2. www.innovastu.com
DNA
Enjoying the creation of simplified construction by Passion
and Optimism
Mission
To serve the industry with simplified construction products &
solutions to optimize resources & deliver operational
excellence by adding value to all stakeholders of the industry
Vision
It is our endeavor to become the most preferred world class
brand in construction solution and services
3. www.innovastu.com
Core strength
Capable to execute project on Design & Build basis in the
domain of Dry construction work.
Around 100 labors on company pay role with consistent
training to improvise skill set.
We use Battery operated equipment's for faster and safe
work.
We use Personal Protective Equipment's(PPE) for safe
work.
6. www.innovastu.com
• Client wants wall without any support at the top
• They do not want any column beam structure of the wall
to be seen
• Wall should be 2 hr fire rated
• We created wall self standing anchored only into RCC
Tremix floor for 12 mtr. height & 20 mtr. 2 bays of wall,
designed based on to generic documents
• Wall area 450 sq. mtr., wall thickness 510 mm
• Total work finished in 33 days
Case study – L'Oreal India – 2005 - 2006
13. www.innovastu.com
• Drywall for engine assembly line
• 180 mtr x 10.3 mtr & 13 mtr x 24 mtr.
• Completed in 75 days with 2 coats of gypsum top coat
• Gantries of 10 tons from both sides of the long wall
• All walls designed for 25 kg per sq. mtr lateral pressure
• Total wall area 3200 sq. mtr.
Case study - Cummins India – 2007 -2008
22. www.innovastu.com
Gable end of the wall
Case study : JSW Sever field India Pvt. Ltd. – 2009-2010
• Wall between plant &
plant office area.
• Wall is 60 Db sound
rated
• Wall height 11 mtr - 9
mtr & length 100 mtr.
• Decision of the wall came
in after finishing the
Mezzanine floor.
• Wall area 1150 sq. mtr.
finished in 40 days.
24. www.innovastu.com
• Wall between sub-station & plant, 1 hr fire rated.
• Wall designed within 220 mm thickness.
• Wall height 18 mtr – 9 mtr & length 100 mtr
• Roll up shutter fabrication designed to fit in within wall
thickness.
• Drytech Insulation clip to hold the glass-wool in
position.
• Total area done with drywall 32,500 sq. mtr. Within 10
months.
Case study– Manufacturing plant –2011-2013
33. www.innovastu.com
Case Study - SCA Hygeine-2014-15
• 2 hr. fire rated wall-2150 sq.mtr.
• Normal drywall for office area
• Length of normal drywall:100m
• Height of normal drywall:4m
36. www.innovastu.com
Case study– BKT, Bhuj, Gujarat – 2013-2014
• Drywalls up to height of 11 mtr – 8000 sq. mtr.
• Drywall upto the length of 255 RMT.
• Self standing drywalls up to height of 5.5 mtr – 2500 sq. mtr.
39. www.innovastu.com
Case Study – Nivea India Private Limited - 2014-15
• 2 hr. Fire rated wall-1500 sq.mtr.
• Normal drywall for office area up to 5mtr.height-2500
sq.mtr.
42. www.innovastu.com
Case study : External Wall @ New Holland – 2015-2016
Client’s Requirement:
Client wants to expand his factory later on in future. So the
current external wall can be used as an Internal wall.
Solution we provided:
We designed the wall currently as External wall of 1750 Sq.
Mtr. and upto height of 14 mtrs. considering the Wind
Pressure of 110Kg per Sq. Mtr. with external colour coated
sheet cladding to perform in the external atmosphere.
In future, this sheet cladding can be removed and wall will
be ready as Finished Internal wall, in case of expansion.
45. www.innovastu.com
Case Study: Moisture resistant Drywall @
Adler Mediequip Pvt. Ltd. 2015-2016
Client’s Requirement:
Client wanted MS Fabrication with Calcium Silicate Board
in partition with moisture resistance.
Solution we provided:
Drywall of 1100 Sq. Mtr. upto 5 mtrs. height
We converted the requirement of Calcium Silicate Board to
the equivalent product consisting of Moisture resistant
Board.
47. www.innovastu.com
Case study :Fire rated Drywall partition @ Ashoka
Hospital
2016-2017
Client’s Requirement:
Client required Paper less drywall having fire resistance
and acoustic value of 44STC
Solution we provided:
We designed 1hr fire rated wall for 4m height using
galvalume and USG fiber rock board.
Total quantity of work: 5831 sqm
49. www.innovastu.com
Case Study: Inclined & curved profile walls @
Cummins MFH 2016-17
Client’s Requirement:
Client required double skin inclined and curved profile
walls
Solution we provided:
We designed 620 sqmt. of double skin partition of 70°
inclined wall and curved profile wall with drywall system
having capacity to take 60kg/m2 loading of screen and LED
TV.
63. www.innovastu.com
• False ceiling with tee grid and PVC laminated gypsum
tiles with bubble insulation on top.
Case study– BKT, Bhuj, Gujarat – 2013-2014
70. www.innovastu.com
Case study– BKT, Bhuj, Gujarat – 2013-2014
• Secondary Grid for false ceiling – 30, 000 sq. mtr.
Secondary grid system for services such as electrical light
fittings, and cable trays designed for 25 kg per sq.mtr. dead load
72. www.innovastu.com
Case Study – Nivea India Private Limited - 2014-15
• Secondary substructure-5800 sq.mtr
Secondary grid designed for 40 kg per sq. mtr.
including dead load
75. www.innovastu.com
Case Study: Louvers @ Pharmaceutical Plant ,Kolar
2016-2017
• Scope of work: 1461 SQM
• Strip louvers with 40% opening ratio.
• Max. height of work is 14mtrs.
• Designed for external local wind pressure
81. www.innovastu.com
Case Study: Fire rated curtain @ Cummins
technical centre ,Kothrud 2016-17
Client’s Requirement:
Client required 2hr fire rated partition above the existing
engine test cells.
Site constraints:
Due to serious constraint at site for conventional drywall
construction we provided following solution.
Solution we provided:
We designed 2hr fire rated curtain (120min integrity only)
along with necessary skeleton fabrication.
84. www.innovastu.com
Case Study: Fire rated windows @Pharmaceutical ,Kolar
2016-2017
120MIN. Fire rated integrity (120 EW) Fully Glazed
6mm thk. schott pyran s glass
87. www.innovastu.com
Case study : 3M India Pvt. Ltd.– 2012-2013
• Shop Offices in plant 650 sq. mtr.
• Cold formed GI steel fabricated skeleton of Light gauge steel
sections installed at site over RCC Tremix floor & structure
steel frame work.
• All internal & external walls in wet area gypsum
plasterboard.
• Drywall is designed for 20 kg/sq. mtr lateral pressure.
• All doors and windows in aluminum.
89. www.innovastu.com
Case study : Cummins QSK Shop Offices – 2013-2014
• Shop Offices in plant 720 sq. mtr.
• Cold formed GI steel fabricated skeleton of Light gauge
steel sections installed at site over RCC Tremix floor.
• All internal & external walls in gypsum plasterboard.
• External walls and few internal walls are designed as load
bearing walls.
• Structure is designed for 40 kg/sq. mtr loading for roof
with coil coated sheeting as roof.
• Internally mineral fibre false ceiling
• All doors and windows in aluminum.
• All services done inside such as electrical, HVAC, fire &
smoke.
92. www.innovastu.com
Case study : Drytech Toilet Block
@ Goethe Institute – 2015-2016
Client’s Requirement: External Toilet Block
Solution we provided: We executed the work with Light
Gauge Steel Structure with Cement Board Cladding,
replacing conventional work in Brick and mortar.
95. www.innovastu.com
Case study : 19mm thick single layered Enclosure @ TCL,
Phaltan – 2015-2016
Client’s Requirement:
Client wanted to office enclosure with MS-Framing with
double layered boarding along with Fire and Moisture
Resistance.
Solution we provided:
We designed the wall with 19mm thick Single layered shaft
liner Board instead of Double Boarding; providing Fire and
Moisture Resistance.
98. www.innovastu.com
Case Study: G + 1 Enclosure @ Hirschvogel -
2015 -2016
Client’s Requirement:
Client required Conventional Enclosure in the plant.
Solution we provided:
We designed Live Load at 500Kg per Sq. mtr. upto a height
of 6 mtrs. Office Enclosure designed and built in LGSF
instead of conventional construction