I/DEE. I/AEE. I/ 14lI, Dated : 16.72.20L4 B. From Engineer-in-Chief (Irrigation), I&CAD Depaftment, Hyderabad Lr. No. ENC(I ) / DCET/ OT 3 / AEEZO/ BOCEs/ 20t4, Dt. 23. 02. 2 0 1 5. Order:- In the reference 1tt cited, Government issued comprehensive instructions relating to simplification of procurement procedure, achieving greater transparency, reducing delay in procurement process etc. In the referencer 2nd read above, amendment orders were issued to para 12 of Annexure-I to G.O. 1't cited with regards to qualification criteria fcr y,,orks. In the reference 3'd cited, amendment orders were issued to Annexure -III of G.O. 1't cited regarding changes in monetary limits, registration fee, solvency certificate and past experience certificate and other requirements. In the reference 4th read above, amendment orders were issued to enlarge the experience gained during the last 10 years for registration instead of limiting the experience to last 5 years only as per G.O.Ms.No,94, I&CAD(PWCOD) Department, dt: 01-07-2003 para 3 in respect of I&CAD Department. In the reference 5th cited, amendments were made to Annexure-Il para- I (h) of G.O. 1't cited in respect of Class of contractors and further modification of monetary limits. 2. After formation of Telangana State, Builders Association of India, Telangana State chapter have represented to Government vide reference 6th cited for certain reforms to the present norms of the tendering system duly enhancing the monetary limits of the works for various category of contractors. 3. In the reference 7th read above, the Engineer-in-Chief (IW), Hyderabad, for the reasons stated in his letter has sought for modification to G.O.Ms.No.130, I&CAD (PW:REFORMS) Department, dt: 22.05.2007, regarding the monetary limits of past experience of civil category for value of group of works and for value of single work that have been executed in any one year during the last five financial years. He also sought for modification to G.O.Ms.No.142, I&CAD (Reforms) Department, Dt. 20-72-2004 regarding qualification criteria for works. (P.r.o)
  • 2. 4. In the reference 8th read above, the Engineer-in-Chief (Irrigation), Hyderabad further sought for modification to G.O.Ms.No.14, I&CAD (Reforms) Department, dt: 31-01-2015, regarding the monetary limits of works for different class of contractors. 5, In order to encourage local entrepreneurship, to enhance transparency and competition in procurement works, the Government after careful consideration of various aspects based on the recommendations of Engineer- in-Chief & Board of Chief Engineers, hereby issue amendments to G.O.Ms.No.130, I&CAD (PW:REFORMS) Department, dt:22.05.2007, G.O.Ms.No. 742, I&CAD (Reforms) Department, Dt. 2O-L2-2004, G.O.Ms.No.14, I&CAD (Reforms) Department, dt: 31-01-2015 as shown in the Annexure-I, Annexure-II and Annexure-III respectively of this order. These modifications will come in to effect from the date of issue of the orde rs. 6. The Engineer-in-Chief (Irrigation), Hyderabad shall take further necessary action accordingly. This order issues with the concurrence of Finance Department vide their Dy.No.265/PFS/2015, dt: 12-03-2015. (BY ORDER AND IN THE NAME OFTHE GOVERNOR OF TELANGANA) DT, SHAILENDRA KUMAR ]OSHI PRINCIPAL SECRETARY TO GOVERNMENT TO) The Engineer-in-Chief (Irrig.ation Wing), I & CAD, Hyderabad. All the Engineers-in-Chief & Chief Engineers of I&CAD Dept. The Commissioner, Commissionerate of Tenders, Hyderabad The Engineer-in-Chief (R&B), Admn, Hyderabad. The Engineer-in-Chief, Admn,PR&RD Department, Hyderabad The Engineer-in-Chief, PH Department, Hyderabad Copy to: The P.S. to Hon'ble Chief Minister The Prl.Secy. R&B Department The Prl. Secy. PR&RD Department. .* The Prl, Secy. MA&UD Department The P.S. to Hon'ble Minister, Irrigation The P.S. to Hon'ble Minister, R&B The P.S, to Hon'ble Minister, PR The P.S. to Hon'ble Minister, MA&UD The P.S. to Prl.Secy. I&CAD Department. SF/SC //FORWARDED : : BY ORDER// SECTION OFFICER
  • 3. II. Annexure -I Amendment to Annexure of G.O.Ms.No. 130, I&CAD(PW:REFORMS) Department, dt: 22.05.2007 I, Amount in Rs. lakhs Sl.No Descript ion of Item Special Class Class-I Class-II Class- III Class- IV Class-V 1 2 3 4 5 6 7 I For V(A) Certificate of past experience (Value of Group of work to have been executed in any one year durinq the last five financial years) i) Civil 500.00 100.00 40.00 20.00 8.00 No monetary limit READ AS V(A) Certificate of Financial Turn over in Civil Engineering works in any one year during the last ten financial years duly certified by charted accountants as filed in their income tax returns, i) Civil 250.00 50.00 20.00 10.00 4.00 No monetary limit Amount in Rs. Lakhs Sl.No Descript iorl of Item Special Class Class-I Class-II Class- III Class- IV Class-V 1 2 3 4 5 6 7 8 For V(B) Certificate of past experience (Value of Single work to have been executed in anv one vear durinq the last five financial years) i) Civil 250.00 50.0 0 20.00 10.00 4,00 No monetary limit READ AS V(B) Certificate of Financial Turn over in eivil Engineering works in any one year during the last ten financial years duly certified by charted accountants as filed in their income tax returns. i) Civil 250,00 50.00 20.00 10.00 4.00 No monetary limit Note: The changes is in the monetary limits of Civil Works. For other categories such as Public Health Engineering, Furniture, Electrical Transport & Fabrication and erection of structural steel the monetary limits mentioned in G.O.Ms.No.130, I&CAD (PW:Reforms) Department, DL.22-O5-2O07 holds good. DT. SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT
  • 4. Annexure -II Amend ment to G.O. Ms. No. 142, I&CAD ( Reforms) Depa rtment, Dt.zO- l2-2OO4. For Read as Para (12) Qualification Criteria works costing Rs.50 lakhs below: for and Para (12) Qualification Criteria for works costing Rs.1000 lakhs and below: The qualification criteria at para.10 of as well as modified procedure of collecting EMD in the shape of Bank Guarantee will not be made applicable for the works costing Rs.50 lakhs (ECV) and below. For above works single cover system shall be followed and the EMD shall be submitted along with the completed Tender Schedule. (i). The qualification criteria at para.lO (A) will not be made applicable for the works costing Rs.1000.00 lakhs (ECV) and below. for Civil works in all State/Central Government Departments, State/ Central Government undertakings/ Public sector undertakings/ Corporations. (ii). However for civil works costing Rs.50.00 lakhs (ECV) and below, collection of EMD only in the shape of D.D. will continue. DT. SHAILENDRA KUMAR ]OSHI PRINCIPAL SECRETARY TO GOVERNMENT
  • 5. Annexure-III Amendment to Annexure of G.O.Ms.No.14, I&CAD(Reforms) Department, dt:31-01-2015 Cateqory of Contractor: Financial limits 1 Special Class Uo to anv amount 2 Class- I Uo to Rs.30.00 Crores Class -II Uo to Rs.10.00 Crores A Class -III Uo to Rs.4.00 Crores Class - IV Uo to Rs.1.00 Crore € Class - V Up to Rs.50.00 Lakhs DT. SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT