SlideShare a Scribd company logo
1 of 29
SEMINAR PRESENTATION
ON RELIABILITY
RAHUL SINGH
214218022
RELIABILITY
 Generally defined as the ability of a product to perform as expected over time.
 Formally defined as the probability that a product, piece of equipment, or system
performs its intended function for a stated period of time under specified
operating conditions.
 Although no product is expected to last forever, the time requirement ensures
satisfactory performance over at least a minimal stated period.
RELIABILITY
Four aspects of reliability are apparent from this definition:
• Reliability is a probability-related concept; the numerical value of this
probability is between 0 and 1.
• The functional performance of the product has to meet certain stipulations.
• Reliability implies successful operation over a certain period of
time.
• Operating or environmental conditions under which product use takes place are
specified.
 Types of Failures
 Functional failure – failure that occurs at the start of product life due to
manufacturing or material detects.
 Reliability failure – failure after some period of use.
RELIABILITY
 Types of Reliability
1) Inherent reliability – predicted by product design.
2) Achieved reliability – observed during use.
 Reliability Measurement
1) Failure rate – number of failures per unit time.
2) Alternative measures
a) Mean time to failure
b) Mean time between failures
LIFE-CYCLE CURVE
 Most products go through three distinct phases from product inception to wear-
out.
1. The debugging phase,
2. The chance-failure phase, and
3. The wear-out phase
 Figure 1 shows a typical life-cycle curve for which the failure rate is plotted as a
function of time. This curve is often referred to as the bathtub curve.
LIFE-CYCLE CURVE
 The debugging phase, also known as the infant-mortality phase, exhibits a drop in
the failure rate as initial problems identified during prototype testing are ironed
out.
 The chance failure phase, between times t1 and t2, is then encountered; failures
occur randomly and independently. This phase, in which the failure rate is constant,
typically represents the useful life of the product.
 Following this is the wear-out phase, in which an increase in the failure rate is
observed. Here, at the end of their useful life, parts age and wear out.
Probability Distributions to Model Failure
Rate
Exponential Distribution :
 The life-cycle curve shows the variation of the failure rate as a function of time.
 For the chance-failure phase, which represents the useful life of the product, the
failure rate is constant.
 As a result, the exponential distribution can be used to describe the time to failure
of the product for this phase.
Exponential Distribution
 The exponential distribution have a probability density function given by:
 The reliability at time t, R(t), is the probability of the product lasting up to at least
time t. It is given by:
Example
 An amplifier has an exponential time-to-failure distribution with a failure rate of 8%
per 1000 hours. What is the reliability of the amplifier at 5000hours? Find the mean
time to failure?
Solution:
Weibull Distribution
Weibull Distribution :
 The Weibull distribution is used to model the time to failure of products that have
a varying failure rate.
 It is therefore a candidate to model the debugging phase (failure rate decreases
with time), or the wear-out phase (failure rate increases with time).
 The Weibull distribution is a three-parameter distribution whose density function is
given by:
Weibull Distribution
 The reliability function for the Weibull distribution is given by
 The mean time to failure, as given by
 The failure-rate function r(t) for the Weibull time-to-failure probability distribution
is
Weibull Distribution
Figure shows the shape of the failure-rate function for the Weibull failure density function, for values of the parameter ß of 0.5, 1, and 3.5.
Example
 Capacitors in an electrical circuit have a time-to-failure distribution that can be
modeled by the Weibull distribution with a scale parameter of 400 hours and a
shape parameter of 0.2. What is the reliability of the capacitor after 600 hours of
operation? Find the mean time to failure. Is the failure rate increasing or decreasing
with time?
Solution:The parameters of the Weibull distribution are a = 400 hours and ß = 0.2. The
location parameter ã is 0 for such reliability problems. The reliability after 600 hours of
operation is given by
Example
 This function decreases with time. It would model components in the debugging
phase.
SYSTEM RELIABILITY
 Most products are made up of a number of components. The reliability of each
component and the configuration of the system consisting of these components
determines the system reliability (i.e., the reliability of the product).
 Systems with Components in Series
 Systems with Components in Parallel
 Systems with Components in Mix Configuration
Systems with Components in Series
 It is assumed that the components operate independent of each other.
 In general, if there are n components in series, where the reliability of the ith
component is denoted by Ri, the system reliability is
Rs = R1 x R2 x ... X Rn
Systems with Components in Series
 The system reliability decreases as the number of components in series increases.
 Although overdesign in each component improves reliability, its impact would be
offset by the number of components in series.
 Moreover, manufacturing capabilities and resource limitations restrict the
maximum reliability of any given component.
 Product redesign that reduces the number of components in series is a viable
alternative.
Systems with Components in Parallel
 System reliability can be improved by placing components in parallel. The
components are redundant; the system operates as long as at least one of the
components operates.
 The only time the system fails is when all the parallel components fail.
 All components are assumed to operate simultaneously.
 Examples of redundant components placed in parallel to improve the reliability of
the system abound. For instance, the braking mechanism is a critical system in the
automobile. Dual subsystems thus exist so that if one fails, the brakes still work
Systems with Components in Parallel
 Suppose that we have n components in parallel, with the reliability of the ith
component denoted by Ri=1, 2, ..., n. Assuming that the components operate
randomly and independently of each other, the probability of failure of each
component is given by
Fi = 1 - Ri
 Now, the system fails only if all the components fail. Thus, the probability of system
failure is
Systems with Components in Parallel
 The reliability of the system is the complement of Fs and is given by
Systems with Components in Series and in
Parallel
 Complex systems often consist of components that are both in series and in
parallel.
 Reliability calculations are based on the concepts discussed previously, assuming
that the components operate independently.
RELIABILITY AND LIFE TESTING PLANS
 Plans for reliability and life testing are usually destructive in nature. They involve
observing a sample of items until a certain number of failures occur, observing over
a certain period of time to record the number of failures, or a combination of both.
 Such testing is usually done at the prototype stage, which can be expensive
depending on the unit cost of the item.
 Testing is usually conducted under simulated conditions, but it should mimic the
actual operating conditions as closely as possible.
Types of Tests
1. Failure-Terminated Test
 In failure-terminated plans, the tests are terminated when a preassigned number of
failures occurs in the chosen sample. Lot acceptance is based on the accumulated
test time of the items when the test is terminated. One acceptance criterion
involves whether the estimated average life of the item exceeds a stipulated value.
2. Time-Terminated Test
 A time-terminated test is terminated when a preassigned time T is reached.
Acceptance of the lot is based on the observed number of failures r during the test
time. If the observed number of failures f exceeds a preassigned value r, the lot is
rejected; otherwise, the lot is accepted.
Types of Tests
3. Sequential Reliability :Test In sequential reliability testing, no prior decision is
made as to the number of failures or the time to conduct the test. Instead, the
accumulated results of the test are used to decide whether to accept the lot, reject
the lot, or continue testing.
THANK YOU!

More Related Content

What's hot

Reliability engineering chapter-1csi
Reliability engineering chapter-1csiReliability engineering chapter-1csi
Reliability engineering chapter-1csiCharlton Inao
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenancePankaj Singh
 
Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Nancy Regan
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceDhanesh S
 
Weibull analysis introduction
Weibull analysis   introductionWeibull analysis   introduction
Weibull analysis introductionShashank Kotwal
 
Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3ASQ Reliability Division
 
Test Cases Vs Test Scenarios
Test Cases Vs Test ScenariosTest Cases Vs Test Scenarios
Test Cases Vs Test ScenariosSneha Singh
 
Reliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systemsReliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systemsCharlton Inao
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliabilityzacksazu
 
2017 Accelerated Testing: ALT, HALT and MEOST
2017   Accelerated Testing: ALT, HALT and MEOST2017   Accelerated Testing: ALT, HALT and MEOST
2017 Accelerated Testing: ALT, HALT and MEOSTJan Eite Bullema
 
An introduction to Software Testing and Test Management
An introduction to Software Testing and Test ManagementAn introduction to Software Testing and Test Management
An introduction to Software Testing and Test ManagementAnuraj S.L
 
We just had a failure will weibull analysis help
We just had a failure will weibull analysis help We just had a failure will weibull analysis help
We just had a failure will weibull analysis help ASQ Reliability Division
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic MaintenanceRAHMAT EIE
 

What's hot (20)

Reliability engineering chapter-1csi
Reliability engineering chapter-1csiReliability engineering chapter-1csi
Reliability engineering chapter-1csi
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
 
Weibull analysis introduction
Weibull analysis   introductionWeibull analysis   introduction
Weibull analysis introduction
 
Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3
 
Embedded SW Testing
Embedded SW TestingEmbedded SW Testing
Embedded SW Testing
 
Reliabilty
ReliabiltyReliabilty
Reliabilty
 
Life Testing[1]
Life Testing[1]Life Testing[1]
Life Testing[1]
 
Test Cases Vs Test Scenarios
Test Cases Vs Test ScenariosTest Cases Vs Test Scenarios
Test Cases Vs Test Scenarios
 
Reliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systemsReliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systems
 
The MTBF - Day1_v2
The MTBF - Day1_v2The MTBF - Day1_v2
The MTBF - Day1_v2
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliability
 
2017 Accelerated Testing: ALT, HALT and MEOST
2017   Accelerated Testing: ALT, HALT and MEOST2017   Accelerated Testing: ALT, HALT and MEOST
2017 Accelerated Testing: ALT, HALT and MEOST
 
An introduction to Software Testing and Test Management
An introduction to Software Testing and Test ManagementAn introduction to Software Testing and Test Management
An introduction to Software Testing and Test Management
 
Weibull analysis
Weibull analysisWeibull analysis
Weibull analysis
 
We just had a failure will weibull analysis help
We just had a failure will weibull analysis help We just had a failure will weibull analysis help
We just had a failure will weibull analysis help
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
Reliability and Safety
Reliability and SafetyReliability and Safety
Reliability and Safety
 

Similar to Seminar presentation on reliability

Reliability.pptx related to quality related
Reliability.pptx related to quality relatedReliability.pptx related to quality related
Reliability.pptx related to quality relatednikhilyadav365577
 
chapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxchapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxGemechisEdosa2
 
WS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxWS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxShakuSingla
 
Section 7a reliability_notes
Section 7a reliability_notesSection 7a reliability_notes
Section 7a reliability_notesKiran Shinde
 
RME-085_TQM Unit-4 Part 3
RME-085_TQM Unit-4  Part 3RME-085_TQM Unit-4  Part 3
RME-085_TQM Unit-4 Part 3ssuserf6c4bd
 
Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Sazedul Ekab
 
Measurement and Evaluation of Reliability, Availability and Maintainability o...
Measurement and Evaluation of Reliability, Availability and Maintainability o...Measurement and Evaluation of Reliability, Availability and Maintainability o...
Measurement and Evaluation of Reliability, Availability and Maintainability o...IOSR Journals
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...IRJET Journal
 
Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerMark Turner CRP
 
Probabilistic r&m parameters and redundancy calculations
Probabilistic r&m parameters and redundancy calculationsProbabilistic r&m parameters and redundancy calculations
Probabilistic r&m parameters and redundancy calculationsilsouris
 
Ex 7101-reliability-engineering-dec-2014
Ex 7101-reliability-engineering-dec-2014Ex 7101-reliability-engineering-dec-2014
Ex 7101-reliability-engineering-dec-2014DEEPAK PATEL
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability J. García - Verdugo
 

Similar to Seminar presentation on reliability (20)

Reliability.pptx related to quality related
Reliability.pptx related to quality relatedReliability.pptx related to quality related
Reliability.pptx related to quality related
 
chapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxchapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptx
 
8745681.ppt
8745681.ppt8745681.ppt
8745681.ppt
 
WS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxWS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptx
 
Section 7a reliability_notes
Section 7a reliability_notesSection 7a reliability_notes
Section 7a reliability_notes
 
RME-085_TQM Unit-4 Part 3
RME-085_TQM Unit-4  Part 3RME-085_TQM Unit-4  Part 3
RME-085_TQM Unit-4 Part 3
 
Mtbf vicor
Mtbf vicorMtbf vicor
Mtbf vicor
 
Availability
AvailabilityAvailability
Availability
 
LCsimulator
LCsimulatorLCsimulator
LCsimulator
 
PPT TARUNA.pptx
PPT TARUNA.pptxPPT TARUNA.pptx
PPT TARUNA.pptx
 
Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability
 
Availability
AvailabilityAvailability
Availability
 
9536322.ppt
9536322.ppt9536322.ppt
9536322.ppt
 
Measurement and Evaluation of Reliability, Availability and Maintainability o...
Measurement and Evaluation of Reliability, Availability and Maintainability o...Measurement and Evaluation of Reliability, Availability and Maintainability o...
Measurement and Evaluation of Reliability, Availability and Maintainability o...
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
 
Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M Turner
 
Probabilistic r&m parameters and redundancy calculations
Probabilistic r&m parameters and redundancy calculationsProbabilistic r&m parameters and redundancy calculations
Probabilistic r&m parameters and redundancy calculations
 
Ex 7101-reliability-engineering-dec-2014
Ex 7101-reliability-engineering-dec-2014Ex 7101-reliability-engineering-dec-2014
Ex 7101-reliability-engineering-dec-2014
 
Sistem Pemeliharaan (01)
Sistem Pemeliharaan (01)Sistem Pemeliharaan (01)
Sistem Pemeliharaan (01)
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W4 Reliability
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Seminar presentation on reliability

  • 2. RELIABILITY  Generally defined as the ability of a product to perform as expected over time.  Formally defined as the probability that a product, piece of equipment, or system performs its intended function for a stated period of time under specified operating conditions.  Although no product is expected to last forever, the time requirement ensures satisfactory performance over at least a minimal stated period.
  • 3. RELIABILITY Four aspects of reliability are apparent from this definition: • Reliability is a probability-related concept; the numerical value of this probability is between 0 and 1. • The functional performance of the product has to meet certain stipulations. • Reliability implies successful operation over a certain period of time. • Operating or environmental conditions under which product use takes place are specified.
  • 4.  Types of Failures  Functional failure – failure that occurs at the start of product life due to manufacturing or material detects.  Reliability failure – failure after some period of use.
  • 5. RELIABILITY  Types of Reliability 1) Inherent reliability – predicted by product design. 2) Achieved reliability – observed during use.  Reliability Measurement 1) Failure rate – number of failures per unit time. 2) Alternative measures a) Mean time to failure b) Mean time between failures
  • 6. LIFE-CYCLE CURVE  Most products go through three distinct phases from product inception to wear- out. 1. The debugging phase, 2. The chance-failure phase, and 3. The wear-out phase  Figure 1 shows a typical life-cycle curve for which the failure rate is plotted as a function of time. This curve is often referred to as the bathtub curve.
  • 7.
  • 8. LIFE-CYCLE CURVE  The debugging phase, also known as the infant-mortality phase, exhibits a drop in the failure rate as initial problems identified during prototype testing are ironed out.  The chance failure phase, between times t1 and t2, is then encountered; failures occur randomly and independently. This phase, in which the failure rate is constant, typically represents the useful life of the product.  Following this is the wear-out phase, in which an increase in the failure rate is observed. Here, at the end of their useful life, parts age and wear out.
  • 9. Probability Distributions to Model Failure Rate Exponential Distribution :  The life-cycle curve shows the variation of the failure rate as a function of time.  For the chance-failure phase, which represents the useful life of the product, the failure rate is constant.  As a result, the exponential distribution can be used to describe the time to failure of the product for this phase.
  • 10. Exponential Distribution  The exponential distribution have a probability density function given by:  The reliability at time t, R(t), is the probability of the product lasting up to at least time t. It is given by:
  • 11.
  • 12. Example  An amplifier has an exponential time-to-failure distribution with a failure rate of 8% per 1000 hours. What is the reliability of the amplifier at 5000hours? Find the mean time to failure? Solution:
  • 13. Weibull Distribution Weibull Distribution :  The Weibull distribution is used to model the time to failure of products that have a varying failure rate.  It is therefore a candidate to model the debugging phase (failure rate decreases with time), or the wear-out phase (failure rate increases with time).  The Weibull distribution is a three-parameter distribution whose density function is given by:
  • 14. Weibull Distribution  The reliability function for the Weibull distribution is given by  The mean time to failure, as given by  The failure-rate function r(t) for the Weibull time-to-failure probability distribution is
  • 15. Weibull Distribution Figure shows the shape of the failure-rate function for the Weibull failure density function, for values of the parameter ß of 0.5, 1, and 3.5.
  • 16. Example  Capacitors in an electrical circuit have a time-to-failure distribution that can be modeled by the Weibull distribution with a scale parameter of 400 hours and a shape parameter of 0.2. What is the reliability of the capacitor after 600 hours of operation? Find the mean time to failure. Is the failure rate increasing or decreasing with time? Solution:The parameters of the Weibull distribution are a = 400 hours and ß = 0.2. The location parameter ã is 0 for such reliability problems. The reliability after 600 hours of operation is given by
  • 17. Example  This function decreases with time. It would model components in the debugging phase.
  • 18. SYSTEM RELIABILITY  Most products are made up of a number of components. The reliability of each component and the configuration of the system consisting of these components determines the system reliability (i.e., the reliability of the product).  Systems with Components in Series  Systems with Components in Parallel  Systems with Components in Mix Configuration
  • 19. Systems with Components in Series  It is assumed that the components operate independent of each other.  In general, if there are n components in series, where the reliability of the ith component is denoted by Ri, the system reliability is Rs = R1 x R2 x ... X Rn
  • 20. Systems with Components in Series  The system reliability decreases as the number of components in series increases.  Although overdesign in each component improves reliability, its impact would be offset by the number of components in series.  Moreover, manufacturing capabilities and resource limitations restrict the maximum reliability of any given component.  Product redesign that reduces the number of components in series is a viable alternative.
  • 21. Systems with Components in Parallel  System reliability can be improved by placing components in parallel. The components are redundant; the system operates as long as at least one of the components operates.  The only time the system fails is when all the parallel components fail.  All components are assumed to operate simultaneously.  Examples of redundant components placed in parallel to improve the reliability of the system abound. For instance, the braking mechanism is a critical system in the automobile. Dual subsystems thus exist so that if one fails, the brakes still work
  • 22.
  • 23. Systems with Components in Parallel  Suppose that we have n components in parallel, with the reliability of the ith component denoted by Ri=1, 2, ..., n. Assuming that the components operate randomly and independently of each other, the probability of failure of each component is given by Fi = 1 - Ri  Now, the system fails only if all the components fail. Thus, the probability of system failure is
  • 24. Systems with Components in Parallel  The reliability of the system is the complement of Fs and is given by
  • 25. Systems with Components in Series and in Parallel  Complex systems often consist of components that are both in series and in parallel.  Reliability calculations are based on the concepts discussed previously, assuming that the components operate independently.
  • 26. RELIABILITY AND LIFE TESTING PLANS  Plans for reliability and life testing are usually destructive in nature. They involve observing a sample of items until a certain number of failures occur, observing over a certain period of time to record the number of failures, or a combination of both.  Such testing is usually done at the prototype stage, which can be expensive depending on the unit cost of the item.  Testing is usually conducted under simulated conditions, but it should mimic the actual operating conditions as closely as possible.
  • 27. Types of Tests 1. Failure-Terminated Test  In failure-terminated plans, the tests are terminated when a preassigned number of failures occurs in the chosen sample. Lot acceptance is based on the accumulated test time of the items when the test is terminated. One acceptance criterion involves whether the estimated average life of the item exceeds a stipulated value. 2. Time-Terminated Test  A time-terminated test is terminated when a preassigned time T is reached. Acceptance of the lot is based on the observed number of failures r during the test time. If the observed number of failures f exceeds a preassigned value r, the lot is rejected; otherwise, the lot is accepted.
  • 28. Types of Tests 3. Sequential Reliability :Test In sequential reliability testing, no prior decision is made as to the number of failures or the time to conduct the test. Instead, the accumulated results of the test are used to decide whether to accept the lot, reject the lot, or continue testing.