SlideShare a Scribd company logo
1 of 25
Download to read offline
Excellence in retail fit-out and
services management for airports
Excellence in retail fit-out and services management for airports Sideland Group | 3
Some of the most challenging locations
for the fit-out and management of retail
concepts are airports. Generally, they
operate in a 24/7 working environment
interfacing with tens of millions of
users which means retail builds require
exceptional standards for health and
security during fit-out and operations. The
degrees of complexity and compliance
for airport retail build and operation are
therefore amongst the most demanding
and stringent in the building industry.
It is in this uniquely challenging environment
that Sideland has particular experience and an
outstanding track record of success. Sideland’s
management have been familiar with airport retail
fit-out and management for over 20 years. Over
this time we have identified the absolutely ‘must
have’ services and standards necessary to convert
great travel retail concepts into great retail results
and honed the skills and procedures necessary to
deliver those services and standards for our clients.
Introduction
Excellence in retail fit-out and services management for airports Sideland Group | 5
The retail and FB offer is one of the
defining experiential features for an
airport’s passengers as well as a crucial
generator of non-aeronautical revenues.
These facilities will need to be 100% fit-for-
purpose from day one and remain so every
day thereafter.
The ultimate objective should be to ensure not
just a faultless fit-out, but successful on-going
operations by each concession, through the entire
duration of the contract periods. The ideal solution
is to implement a seamless process begun with the
fit-out and then transitioning into a ‘whole of life’
concessions facilities management, that will stay
with and help support each concession contract
from start to finish.
This is the service and long-term commitment that
Sideland delivers for airports.
Faultless fit-out for high performance retail
Excellence in retail fit-out and services management for airports Sideland Group | 7
Sideland is also a rarity amongst retail
consultants because we are experts not
just in the fit-out of retail concepts, we also
have unrivalled experience at managing
retail building services in airports.
At Sideland we believe that the initial design and
build is just is just the first step in a programme
of continuous performance to ensure the project
operates at maximum efficiency helping it to
achieve its full revenue generating potential.
This means we stay on the case with our clients’
retail build projects from the start to the end of
their concept’s life cycle. If you know where you
‘buried the wires’ you are in the best position to
maintain them for as long as they need to be!
Sideland – experts in retail fit-out
and facilities management
Excellence in retail fit-out and services management for airports Sideland Group | 9
As committed partners to our clients, our
expertise and resources are able to ensure
we cover all the key services and disciplines
that protect and maintain their retail
concepts from the first to the very last day
of their life cycles. Even to the extent of
facilitating effective handover assistance
whenever that is called for by our clients or
their landlords.
We deliver
• Safety management
• Fire engineering
• Building regulations
• Sustainability
• Standardisation and Modularisation
• Disabled and discrimination regulations
• Logistics
• Design
• Space management
A partner for life
Excellence in retail fit-out and services management for airports Sideland Group | 11
1. People with proven skills and experience in fit-out and facilities
management for major international airports
2. Resources and expertise
3. Commitment to full time, permanent on-site presence
4. A ‘phased’ programme of long term support
5. Knowledge transfer and local nationals management development.
What we build…we look after
Where we work…we create opportunity
What we offer airports
Excellence in retail fit-out and services management for airports Sideland Group | 13
The ‘Set up’
1. We locate on-site, full time
We can locate in our own offices or in the client’s office space
2. We field a full time, 100% dedicated project team
A project team who will look after the concessionaires and the interests of the airport company
from start to finish and coordinate every aspect of the project on the airport’s behalf. We will also
encourage the use of local talent within the project team
3. We can embed ourselves within the airport’s commercial team
The airport’s management can be part of our organisational structure in terms of oversight and
reporting
4. We employ and ‘train up’ local teams to ensure long-term knowledge transfer
Ownership of the service skills should be the airport’s ultimate ambition.
Our support for airports
Excellence in retail fit-out and services management for airports Sideland Group | 15
A typical phased programme of support
The months leading up to a development
programme are critical. They afford an
irreplaceable opportunity to implement
an initial assessment process or ‘readiness
project’ that can evolve seamlessly into
the fit-out phase. This in turn can ‘morph’
into an on-going ‘whole of life’ facilities
management service.
Phase One – Readiness project
Step One Timing
An ‘as is’ audit and ‘critique’ of current
systems and procedures
6 months
Step Two
A ‘to be’ strategy identifying and proposing
the best way forward in terms of people;
procedures; controls; resources; ‘must dos’,
challenges, threats
3 months
Full team appointment
and composition to be
determined by the airport.
Excellence in retail fit-out and services management for airports Sideland Group | 17
Phase Two – Fit-out and preparedness
• Working with the airport on the creation and implementation of
design guidelines and technical standards
• Working with the airport on key stakeholder approval processes
in regard to concessionaire concept and full design package
• Preparation of coherent, simple and clear fit-out processes and
guidelines with Security and Health  Safety at the forefront
• Production of all collateral ‘briefing’ documents to ensure
compliance to all the airport’s rules and regulations
• Working with the airport on contractor induction processes and
guidelines
• Aim to create a safe and positive working environment with
thorough but minimised administrative requirements.
Excellence in retail fit-out and services management for airports Sideland Group | 19
Phase Three – Fit-out process
We provide a full support team along with all the
collateral (produced in Phase Two) necessary in
helping each concessionaire implement their fit-out
programme in full compliance with the airport’s
standards such as:
• Technical guidelines manuals
• Compliance procedures guidelines manuals
• Design guidelines manuals
• Health  Safety guidelines manuals
• Airport ‘Support’ manual (recruitment, security
etc).
It will also be an essential part of our responsibility
to instil in all concession operators the core principle
that they are standard bearers of the airport’s brand
name and its brand values.
A key element in all guidelines will therefore be an
emphasis on every concessionaire’s obligation to
respect and reflect these values through the quality
and standards of their store presentation.
Excellence in retail fit-out and services management for airports Sideland Group | 21
Phase Four – On-going facilities management
What we help build, we look after
What sets us apart from other fit-out process
companies is our willingness to stay with the client
for the long term. The ‘fit-out’ for us is only the
establishing phase, not a one-off project.
Our facilities management skills and experience is
available to clients on a long-term basis, ensuring
that each unit is operating at maximum efficiency,
not just on day one, but throughout its life-span.
Mid-contract refurbishments
We will ensure these are carried out as per the
terms of each contract.
Excellence in retail fit-out and services management for airports Sideland Group | 23
Why?
• Retail needs to become a seamless delivery team
• The need for a dedicated commercial focus to support
the vision
• Tenants create commercially focused delivery teams,
so should the airport
• We need to build well and integrate the asset to
ensure retail doesn’t bring uncontrolled risks.
• Handover isn’t the time to find problems, they
should be retired during fit-out
• This is a technical role and vitally important.
What?
• Retail Project Support owns all fit-out technical
and construction issues, developing guidelines and
procedures to enable fit-out and provide a one stop
shop for tenants
• Providing a technical and procedural link to airport
guardians (Fire and Asset teams for example)
• Providing an on site quality control check to ensure
technical guidelines are not ignored within the build
• Taking ownership of all retail handovers and ensuring
compliance and integration with the airport
• Retail Project Support provides pre-start and on site
safety and compliance support to the tenant
• Ensuring technical standards are met
• Ensuring proper testing and validation is undertaken
prior to handover
• Ensuring projects are fitted out as per the approved plans
Retail project support
• Ensuring the airport guardians are confident that retail
projects are delivered into the business without undue risk
• Ensuring that building up the retail business is done with
airport stakeholder support.
Benefits
• Improved control of life-cycle risk
• Focussed retail delivery, reduced fit-out time lag leading to
increased revenue for concessionaires and the airport
• Consistency of fit-out standards
• One stop shop for tenants, technical suppliers contractors and
airport asset teams
• Provides the airport retail team the freedom to manage and
grow the commercial side of the business faster. (Accountable
self sufficiency)
• Allows the airport team time to focus on the core business.
We offer a full facilities management resource to ensure compliance and peace of mind for the airport
Excellence in retail fit-out and services management for airports Sideland Group | 25
1. A ‘readiness’ preparation resource that ensures the airport sets off in the
right direction
2. A ‘fit-out’ process resource that ensures a faultless implementation
programme/process for each concessionaire’s unit(s)
3. A facilities management resource that stays with the airport throughout
the duration of each concessionaire contract period, ensuring an
uninterrupted ‘whole of life’ quality control
4. A strategic partner that can help define key operational criteria within
Requests for Proposals for the next generation of tenders.
Sideland: A ‘one-stop’ end to end resource,
embedded within the airport for the long term
Excellence in retail fit-out and services management for airports Sideland Group | 27
A typical organisational
structure for airport projects
Phase One, Two  Three – Readiness project and fit-out
Typical team composition for multiple retail delivery – Sideland Group will look to build local talent within team composition
Client Team
Stakeholders
Category Teams
Contracts
Lead authorities
Design/Architects
Property teams
Public affairs
FM Integration
Utilities
Lead suppliers
Specialist artisans
Way finding
Head of Retail Delivery
Health  Safety
Development Manager
Construction Manager,
Building Services
Construction Manager,
Fit Out Delivery
Assistant DM
Assistant DM
(Potential local appointment)
Assistant CM
Assistant CM
(Potential local appointment)
Assistant CM
Assistant CM
(Potential local appointment)
Assistant CM
Excellence in retail fit-out and services management for airports Sideland Group | 29
Phase Four – Facilities management service
The build team would remain in situ for at least 12 months to ensure life-cycle management
has embedded and ‘check the checker’ systems are in place and working.
Succession planning:
Over a planned and managed phased process, the local Assistants would begin to take more
of a leadership role with the intention of owning the process going forward.
Team Leader Building Services – CM
RDM
Fit-Out – CM
Local Assistant DM
Local Assistant CM
Local Assistant CM
Airport Day to Day
Support Team
Excellence in retail fit-out and services management for airports Sideland Group | 31
Our people
The management of Sideland have
impeccable pedigrees in the world of
airport retail design, implementation and
facilities management.
From all our personal experiences, we know
the challenges our clients face, we are acutely
conscious of their requirement to deliver what are
always extremely ambitious retail performance
results and we know just how critical effective
building service management is to their retail
concept’s commercial success.
Excellence in retail fit-out and services management for airports Sideland Group | 33
• Sideland Group Ltd 2003 – date
Managing Director
• BAA PLC 2002 – 2003
Group Retail Technical Support Manager
Company Senior Manager
• Heathrow Airport Ltd 1980 – 2003
Head of Retail Facilities
• Airport Senior Manager 1998 – 2003
Construction Manager, Capital Projects,
Heathrow wide 1993 –1998
• Project Manager, Terminal 3 1989 – 1993
Profile
A commercially minded project and facilities manager with over 30
years experience operating in complex and dynamic environments.
Demonstrating strong problem solving skills and ability to implement
new and creative products and solutions. Proven ability to build
constructive relationships with a wide number of stakeholders in
order to deliver against challenging cost and program deadlines.
Project management
• Leading the fit-out of all retail projects +23 units at London
Waterloo station during their refurbishment project pre-Olympics,
ensuring that all aspects of fit-out progress without impacting a
fully operational station
• Led the delivery of all Retail fit-out projects +35 units at London
Kings Cross, ensuring that all tenants opened in line with the
station opening date. This project required multiple stakeholder
interaction and excellent negotiation skills
• Recently completed a new Landside catering mall concept for
Glasgow Airport. Through re-phasing the project was operational 3
weeks ahead of the original programme
• Led and co-ordinated stakeholder management with multiple
agencies, successfully integrated the works within the St Pancras
International development and other landlord sites including Euston
station and Westfield London Westfield Stratford
• Successfully refitted and extended an airport catering unit and
achieved the completion date, even though the start was delayed
by another project, without exceeding budget. Used innovative
solutions to minimise lead times, led the client activities to ensure
operational and lifecycle opportunities were optimised
• Led the delivery of the Terminal 5 contractors eating and
welfare facilities within the footprint of the Terminal 5 building,
A compound some 100 metres long, providing a full canteen
service with all passive and active fire mitigating measures
in place, providing welfare facilities within the heart of the
terminal building saved approx 1 hour per man per day in
wasted time, saving BAA in £45M in productivity savings.
Facilities management
• Prepared and introduced a planned and reactive building
services facilities management programme, for a London
based client, including creating a preferred supplier listing
and contractual relationships. As a result a 30% saving against
maintenance budget and with improved compliance
• Initiated and implemented actions to reduce the carbon footprint
of a clients operation through analysis and development of
practical improvements to eliminate wasted energy. Project on
track to make savings of 15%.
Product development / Process improvement
• Identified and created a new product to reduce fire risk
within commercial kitchen ductwork. Designed and built the
product, registered for all required certification and successfully
patented. Led the co-ordination of all suppliers of component
parts and sought business collaborations to license and further
market the product. The product is successfully installed in
Terminal 5 Heathrow, Westfield London, and a number of other
restaurants throughout England and Wales
• Evaluated processes and implemented changes between
operational parties to improve cost control and effectiveness
of day to day delivery. This involved bringing people from
different departments together and resulted in an embedded
framework and the introduction of innovative solutions.
Phil Prosser
Managing Director
The Sideland Group
A bit more about our people...
Excellence in retail fit-out and services management for airports Sideland Group | 35
Waterloo Station (Network Rail)
Part of a team that created the landlord procedures and approvals
process for the new Waterloo station retail redevelopment built
upon on our success and process created for the Kings Cross
Redevelopment Programme.
Kings Cross Station (Network Rail)
Part of a small team that created the landlord procedures and
approvals process for the new £550 million Kings Cross grade 1 listed
retail redevelopment programme.
Process involved:
• Creating a landlord technical standards document for retail
development on the station
• Creating/ advising on a retail design guidelines document
• Creating a landlords approval process
• Acting as a single point of contact for all new retailers to lead them
through the process from start to finish
• Helping/Advising retailers through their design process to ensure
that their final design/concept adheres to station regulations and
capped service provision
• Helped in the security and logistics process of site delivery and
Health and Safety inductions
• Acting as key contact between main stakeholders (Network Rail)
and Tenant.
In 10 months over 27 retail units (27,000 sq ft) were opened and
turned over £2.4 million in the first four weeks with predicted sales
reaching over £34 Million in the first 12 months of operating.
Property Manager
Young’s Pubs
 Hotels (Heathrow Airport)
Responsible for planning, organising and reporting of facilities/
maintenance, security and Health and Safety activities. All BAA
contractual obligations, processing and administering security
for company staff; aiming for pubs to be compliant with all DFT
guidelines. To establish, manage and monitor standards, processes
and communication.
Property Manager
Geronimo Inns (Heathrow Airport)
Responsible for planning, organising and reporting of facilities/
maintenance.
Chris Mole
Retail Development Manager
The Sideland Group
Waterloo Station (Network Rail)
Part of a small team that created and developed the technical
specification, site fit-out management and logistical operation for
the new Waterloo station retail redevelopment built upon on our
success and process created for the Kings Cross Redevelopment
Programme.
Kings Cross Station (Network Rail)
Part of a small team that created the landlord procedures and
approvals process for the new £550 million Kings Cross grade 1 listed
retail redevelopment programme.
Process involved:
• Creating a landlord technical standards document for retail
development on the station
• Creating/advising on retail design guidelines
• Creating a landlords approval process
• Helped in the security and logistics process of site delivery and
Health and Safety inductions
• Retail liaison between stakeholder (Network Rail) and main
building contractor (Vinci)
• Acting as key contact between main stakeholders (Network Rail)
and Tenant once retail fit-out contractors commenced on site
• Ensuring compliance of technical standards are being met during
fit-out process
• Ensuring all contractors adhere to site restrictions and regulations
during time on site.
Site Manager
Richardson Shopfitters (Selfridges, Harvey Nichols, Harrods, Fortnum
 Masons, Disney (Paris), Waldorff Astoria, St Pancras, Westfields
Responsible for the site management and construction of retail units
within some of the largest commercial organizations in the UK.
Delivering high-end specification retail units with health and safety at
the forefront. Working and Managing sub-contractors, site logistics,
security related matters and detailed regulatory controls within
concessionaire sites, all projects have been completed on time, within
budget and too a high finish, much to the satisfaction on the client.
Site Manager
Elite Shopfitters (St Pancras, Westfields, Heathrow)
Managing complex and highly regulated bespoke retail fit-outs
for a large nationwide shop fitters. Ensuring that the fit-out and all
sub-contractors adhere to strict protocols within some of the largest
Airports and Rail Stations in the UK.
John Richardson
Retail Construction Manager
The Sideland Group
Excellence in retail fit-out and services management for airports Sideland Group | 37
A highly experienced and accomplished team leader and
technical project manager with extensive experience in safety
management, travel retail, travel services, project management,
project integration, project delivery, building services/infrastructure,
construction, engineering and maintenance.
Heathrow Lead Commercial Manager
• Preparing and delivering projects for all commercial activities
(Property, Travel Retail and Travel services)
• Portfolios involve the design and delivery of new spaces,
refurbishment of existing spaces and assets
• Client design and fit out management
• Health and Safety Management
• Minor works, maintenance and cost management, to drive revenue
for Heathrow’s business and creating a world class offer for our
customers.
Heathrow Senior Delivery Manager
• Accountable for managing and leading the Commercial Delivery
Team for Heathrow
• Heathrow’s estate has over 400 retail outlets, 1200 support spaces and
over 2500 media sites; Stefano was responsible for ensuring each and
every project was delivered on time, safely and to budget
• Working with multiple stakeholders both internal and external
agreeing and delivering the Commercial plan
• Manage and lead the team to ensure any operating units are
maintained and kept safe ensuring passengers can relax and enjoy
their time at Heathrow.
Heathrow Terminal 5 Retail Delivery Portfolio Manager
Managing the successful design, fit-out, handover and opening of over
200,000 sq. ft. of retail space. This was achieved through leading the
concessionaires and their design and construction teams through the
planning, design and delivery stages of the retail spaces within Terminal
5 which included shops, store rooms and media sites.
BAA Retail Facilities Engineer
Managing the successful fit-out, handover and opening of retail units
across Heathrow, developing new engineering solutions for the delivery
of capital and revenue projects; also providing technical support to the
retail operation to ensure services are provided that meets the needs of
the customer and the business partners.
Stefano Mule
General Manager
The Sideland Group
Excellence in retail fit-out and services management for airports Sideland Group | 39
• Led the retail build programmes in all Terminals at Heathrow Airport
• Set up and led retail facilities management
• Led technical services for BAA Retail for all 7 Airports and assisted BAA’s international
business with risk assurance
• Led the development and implementation of retail technical standards for retail
development and facilities management
• Delivered year on year retail revenue growth through the timely and compliant
introduction of all categories of retail offer
• Led Heathrow retail business recovery to ensure rapid return to ‘normal’ after any crisis
management situation
• Operated in the capacity of Airport Duty Manager (ADM) immediately after 9/11.
Some examples of airport projects led by
Sideland principals
Excellence in retail fit-out and services management for airports Sideland Group | 41
The Gorgeous Kitchen
A fine dining restaurant with the best views of the airfield. Delivered within an 11 week period, the
innovative design and build creates a destination restaurant within a congested part of the terminal.
The fit out used the best available materials – marble, solid timbers, leather and hand-coloured glass.
Heathrow Terminal 2 – new units
Leon
Bricks from the old Heathrow control tower were reused in the build. Leon at Terminal 2 is the most
environmentally sustainable restaurant in the Heathrow portfolio
East Midlands Airport
A complete transformation of the airside Food  Beverage offer
Excellence in retail fit-out and services management for airports Sideland Group | 43
Appendices
Excellence in retail fit-out and services management for airports Sideland Group | 45
April 2013
To Whom it may concern.
I have been asked to supply a reference for Phil Prosser as someone who
has previously worked with him.
I was Managing Director of Retail for BAA from 1997-2008. During this
time the team completed numerous commercially driven construction and
retail projects and re-developed every airport in the portfolio.
As part of the team Phil demonstrated an enthusiasm to constantly
challenge the traditional and historic ways of working whilst being totally
aware of the commercial imperative and retailer needs. His practical but
challenging way of working ensured that BAA, retailers, construction
partners and eventually customers all benefitted from his approach. His
technical knowledge and leadership skills enabled him to work across
many partners with ease.
Since leaving BAA Phil has obviously continued to enhance and develop
those skills and has delivered great projects for Network Rail and others.
I have no hesitation in recommending Phil and his team as I am
confident they will deliver enhanced service delivery and shareholder
value.
Yours faithfully.
Colin Hargrave
4 April 2013
To whom it may concern
Reference for Phil Prosser
Phil Prosser was a colleague of mine at BAA responsible for project
management and bringing on stream the opening of Retail Units.
He worked within a complicated environment at Heathrow with the
Airport working at maximum capacity.
Phil always rose to the challenge often coming up with his own
innovative solutions to ensure he hit critical deadlines, thereby protecting
the Airport Operation and maximising Commercial Revenues.
Phil has a real work ethic, delivers and has a “can do” attitude. He drives
hard and expects high standards from those who work with/for him.
I have no hesitation in recommending Phil to ADAC.
Mark Riches
Braid Retail.
Excellence in retail fit-out and services management for airports Sideland Group | 47
Phil Prosser
Director and Founder
20–22 Aylesbury End
Beaconsfield
Buckinghamshire
HP9 1LW
Mobile 07985 159661
Email phil@sideland.co.uk
Contact us
Airports Brochure

More Related Content

What's hot

Air Energi Capability Statement
Air Energi Capability StatementAir Energi Capability Statement
Air Energi Capability StatementMcinerney79
 
1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMACKMAC ADMIN
 
Mactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - CopyMactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - Copyshiladitya chanda
 
Offshore Energy Limited - Crane, lifting and training support services presen...
Offshore Energy Limited - Crane, lifting and training support services presen...Offshore Energy Limited - Crane, lifting and training support services presen...
Offshore Energy Limited - Crane, lifting and training support services presen...RichardTurnbull9
 
Waypoint Global Company Brochure
Waypoint Global Company BrochureWaypoint Global Company Brochure
Waypoint Global Company BrochureJames Spencer
 
Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyVijith Nambiar
 
Deera company profile 2015
Deera company profile 2015Deera company profile 2015
Deera company profile 2015Aiman Hamdan
 
180328 profectus presentation developers
180328 profectus presentation   developers180328 profectus presentation   developers
180328 profectus presentation developersAladin Wazani
 
Brand Guardian Capability Statement September 09
Brand Guardian Capability Statement September 09Brand Guardian Capability Statement September 09
Brand Guardian Capability Statement September 09pmeadow2
 

What's hot (14)

Air Energi Capability Statement
Air Energi Capability StatementAir Energi Capability Statement
Air Energi Capability Statement
 
1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC
 
Mactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - CopyMactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - Copy
 
Offshore Energy Limited - Crane, lifting and training support services presen...
Offshore Energy Limited - Crane, lifting and training support services presen...Offshore Energy Limited - Crane, lifting and training support services presen...
Offshore Energy Limited - Crane, lifting and training support services presen...
 
Hangar 22
Hangar 22Hangar 22
Hangar 22
 
Waypoint Global Company Brochure
Waypoint Global Company BrochureWaypoint Global Company Brochure
Waypoint Global Company Brochure
 
Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancy
 
Deera company profile 2015
Deera company profile 2015Deera company profile 2015
Deera company profile 2015
 
My CV
My CVMy CV
My CV
 
2014 Brochure-TessCS Electronic-proof
2014 Brochure-TessCS Electronic-proof2014 Brochure-TessCS Electronic-proof
2014 Brochure-TessCS Electronic-proof
 
180328 profectus presentation developers
180328 profectus presentation   developers180328 profectus presentation   developers
180328 profectus presentation developers
 
Brand Guardian Capability Statement September 09
Brand Guardian Capability Statement September 09Brand Guardian Capability Statement September 09
Brand Guardian Capability Statement September 09
 
AIMs Software
AIMs SoftwareAIMs Software
AIMs Software
 
Mentor imc group brochure
Mentor imc group brochureMentor imc group brochure
Mentor imc group brochure
 

Viewers also liked (14)

letter_eugenie
letter_eugenieletter_eugenie
letter_eugenie
 
ChaBa_Magazine_Insight
ChaBa_Magazine_InsightChaBa_Magazine_Insight
ChaBa_Magazine_Insight
 
Actor call sheet
Actor call sheet Actor call sheet
Actor call sheet
 
教學影片製作 02
教學影片製作 02教學影片製作 02
教學影片製作 02
 
Building Innovation Mindsets
Building Innovation MindsetsBuilding Innovation Mindsets
Building Innovation Mindsets
 
Aljazeera international academy
Aljazeera international academyAljazeera international academy
Aljazeera international academy
 
Organizing
OrganizingOrganizing
Organizing
 
09 dibuj arte
09   dibuj arte09   dibuj arte
09 dibuj arte
 
EndowedProfsBrochure_LowResForWeb_REVISED.PDF
EndowedProfsBrochure_LowResForWeb_REVISED.PDFEndowedProfsBrochure_LowResForWeb_REVISED.PDF
EndowedProfsBrochure_LowResForWeb_REVISED.PDF
 
String handling in_java
String handling in_javaString handling in_java
String handling in_java
 
1662 3703-1-pb
1662 3703-1-pb1662 3703-1-pb
1662 3703-1-pb
 
29 dibuj arte
29   dibuj arte29   dibuj arte
29 dibuj arte
 
sejarah tingkatan 2 Bab 1
sejarah tingkatan 2 Bab 1sejarah tingkatan 2 Bab 1
sejarah tingkatan 2 Bab 1
 
Powerpoint presentation
Powerpoint presentationPowerpoint presentation
Powerpoint presentation
 

Similar to Airports Brochure

Mosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileMosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileRami Almahmoud
 
Airport 2020 Overview
Airport 2020 OverviewAirport 2020 Overview
Airport 2020 OverviewIlya Burkin
 
Roles of Aviation Infrastructure Management in the Aviation Industry
Roles of Aviation Infrastructure Management in the Aviation IndustryRoles of Aviation Infrastructure Management in the Aviation Industry
Roles of Aviation Infrastructure Management in the Aviation IndustryGlobal Aviation Infrastructure LLC
 
Capita Symonds Aviation capability
Capita Symonds Aviation capability Capita Symonds Aviation capability
Capita Symonds Aviation capability Capita Symonds
 
Air energi capability statement 2013
Air energi capability statement 2013Air energi capability statement 2013
Air energi capability statement 2013Andrew Mullineux
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statementArsen Borisovich
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statementArsen Borisovich
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statementArsen Borisovich
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statementArsen Borisovich
 
RPM COMPANY PROFILE 2015
RPM COMPANY PROFILE 2015RPM COMPANY PROFILE 2015
RPM COMPANY PROFILE 2015Anja Vasić
 
Consultancy in Airport Sector Scope and Opportunities
Consultancy in  Airport Sector Scope and OpportunitiesConsultancy in  Airport Sector Scope and Opportunities
Consultancy in Airport Sector Scope and OpportunitiesPrashanth M R
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYBerr Industry
 
C3 Projects mining capability statement
C3 Projects mining capability statementC3 Projects mining capability statement
C3 Projects mining capability statementStephen Smith
 

Similar to Airports Brochure (20)

Mosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileMosanada-UGL-Company-Profile
Mosanada-UGL-Company-Profile
 
Airport 2020 Overview
Airport 2020 OverviewAirport 2020 Overview
Airport 2020 Overview
 
Seetek company profile 2015
Seetek company profile 2015Seetek company profile 2015
Seetek company profile 2015
 
Seetek company profile
Seetek company profile Seetek company profile
Seetek company profile
 
Roles of Aviation Infrastructure Management in the Aviation Industry
Roles of Aviation Infrastructure Management in the Aviation IndustryRoles of Aviation Infrastructure Management in the Aviation Industry
Roles of Aviation Infrastructure Management in the Aviation Industry
 
Capita Symonds Aviation capability
Capita Symonds Aviation capability Capita Symonds Aviation capability
Capita Symonds Aviation capability
 
Air energi capability statement 2013
Air energi capability statement 2013Air energi capability statement 2013
Air energi capability statement 2013
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statement
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statement
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statement
 
Air energi capability statement
Air energi   capability statementAir energi   capability statement
Air energi capability statement
 
RPM COMPANY PROFILE 2015
RPM COMPANY PROFILE 2015RPM COMPANY PROFILE 2015
RPM COMPANY PROFILE 2015
 
Consultancy in Airport Sector Scope and Opportunities
Consultancy in  Airport Sector Scope and OpportunitiesConsultancy in  Airport Sector Scope and Opportunities
Consultancy in Airport Sector Scope and Opportunities
 
CPC Certified Project Consultant contact: sysenegacademy@gmail.com
CPC Certified Project Consultant   contact: sysenegacademy@gmail.comCPC Certified Project Consultant   contact: sysenegacademy@gmail.com
CPC Certified Project Consultant contact: sysenegacademy@gmail.com
 
Blue Ocean Ventures
Blue Ocean VenturesBlue Ocean Ventures
Blue Ocean Ventures
 
INDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONSINDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONS
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 
Green line profile
Green line profile Green line profile
Green line profile
 
Air Energi - Integrated Project Solutions
Air Energi - Integrated Project SolutionsAir Energi - Integrated Project Solutions
Air Energi - Integrated Project Solutions
 
C3 Projects mining capability statement
C3 Projects mining capability statementC3 Projects mining capability statement
C3 Projects mining capability statement
 

Airports Brochure

  • 1. Excellence in retail fit-out and services management for airports
  • 2. Excellence in retail fit-out and services management for airports Sideland Group | 3 Some of the most challenging locations for the fit-out and management of retail concepts are airports. Generally, they operate in a 24/7 working environment interfacing with tens of millions of users which means retail builds require exceptional standards for health and security during fit-out and operations. The degrees of complexity and compliance for airport retail build and operation are therefore amongst the most demanding and stringent in the building industry. It is in this uniquely challenging environment that Sideland has particular experience and an outstanding track record of success. Sideland’s management have been familiar with airport retail fit-out and management for over 20 years. Over this time we have identified the absolutely ‘must have’ services and standards necessary to convert great travel retail concepts into great retail results and honed the skills and procedures necessary to deliver those services and standards for our clients. Introduction
  • 3. Excellence in retail fit-out and services management for airports Sideland Group | 5 The retail and FB offer is one of the defining experiential features for an airport’s passengers as well as a crucial generator of non-aeronautical revenues. These facilities will need to be 100% fit-for- purpose from day one and remain so every day thereafter. The ultimate objective should be to ensure not just a faultless fit-out, but successful on-going operations by each concession, through the entire duration of the contract periods. The ideal solution is to implement a seamless process begun with the fit-out and then transitioning into a ‘whole of life’ concessions facilities management, that will stay with and help support each concession contract from start to finish. This is the service and long-term commitment that Sideland delivers for airports. Faultless fit-out for high performance retail
  • 4. Excellence in retail fit-out and services management for airports Sideland Group | 7 Sideland is also a rarity amongst retail consultants because we are experts not just in the fit-out of retail concepts, we also have unrivalled experience at managing retail building services in airports. At Sideland we believe that the initial design and build is just is just the first step in a programme of continuous performance to ensure the project operates at maximum efficiency helping it to achieve its full revenue generating potential. This means we stay on the case with our clients’ retail build projects from the start to the end of their concept’s life cycle. If you know where you ‘buried the wires’ you are in the best position to maintain them for as long as they need to be! Sideland – experts in retail fit-out and facilities management
  • 5. Excellence in retail fit-out and services management for airports Sideland Group | 9 As committed partners to our clients, our expertise and resources are able to ensure we cover all the key services and disciplines that protect and maintain their retail concepts from the first to the very last day of their life cycles. Even to the extent of facilitating effective handover assistance whenever that is called for by our clients or their landlords. We deliver • Safety management • Fire engineering • Building regulations • Sustainability • Standardisation and Modularisation • Disabled and discrimination regulations • Logistics • Design • Space management A partner for life
  • 6. Excellence in retail fit-out and services management for airports Sideland Group | 11 1. People with proven skills and experience in fit-out and facilities management for major international airports 2. Resources and expertise 3. Commitment to full time, permanent on-site presence 4. A ‘phased’ programme of long term support 5. Knowledge transfer and local nationals management development. What we build…we look after Where we work…we create opportunity What we offer airports
  • 7. Excellence in retail fit-out and services management for airports Sideland Group | 13 The ‘Set up’ 1. We locate on-site, full time We can locate in our own offices or in the client’s office space 2. We field a full time, 100% dedicated project team A project team who will look after the concessionaires and the interests of the airport company from start to finish and coordinate every aspect of the project on the airport’s behalf. We will also encourage the use of local talent within the project team 3. We can embed ourselves within the airport’s commercial team The airport’s management can be part of our organisational structure in terms of oversight and reporting 4. We employ and ‘train up’ local teams to ensure long-term knowledge transfer Ownership of the service skills should be the airport’s ultimate ambition. Our support for airports
  • 8. Excellence in retail fit-out and services management for airports Sideland Group | 15 A typical phased programme of support The months leading up to a development programme are critical. They afford an irreplaceable opportunity to implement an initial assessment process or ‘readiness project’ that can evolve seamlessly into the fit-out phase. This in turn can ‘morph’ into an on-going ‘whole of life’ facilities management service. Phase One – Readiness project Step One Timing An ‘as is’ audit and ‘critique’ of current systems and procedures 6 months Step Two A ‘to be’ strategy identifying and proposing the best way forward in terms of people; procedures; controls; resources; ‘must dos’, challenges, threats 3 months Full team appointment and composition to be determined by the airport.
  • 9. Excellence in retail fit-out and services management for airports Sideland Group | 17 Phase Two – Fit-out and preparedness • Working with the airport on the creation and implementation of design guidelines and technical standards • Working with the airport on key stakeholder approval processes in regard to concessionaire concept and full design package • Preparation of coherent, simple and clear fit-out processes and guidelines with Security and Health Safety at the forefront • Production of all collateral ‘briefing’ documents to ensure compliance to all the airport’s rules and regulations • Working with the airport on contractor induction processes and guidelines • Aim to create a safe and positive working environment with thorough but minimised administrative requirements.
  • 10. Excellence in retail fit-out and services management for airports Sideland Group | 19 Phase Three – Fit-out process We provide a full support team along with all the collateral (produced in Phase Two) necessary in helping each concessionaire implement their fit-out programme in full compliance with the airport’s standards such as: • Technical guidelines manuals • Compliance procedures guidelines manuals • Design guidelines manuals • Health Safety guidelines manuals • Airport ‘Support’ manual (recruitment, security etc). It will also be an essential part of our responsibility to instil in all concession operators the core principle that they are standard bearers of the airport’s brand name and its brand values. A key element in all guidelines will therefore be an emphasis on every concessionaire’s obligation to respect and reflect these values through the quality and standards of their store presentation.
  • 11. Excellence in retail fit-out and services management for airports Sideland Group | 21 Phase Four – On-going facilities management What we help build, we look after What sets us apart from other fit-out process companies is our willingness to stay with the client for the long term. The ‘fit-out’ for us is only the establishing phase, not a one-off project. Our facilities management skills and experience is available to clients on a long-term basis, ensuring that each unit is operating at maximum efficiency, not just on day one, but throughout its life-span. Mid-contract refurbishments We will ensure these are carried out as per the terms of each contract.
  • 12. Excellence in retail fit-out and services management for airports Sideland Group | 23 Why? • Retail needs to become a seamless delivery team • The need for a dedicated commercial focus to support the vision • Tenants create commercially focused delivery teams, so should the airport • We need to build well and integrate the asset to ensure retail doesn’t bring uncontrolled risks. • Handover isn’t the time to find problems, they should be retired during fit-out • This is a technical role and vitally important. What? • Retail Project Support owns all fit-out technical and construction issues, developing guidelines and procedures to enable fit-out and provide a one stop shop for tenants • Providing a technical and procedural link to airport guardians (Fire and Asset teams for example) • Providing an on site quality control check to ensure technical guidelines are not ignored within the build • Taking ownership of all retail handovers and ensuring compliance and integration with the airport • Retail Project Support provides pre-start and on site safety and compliance support to the tenant • Ensuring technical standards are met • Ensuring proper testing and validation is undertaken prior to handover • Ensuring projects are fitted out as per the approved plans Retail project support • Ensuring the airport guardians are confident that retail projects are delivered into the business without undue risk • Ensuring that building up the retail business is done with airport stakeholder support. Benefits • Improved control of life-cycle risk • Focussed retail delivery, reduced fit-out time lag leading to increased revenue for concessionaires and the airport • Consistency of fit-out standards • One stop shop for tenants, technical suppliers contractors and airport asset teams • Provides the airport retail team the freedom to manage and grow the commercial side of the business faster. (Accountable self sufficiency) • Allows the airport team time to focus on the core business. We offer a full facilities management resource to ensure compliance and peace of mind for the airport
  • 13. Excellence in retail fit-out and services management for airports Sideland Group | 25 1. A ‘readiness’ preparation resource that ensures the airport sets off in the right direction 2. A ‘fit-out’ process resource that ensures a faultless implementation programme/process for each concessionaire’s unit(s) 3. A facilities management resource that stays with the airport throughout the duration of each concessionaire contract period, ensuring an uninterrupted ‘whole of life’ quality control 4. A strategic partner that can help define key operational criteria within Requests for Proposals for the next generation of tenders. Sideland: A ‘one-stop’ end to end resource, embedded within the airport for the long term
  • 14. Excellence in retail fit-out and services management for airports Sideland Group | 27 A typical organisational structure for airport projects Phase One, Two Three – Readiness project and fit-out Typical team composition for multiple retail delivery – Sideland Group will look to build local talent within team composition Client Team Stakeholders Category Teams Contracts Lead authorities Design/Architects Property teams Public affairs FM Integration Utilities Lead suppliers Specialist artisans Way finding Head of Retail Delivery Health Safety Development Manager Construction Manager, Building Services Construction Manager, Fit Out Delivery Assistant DM Assistant DM (Potential local appointment) Assistant CM Assistant CM (Potential local appointment) Assistant CM Assistant CM (Potential local appointment) Assistant CM
  • 15. Excellence in retail fit-out and services management for airports Sideland Group | 29 Phase Four – Facilities management service The build team would remain in situ for at least 12 months to ensure life-cycle management has embedded and ‘check the checker’ systems are in place and working. Succession planning: Over a planned and managed phased process, the local Assistants would begin to take more of a leadership role with the intention of owning the process going forward. Team Leader Building Services – CM RDM Fit-Out – CM Local Assistant DM Local Assistant CM Local Assistant CM Airport Day to Day Support Team
  • 16. Excellence in retail fit-out and services management for airports Sideland Group | 31 Our people The management of Sideland have impeccable pedigrees in the world of airport retail design, implementation and facilities management. From all our personal experiences, we know the challenges our clients face, we are acutely conscious of their requirement to deliver what are always extremely ambitious retail performance results and we know just how critical effective building service management is to their retail concept’s commercial success.
  • 17. Excellence in retail fit-out and services management for airports Sideland Group | 33 • Sideland Group Ltd 2003 – date Managing Director • BAA PLC 2002 – 2003 Group Retail Technical Support Manager Company Senior Manager • Heathrow Airport Ltd 1980 – 2003 Head of Retail Facilities • Airport Senior Manager 1998 – 2003 Construction Manager, Capital Projects, Heathrow wide 1993 –1998 • Project Manager, Terminal 3 1989 – 1993 Profile A commercially minded project and facilities manager with over 30 years experience operating in complex and dynamic environments. Demonstrating strong problem solving skills and ability to implement new and creative products and solutions. Proven ability to build constructive relationships with a wide number of stakeholders in order to deliver against challenging cost and program deadlines. Project management • Leading the fit-out of all retail projects +23 units at London Waterloo station during their refurbishment project pre-Olympics, ensuring that all aspects of fit-out progress without impacting a fully operational station • Led the delivery of all Retail fit-out projects +35 units at London Kings Cross, ensuring that all tenants opened in line with the station opening date. This project required multiple stakeholder interaction and excellent negotiation skills • Recently completed a new Landside catering mall concept for Glasgow Airport. Through re-phasing the project was operational 3 weeks ahead of the original programme • Led and co-ordinated stakeholder management with multiple agencies, successfully integrated the works within the St Pancras International development and other landlord sites including Euston station and Westfield London Westfield Stratford • Successfully refitted and extended an airport catering unit and achieved the completion date, even though the start was delayed by another project, without exceeding budget. Used innovative solutions to minimise lead times, led the client activities to ensure operational and lifecycle opportunities were optimised • Led the delivery of the Terminal 5 contractors eating and welfare facilities within the footprint of the Terminal 5 building, A compound some 100 metres long, providing a full canteen service with all passive and active fire mitigating measures in place, providing welfare facilities within the heart of the terminal building saved approx 1 hour per man per day in wasted time, saving BAA in £45M in productivity savings. Facilities management • Prepared and introduced a planned and reactive building services facilities management programme, for a London based client, including creating a preferred supplier listing and contractual relationships. As a result a 30% saving against maintenance budget and with improved compliance • Initiated and implemented actions to reduce the carbon footprint of a clients operation through analysis and development of practical improvements to eliminate wasted energy. Project on track to make savings of 15%. Product development / Process improvement • Identified and created a new product to reduce fire risk within commercial kitchen ductwork. Designed and built the product, registered for all required certification and successfully patented. Led the co-ordination of all suppliers of component parts and sought business collaborations to license and further market the product. The product is successfully installed in Terminal 5 Heathrow, Westfield London, and a number of other restaurants throughout England and Wales • Evaluated processes and implemented changes between operational parties to improve cost control and effectiveness of day to day delivery. This involved bringing people from different departments together and resulted in an embedded framework and the introduction of innovative solutions. Phil Prosser Managing Director The Sideland Group A bit more about our people...
  • 18. Excellence in retail fit-out and services management for airports Sideland Group | 35 Waterloo Station (Network Rail) Part of a team that created the landlord procedures and approvals process for the new Waterloo station retail redevelopment built upon on our success and process created for the Kings Cross Redevelopment Programme. Kings Cross Station (Network Rail) Part of a small team that created the landlord procedures and approvals process for the new £550 million Kings Cross grade 1 listed retail redevelopment programme. Process involved: • Creating a landlord technical standards document for retail development on the station • Creating/ advising on a retail design guidelines document • Creating a landlords approval process • Acting as a single point of contact for all new retailers to lead them through the process from start to finish • Helping/Advising retailers through their design process to ensure that their final design/concept adheres to station regulations and capped service provision • Helped in the security and logistics process of site delivery and Health and Safety inductions • Acting as key contact between main stakeholders (Network Rail) and Tenant. In 10 months over 27 retail units (27,000 sq ft) were opened and turned over £2.4 million in the first four weeks with predicted sales reaching over £34 Million in the first 12 months of operating. Property Manager Young’s Pubs
 Hotels (Heathrow Airport) Responsible for planning, organising and reporting of facilities/ maintenance, security and Health and Safety activities. All BAA contractual obligations, processing and administering security for company staff; aiming for pubs to be compliant with all DFT guidelines. To establish, manage and monitor standards, processes and communication. Property Manager Geronimo Inns (Heathrow Airport) Responsible for planning, organising and reporting of facilities/ maintenance. Chris Mole Retail Development Manager The Sideland Group Waterloo Station (Network Rail) Part of a small team that created and developed the technical specification, site fit-out management and logistical operation for the new Waterloo station retail redevelopment built upon on our success and process created for the Kings Cross Redevelopment Programme. Kings Cross Station (Network Rail) Part of a small team that created the landlord procedures and approvals process for the new £550 million Kings Cross grade 1 listed retail redevelopment programme. Process involved: • Creating a landlord technical standards document for retail development on the station • Creating/advising on retail design guidelines • Creating a landlords approval process • Helped in the security and logistics process of site delivery and Health and Safety inductions • Retail liaison between stakeholder (Network Rail) and main building contractor (Vinci) • Acting as key contact between main stakeholders (Network Rail) and Tenant once retail fit-out contractors commenced on site • Ensuring compliance of technical standards are being met during fit-out process • Ensuring all contractors adhere to site restrictions and regulations during time on site. Site Manager Richardson Shopfitters (Selfridges, Harvey Nichols, Harrods, Fortnum Masons, Disney (Paris), Waldorff Astoria, St Pancras, Westfields Responsible for the site management and construction of retail units within some of the largest commercial organizations in the UK. Delivering high-end specification retail units with health and safety at the forefront. Working and Managing sub-contractors, site logistics, security related matters and detailed regulatory controls within concessionaire sites, all projects have been completed on time, within budget and too a high finish, much to the satisfaction on the client. Site Manager Elite Shopfitters (St Pancras, Westfields, Heathrow) Managing complex and highly regulated bespoke retail fit-outs for a large nationwide shop fitters. Ensuring that the fit-out and all sub-contractors adhere to strict protocols within some of the largest Airports and Rail Stations in the UK. John Richardson Retail Construction Manager The Sideland Group
  • 19. Excellence in retail fit-out and services management for airports Sideland Group | 37 A highly experienced and accomplished team leader and technical project manager with extensive experience in safety management, travel retail, travel services, project management, project integration, project delivery, building services/infrastructure, construction, engineering and maintenance. Heathrow Lead Commercial Manager • Preparing and delivering projects for all commercial activities (Property, Travel Retail and Travel services) • Portfolios involve the design and delivery of new spaces, refurbishment of existing spaces and assets • Client design and fit out management • Health and Safety Management • Minor works, maintenance and cost management, to drive revenue for Heathrow’s business and creating a world class offer for our customers. Heathrow Senior Delivery Manager • Accountable for managing and leading the Commercial Delivery Team for Heathrow • Heathrow’s estate has over 400 retail outlets, 1200 support spaces and over 2500 media sites; Stefano was responsible for ensuring each and every project was delivered on time, safely and to budget • Working with multiple stakeholders both internal and external agreeing and delivering the Commercial plan • Manage and lead the team to ensure any operating units are maintained and kept safe ensuring passengers can relax and enjoy their time at Heathrow. Heathrow Terminal 5 Retail Delivery Portfolio Manager Managing the successful design, fit-out, handover and opening of over 200,000 sq. ft. of retail space. This was achieved through leading the concessionaires and their design and construction teams through the planning, design and delivery stages of the retail spaces within Terminal 5 which included shops, store rooms and media sites. BAA Retail Facilities Engineer Managing the successful fit-out, handover and opening of retail units across Heathrow, developing new engineering solutions for the delivery of capital and revenue projects; also providing technical support to the retail operation to ensure services are provided that meets the needs of the customer and the business partners. Stefano Mule General Manager The Sideland Group
  • 20. Excellence in retail fit-out and services management for airports Sideland Group | 39 • Led the retail build programmes in all Terminals at Heathrow Airport • Set up and led retail facilities management • Led technical services for BAA Retail for all 7 Airports and assisted BAA’s international business with risk assurance • Led the development and implementation of retail technical standards for retail development and facilities management • Delivered year on year retail revenue growth through the timely and compliant introduction of all categories of retail offer • Led Heathrow retail business recovery to ensure rapid return to ‘normal’ after any crisis management situation • Operated in the capacity of Airport Duty Manager (ADM) immediately after 9/11. Some examples of airport projects led by Sideland principals
  • 21. Excellence in retail fit-out and services management for airports Sideland Group | 41 The Gorgeous Kitchen A fine dining restaurant with the best views of the airfield. Delivered within an 11 week period, the innovative design and build creates a destination restaurant within a congested part of the terminal. The fit out used the best available materials – marble, solid timbers, leather and hand-coloured glass. Heathrow Terminal 2 – new units Leon Bricks from the old Heathrow control tower were reused in the build. Leon at Terminal 2 is the most environmentally sustainable restaurant in the Heathrow portfolio East Midlands Airport A complete transformation of the airside Food Beverage offer
  • 22. Excellence in retail fit-out and services management for airports Sideland Group | 43 Appendices
  • 23. Excellence in retail fit-out and services management for airports Sideland Group | 45 April 2013 To Whom it may concern. I have been asked to supply a reference for Phil Prosser as someone who has previously worked with him. I was Managing Director of Retail for BAA from 1997-2008. During this time the team completed numerous commercially driven construction and retail projects and re-developed every airport in the portfolio. As part of the team Phil demonstrated an enthusiasm to constantly challenge the traditional and historic ways of working whilst being totally aware of the commercial imperative and retailer needs. His practical but challenging way of working ensured that BAA, retailers, construction partners and eventually customers all benefitted from his approach. His technical knowledge and leadership skills enabled him to work across many partners with ease. Since leaving BAA Phil has obviously continued to enhance and develop those skills and has delivered great projects for Network Rail and others. I have no hesitation in recommending Phil and his team as I am confident they will deliver enhanced service delivery and shareholder value. Yours faithfully. Colin Hargrave 4 April 2013 To whom it may concern Reference for Phil Prosser Phil Prosser was a colleague of mine at BAA responsible for project management and bringing on stream the opening of Retail Units. He worked within a complicated environment at Heathrow with the Airport working at maximum capacity. Phil always rose to the challenge often coming up with his own innovative solutions to ensure he hit critical deadlines, thereby protecting the Airport Operation and maximising Commercial Revenues. Phil has a real work ethic, delivers and has a “can do” attitude. He drives hard and expects high standards from those who work with/for him. I have no hesitation in recommending Phil to ADAC. Mark Riches Braid Retail.
  • 24. Excellence in retail fit-out and services management for airports Sideland Group | 47 Phil Prosser Director and Founder 20–22 Aylesbury End Beaconsfield Buckinghamshire HP9 1LW Mobile 07985 159661 Email phil@sideland.co.uk Contact us