EDI SUPRIYANTO
TOTAL STATION BASICS
FOR BEGINNER
DONE
DONE
DAFTAR ISI
Kata Pengantar …………………………………………............................................................ 4
Daftar Isi ………………………………………..........…............................................................ 4
Bab 1 Pendahuluan …………………………………….......................................................... 4
1.1 Sejarah Ilmu Survey ………………………………….................................................. 4
Bab 2 Electronic Total Station (ETS) ………………………....………................................. 4
2.1 Apa Itu Total Station ……………………………………............................................ 4
2.2 Kemampuan Electronic Total Station ………….......................................................... 4
2.3 Penggunaan Electronic Total Station ………….......................................................... 4
2.4 Bagian-Bagian Alat ……………………………........................................................... 4
2.5 Kelengkapan Unit (Aksesories) ……………………………....................................... 4
2.6 Tombol-Tombol Operasi ......................…………………………................................ 4
2.7 Keterangan Simbol Pada Layar ................………………………................................ 4
Bab 3 Persiapan Pengukuran ……………….............………....………................................. 4
3.1 Kelengkapan Peralatan Pengukuran ..................................................…........................ 4
3.2 Mendirikan Alat ...................................................................................…........................ 4
3.3 Mendirikan Prisma Poligon ...............................................................…........................ 4
3.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4
3.5 Membuat Job ........................................................................................…........................ 4
3.5 Set Up / Setting Instrument ………………………...................................................... 4
DONE
DONE
3.6 Setting Measurements ….........……………………...................................................... 4
3.7 Pengukuran Sederhana .......................................................................…........................ 4
Bab 4 Pengukuran Polygon ……………………………......................................................... 4
4.1 Apa Itu Pengukuran Polygon ..............……………….................................................. 4
4.2 Mendirikan Alat ...................................................................................…........................ 4
4.4 Memasang Kompas ………………………................................................................... 4
4.3 Mendirikan Prisma Poligon ...............................................................…........................ 4
4.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4
4.5 Membuat Job ……………………….............................................................................. 4
4.6 Setting Instrument .....................…….............................................................................. 4
4.7 Setting Measurement ..................……............................................................................ 4
4.8 Mencari Sudut Azimuth Pendekatan Dengan Kompas .............................................. 4
4.9 Memasukkan Koordinat Tempat Berdiri Alat .............................................................. 4
4.10 Memasukkan Backsight ………………………............................................................ 4
4.4 Melakukan Pengukuran Foresight …............................................................................. 4
Bab 4 Pengukuran Rutin (Detail) ………………………….................................................. 4
4.1 Apa Itu Pengukuran Rutin (Detail) ..............………………........................................ 4
4.2 Mendirikan Alat ...................................................................................…........................ 4
4.3 Mendirikan Prisma Poligon ...............................................................…........................ 4
4.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4
4.5 Membuat Job ……………………….............................................................................. 4
4.6 Setting Instrument .....................…….............................................................................. 4
DONE
4.7 Setting Measurement ..................……............................................................................ 4
4.8 Memasukkan Koordinat Tempat Berdiri Alat .............................................................. 4
4.9 Memasukkan Backsight ………………………............................................................ 4
4.10 Melakukan Pengukuran Detail .............…………….................................................... 4
Bab 5 Stake Out …………….....................………………....................................................... 4
Bab 6 Download Data …………….....................………......................................................... 4
6.1 Mengenal Software TransIT .........................…….......................................................... 4
6.2 Tahapan Download Data Dengan Software TransIt .................................................... 4
Bab 7 Upload Data …....…….....................………………....................................................... 4
7.1 Apa Itu Upload Data ............................……………....................................................... 4
7.2 Upload Manual .........................................…………....................................................... 4
7.3 Upload Dengan Komputer ..............................……....................................................... 4
Tentang Penulis ………………………........................................................................................ 4
Daftar Pustaka ……………………….......................................................................................... 4
Lampiran 1 ………………………............................................................................................... 4
Lampiran 2 ………………………............................................................................................... 4
Lampiran 3 ………………………............................................................................................... 4
Lampiran 4 ………………………............................................................................................... 4
DRAFT TRAINING TOTAL STATION
STAKEOUT - ANGLE & DISTANCE METHOD
EDI@SUPRIYANTO.WEB.ID
BAB 1
STAKE OUT
1.1 Apa Itu Stake Out ?
Salah satu pekerjaan penting dalam surveying rekayasa (engineering surveying) ada-
lah pematokan (setting-out/staking-out). Oleh karena itu, seorang surveyor ataupun anda yang
ingin menjadi surveyor tentu diwajibkan memiliki pengetahuan bagaimana melakukan stake-
out.
Pematokan/stakeout adalah memindahkan, mentransfer atau menentukan koordinat ti-
tik-titik yang ada di peta desain perencanaan ke lapangan (permukaan bumi). Prinsip stake out
adalah terbalik dengan konsep pengambilan data lapangan, dimana pengambilan data lapangan
adalah mengumpulkan koordinat-koordinat titik di lapangan untuk kemudian di tuangkan ke
dalam gambar.
Implementasi staking-out bisa dilakukan pada horisontal dan vertikal sekaligus dengan
akurasi tertentu. Untuk memenuhi akurasi titik stake-out yang diinginkan, standard deviasi
titik stake-out yang dicapai harus lebih kecil dari standar deviasi titik stake-out yang diinginkan.
Ilustrasi pekerjaan stake-out sebagaimana diperlihatkan pada Gambar 1.1
Gambar 1.1 Ilustrasi Pekerjaan Stake-out Pada Konstrtuksi Jalan
vishallandsurveyors.com
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
1.2 Penggunaan Stake Out Dalam Bebagai Pekerjaan Lapangan
Pekerjaan stake-out biasanya adalah tahap implementasi desain untuk kemudian di tu-
angkan di lapangan yang sesungguhnya. Dan berikut adalah pekerjaan-pekerjaan yang membu-
tuhkan stake out antara lain :
t Penentuan titik pondasi bor pile pada konstruksi bangunan gedung
t Pemancangan titik tiang pancang diatas laut
t Stake-out titik bagian-bagian mesin
t Soket tiang jembatan (viaduct)
t Penentuan grid-grid bangunan
t Pengkaplingan (sub-division) tanah untuk perumahan
t Alignment pada konstruksi jalan
t Jalur rel kereta api
t Saluran Udara Tegangan Extra Tinggi (SUTET)
t Akselerator elektron
t Dan lain sebagainya
1.3 Beberapa Metode Di Dalam Melakukan Stake Out
Dengan semakin banyaknya kemunculan perangkat Electronic Total Station (ETS) den-
gan fitur-fitur yang semakin canggih, maka pekerjaan stake-out menjadi semakin mudah den-
gan tingkat akurasi yang sangat tinggi hingga dalam hitungan milimeter.
Dan berikut fitur-fitur standar Electronic Total Station untuk pekerjaan stake out yaitu ;
t Stake out berdasarkan HA-HD, yaitu stake out berdasarkan pada besaran sudut horizontal
dan jarak datar
t Stake out berdasarkan koordinat (X, Y, Z), yaitu menentukan posisi suatu titik dilapangan
berdasrkan data koordinat.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Stake out DivLine, yaitu stake out untuk menentukan posisi titik-titik dengan membagi ja-
rak yang sama pada satu garis
t Stake out RefLine, yaitu stake out untuk menentukan offset suatu titik berdasarkan dua titik
pada suatu garis.
Namun, dilapangan yang sering digunakan adalah stake out berdasarkan nilai koordinat karena
lebih praktis dan mudah. Sehingga pada bab ini juga kita hanya akan singgung pekerjaan stake
out berdasarkan koordinat.
Gambar 1.2 Menu Stake-out Pada Electronic Total Station
1.3.1 Stake Out Dengan Metode HA - HD
Stake-out dengan metode HA - HD adalah stake-out berdasarkan sudut hosrisontal
(Horizontal Angle - HA) dan jarak horisontal (Horizontal Distance - HD). Adapun langkah-
langkahnya adalah sebagai berikut :
t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah
di definisikan dan back sight sudah di tentukan.
t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.3
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.3 Menu Stake-out Pada Electronic Total Station
Gambar 1.4 Stake-out Metode HA - HD
t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 1. HA - HD, sebagaimana
diperlihatkan pada Gambar 1.4
t Selanjutnya akan muncul isian “Angle and Distance” dengan penjelasan sebagai berikut :
HD (Horizontal Distance) : Jarak horisontal dari titik station ke titik stake-out (m)
dVD (Vertical Distance) : Beda tinggi dari titik station ke titik stake-out (m)
HA (Horizontal Angle) : Sudut horisontal ke titk stake-out (m) , dan terakhir tekan tombol
enter untuk menyelesaikan, sebagaimana diperlihatkan pada Gambar 1.5
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.5 Memberikan Nilai Sudut Dan Jarak
Gambar 1.6 Memutar Alat Dan Melakukan Pengukuran Uji Coba
t Selanjutnya lakukan putaran total station mengikuti tanda panah dHA sampai seluruhnya
bernilai 0° 00’ 00”. Di sini kita memerlukan penggerak halus horisontal secara pelan-pelan
untuk mendapatkan akurasi yang tinggi dari pengukuran dan selanjutnya kita tekan tombol
MSR untuk melakukan uji coba penembakan, sebagaimana diperlihatkan pada Gambar 1.6
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.7 Hasil Uji Coba Penembakan
t Dan selanjutnya pada layar akan di ketahui hasil uji coba penembakan pertama, dimana
putaran sudut kurang 1”, prisma target kurang mundur 0.27 meter dan kurang naik 0.4 me-
ter. Ulangi secara berulang-ulang hingga mendapatkan angka seluruhnya adalah 0. Dan di
situlah titik yang dimaksud dala stake-out, sebagaimana diperlihatkan pada Gambar 1.7
t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih
untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama
untuk menemukan titik stake-out.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
DRAFT TRAINING TOTAL STATION
STAKEOUT - COORDINATE XYZ METHOD
EDI@SUPRIYANTO.WEB.ID
1.3.2 Stake Out Dengan Metode Coordinate XYZ
Stake-out dengan metode coordinate XYZ adalah stake-out berdasarkan input koordi-
nat Easting Northing Zenith (ENZ) atau bisa juga kita sebut XYZ. Penginputan koordinat bisa
dilakukan secara langsung satu-persatu, bisa juga kita lakukan dengan cara transfer data apabila
jumlahnya sangat banyak.
Untuk beberapa contoh berikut hanya akan diberikan contoh untuk penginputan data
dengan cara langsung satu persatu. Adapun langkah-langkahnya adalah sebagai berikut :
t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah
di definisikan dan back sight sudah di tentukan.
t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.8
Gambar 1.8 Menu Stake-out Pada Electronic Total Station
t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 2. XYZ dan kembali kita
tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan
pada Gambar 1.9
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.9 Stake-out Metode Input Koordinat XYZ
Gambar 1.10 Tampilan Layar Imput Point
t Selanjutnya akan muncul menu input point dimana pada label PT kita berikan penomoran
point berikutnya misal 7, dan kembali kita tekan tombol enter pada sisi kanan bawah untuk
konfirmasi, sebagaimana diperlihatkan pada Gambar 1.10
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.12 Hasil Uji Coba Penembakan
Gambar 1.11 Input Koordinat NEZ / XYZ
t Selanjutnya kita inputkan koordinat yang kita maksudkan dan untuk contoh kali ini untuk
Northing (N) = 1025.000 ; Easting (E) = 2025.000 ; Zenith (Z) = 203.000, dan kembali kita
tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan
pada Gambar 1.11
t Selanjutnya pada layar akan muncul sudut horisontal (Horizontal Angle - HA) dan ke arah
mana alat harus diputar. Indikasi jarak dari titik alat berdiri sampai dengan titik stake-out
juga diberikan yaitu sebesar 35.36 meter, sebagaimana diperlihatkan pada Gambar 1.11
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya lakukan putaran total station mengikuti tanda panah dHA sampai seluruhnya
bernilai 0° 00’ 00”. Di sini kita memerlukan penggerak halus horisontal secara pelan-pelan
untuk mendapatkan akurasi yang tinggi dari pengukuran dan selanjutnya kita tekan tombol
MSR1 (atau MSR2 tergantung setting alat) untuk melakukan uji coba penembakan, seba-
gaimana diperlihatkan pada Gambar 1.13
Gambar 1.12 Hasil Uji Coba Penembakan
t Selanjutnya setelah melakukan penembakan dengan alat maka sesaat akan muncul pada la-
yar hasil uji coba tembakan tersebut. Dalam contoh kali ini putaran sudut horisontal perlu di
putar lagi hingga memperoleh nilai 0° 00’ 00”, prisma perlu mundur lagi sejauh 33.05 meter
dan ketinggian perlu dinaikkan 2.75 meter, sebagaimana diperlihatkan pada Gambar 1.13
t Di sini uji coba perlu dilakukan secara berulang-ulang hingga seluruhnya mendapatkan
nilai 0. Yang artinya titik tersebut adalah titik stake-out yang dimaksud.
t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih
untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama
untuk menemukan titik stake-out.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.13 Hasil Uji Coba Penembakan
1.3.2.1 Stake Out Dengan Metode Coordinate XYZ (Input Cogo)
Stake-out dengan metode coordinate XYZ adalah stake-out berdasarkan input koordi-
nat Easting Northing Zenith (ENZ) atau bisa juga kita sebut XYZ. Untuk contoh penginputan
kali ini akan dilakukan terlebih dahulu melalui menu COGO (Coordinate Geometry). Adapun
langkah-langkahnya adalah sebagai berikut :
t Kita tekan tombol “Menu” sebagaimana diperlihatkan pada Gambar 1.14
Gambar 1.14 Akses Tombol Menu
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.15 Akses Menu Cogo (Coordinate Geometry)
Gambar 1.16 Hasil Uji Coba Penembakan
t Selanjutnya pada layar akan muncul tampilan pilihan “Menu” dimana kita pilih 2. COGO
dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada Gambar
1.15
t Selanjutnya pada layar akan muncul tampilan pilihan “Menu Cogo” dimana kita pilih 2. In-
put dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada Gam-
bar 1.16
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.17 Hasil Uji Coba Penembakan
Gambar 1.18 Hasil Uji Coba Penembakan
t Selanjutnya pada layar akan muncul tampilan pilihan “Menu Input” dimana kita pilih 2.
Input XYZ dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada
Gambar 1.17
t Selanjutnya kita inputkan koordinat yang kita maksudkan dan untuk contoh kali ini untuk
Northing (N) = 1050.000 ; Easting (E) = 2050.000 ; Zenith (Z) = 205.000, dan kembali kita
tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan
pada Gambar 1.18
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.19 Menu Stake-Out
t Sesaat setelah kita menekan tombol enter, maka koordinat titik telah di simpan di dalan alat.
Sehingga pada saat melakukan stake-out kita cukup memanggil nomor point dalam hal ini
point 8, maka dengan cepat pada layar monitor akan di tampilkan koordinatnya. Dan pada
saat stake-out tinggal mengikuti saja putaran sdut dan jaraknya, sebagaimana diperlihatkan
pada Gambar sampai dengan 1.19 Gambar 1.22
Gambar 1.20 Memanggil Titik (Point) Stake-Out
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.21 Koordinat Titik Stake Out
Gambar 1.22 Putaran Sudut dan Jarak Stake-Out
t Di sini uji coba perlu dilakukan secara berulang-ulang hingga seluruhnya mendapatkan
nilai 0. Yang artinya titik tersebut adalah titik stake-out yang dimaksud.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
DRAFT TRAINING TOTAL STATION
STAKEOUT - DIVIDE LINE METHOD
EDI@SUPRIYANTO.WEB.ID
1.3.2 Stake Out Dengan Metode Divide Line
Stake-out dengan metode Divide Line adalah stake-out berdasarkan pembagian garis
antara instrumen dengan target pertama dengan memasukkan jumlah bentang atau bagian
yang sama panjang. Adapun langkah-langkahnya adalah sebagai berikut :
t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah
di definisikan dan back sight sudah di tentukan.
t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.23
Gambar 1.23 Menu Stake-out Pada Electronic Total Station
t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 3. DivLine S-O dan kembali
kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihat-
kan pada Gambar 1.24
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.24 Stake-out Metode Divide Line S-O
Gambar 1.25 Tampilan Layar Line Stake Out
t Selanjutnya akan muncul menu ”Line Stake Out” yaitu berupa informasi HA (Horisontal
Angle) dan HD (Horisontal Distance) yang saat ini masih belum mempunyai nilai atau 0.
Untuk itu kita lakukan penembakan dengan cara menekan tombol MSR1 / MSR2 untuk me-
nentukan titik yang akan kita jadikan referensi, sebagaimana diperlihatkan pada Gambar
1.25
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.26 Memasukkan Jumlah Pembagian Bentang
t Selanjutnya setelah dilakukan penembakan titik maka pada HD (Horisontal Distance) kini
memiliki nilai yaitu 23.06 meter. Nilai ini merupakan pembulatan kedalam 2 angka desimal.
Pada bagian “Span Total” kita masukkan jumlah bentang atau jumlah pembagian, seba-
gaimana diperlihatkan pada Gambar 1.26
t Selanjutnya pada layar monitor akan muncul titik pertama stake-out berdasarkan pembagi-
an tersebut. Dan untuk berpindah ke titik-titik berikutnya, maka cukup dengan memencet
tombol panah ke bawah atau panah ke atas, sebagaimana diperlihatkan pada Gambar 1.27
sampai dengan Gambar 1.26
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.27 Jarak Titik Stake Out 1
Gambar 1.28 Jarak Titik Stake Out 2
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.29 Jarak Titik Stake Out 3
Gambar 1.30 Jarak Titik Stake Out 4
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.32 Jarak Titik Stake Out 6
Gambar 1.31 Jarak Titik Stake Out 5
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Untuk menyederhanakan pemahaman bagaimana alat bekerja untuk menghitung pemba-
gian tersebut adalah sebagai berikut : misal dalam tembakan point di dapat angka 100 meter
dari instrumen, dan kemudian kita melakukan pembagian dengan set span sebesar 2, maka
di berikan ilustrasi sebagaimana Gambar 1.33
Gambar 1.33 Ilustrasi Jarak Titik 100 Meter  Pembagian Bentang 2
t Dan selanjutnya untuk melakukan stake-out titik-titik tersebut maka kita cukup melakukan
penembakan dengan menekan tombol MSR1 / MSR2. Misal dari tembakan uji coba per-
tama prisma target kurang maju 11.85 meter; dan kurang bergeser ke kiri sebesar 0.57 meter.
Pada uji coba tembakan ke dua prisma target kurang maju 0.54 meter; dan kurang bergeser
ke kiri sebesar 0.17 meter, sebagaimana pada Gambar 1.34 dan Gambar 1.34
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.35 Uji Coba Kedua Stake-Out Point 1
Gambar 1.34 Uji Coba Pertama Stake-Out Point 1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Ulangi secara berulang-ulang hingga mendapatkan angka seluruhnya adalah 0. Dan di situ-
lah titik yang dimaksud dala stake-out
t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih
untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama
untuk menemukan titik stake-out.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
DRAFT TRAINING TOTAL STATION
DOWNLOAD - UPLOAD DATA
EDI@SUPRIYANTO.WEB.ID
Gambar 5.1 Ilustrasi Transfer Data Dari dan Ke Total Station
5.1 Transfer Data
Total Station sebagai perangkat survey yang ringkas dan portable memiliki kelebihan
di dalam mengumpulkan jumlah koordinat dalam jumlah besar antara 100 hingga ribuan titik
perhari, sehingga produktifitasnya sangat bisa di andalkan. Data dari Total Station bisa langsung
di hubungkan dengan komputer yang kemudian diolah menjadi peta dengan program mapping
software. Selain itu upload data juga bisa dilakukan untuk kepentingan stake-out misalnya dari
komputer ke Total Station.
Ada banyak program untuk bisa melakukan transfer data, bergantung perangkat Total Station
yang dipergunakan. Misal untuk Topcon atau Gowin biasa dipergunakan Topcon Link, untuk
Total Station Sokkia bisa dipergunakan Prolink, untuk Total Station Nikon bisa memperguna-
kan software TransIt dan lain sebagainya.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Pada buku ini akan diberikan contoh penggunaan software Connex yang dikembangkan
oleh TDS (Tripod Data System) yang memungkinkan transfer data dua arah (import dan ex-
port) antara Total Station Spectra Precision dan Nikon dengan komputer. Program Connex saat
ini telah menggantikan program transIt yang sudah dihentikan pengembangannya.
t Kita akses menu Programs  Connex pada sistem operasi Windows, sebagaimana diperli-
hatkan pada Gambar 5.1
Gambar 5.1 Menu Akses Program Connex
t Selanjutnya akan muncul splash screen program Connex dan dilanjutkan dengan tampilan
halaman muka program, sebagaimana diperlihatkan pada Gambar 5.1 dan Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 5.1 Splash Screen Program Connex
Gambar 1.6 Tampilan Antar Muka Program Connex
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
5.2 Mendownload Data Dari Total Station
Mendownload data adalah memindahkan data yang dihasilkan oleh perangkat Total
Station ke dalam komputer kita untuk di olah lebih lanjut. Adapun langkah-langkah di dalam
mendownload data dari Total Station ke dalam komputer kita adalah sebagai berikut :
t Kita lakukan klik pada menu Transfer  Get Job From Total Station, sebagaimana diperli-
hatkan pada Gambar 5.1
Gambar 1.6 Akses Menu Transfer Data Dari Total Station
t Sebelum melakukan transfer data, kita lakukan “Transfer Setting” terlebih dahulu dengan
menekan tombol “Transfer Setting”, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Akses Menu Transfer Setting
t Selanjutnya akan muncul jendela “Preference” yang terdiri atas beberapa tab antara lain :
Colors, Display, Transfer, Snap, General, Format dan Rename Rules, sebagaimana diper-
lihatkan pada Gambar 5.1 sampai dengan Gambar 5.1
t Untuk kali ini kita hanya akan melakukan setting pada tab “Transfer” sebagai berikut : pada
bagian Total Station kita plih pada tombol radio jenis total station kita pilih sesuai dengan
alat yang kita pergunakan misal : Spectra Precision dan pada drop down menu kita pilih mis-
al : Focus 4; pada bagian Communication kita klik drop down menu kita sesuaikan antara
Total Station dengan komputer kita misal : Com Port On PC= Com6, Baud Rate=4800,
Parity=None dan lain sebagainya. Dan terkahir kita tekan tombol “OK” untuk melakukan
konfirmasi akhir, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Tab Display Preferences
Gambar 1.6 Tab Color Preferences
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Tab Transfer Preferences
5.2.1 Download Raw Data
t Untuk melakukan download data ada dua pilihan download bergantung peralatan yang kita
pakai. Pilihan tersebut adalah Download Raw data dan Download Coordinate data. Dan
kali ini kita akan coba pilih Download Raw data dengan cara menekan tombol “Download
Raw”, sebagaimana diperlihatkan pada Gambar 5.1
t Sampai denga tahap ini untuk setting dikomputer sudah cukup menunggu respon dari per-
angakat Total Station.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya kita beralih ke perangkat Total Station. Pada Total Station kita tekan tombol
“Menu”, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 1.6 Proses Pemindahan Data Dari Total Station
Gambar 5.1 Menu Akses Program Connex
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada
keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat-
kan pada Gambar 5.1
Gambar 5.1 Memilih Menu Comm
Gambar 5.1 Memilih Menu Download
t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih
“1. Download“, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter-
lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me-
milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Peringatan Seleksi Job
Gambar 5.1 Memilih Salah Satu Job
t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene-
kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter,
sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 5.1 Layar Setting Download
t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis
data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana
diperlihatkan pada Gambar 5.1
t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol
“GO”, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Tekan Tombol GO
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Dan selanjutnya proses transfer data akan berlangsung, sebagaimana diperlihatkan pada
Gambar 5.1
Gambar 5.1 Tampilan Proses Transfer Pada Total Station
Gambar 1.6 Tampilan Proses Transfer Pada Program Connex
t Proses transfer data juga akan muncul pada program Connex, sebagaimana diperlihatkan
pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Setelah seluruh proses pemindahan data selesai maka kita tinggal memberikan nama file
yang nantinya akan ber extensi Connex Raw File (*.Cxr), sebagaimana diperlihatkan pada
Gambar 5.1
Gambar 1.6 Memberikan Nama File
t Sesaat setelah kita tekan tombol “Save” maka seluruh data telah berada di dalam komputer
kita dengan nama file dan folder yang telah kita tempatkan sebelumnya.
t Program Connex juga akan menampilkan sebaran data pada layar utama, sebagaimana
diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Tampilan Sebaran Data Dalam Program Connex
5.2.2 Download Coordinate Data
Selain raw data kita juga bisa mendownload Coordinate Data, adapun langkah-lang-
kahnya adalah sebagai berikut :
t Pertama kita menekan tombol “Download Coordinate”, sebagaimana diperlihatkan pada
Gambar 5.1
t Selanjutnya kita tunggu respon dari perangkat Total Station untuk proses dowload data
koordinat.
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Download Coordinate
t Selanjutnya kita beralih ke perangkat Total Station. Pada Total Station kita tekan tombol
“Menu”, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Menu Akses Program Connex
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada
keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat-
kan pada Gambar 5.1
Gambar 5.1 Memilih Menu Comm
Gambar 5.1 Memilih Menu Download
t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih
“1. Download“, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter-
lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me-
milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Peringatan Seleksi Job
Gambar 5.1 Memilih Salah Satu Job
t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene-
kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter,
sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis
data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana
diperlihatkan pada Gambar 5.1
Gambar 5.1 Layar Setting Download
t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol
“GO”, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Tekan Tombol GO
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Dan selanjutnya proses transfer data akan berlangsung, sebagaimana diperlihatkan pada
Gambar 5.1
Gambar 5.1 Tampilan Proses Transfer Pada Total Station
Gambar 1.6 Tampilan Proses Transfer Pada Program Connex
t Proses transfer data juga akan muncul pada program Connex, sebagaimana diperlihatkan
pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Setelah seluruh proses pemindahan data selesai maka kita tinggal memberikan nama file
yang nantinya akan ber extensi Connex Job File (*.Cxj), sebagaimana diperlihatkan pada
Gambar 5.1
Gambar 1.6 Penyimpanan File Format Conex Job File (*Cxj)
t Sesaat setelah kita tekan tombol “Save” maka seluruh data telah berada di dalam komputer
kita dengan nama file dan folder yang telah kita tempatkan sebelumnya.
t Program Connex juga akan menampilkan sebaran data pada layar utama, sebagaimana
diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Hasil Uji Coba Penembakan
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
5.3. Export Data
Program Connex bukan merupakan program yang serba bisa dalam hal ini misal di
dalam melakukan data proses. Maka perlu dilakukan pengolahan data lebih lanjut mempergu-
nakan program yang lain semisal Civil 3D atau Autocad. Untuk itu perlu dilakukan export data
dari program Connex ke program yang lain semisal Civil 3D atau Autocad. Dimana Connex
mendukung tiga buah format file untuk meng export yaitu ASCII text file, dxf dan Land Xml.
5.3.1 Export ASCII Text File
ASCII (American Standard Code for Information Interchange) adalah kode standar
Amerika untuk pertukaran informasi yang bersifat universal, dikembangkan oleh ANSI (Amer-
ican National Standard Institue). Untuk meng export ASCII text file maka berikut adalah lang-
kah-langkahnya :
t Kita lakukan klik pada Tree View Export dan kita pilih ASCII, sebagaimana diperlihatkan
pada Gambar 5.1
Gambar 1.6 Akses Menu Export ASCII Text File
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Setting Delimiter dan Column Order
t Selanjutnya akan muncul jendela Export ASCII Coordinates. Untuk delimiter (pembatas)
antar koordinat bisa kita pergunakan comma, tabs, maupun spasi. Untuk Column Order
(Urutan Kolom) bisa kita pilih PNEZD (Point Northing Easting Zenith Description) dengan
mengaktifkan seluruh check box, sebagaimana diperlihatkan pada Gambar 5.1
t Pada Select Point saat ini kita belum memiliki satu point pun dengan di tandai “0 objects
selected” pada sisi kanan bawah layar. Untuk memilih point kita klik icon mouses dan di-
lanjutkan dengan menjaring point pada layar, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Seleksi Point
Gambar 1.6 Object Point Terseleksi
t Kini seluruh point sudah terseleksi di tandai dengan perubahan warna pada point dari biru
menjadi warna merah. Begitu pula pada sisi kanan bawah diberikan informasi “17 objects
selected”, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Penyimpanan Data Dalam Format CSV
t Selanjutnya akan muncul jendela baru dimana kita tinggal memberikan nama file dan lokasi
folder. Extensi file kita pilih Comma Separated Values (CSV), sebagaimana diperlihatkan
pada Gambar 5.1
t Dan kini kita tinggal mengecheck file pada lokasi folder yang sudah kita pilih, sebagaimana
diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 File Hasil Export
t Dan apabila kita buka dengan program Notepad maka akan ditampilkan deretan data koor-
dinat, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Tampilan Koordinat Dalam Program Notepad
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Export DXF File
5.3.2 Export DXF File
File DXF (Drawing Exchange Format) adalah sebuah file format yang dikembangkan
oleh Autodesk yang memungkinkan data bisa dioperasikan antara Autocad dengan program
yang lain. Untuk meng export DXF file maka berikut adalah langkah-langkahnya :
t Kita lakukan klik pada Tree View Export dan kita pilih DXF, sebagaimana diperlihatkan
pada Gambar 5.1
t Selanjutnya akan muncul jendela Export DXF Autocad. Untuk Point Block Definitions kita
berikan check box apa saja yang ingin di tampilkan. Tinggi text serta jarak spasi bisa juga
dilakukan pengaturan, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Setting Point Block
t Sebagaimana halnya dengan export ASCII text file sebelumnya, kita lakukan seleksi point
juga dengan cara menjaring point pada layar. Point yang terseleksi akan berubah warna
dari biru menjadi merah, dan pada sisi kanan bawah layar terdapat informasi jumlah object
point yang terseleksi, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Penyimpanan Data Dalam Format DXF
t Selanjutnya akan muncul jendela baru dimana kita tinggal memberikan nama file dan lokasi
folder. Extensi file kita pilih Drawing Exchange Format (*DXF), sebagaimana diperlihatkan
pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Dan kini kita tinggal mengecheck file pada lokasi folder yang sudah kita pilih, sebagaimana
diperlihatkan pada Gambar 5.1
Gambar 1.6 File Hasil Export
t Dan apabila kita buka dengan program Autocad maka akan ditampilkan point-point survey,
sebagaimana diperlihatkan pada Gambar 5.1
Gambar 1.6 Tampilan Point Dalam Program Autocad
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
5.4 Mengupload Data
Mengupload data adalah memindahkan data yang ada di dalam komputer kita untuk
dipindahkan ke perangkat Total Station atau merupakan kebalikan dari mendownload data.
Input data ke dalam perangkat Total Station bisa dilakukan manual satu persatu, namun apabila
pointnya terlalu banyak, maka menjadi pekerjaan yang besar dan memakan waktu yang sangat
lama. Maka mengupload data menjadi pilihan yang paling mudah. Adapun langkah-langkah di
dalam mendownload data dari Total Station ke dalam komputer kita adalah sebagai berikut :
t Asumsi kita sudah memiliki sebuah file dalam program Connex, file tersebut bisa diperoleh
dengan import data misal dari ASCII data file atau dengan metode yang lain.
t Kita lakukan klik pada menu Transfer  Send Job To Total Station, sebagaimana diperli-
hatkan pada Gambar 5.1
Gambar 1.6 Akses Menu Upload/Send Data
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Akses Menu Select Points
Gambar 1.6 Seleksi Point
t Pada Select Points saat ini kita belum memiliki satu point pun dengan di tandai “0 objects
selected” pada sisi kanan bawah layar. Untuk memilih point kita klik icon mouses dan di-
lanjutkan dengan menjaring point pada layar, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Point Terseleksi
t Selanjutnya kita ke menu pada Pada Total Station kita tekan tombol “Menu”, sebagaimana
diperlihatkan pada Gambar 5.1
Gambar 5.1 Menu Pada Total Station
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada
keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat-
kan pada Gambar 5.1
Gambar 5.1 Memilih Menu Comm
Gambar 5.1 Memilih Menu Upload XYZ
t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih
“1. Upload XYZ“, sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 5.1 Peringatan Seleksi Job
t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter-
lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me-
milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Memilih Salah Satu Job
t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene-
kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter,
sebagaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 5.1 Tombol Go Untuk Memulai Upload
t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol
“GO”, sebagaimana diperlihatkan pada Gambar 5.1
Gambar 5.1 Menu Akses Program Connex
t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis
data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana
diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Gambar 1.6 Progress Upload / Send File
t Selanjutnya pada program Connex kita tekan tombol “Send” untuk memerintahkan pen-
giriman data. Dan selanjutnya progress pengiriman akan di tampilkan pada layar, seba-
gaimana diperlihatkan pada Gambar 5.1
D
R
A
F
T
T
R
A
I
N
I
N
G
T
O
T
A
L
S
T
A
T
I
O
N
-
E
D
I
S
U
P
R
I
Y
A
N
T
O
Tutorial penggunaan total station   edi supriyanto, st

More Related Content

What's hot

Sistem UAV Untuk Perhitungan Volume
Sistem UAV Untuk Perhitungan VolumeSistem UAV Untuk Perhitungan Volume
Sistem UAV Untuk Perhitungan VolumeTutus Kusuma
 
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANG
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANGLAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANG
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANGafifsalim
 
Tutorial agisoft metashape pengolahan data drone - edi supriyanto, st
Tutorial agisoft metashape   pengolahan data drone - edi supriyanto, stTutorial agisoft metashape   pengolahan data drone - edi supriyanto, st
Tutorial agisoft metashape pengolahan data drone - edi supriyanto, stProjectEngineer5
 
Grandindonesia data
Grandindonesia dataGrandindonesia data
Grandindonesia datadarwanloei
 
Menggambar bangunan air
Menggambar bangunan airMenggambar bangunan air
Menggambar bangunan airAgam Agam
 
Polygon tertutup
Polygon tertutupPolygon tertutup
Polygon tertutupArif Anwar
 
2007 08-pekerjaan drainase
2007 08-pekerjaan drainase2007 08-pekerjaan drainase
2007 08-pekerjaan drainaseahmad fuadi
 
Makalah metode pelaksanaan_jembatan_beto
Makalah metode pelaksanaan_jembatan_betoMakalah metode pelaksanaan_jembatan_beto
Makalah metode pelaksanaan_jembatan_betoJamauddin Akkuan
 
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8Wachidatin N C
 
Timor-Leste Standard Method of Measurement (TL-SMM)
Timor-Leste Standard Method of Measurement (TL-SMM)Timor-Leste Standard Method of Measurement (TL-SMM)
Timor-Leste Standard Method of Measurement (TL-SMM)Luis Noronha
 
Motorola solutions ap6532 series access point installation guide wi ng 5.5 ...
Motorola solutions ap6532 series access point installation guide   wi ng 5.5 ...Motorola solutions ap6532 series access point installation guide   wi ng 5.5 ...
Motorola solutions ap6532 series access point installation guide wi ng 5.5 ...Advantec Distribution
 
penggunaan geosintetik untuk konstruksi jalan
penggunaan geosintetik untuk konstruksi jalanpenggunaan geosintetik untuk konstruksi jalan
penggunaan geosintetik untuk konstruksi jalanrobert tuba
 
2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)franst
 
Kerangka acuan kerja perencanaan jalan
Kerangka acuan kerja perencanaan jalanKerangka acuan kerja perencanaan jalan
Kerangka acuan kerja perencanaan jalanKHRISTIAN MAUKO
 

What's hot (20)

Sistem UAV Untuk Perhitungan Volume
Sistem UAV Untuk Perhitungan VolumeSistem UAV Untuk Perhitungan Volume
Sistem UAV Untuk Perhitungan Volume
 
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANG
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANGLAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANG
LAPORAN KERJA PRAKTEK PROYEK PEMBANGUNAN GEDUNG JASA RAHARJA PERSERO SEMARANG
 
Tutorial agisoft metashape pengolahan data drone - edi supriyanto, st
Tutorial agisoft metashape   pengolahan data drone - edi supriyanto, stTutorial agisoft metashape   pengolahan data drone - edi supriyanto, st
Tutorial agisoft metashape pengolahan data drone - edi supriyanto, st
 
Grandindonesia data
Grandindonesia dataGrandindonesia data
Grandindonesia data
 
01. petunjuk praktis garmin 76 c sx
01. petunjuk praktis garmin 76 c sx01. petunjuk praktis garmin 76 c sx
01. petunjuk praktis garmin 76 c sx
 
Menggambar bangunan air
Menggambar bangunan airMenggambar bangunan air
Menggambar bangunan air
 
Polygon tertutup
Polygon tertutupPolygon tertutup
Polygon tertutup
 
2007 08-pekerjaan drainase
2007 08-pekerjaan drainase2007 08-pekerjaan drainase
2007 08-pekerjaan drainase
 
Documents.tips brosur peri-pd-8
Documents.tips brosur peri-pd-8Documents.tips brosur peri-pd-8
Documents.tips brosur peri-pd-8
 
Bab 7: Pemetaan dengan Kompas
Bab 7:   Pemetaan dengan KompasBab 7:   Pemetaan dengan Kompas
Bab 7: Pemetaan dengan Kompas
 
Makalah metode pelaksanaan_jembatan_beto
Makalah metode pelaksanaan_jembatan_betoMakalah metode pelaksanaan_jembatan_beto
Makalah metode pelaksanaan_jembatan_beto
 
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8
Penginderaan Jauh : Koreksi Geometrik Citra Landsat 8
 
Timor-Leste Standard Method of Measurement (TL-SMM)
Timor-Leste Standard Method of Measurement (TL-SMM)Timor-Leste Standard Method of Measurement (TL-SMM)
Timor-Leste Standard Method of Measurement (TL-SMM)
 
Motorola solutions ap6532 series access point installation guide wi ng 5.5 ...
Motorola solutions ap6532 series access point installation guide   wi ng 5.5 ...Motorola solutions ap6532 series access point installation guide   wi ng 5.5 ...
Motorola solutions ap6532 series access point installation guide wi ng 5.5 ...
 
Sistem Koordinat
Sistem KoordinatSistem Koordinat
Sistem Koordinat
 
penggunaan geosintetik untuk konstruksi jalan
penggunaan geosintetik untuk konstruksi jalanpenggunaan geosintetik untuk konstruksi jalan
penggunaan geosintetik untuk konstruksi jalan
 
2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)
 
Sistem waktu sipil dan waktu julian
Sistem waktu sipil dan waktu julianSistem waktu sipil dan waktu julian
Sistem waktu sipil dan waktu julian
 
Kerangka acuan kerja perencanaan jalan
Kerangka acuan kerja perencanaan jalanKerangka acuan kerja perencanaan jalan
Kerangka acuan kerja perencanaan jalan
 
SNI-JARING KONTROL VERTIKAL (JKV)
SNI-JARING KONTROL VERTIKAL (JKV)SNI-JARING KONTROL VERTIKAL (JKV)
SNI-JARING KONTROL VERTIKAL (JKV)
 

Similar to Tutorial penggunaan total station edi supriyanto, st

Petunjuk operasional peb53
Petunjuk operasional peb53Petunjuk operasional peb53
Petunjuk operasional peb53lahuddu76
 
Onetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianOnetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianSyariFah Maulidayati
 
Onetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianOnetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianadel_amran
 
Draft urs tms version 1 0 a
Draft urs   tms version 1 0  aDraft urs   tms version 1 0  a
Draft urs tms version 1 0 ad3styakrisna
 
Dokumentasi open streetmap reimplementation
Dokumentasi open streetmap reimplementationDokumentasi open streetmap reimplementation
Dokumentasi open streetmap reimplementationThe World Bank
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014abijand
 
Buku Ajar Mikrokontroler dan Interface.pdf
Buku Ajar Mikrokontroler dan Interface.pdfBuku Ajar Mikrokontroler dan Interface.pdf
Buku Ajar Mikrokontroler dan Interface.pdfSiswantoSpd
 
Software Requirement Spesification
Software Requirement SpesificationSoftware Requirement Spesification
Software Requirement Spesificationwida dwitiayasa
 
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdf
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdfPetunjuk Teknis Pengisian Non Perseorangan OSS v5.pdf
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdfImam Prastio
 
Buku Manual Aplikasi Dapodikdas Versi 3.0.0
Buku Manual Aplikasi Dapodikdas Versi 3.0.0Buku Manual Aplikasi Dapodikdas Versi 3.0.0
Buku Manual Aplikasi Dapodikdas Versi 3.0.0Ahmad Mubarak
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Kahar Muzakkir
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Dwi AndriWongso
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014mpubarata
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Mohamad Ambyah
 
Buku Panduan Aplikasi eKinerja
Buku Panduan Aplikasi eKinerjaBuku Panduan Aplikasi eKinerja
Buku Panduan Aplikasi eKinerjaMuh Saleh
 
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)Donny Kurniawan
 

Similar to Tutorial penggunaan total station edi supriyanto, st (20)

Petunjuk operasional peb53
Petunjuk operasional peb53Petunjuk operasional peb53
Petunjuk operasional peb53
 
Onetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianOnetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesian
 
Onetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesianOnetouch t60-quick-guide-indonesian
Onetouch t60-quick-guide-indonesian
 
Kata pengantar daf isi sisop
Kata pengantar daf isi sisopKata pengantar daf isi sisop
Kata pengantar daf isi sisop
 
Draft urs tms version 1 0 a
Draft urs   tms version 1 0  aDraft urs   tms version 1 0  a
Draft urs tms version 1 0 a
 
Dokumentasi open streetmap reimplementation
Dokumentasi open streetmap reimplementationDokumentasi open streetmap reimplementation
Dokumentasi open streetmap reimplementation
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014
 
Buku Ajar Mikrokontroler dan Interface.pdf
Buku Ajar Mikrokontroler dan Interface.pdfBuku Ajar Mikrokontroler dan Interface.pdf
Buku Ajar Mikrokontroler dan Interface.pdf
 
Software Requirement Spesification
Software Requirement SpesificationSoftware Requirement Spesification
Software Requirement Spesification
 
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdf
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdfPetunjuk Teknis Pengisian Non Perseorangan OSS v5.pdf
Petunjuk Teknis Pengisian Non Perseorangan OSS v5.pdf
 
Buku Manual Aplikasi Dapodikdas Versi 3.0.0
Buku Manual Aplikasi Dapodikdas Versi 3.0.0Buku Manual Aplikasi Dapodikdas Versi 3.0.0
Buku Manual Aplikasi Dapodikdas Versi 3.0.0
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014
 
Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014Manual aplikasi dapodikdas_v300_01082014
Manual aplikasi dapodikdas_v300_01082014
 
Buku Panduan Aplikasi eKinerja
Buku Panduan Aplikasi eKinerjaBuku Panduan Aplikasi eKinerja
Buku Panduan Aplikasi eKinerja
 
Tik.pr02.003.01 b informasi2
Tik.pr02.003.01 b informasi2Tik.pr02.003.01 b informasi2
Tik.pr02.003.01 b informasi2
 
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)
Cara Membuat Program Chatting Sederhana Dengan Visual Basic (Program 3)
 
Sistem operasi 1.3
Sistem operasi 1.3Sistem operasi 1.3
Sistem operasi 1.3
 
Sistem operasi 1.3
Sistem operasi 1.3Sistem operasi 1.3
Sistem operasi 1.3
 

More from ProjectEngineer5

Surveying with google earth & civil 3 d edi supriyanto, st
Surveying with google earth & civil 3 d   edi supriyanto, stSurveying with google earth & civil 3 d   edi supriyanto, st
Surveying with google earth & civil 3 d edi supriyanto, stProjectEngineer5
 
Percakapan bahasa inggris english conversation - edi supriyanto, st
Percakapan bahasa inggris   english conversation - edi supriyanto, stPercakapan bahasa inggris   english conversation - edi supriyanto, st
Percakapan bahasa inggris english conversation - edi supriyanto, stProjectEngineer5
 
Mengontrol pekerjaan survey lapangan edi supriyanto, st
Mengontrol pekerjaan survey lapangan   edi supriyanto, stMengontrol pekerjaan survey lapangan   edi supriyanto, st
Mengontrol pekerjaan survey lapangan edi supriyanto, stProjectEngineer5
 
Kamus teknik dictionary - edi supriyanto, st
Kamus teknik   dictionary  - edi supriyanto, stKamus teknik   dictionary  - edi supriyanto, st
Kamus teknik dictionary - edi supriyanto, stProjectEngineer5
 
English tenses tenses bahasa inggris - edi supriyanto, st
English tenses   tenses bahasa inggris - edi supriyanto, stEnglish tenses   tenses bahasa inggris - edi supriyanto, st
English tenses tenses bahasa inggris - edi supriyanto, stProjectEngineer5
 
English collocation bahasa inggris - edi supriyanto, st
English collocation   bahasa inggris - edi supriyanto, stEnglish collocation   bahasa inggris - edi supriyanto, st
English collocation bahasa inggris - edi supriyanto, stProjectEngineer5
 
Earthwork volumes civil 3 d galian timbunan- edi supriyanto, st
Earthwork volumes civil 3 d   galian timbunan- edi supriyanto, stEarthwork volumes civil 3 d   galian timbunan- edi supriyanto, st
Earthwork volumes civil 3 d galian timbunan- edi supriyanto, stProjectEngineer5
 
Civil 3 d to the point seri 2 edi supriyanto, st
Civil 3 d to the point seri 2   edi supriyanto, stCivil 3 d to the point seri 2   edi supriyanto, st
Civil 3 d to the point seri 2 edi supriyanto, stProjectEngineer5
 

More from ProjectEngineer5 (8)

Surveying with google earth & civil 3 d edi supriyanto, st
Surveying with google earth & civil 3 d   edi supriyanto, stSurveying with google earth & civil 3 d   edi supriyanto, st
Surveying with google earth & civil 3 d edi supriyanto, st
 
Percakapan bahasa inggris english conversation - edi supriyanto, st
Percakapan bahasa inggris   english conversation - edi supriyanto, stPercakapan bahasa inggris   english conversation - edi supriyanto, st
Percakapan bahasa inggris english conversation - edi supriyanto, st
 
Mengontrol pekerjaan survey lapangan edi supriyanto, st
Mengontrol pekerjaan survey lapangan   edi supriyanto, stMengontrol pekerjaan survey lapangan   edi supriyanto, st
Mengontrol pekerjaan survey lapangan edi supriyanto, st
 
Kamus teknik dictionary - edi supriyanto, st
Kamus teknik   dictionary  - edi supriyanto, stKamus teknik   dictionary  - edi supriyanto, st
Kamus teknik dictionary - edi supriyanto, st
 
English tenses tenses bahasa inggris - edi supriyanto, st
English tenses   tenses bahasa inggris - edi supriyanto, stEnglish tenses   tenses bahasa inggris - edi supriyanto, st
English tenses tenses bahasa inggris - edi supriyanto, st
 
English collocation bahasa inggris - edi supriyanto, st
English collocation   bahasa inggris - edi supriyanto, stEnglish collocation   bahasa inggris - edi supriyanto, st
English collocation bahasa inggris - edi supriyanto, st
 
Earthwork volumes civil 3 d galian timbunan- edi supriyanto, st
Earthwork volumes civil 3 d   galian timbunan- edi supriyanto, stEarthwork volumes civil 3 d   galian timbunan- edi supriyanto, st
Earthwork volumes civil 3 d galian timbunan- edi supriyanto, st
 
Civil 3 d to the point seri 2 edi supriyanto, st
Civil 3 d to the point seri 2   edi supriyanto, stCivil 3 d to the point seri 2   edi supriyanto, st
Civil 3 d to the point seri 2 edi supriyanto, st
 

Recently uploaded

ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxArisatrianingsih
 
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasi
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan KonsultasiJual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasi
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasissupi412
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptxVinaAmelia23
 
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturBahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturAhmadAffandi36
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxAndimarini2
 
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistikaPengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika3334230074
 
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfGambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfYoyokSuwiknyo
 
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madya
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman MadyaPelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madya
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madyadedekhendro370
 
Kalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptKalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptAchmadDwitamaKarisma
 
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptx
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptxESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptx
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptxadnijayautama
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxyoodika046
 
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdf
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdfMATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdf
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdfHiburanEmail
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxMuhamadIrfan190120
 
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfGambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfYoyokSuwiknyo
 
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015IrfanAdiPratomo1
 
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptx
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptxPPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptx
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptxHeruHadiSaputro
 

Recently uploaded (20)

ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
 
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasi
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan KonsultasiJual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasi
Jual Cytotec Di Batam Ori 👙082122229359👙Pusat Peluntur Kandungan Konsultasi
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
 
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai PenuhObat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
 
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturBahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
 
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistikaPengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika
Pengujian (hipotesis) pak aulia ikhsan dalam ilmu statistika
 
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
 
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfGambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
 
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madya
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman MadyaPelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madya
Pelaksana Lapangan Pekerjaan Bangun air Limbah Permukiman Madya
 
Kalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptKalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.ppt
 
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
 
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptx
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptxESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptx
ESTIMASI BIAYA PEMELIHARAAN BANGUNAN BERDASARKAN PEDOMAN PEMELIHARAAN DAN.pptx
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
 
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdf
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdfMATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdf
MATERI-FINON-ANALISIS-KEUANGAN-14-16-AGUSTUS-2017.pdf
 
Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakartaObat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptx
 
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfGambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
 
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015
K3 INSTALASI PENYALUR PETIR PERMEN 31 TH 2015
 
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptx
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptxPPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptx
PPT PELAKSANA LAPANGAN PERPIPAAN MADYA - IWAN SYAHRONI.pptx
 

Tutorial penggunaan total station edi supriyanto, st

  • 1. EDI SUPRIYANTO TOTAL STATION BASICS FOR BEGINNER DONE
  • 3. DAFTAR ISI Kata Pengantar …………………………………………............................................................ 4 Daftar Isi ………………………………………..........…............................................................ 4 Bab 1 Pendahuluan …………………………………….......................................................... 4 1.1 Sejarah Ilmu Survey ………………………………….................................................. 4 Bab 2 Electronic Total Station (ETS) ………………………....………................................. 4 2.1 Apa Itu Total Station ……………………………………............................................ 4 2.2 Kemampuan Electronic Total Station ………….......................................................... 4 2.3 Penggunaan Electronic Total Station ………….......................................................... 4 2.4 Bagian-Bagian Alat ……………………………........................................................... 4 2.5 Kelengkapan Unit (Aksesories) ……………………………....................................... 4 2.6 Tombol-Tombol Operasi ......................…………………………................................ 4 2.7 Keterangan Simbol Pada Layar ................………………………................................ 4 Bab 3 Persiapan Pengukuran ……………….............………....………................................. 4 3.1 Kelengkapan Peralatan Pengukuran ..................................................…........................ 4 3.2 Mendirikan Alat ...................................................................................…........................ 4 3.3 Mendirikan Prisma Poligon ...............................................................…........................ 4 3.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4 3.5 Membuat Job ........................................................................................…........................ 4 3.5 Set Up / Setting Instrument ………………………...................................................... 4 DONE
  • 4. DONE 3.6 Setting Measurements ….........……………………...................................................... 4 3.7 Pengukuran Sederhana .......................................................................…........................ 4 Bab 4 Pengukuran Polygon ……………………………......................................................... 4 4.1 Apa Itu Pengukuran Polygon ..............……………….................................................. 4 4.2 Mendirikan Alat ...................................................................................…........................ 4 4.4 Memasang Kompas ………………………................................................................... 4 4.3 Mendirikan Prisma Poligon ...............................................................…........................ 4 4.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4 4.5 Membuat Job ……………………….............................................................................. 4 4.6 Setting Instrument .....................…….............................................................................. 4 4.7 Setting Measurement ..................……............................................................................ 4 4.8 Mencari Sudut Azimuth Pendekatan Dengan Kompas .............................................. 4 4.9 Memasukkan Koordinat Tempat Berdiri Alat .............................................................. 4 4.10 Memasukkan Backsight ………………………............................................................ 4 4.4 Melakukan Pengukuran Foresight …............................................................................. 4 Bab 4 Pengukuran Rutin (Detail) ………………………….................................................. 4 4.1 Apa Itu Pengukuran Rutin (Detail) ..............………………........................................ 4 4.2 Mendirikan Alat ...................................................................................…........................ 4 4.3 Mendirikan Prisma Poligon ...............................................................…........................ 4 4.4 Menghidupkan dan Mematikan Alat ................................................…........................ 4 4.5 Membuat Job ……………………….............................................................................. 4 4.6 Setting Instrument .....................…….............................................................................. 4
  • 5. DONE 4.7 Setting Measurement ..................……............................................................................ 4 4.8 Memasukkan Koordinat Tempat Berdiri Alat .............................................................. 4 4.9 Memasukkan Backsight ………………………............................................................ 4 4.10 Melakukan Pengukuran Detail .............…………….................................................... 4 Bab 5 Stake Out …………….....................………………....................................................... 4 Bab 6 Download Data …………….....................………......................................................... 4 6.1 Mengenal Software TransIT .........................…….......................................................... 4 6.2 Tahapan Download Data Dengan Software TransIt .................................................... 4 Bab 7 Upload Data …....…….....................………………....................................................... 4 7.1 Apa Itu Upload Data ............................……………....................................................... 4 7.2 Upload Manual .........................................…………....................................................... 4 7.3 Upload Dengan Komputer ..............................……....................................................... 4 Tentang Penulis ………………………........................................................................................ 4 Daftar Pustaka ……………………….......................................................................................... 4 Lampiran 1 ………………………............................................................................................... 4 Lampiran 2 ………………………............................................................................................... 4 Lampiran 3 ………………………............................................................................................... 4 Lampiran 4 ………………………............................................................................................... 4
  • 6.
  • 7. DRAFT TRAINING TOTAL STATION STAKEOUT - ANGLE & DISTANCE METHOD EDI@SUPRIYANTO.WEB.ID
  • 8. BAB 1 STAKE OUT 1.1 Apa Itu Stake Out ? Salah satu pekerjaan penting dalam surveying rekayasa (engineering surveying) ada- lah pematokan (setting-out/staking-out). Oleh karena itu, seorang surveyor ataupun anda yang ingin menjadi surveyor tentu diwajibkan memiliki pengetahuan bagaimana melakukan stake- out. Pematokan/stakeout adalah memindahkan, mentransfer atau menentukan koordinat ti- tik-titik yang ada di peta desain perencanaan ke lapangan (permukaan bumi). Prinsip stake out adalah terbalik dengan konsep pengambilan data lapangan, dimana pengambilan data lapangan adalah mengumpulkan koordinat-koordinat titik di lapangan untuk kemudian di tuangkan ke dalam gambar. Implementasi staking-out bisa dilakukan pada horisontal dan vertikal sekaligus dengan akurasi tertentu. Untuk memenuhi akurasi titik stake-out yang diinginkan, standard deviasi titik stake-out yang dicapai harus lebih kecil dari standar deviasi titik stake-out yang diinginkan. Ilustrasi pekerjaan stake-out sebagaimana diperlihatkan pada Gambar 1.1 Gambar 1.1 Ilustrasi Pekerjaan Stake-out Pada Konstrtuksi Jalan vishallandsurveyors.com D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 9. 1.2 Penggunaan Stake Out Dalam Bebagai Pekerjaan Lapangan Pekerjaan stake-out biasanya adalah tahap implementasi desain untuk kemudian di tu- angkan di lapangan yang sesungguhnya. Dan berikut adalah pekerjaan-pekerjaan yang membu- tuhkan stake out antara lain : t Penentuan titik pondasi bor pile pada konstruksi bangunan gedung t Pemancangan titik tiang pancang diatas laut t Stake-out titik bagian-bagian mesin t Soket tiang jembatan (viaduct) t Penentuan grid-grid bangunan t Pengkaplingan (sub-division) tanah untuk perumahan t Alignment pada konstruksi jalan t Jalur rel kereta api t Saluran Udara Tegangan Extra Tinggi (SUTET) t Akselerator elektron t Dan lain sebagainya 1.3 Beberapa Metode Di Dalam Melakukan Stake Out Dengan semakin banyaknya kemunculan perangkat Electronic Total Station (ETS) den- gan fitur-fitur yang semakin canggih, maka pekerjaan stake-out menjadi semakin mudah den- gan tingkat akurasi yang sangat tinggi hingga dalam hitungan milimeter. Dan berikut fitur-fitur standar Electronic Total Station untuk pekerjaan stake out yaitu ; t Stake out berdasarkan HA-HD, yaitu stake out berdasarkan pada besaran sudut horizontal dan jarak datar t Stake out berdasarkan koordinat (X, Y, Z), yaitu menentukan posisi suatu titik dilapangan berdasrkan data koordinat. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 10. t Stake out DivLine, yaitu stake out untuk menentukan posisi titik-titik dengan membagi ja- rak yang sama pada satu garis t Stake out RefLine, yaitu stake out untuk menentukan offset suatu titik berdasarkan dua titik pada suatu garis. Namun, dilapangan yang sering digunakan adalah stake out berdasarkan nilai koordinat karena lebih praktis dan mudah. Sehingga pada bab ini juga kita hanya akan singgung pekerjaan stake out berdasarkan koordinat. Gambar 1.2 Menu Stake-out Pada Electronic Total Station 1.3.1 Stake Out Dengan Metode HA - HD Stake-out dengan metode HA - HD adalah stake-out berdasarkan sudut hosrisontal (Horizontal Angle - HA) dan jarak horisontal (Horizontal Distance - HD). Adapun langkah- langkahnya adalah sebagai berikut : t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah di definisikan dan back sight sudah di tentukan. t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.3 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 11. Gambar 1.3 Menu Stake-out Pada Electronic Total Station Gambar 1.4 Stake-out Metode HA - HD t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 1. HA - HD, sebagaimana diperlihatkan pada Gambar 1.4 t Selanjutnya akan muncul isian “Angle and Distance” dengan penjelasan sebagai berikut : HD (Horizontal Distance) : Jarak horisontal dari titik station ke titik stake-out (m) dVD (Vertical Distance) : Beda tinggi dari titik station ke titik stake-out (m) HA (Horizontal Angle) : Sudut horisontal ke titk stake-out (m) , dan terakhir tekan tombol enter untuk menyelesaikan, sebagaimana diperlihatkan pada Gambar 1.5 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 12. Gambar 1.5 Memberikan Nilai Sudut Dan Jarak Gambar 1.6 Memutar Alat Dan Melakukan Pengukuran Uji Coba t Selanjutnya lakukan putaran total station mengikuti tanda panah dHA sampai seluruhnya bernilai 0° 00’ 00”. Di sini kita memerlukan penggerak halus horisontal secara pelan-pelan untuk mendapatkan akurasi yang tinggi dari pengukuran dan selanjutnya kita tekan tombol MSR untuk melakukan uji coba penembakan, sebagaimana diperlihatkan pada Gambar 1.6 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 13. Gambar 1.7 Hasil Uji Coba Penembakan t Dan selanjutnya pada layar akan di ketahui hasil uji coba penembakan pertama, dimana putaran sudut kurang 1”, prisma target kurang mundur 0.27 meter dan kurang naik 0.4 me- ter. Ulangi secara berulang-ulang hingga mendapatkan angka seluruhnya adalah 0. Dan di situlah titik yang dimaksud dala stake-out, sebagaimana diperlihatkan pada Gambar 1.7 t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama untuk menemukan titik stake-out. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 14. DRAFT TRAINING TOTAL STATION STAKEOUT - COORDINATE XYZ METHOD EDI@SUPRIYANTO.WEB.ID
  • 15. 1.3.2 Stake Out Dengan Metode Coordinate XYZ Stake-out dengan metode coordinate XYZ adalah stake-out berdasarkan input koordi- nat Easting Northing Zenith (ENZ) atau bisa juga kita sebut XYZ. Penginputan koordinat bisa dilakukan secara langsung satu-persatu, bisa juga kita lakukan dengan cara transfer data apabila jumlahnya sangat banyak. Untuk beberapa contoh berikut hanya akan diberikan contoh untuk penginputan data dengan cara langsung satu persatu. Adapun langkah-langkahnya adalah sebagai berikut : t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah di definisikan dan back sight sudah di tentukan. t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.8 Gambar 1.8 Menu Stake-out Pada Electronic Total Station t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 2. XYZ dan kembali kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan pada Gambar 1.9 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 16. Gambar 1.9 Stake-out Metode Input Koordinat XYZ Gambar 1.10 Tampilan Layar Imput Point t Selanjutnya akan muncul menu input point dimana pada label PT kita berikan penomoran point berikutnya misal 7, dan kembali kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan pada Gambar 1.10 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 17. Gambar 1.12 Hasil Uji Coba Penembakan Gambar 1.11 Input Koordinat NEZ / XYZ t Selanjutnya kita inputkan koordinat yang kita maksudkan dan untuk contoh kali ini untuk Northing (N) = 1025.000 ; Easting (E) = 2025.000 ; Zenith (Z) = 203.000, dan kembali kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan pada Gambar 1.11 t Selanjutnya pada layar akan muncul sudut horisontal (Horizontal Angle - HA) dan ke arah mana alat harus diputar. Indikasi jarak dari titik alat berdiri sampai dengan titik stake-out juga diberikan yaitu sebesar 35.36 meter, sebagaimana diperlihatkan pada Gambar 1.11 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 18. t Selanjutnya lakukan putaran total station mengikuti tanda panah dHA sampai seluruhnya bernilai 0° 00’ 00”. Di sini kita memerlukan penggerak halus horisontal secara pelan-pelan untuk mendapatkan akurasi yang tinggi dari pengukuran dan selanjutnya kita tekan tombol MSR1 (atau MSR2 tergantung setting alat) untuk melakukan uji coba penembakan, seba- gaimana diperlihatkan pada Gambar 1.13 Gambar 1.12 Hasil Uji Coba Penembakan t Selanjutnya setelah melakukan penembakan dengan alat maka sesaat akan muncul pada la- yar hasil uji coba tembakan tersebut. Dalam contoh kali ini putaran sudut horisontal perlu di putar lagi hingga memperoleh nilai 0° 00’ 00”, prisma perlu mundur lagi sejauh 33.05 meter dan ketinggian perlu dinaikkan 2.75 meter, sebagaimana diperlihatkan pada Gambar 1.13 t Di sini uji coba perlu dilakukan secara berulang-ulang hingga seluruhnya mendapatkan nilai 0. Yang artinya titik tersebut adalah titik stake-out yang dimaksud. t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama untuk menemukan titik stake-out. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 19. Gambar 1.13 Hasil Uji Coba Penembakan 1.3.2.1 Stake Out Dengan Metode Coordinate XYZ (Input Cogo) Stake-out dengan metode coordinate XYZ adalah stake-out berdasarkan input koordi- nat Easting Northing Zenith (ENZ) atau bisa juga kita sebut XYZ. Untuk contoh penginputan kali ini akan dilakukan terlebih dahulu melalui menu COGO (Coordinate Geometry). Adapun langkah-langkahnya adalah sebagai berikut : t Kita tekan tombol “Menu” sebagaimana diperlihatkan pada Gambar 1.14 Gambar 1.14 Akses Tombol Menu D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 20. Gambar 1.15 Akses Menu Cogo (Coordinate Geometry) Gambar 1.16 Hasil Uji Coba Penembakan t Selanjutnya pada layar akan muncul tampilan pilihan “Menu” dimana kita pilih 2. COGO dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada Gambar 1.15 t Selanjutnya pada layar akan muncul tampilan pilihan “Menu Cogo” dimana kita pilih 2. In- put dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada Gam- bar 1.16 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 21. Gambar 1.17 Hasil Uji Coba Penembakan Gambar 1.18 Hasil Uji Coba Penembakan t Selanjutnya pada layar akan muncul tampilan pilihan “Menu Input” dimana kita pilih 2. Input XYZ dan kita tekan tombol enter pada kanan bawah, sebagaimana diperlihatkan pada Gambar 1.17 t Selanjutnya kita inputkan koordinat yang kita maksudkan dan untuk contoh kali ini untuk Northing (N) = 1050.000 ; Easting (E) = 2050.000 ; Zenith (Z) = 205.000, dan kembali kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihatkan pada Gambar 1.18 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 22. Gambar 1.19 Menu Stake-Out t Sesaat setelah kita menekan tombol enter, maka koordinat titik telah di simpan di dalan alat. Sehingga pada saat melakukan stake-out kita cukup memanggil nomor point dalam hal ini point 8, maka dengan cepat pada layar monitor akan di tampilkan koordinatnya. Dan pada saat stake-out tinggal mengikuti saja putaran sdut dan jaraknya, sebagaimana diperlihatkan pada Gambar sampai dengan 1.19 Gambar 1.22 Gambar 1.20 Memanggil Titik (Point) Stake-Out D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 23. Gambar 1.21 Koordinat Titik Stake Out Gambar 1.22 Putaran Sudut dan Jarak Stake-Out t Di sini uji coba perlu dilakukan secara berulang-ulang hingga seluruhnya mendapatkan nilai 0. Yang artinya titik tersebut adalah titik stake-out yang dimaksud. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 24. DRAFT TRAINING TOTAL STATION STAKEOUT - DIVIDE LINE METHOD EDI@SUPRIYANTO.WEB.ID
  • 25. 1.3.2 Stake Out Dengan Metode Divide Line Stake-out dengan metode Divide Line adalah stake-out berdasarkan pembagian garis antara instrumen dengan target pertama dengan memasukkan jumlah bentang atau bagian yang sama panjang. Adapun langkah-langkahnya adalah sebagai berikut : t Asumsi kita telah mendirikan alat total station yang mana station tempat berdiri alat sudah di definisikan dan back sight sudah di tentukan. t Tekan tombol S-O (tombol 8), sebagaimana diperlihatkan pada Gambar 1.23 Gambar 1.23 Menu Stake-out Pada Electronic Total Station t Selanjutnya akan muncul menu stake-out dan kita pilih nomor 3. DivLine S-O dan kembali kita tekan tombol enter pada sisi kanan bawah untuk konfirmasi, sebagaimana diperlihat- kan pada Gambar 1.24 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 26. Gambar 1.24 Stake-out Metode Divide Line S-O Gambar 1.25 Tampilan Layar Line Stake Out t Selanjutnya akan muncul menu ”Line Stake Out” yaitu berupa informasi HA (Horisontal Angle) dan HD (Horisontal Distance) yang saat ini masih belum mempunyai nilai atau 0. Untuk itu kita lakukan penembakan dengan cara menekan tombol MSR1 / MSR2 untuk me- nentukan titik yang akan kita jadikan referensi, sebagaimana diperlihatkan pada Gambar 1.25 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 27. Gambar 1.26 Memasukkan Jumlah Pembagian Bentang t Selanjutnya setelah dilakukan penembakan titik maka pada HD (Horisontal Distance) kini memiliki nilai yaitu 23.06 meter. Nilai ini merupakan pembulatan kedalam 2 angka desimal. Pada bagian “Span Total” kita masukkan jumlah bentang atau jumlah pembagian, seba- gaimana diperlihatkan pada Gambar 1.26 t Selanjutnya pada layar monitor akan muncul titik pertama stake-out berdasarkan pembagi- an tersebut. Dan untuk berpindah ke titik-titik berikutnya, maka cukup dengan memencet tombol panah ke bawah atau panah ke atas, sebagaimana diperlihatkan pada Gambar 1.27 sampai dengan Gambar 1.26 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 28. Gambar 1.27 Jarak Titik Stake Out 1 Gambar 1.28 Jarak Titik Stake Out 2 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 29. Gambar 1.29 Jarak Titik Stake Out 3 Gambar 1.30 Jarak Titik Stake Out 4 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 30. Gambar 1.32 Jarak Titik Stake Out 6 Gambar 1.31 Jarak Titik Stake Out 5 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 31. t Untuk menyederhanakan pemahaman bagaimana alat bekerja untuk menghitung pemba- gian tersebut adalah sebagai berikut : misal dalam tembakan point di dapat angka 100 meter dari instrumen, dan kemudian kita melakukan pembagian dengan set span sebesar 2, maka di berikan ilustrasi sebagaimana Gambar 1.33 Gambar 1.33 Ilustrasi Jarak Titik 100 Meter Pembagian Bentang 2 t Dan selanjutnya untuk melakukan stake-out titik-titik tersebut maka kita cukup melakukan penembakan dengan menekan tombol MSR1 / MSR2. Misal dari tembakan uji coba per- tama prisma target kurang maju 11.85 meter; dan kurang bergeser ke kiri sebesar 0.57 meter. Pada uji coba tembakan ke dua prisma target kurang maju 0.54 meter; dan kurang bergeser ke kiri sebesar 0.17 meter, sebagaimana pada Gambar 1.34 dan Gambar 1.34 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 32. Gambar 1.35 Uji Coba Kedua Stake-Out Point 1 Gambar 1.34 Uji Coba Pertama Stake-Out Point 1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 33. t Ulangi secara berulang-ulang hingga mendapatkan angka seluruhnya adalah 0. Dan di situ- lah titik yang dimaksud dala stake-out t Untuk mendapatkan hasil stake-out yang cepat asisten survey harus sudah cukup terlatih untuk memperkirakan jarak-jarak pergeseran sehingga tidak terlalu butuh waktu yang lama untuk menemukan titik stake-out. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 35. DRAFT TRAINING TOTAL STATION DOWNLOAD - UPLOAD DATA EDI@SUPRIYANTO.WEB.ID
  • 36. Gambar 5.1 Ilustrasi Transfer Data Dari dan Ke Total Station 5.1 Transfer Data Total Station sebagai perangkat survey yang ringkas dan portable memiliki kelebihan di dalam mengumpulkan jumlah koordinat dalam jumlah besar antara 100 hingga ribuan titik perhari, sehingga produktifitasnya sangat bisa di andalkan. Data dari Total Station bisa langsung di hubungkan dengan komputer yang kemudian diolah menjadi peta dengan program mapping software. Selain itu upload data juga bisa dilakukan untuk kepentingan stake-out misalnya dari komputer ke Total Station. Ada banyak program untuk bisa melakukan transfer data, bergantung perangkat Total Station yang dipergunakan. Misal untuk Topcon atau Gowin biasa dipergunakan Topcon Link, untuk Total Station Sokkia bisa dipergunakan Prolink, untuk Total Station Nikon bisa memperguna- kan software TransIt dan lain sebagainya. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 37. Pada buku ini akan diberikan contoh penggunaan software Connex yang dikembangkan oleh TDS (Tripod Data System) yang memungkinkan transfer data dua arah (import dan ex- port) antara Total Station Spectra Precision dan Nikon dengan komputer. Program Connex saat ini telah menggantikan program transIt yang sudah dihentikan pengembangannya. t Kita akses menu Programs Connex pada sistem operasi Windows, sebagaimana diperli- hatkan pada Gambar 5.1 Gambar 5.1 Menu Akses Program Connex t Selanjutnya akan muncul splash screen program Connex dan dilanjutkan dengan tampilan halaman muka program, sebagaimana diperlihatkan pada Gambar 5.1 dan Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 38. Gambar 5.1 Splash Screen Program Connex Gambar 1.6 Tampilan Antar Muka Program Connex D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 39. 5.2 Mendownload Data Dari Total Station Mendownload data adalah memindahkan data yang dihasilkan oleh perangkat Total Station ke dalam komputer kita untuk di olah lebih lanjut. Adapun langkah-langkah di dalam mendownload data dari Total Station ke dalam komputer kita adalah sebagai berikut : t Kita lakukan klik pada menu Transfer Get Job From Total Station, sebagaimana diperli- hatkan pada Gambar 5.1 Gambar 1.6 Akses Menu Transfer Data Dari Total Station t Sebelum melakukan transfer data, kita lakukan “Transfer Setting” terlebih dahulu dengan menekan tombol “Transfer Setting”, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 40. Gambar 1.6 Akses Menu Transfer Setting t Selanjutnya akan muncul jendela “Preference” yang terdiri atas beberapa tab antara lain : Colors, Display, Transfer, Snap, General, Format dan Rename Rules, sebagaimana diper- lihatkan pada Gambar 5.1 sampai dengan Gambar 5.1 t Untuk kali ini kita hanya akan melakukan setting pada tab “Transfer” sebagai berikut : pada bagian Total Station kita plih pada tombol radio jenis total station kita pilih sesuai dengan alat yang kita pergunakan misal : Spectra Precision dan pada drop down menu kita pilih mis- al : Focus 4; pada bagian Communication kita klik drop down menu kita sesuaikan antara Total Station dengan komputer kita misal : Com Port On PC= Com6, Baud Rate=4800, Parity=None dan lain sebagainya. Dan terkahir kita tekan tombol “OK” untuk melakukan konfirmasi akhir, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 41. Gambar 1.6 Tab Display Preferences Gambar 1.6 Tab Color Preferences D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 42. Gambar 1.6 Tab Transfer Preferences 5.2.1 Download Raw Data t Untuk melakukan download data ada dua pilihan download bergantung peralatan yang kita pakai. Pilihan tersebut adalah Download Raw data dan Download Coordinate data. Dan kali ini kita akan coba pilih Download Raw data dengan cara menekan tombol “Download Raw”, sebagaimana diperlihatkan pada Gambar 5.1 t Sampai denga tahap ini untuk setting dikomputer sudah cukup menunggu respon dari per- angakat Total Station. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 43. t Selanjutnya kita beralih ke perangkat Total Station. Pada Total Station kita tekan tombol “Menu”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 Proses Pemindahan Data Dari Total Station Gambar 5.1 Menu Akses Program Connex D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 44. t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat- kan pada Gambar 5.1 Gambar 5.1 Memilih Menu Comm Gambar 5.1 Memilih Menu Download t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih “1. Download“, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 45. t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter- lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me- milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Peringatan Seleksi Job Gambar 5.1 Memilih Salah Satu Job t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene- kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 46. Gambar 5.1 Layar Setting Download t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol “GO”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Tekan Tombol GO D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 47. t Dan selanjutnya proses transfer data akan berlangsung, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Tampilan Proses Transfer Pada Total Station Gambar 1.6 Tampilan Proses Transfer Pada Program Connex t Proses transfer data juga akan muncul pada program Connex, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 48. t Setelah seluruh proses pemindahan data selesai maka kita tinggal memberikan nama file yang nantinya akan ber extensi Connex Raw File (*.Cxr), sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 Memberikan Nama File t Sesaat setelah kita tekan tombol “Save” maka seluruh data telah berada di dalam komputer kita dengan nama file dan folder yang telah kita tempatkan sebelumnya. t Program Connex juga akan menampilkan sebaran data pada layar utama, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 49. Gambar 1.6 Tampilan Sebaran Data Dalam Program Connex 5.2.2 Download Coordinate Data Selain raw data kita juga bisa mendownload Coordinate Data, adapun langkah-lang- kahnya adalah sebagai berikut : t Pertama kita menekan tombol “Download Coordinate”, sebagaimana diperlihatkan pada Gambar 5.1 t Selanjutnya kita tunggu respon dari perangkat Total Station untuk proses dowload data koordinat. D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 50. Gambar 1.6 Download Coordinate t Selanjutnya kita beralih ke perangkat Total Station. Pada Total Station kita tekan tombol “Menu”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Menu Akses Program Connex D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 51. t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat- kan pada Gambar 5.1 Gambar 5.1 Memilih Menu Comm Gambar 5.1 Memilih Menu Download t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih “1. Download“, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 52. t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter- lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me- milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Peringatan Seleksi Job Gambar 5.1 Memilih Salah Satu Job t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene- kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 53. t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Layar Setting Download t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol “GO”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Tekan Tombol GO D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 54. t Dan selanjutnya proses transfer data akan berlangsung, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Tampilan Proses Transfer Pada Total Station Gambar 1.6 Tampilan Proses Transfer Pada Program Connex t Proses transfer data juga akan muncul pada program Connex, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 55. t Setelah seluruh proses pemindahan data selesai maka kita tinggal memberikan nama file yang nantinya akan ber extensi Connex Job File (*.Cxj), sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 Penyimpanan File Format Conex Job File (*Cxj) t Sesaat setelah kita tekan tombol “Save” maka seluruh data telah berada di dalam komputer kita dengan nama file dan folder yang telah kita tempatkan sebelumnya. t Program Connex juga akan menampilkan sebaran data pada layar utama, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 56. Gambar 1.6 Hasil Uji Coba Penembakan D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 57. 5.3. Export Data Program Connex bukan merupakan program yang serba bisa dalam hal ini misal di dalam melakukan data proses. Maka perlu dilakukan pengolahan data lebih lanjut mempergu- nakan program yang lain semisal Civil 3D atau Autocad. Untuk itu perlu dilakukan export data dari program Connex ke program yang lain semisal Civil 3D atau Autocad. Dimana Connex mendukung tiga buah format file untuk meng export yaitu ASCII text file, dxf dan Land Xml. 5.3.1 Export ASCII Text File ASCII (American Standard Code for Information Interchange) adalah kode standar Amerika untuk pertukaran informasi yang bersifat universal, dikembangkan oleh ANSI (Amer- ican National Standard Institue). Untuk meng export ASCII text file maka berikut adalah lang- kah-langkahnya : t Kita lakukan klik pada Tree View Export dan kita pilih ASCII, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 Akses Menu Export ASCII Text File D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 58. Gambar 1.6 Setting Delimiter dan Column Order t Selanjutnya akan muncul jendela Export ASCII Coordinates. Untuk delimiter (pembatas) antar koordinat bisa kita pergunakan comma, tabs, maupun spasi. Untuk Column Order (Urutan Kolom) bisa kita pilih PNEZD (Point Northing Easting Zenith Description) dengan mengaktifkan seluruh check box, sebagaimana diperlihatkan pada Gambar 5.1 t Pada Select Point saat ini kita belum memiliki satu point pun dengan di tandai “0 objects selected” pada sisi kanan bawah layar. Untuk memilih point kita klik icon mouses dan di- lanjutkan dengan menjaring point pada layar, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 59. Gambar 1.6 Seleksi Point Gambar 1.6 Object Point Terseleksi t Kini seluruh point sudah terseleksi di tandai dengan perubahan warna pada point dari biru menjadi warna merah. Begitu pula pada sisi kanan bawah diberikan informasi “17 objects selected”, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 60. Gambar 1.6 Penyimpanan Data Dalam Format CSV t Selanjutnya akan muncul jendela baru dimana kita tinggal memberikan nama file dan lokasi folder. Extensi file kita pilih Comma Separated Values (CSV), sebagaimana diperlihatkan pada Gambar 5.1 t Dan kini kita tinggal mengecheck file pada lokasi folder yang sudah kita pilih, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 61. Gambar 1.6 File Hasil Export t Dan apabila kita buka dengan program Notepad maka akan ditampilkan deretan data koor- dinat, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 62. Gambar 1.6 Tampilan Koordinat Dalam Program Notepad D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 63. Gambar 1.6 Export DXF File 5.3.2 Export DXF File File DXF (Drawing Exchange Format) adalah sebuah file format yang dikembangkan oleh Autodesk yang memungkinkan data bisa dioperasikan antara Autocad dengan program yang lain. Untuk meng export DXF file maka berikut adalah langkah-langkahnya : t Kita lakukan klik pada Tree View Export dan kita pilih DXF, sebagaimana diperlihatkan pada Gambar 5.1 t Selanjutnya akan muncul jendela Export DXF Autocad. Untuk Point Block Definitions kita berikan check box apa saja yang ingin di tampilkan. Tinggi text serta jarak spasi bisa juga dilakukan pengaturan, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 64. Gambar 1.6 Setting Point Block t Sebagaimana halnya dengan export ASCII text file sebelumnya, kita lakukan seleksi point juga dengan cara menjaring point pada layar. Point yang terseleksi akan berubah warna dari biru menjadi merah, dan pada sisi kanan bawah layar terdapat informasi jumlah object point yang terseleksi, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 65. Gambar 1.6 Penyimpanan Data Dalam Format DXF t Selanjutnya akan muncul jendela baru dimana kita tinggal memberikan nama file dan lokasi folder. Extensi file kita pilih Drawing Exchange Format (*DXF), sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 66. t Dan kini kita tinggal mengecheck file pada lokasi folder yang sudah kita pilih, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 File Hasil Export t Dan apabila kita buka dengan program Autocad maka akan ditampilkan point-point survey, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 1.6 Tampilan Point Dalam Program Autocad D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 67. 5.4 Mengupload Data Mengupload data adalah memindahkan data yang ada di dalam komputer kita untuk dipindahkan ke perangkat Total Station atau merupakan kebalikan dari mendownload data. Input data ke dalam perangkat Total Station bisa dilakukan manual satu persatu, namun apabila pointnya terlalu banyak, maka menjadi pekerjaan yang besar dan memakan waktu yang sangat lama. Maka mengupload data menjadi pilihan yang paling mudah. Adapun langkah-langkah di dalam mendownload data dari Total Station ke dalam komputer kita adalah sebagai berikut : t Asumsi kita sudah memiliki sebuah file dalam program Connex, file tersebut bisa diperoleh dengan import data misal dari ASCII data file atau dengan metode yang lain. t Kita lakukan klik pada menu Transfer Send Job To Total Station, sebagaimana diperli- hatkan pada Gambar 5.1 Gambar 1.6 Akses Menu Upload/Send Data D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 68. Gambar 1.6 Akses Menu Select Points Gambar 1.6 Seleksi Point t Pada Select Points saat ini kita belum memiliki satu point pun dengan di tandai “0 objects selected” pada sisi kanan bawah layar. Untuk memilih point kita klik icon mouses dan di- lanjutkan dengan menjaring point pada layar, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 69. Gambar 1.6 Point Terseleksi t Selanjutnya kita ke menu pada Pada Total Station kita tekan tombol “Menu”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Menu Pada Total Station D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 70. t Selanjutnya kita pilih menu “Comm” dengan cara menekan tombol panah ke bawah pada keypad Total Station dan terakhir kita tekan tombol “Rec/Enter”, sebagaimana diperlihat- kan pada Gambar 5.1 Gambar 5.1 Memilih Menu Comm Gambar 5.1 Memilih Menu Upload XYZ t Selanjutnya pada layar akan muncul kembali beberapa pilihan menu yang kali ini kita pilih “1. Upload XYZ“, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 71. Gambar 5.1 Peringatan Seleksi Job t Apabila sebelumnya belum memilih Job, maka akan ada peringatan untuk memilih Job ter- lebih dahulu yang akan dilakukan download data. Kita tekan tombol Rec/Enter untuk me- milih job yang akan kita download, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Memilih Salah Satu Job t Apabila ada beberapa daftar job, maka kita harus memilih salah satu job dengan cara mene- kan tombol panah ke atas atau ke bawah. Selanjutnya kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 72. Gambar 5.1 Tombol Go Untuk Memulai Upload t Apabila cable data sudah tersambung antara Total Station dan Komputer kita tekan tombol “GO”, sebagaimana diperlihatkan pada Gambar 5.1 Gambar 5.1 Menu Akses Program Connex t Selanjutnya akan tampil layar download dengan menampilkan nama job, format dan jenis data. Apabila semuanya sudah sesuai kembali kita tekan tombol Rec/Enter, sebagaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O
  • 73. Gambar 1.6 Progress Upload / Send File t Selanjutnya pada program Connex kita tekan tombol “Send” untuk memerintahkan pen- giriman data. Dan selanjutnya progress pengiriman akan di tampilkan pada layar, seba- gaimana diperlihatkan pada Gambar 5.1 D R A F T T R A I N I N G T O T A L S T A T I O N - E D I S U P R I Y A N T O