1. CFBC THERMAL PLANT, BHEL – NLC SITE
Tasks:
I. Responsible for checking signals between Control System (DCS) to Full
condensing Steam Turbine (120MW X 2 ) Boiler, cooling Water and Steam
Cycle (HP AND LP Bypass System),FD and PA fan ,ID FAN and Balance of
Plant devices
II. Responsible for testing the functionality and protections, as well as tuning
and optimizing the Full condensing Steam Turbine (120MW X 2 )
Boiler, cooling Water and Steam Cycle (HP AND LP Bypass System),FD
and PA fan ,ID FAN ,Coal Feeder and Balance of Plant devices
a) Studying vendor supplied logic diagrams.
b) Developing Logic using MAX Tool.
c) Developing HMI Screens using MAX Editor .
d) IO downloads for IO panels .
e) Making report for IO downloads .
f) Forcing IO’s and checking the status in screens.
g) Preparing documentation for logics and screens developed
h) Reading of Process and Instrumentation Diagram.
i) Review of Commissioning sequence and plan, development of detailed
commissioning procedures for leak test, steam turbine solo run, gas
turbine solo run, DCS loop checking, DCS, ESD and PLC logic test, test
forms and Ready for Start-up for systems. In collaboration with others
departments and vendor’s representatives, where necessary, convert
vendors procedures, check list and forms for commissioning accordingly to
company commissioning plan, submission to management for approval,
j) Organize and supervise client assigned teams, of 4-6 persons, for carry out
of commissioning test such as DCS&ESD logic test, dryers
k) Support vendor’s representative to carry of commissioning test and during
start-up.
l) Review, update and develop detailed start-up sequence, procedures and
operating manuals
m) Advising and support client operation team for preparation of unit for
start-up, during start-up and normal operation. Suggest for best practice
and where necessary on job training,
- Preparation and update of commissioning progress reports, minutes of
meetings.

More Related Content

Viewers also liked

Viewers also liked (14)

Presentacion elche
Presentacion elchePresentacion elche
Presentacion elche
 
IFRS GLOSSARY
IFRS GLOSSARYIFRS GLOSSARY
IFRS GLOSSARY
 
LA EDUCACIÓN Y EL CONECTIVISMO
LA EDUCACIÓN Y EL CONECTIVISMOLA EDUCACIÓN Y EL CONECTIVISMO
LA EDUCACIÓN Y EL CONECTIVISMO
 
New bp [autosaved]
New bp [autosaved]New bp [autosaved]
New bp [autosaved]
 
Innovative assessment
Innovative assessmentInnovative assessment
Innovative assessment
 
Passive voice and Yorkshire
Passive voice and YorkshirePassive voice and Yorkshire
Passive voice and Yorkshire
 
Branding Sao Paulo
Branding Sao PauloBranding Sao Paulo
Branding Sao Paulo
 
compressed_IPCS Exec Summary
compressed_IPCS Exec Summarycompressed_IPCS Exec Summary
compressed_IPCS Exec Summary
 
Virtual Network
Virtual NetworkVirtual Network
Virtual Network
 
Parc_ja
Parc_jaParc_ja
Parc_ja
 
Neyveli lignite corporation limited
Neyveli lignite corporation limitedNeyveli lignite corporation limited
Neyveli lignite corporation limited
 
音声生成の基礎と音声学
音声生成の基礎と音声学音声生成の基礎と音声学
音声生成の基礎と音声学
 
packaging types
packaging typespackaging types
packaging types
 
Resume - Syed Bari - Nov,2016
Resume - Syed Bari - Nov,2016Resume - Syed Bari - Nov,2016
Resume - Syed Bari - Nov,2016
 

Similar to CFBC THERMAL PLANT

Similar to CFBC THERMAL PLANT (20)

Zaheer us cv automation specialist 22 01-15
Zaheer us cv  automation specialist 22 01-15 Zaheer us cv  automation specialist 22 01-15
Zaheer us cv automation specialist 22 01-15
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
resume-6
resume-6resume-6
resume-6
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
MY_CV_1
MY_CV_1MY_CV_1
MY_CV_1
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
CV
CVCV
CV
 
My Profile - SHI
My Profile - SHIMy Profile - SHI
My Profile - SHI
 
Sr.Inst Tech
Sr.Inst TechSr.Inst Tech
Sr.Inst Tech
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
luai_cv
luai_cvluai_cv
luai_cv
 
C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)C V LAVERNE-LOUIS 2012 (1) (1)
C V LAVERNE-LOUIS 2012 (1) (1)
 
E&I Role Firebag
E&I Role FirebagE&I Role Firebag
E&I Role Firebag
 
MUKUL PATEL 21042016
MUKUL PATEL 21042016MUKUL PATEL 21042016
MUKUL PATEL 21042016
 

CFBC THERMAL PLANT

  • 1. 1. CFBC THERMAL PLANT, BHEL – NLC SITE Tasks: I. Responsible for checking signals between Control System (DCS) to Full condensing Steam Turbine (120MW X 2 ) Boiler, cooling Water and Steam Cycle (HP AND LP Bypass System),FD and PA fan ,ID FAN and Balance of Plant devices II. Responsible for testing the functionality and protections, as well as tuning and optimizing the Full condensing Steam Turbine (120MW X 2 ) Boiler, cooling Water and Steam Cycle (HP AND LP Bypass System),FD and PA fan ,ID FAN ,Coal Feeder and Balance of Plant devices a) Studying vendor supplied logic diagrams. b) Developing Logic using MAX Tool. c) Developing HMI Screens using MAX Editor . d) IO downloads for IO panels . e) Making report for IO downloads . f) Forcing IO’s and checking the status in screens. g) Preparing documentation for logics and screens developed h) Reading of Process and Instrumentation Diagram. i) Review of Commissioning sequence and plan, development of detailed commissioning procedures for leak test, steam turbine solo run, gas turbine solo run, DCS loop checking, DCS, ESD and PLC logic test, test forms and Ready for Start-up for systems. In collaboration with others departments and vendor’s representatives, where necessary, convert vendors procedures, check list and forms for commissioning accordingly to company commissioning plan, submission to management for approval, j) Organize and supervise client assigned teams, of 4-6 persons, for carry out of commissioning test such as DCS&ESD logic test, dryers k) Support vendor’s representative to carry of commissioning test and during start-up. l) Review, update and develop detailed start-up sequence, procedures and operating manuals m) Advising and support client operation team for preparation of unit for start-up, during start-up and normal operation. Suggest for best practice and where necessary on job training, - Preparation and update of commissioning progress reports, minutes of meetings.