SlideShare a Scribd company logo
1 of 3
A competent Operations Director within the Nuclear Industry with a proven
ability to define and provide operational and technical solutions to most clients’
operational, engineering projects and maintenance plant needs.
Operating at various level win the client organisation in the last 7 to 10 years my
focus has been within heavily regulated industries, with a main specific
concentration in the Nuclear and Conventional Power Generation Industry for
the las 8years. In this period I have been managing change and transformation of
the business area I initially inherited and further developed the current business
into supporting situations that need plant stability, sustained or increased
performance for generation with the provision of implementing high-end
operational and technical recoveries of operational people, plant and process,
coupled with a number of successful fast track interventions across 68 EPRI
systems on the likes of reactor island, balancer plant and control systems
including mitigations in aging and obsolescence and plant life extension.
Responsible for the businesses Framework and P&L, daily operations,
development of product sets across a staffing level that fluctuates between 40
and in excess of 200 at any one time, I work as a team player operating at all
required levels in the customer and own business operations and technical
sphere.
I am proud to say that I have been instrumental to the key businesses successes
in the asset management area within the Nuclear Fleet of operators and at the
specific clients request more recently also the Coal Gas & Renewable Fleet where
I am bringing OPEX and shared knowledge.
I have adapted to the multi-parallel challenges and situations that have been
presented to me to provide business, development of products, daily operations
needs, safety, quality, commercial and technical engineering solutions to the
variety of tasks project and programmes ranging from a circa £5k to £ 4.5M each,
with over 72 individual task projects and programmes at anyone time, along
with an operational business unit in parallel.
I have played key roles of building several businesses from the concept and from
experiencing poor performance, establishing the recovery / development
strategy plan, raising finance, stake holding and implementation.
I have built a solid foundation of a trusted client network, within the Nuclear
Generation industry, and key suppliers that has become a key asset in the role I
currently succeed and further develop.
I had developed and owned my own business that provided the design,
integration and installation of Automation, Control & Mechatronic systems and
as part of this had my own workshops facilities and software engineering with a
through put to the tune of 4 to 5 control panels and motor control centres on
average leaving my workshops per week for the installation teams supporting
the Generation, MOD, Manufacturing, Process, Pharmaceuticals and Petro-Chem
industries, which I later merged into a group of businesses, taking on a group
Technical Director role.
My own core engineering knowledge basis is in the areas of Electrical, Control,
Instrumentation, and Automation that has included PCS7, WinCC and Discrete
and Distributed PLC and SCADA systems, that have been integrated intothe
industries I have named.
I have taken on behalf of my current, embedded / key seconded client
operational roles, this tends to be in the role of developing the recovery
methodology / strategy, driving the recovery application and holding the
accountability of the poor plant performance of the generation power plant.
I have in my career on a number of occasions had to manage and motivate
personnel in a changing environment, requiring coaching, mentoring and the
appropriate level of support to achieve the businesses goals and results, applying
Human Factors and behavioural techniques.
I am flexible and understanding, and I will strive for success in the business I
work for, I have over the years now my own proven man management skill, style
and technique, and find I am able to motivate and achieve results from my work
force or teams provided to me.
The works I have been involved from an operations, engineering plant build and
maintenance role has been in performance and management, cost control,
construction, sign-off and life cycle support on civil, building, mechanical, piping,
production, fabrication, electrical, control, automation and instrumentation.
For a range of clients I have implemented Project Portfolio, Plant Enhancements,
Technical Performance Recoveries, Commercial Viability and engrained Cultural
Changes covering engineering plant on, electrical, mechanical, control,
automation, fabrication, manufacturing, maintenance & installation /
construction issues
I have been instrumental in the Nuclear Industry in PLEX (Plant Lifetime
Extensions) key decisions and process to establish the PLEX and MTP investment
portfolio of £3/4BN from the development of System Lifetime Plans, mechanisms
in gather the multi-plant needs, setting challenge, prioritising, report
development for Investment Councils presenting the requirement to Multi
Senior Boards and Councils,
In all the roles that I have had, I have been keen to support and transfer my
knowledge to others through coaching and mentoring and have taken key roles
in mentoring apprentices and engineers at all levels for succession as to pass on
to them my wide wealth of knowledge and skill, many whom today have now
developed into Senior Engineers, Managers and Directors of some very
successful international Blue Chip organisations.
As well as managing my own companies team i have personally support the
customers with the likes of:
> Increased Asset Performance and Recovery, from defining and establishing the
origin route problem and recovery definition, through to Implementation of of
tactical, and strategic technical, cultural and sustained solutions.
> Plant Reliability, Availability and Maintainability across the 68 EPRI SHIP, on a
Fleet of Stations
> PLEX Definition and Investment circa £3/4Billion across multi-fleet.
> Programme Management of high end technical challenges.
> Turn-Around and Outage Recovery.
> Critical Projects - Programme Management, inc Safety Case IJCO, and fast track
solutions, Scheme, Mech, Elec, C&I and
However, in the last thirty years of electro mechanical engineering experience,
my career path has progressed from hands on installation, progressing through
engineering, project management and commercial roles to director, increasing
responsibility in plant, people and process,
I cover electro-mechanical, instrumentation and automation, and have
experience within the Power Gen, Airport, Pharma Steel, Manufacturing, MOD,
Marine and Petrochem, Nuclear. Euro and International.
I have been appointed in the following Roles in the past:
 Technical and Engineering Director
 Business Manager
Programme Management
 Engineering Management of an Number of Contracts at once
 Design and Build – Technical and Projects Mang't
 Electrical and Mechanical Maintenance, including CBM
 Asset Relocation
 Brown and Greenfield Power, Control and Networking
 Refits and Outages of Assets
 Plant Enhancements
 Preventative and Reactive Maintenace
 Business Based Maintenance
 Motor Management
 Systems Integration
 Control and Automation
 Process Plant EC&I
 Production Engineering and Fabrication
 Prototyping and Development Engineering
 Prod Eng and Pref Enhancement
 Estimator / Draughtsman.

More Related Content

What's hot

HPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP OptimizationHPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP Optimization
David Yancosky
 
Sundra resume.1
Sundra resume.1Sundra resume.1
Sundra resume.1
Sundra Raj
 
Brian_Ash_Resume
Brian_Ash_ResumeBrian_Ash_Resume
Brian_Ash_Resume
Brian Ash
 
How to Leverage Engineering & R&D From India and China in the Med Tech Business
How to Leverage Engineering & R&D From India and China in the Med Tech BusinessHow to Leverage Engineering & R&D From India and China in the Med Tech Business
How to Leverage Engineering & R&D From India and China in the Med Tech Business
UBMCanon
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01
Juergen Pfeiffer
 

What's hot (20)

Rob Donley Resume 2020
Rob Donley Resume 2020Rob Donley Resume 2020
Rob Donley Resume 2020
 
Rob Donley Resume 2020
Rob Donley Resume 2020Rob Donley Resume 2020
Rob Donley Resume 2020
 
HPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP OptimizationHPAC article_AUG2015_CP Optimization
HPAC article_AUG2015_CP Optimization
 
Chapter 02 The Balanced Scorecard and Strategy Map
Chapter 02 The Balanced Scorecard and Strategy MapChapter 02 The Balanced Scorecard and Strategy Map
Chapter 02 The Balanced Scorecard and Strategy Map
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Chapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle CostsChapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle Costs
 
Sundra resume.1
Sundra resume.1Sundra resume.1
Sundra resume.1
 
Corneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations managementCorneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations management
 
Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2
 
Chapter 07 Measuring and Managing Process Performance
Chapter 07 Measuring and Managing Process PerformanceChapter 07 Measuring and Managing Process Performance
Chapter 07 Measuring and Managing Process Performance
 
akil R1.doc
akil R1.docakil R1.doc
akil R1.doc
 
My cv 016
My cv 016My cv 016
My cv 016
 
Brian_Ash_Resume
Brian_Ash_ResumeBrian_Ash_Resume
Brian_Ash_Resume
 
CV S Larner 2016
CV S Larner 2016CV S Larner 2016
CV S Larner 2016
 
JC Asset Management Services
JC Asset Management ServicesJC Asset Management Services
JC Asset Management Services
 
How to Leverage Engineering & R&D From India and China in the Med Tech Business
How to Leverage Engineering & R&D From India and China in the Med Tech BusinessHow to Leverage Engineering & R&D From India and China in the Med Tech Business
How to Leverage Engineering & R&D From India and China in the Med Tech Business
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01
 
Prima 10 wolf-6-17
Prima 10 wolf-6-17Prima 10 wolf-6-17
Prima 10 wolf-6-17
 
Chapter 05 Activity-Based Cost Systems
Chapter 05 Activity-Based Cost SystemsChapter 05 Activity-Based Cost Systems
Chapter 05 Activity-Based Cost Systems
 
Beall, edwin bio
Beall, edwin bioBeall, edwin bio
Beall, edwin bio
 

Viewers also liked

english@nottingham-sept-14
english@nottingham-sept-14english@nottingham-sept-14
english@nottingham-sept-14
Radhika Chond
 

Viewers also liked (11)

Los lápices de colores
Los lápices de coloresLos lápices de colores
Los lápices de colores
 
Tic’s en la educación
Tic’s en la educaciónTic’s en la educación
Tic’s en la educación
 
Codemash-2017
Codemash-2017Codemash-2017
Codemash-2017
 
english@nottingham-sept-14
english@nottingham-sept-14english@nottingham-sept-14
english@nottingham-sept-14
 
Tips for web security
Tips for web securityTips for web security
Tips for web security
 
presentacion los paises
presentacion los paisespresentacion los paises
presentacion los paises
 
Jaqueline
JaquelineJaqueline
Jaqueline
 
1.การประชุมผู้ปกครองครั้งที่ 2 2559
1.การประชุมผู้ปกครองครั้งที่ 2 25591.การประชุมผู้ปกครองครั้งที่ 2 2559
1.การประชุมผู้ปกครองครั้งที่ 2 2559
 
Trastorno especifico del lenguaje
Trastorno especifico del lenguajeTrastorno especifico del lenguaje
Trastorno especifico del lenguaje
 
Foco e disciplina personaldosucesso
Foco e disciplina   personaldosucessoFoco e disciplina   personaldosucesso
Foco e disciplina personaldosucesso
 
TOP Statistical Analysis Software
TOP Statistical Analysis SoftwareTOP Statistical Analysis Software
TOP Statistical Analysis Software
 

Similar to Summary for Linkedin

neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015
Neil Mckie
 
Resume for Management position 14-05-15
Resume for Management position 14-05-15Resume for Management position 14-05-15
Resume for Management position 14-05-15
John Barnett
 
Src Resume Full
Src Resume FullSrc Resume Full
Src Resume Full
Scott Cook
 
2016_RRC_Cover_Letter v2
2016_RRC_Cover_Letter v22016_RRC_Cover_Letter v2
2016_RRC_Cover_Letter v2
Richard Clark
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
jacques Kouadio
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
Al Obaidi Abdullah
 
Pwc energy-consulting-capability-statement-delivering-operational-excellence
Pwc energy-consulting-capability-statement-delivering-operational-excellencePwc energy-consulting-capability-statement-delivering-operational-excellence
Pwc energy-consulting-capability-statement-delivering-operational-excellence
Jreyesmolina
 
Ron Campanella Resume January 2017
Ron Campanella Resume January 2017Ron Campanella Resume January 2017
Ron Campanella Resume January 2017
Ron Campanella, P.E.
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphic
Ed Hockwater
 

Similar to Summary for Linkedin (20)

BobJordan-6-13-16a
BobJordan-6-13-16aBobJordan-6-13-16a
BobJordan-6-13-16a
 
neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015
 
Resume for Management position 14-05-15
Resume for Management position 14-05-15Resume for Management position 14-05-15
Resume for Management position 14-05-15
 
Src Resume Full
Src Resume FullSrc Resume Full
Src Resume Full
 
Ketul Resume
Ketul ResumeKetul Resume
Ketul Resume
 
Shaktikumar_Potdar
Shaktikumar_PotdarShaktikumar_Potdar
Shaktikumar_Potdar
 
AMurray2015
AMurray2015AMurray2015
AMurray2015
 
AMurray2015
AMurray2015AMurray2015
AMurray2015
 
2016_RRC_Cover_Letter v2
2016_RRC_Cover_Letter v22016_RRC_Cover_Letter v2
2016_RRC_Cover_Letter v2
 
Sudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-SSudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-S
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
Pwc energy-consulting-capability-statement-delivering-operational-excellence
Pwc energy-consulting-capability-statement-delivering-operational-excellencePwc energy-consulting-capability-statement-delivering-operational-excellence
Pwc energy-consulting-capability-statement-delivering-operational-excellence
 
Ron Campanella Resume January 2017
Ron Campanella Resume January 2017Ron Campanella Resume January 2017
Ron Campanella Resume January 2017
 
Lawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pmLawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pm
 
Yong Sik Choe -cv
Yong Sik Choe -cvYong Sik Choe -cv
Yong Sik Choe -cv
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphic
 

Summary for Linkedin

  • 1. A competent Operations Director within the Nuclear Industry with a proven ability to define and provide operational and technical solutions to most clients’ operational, engineering projects and maintenance plant needs. Operating at various level win the client organisation in the last 7 to 10 years my focus has been within heavily regulated industries, with a main specific concentration in the Nuclear and Conventional Power Generation Industry for the las 8years. In this period I have been managing change and transformation of the business area I initially inherited and further developed the current business into supporting situations that need plant stability, sustained or increased performance for generation with the provision of implementing high-end operational and technical recoveries of operational people, plant and process, coupled with a number of successful fast track interventions across 68 EPRI systems on the likes of reactor island, balancer plant and control systems including mitigations in aging and obsolescence and plant life extension. Responsible for the businesses Framework and P&L, daily operations, development of product sets across a staffing level that fluctuates between 40 and in excess of 200 at any one time, I work as a team player operating at all required levels in the customer and own business operations and technical sphere. I am proud to say that I have been instrumental to the key businesses successes in the asset management area within the Nuclear Fleet of operators and at the specific clients request more recently also the Coal Gas & Renewable Fleet where I am bringing OPEX and shared knowledge. I have adapted to the multi-parallel challenges and situations that have been presented to me to provide business, development of products, daily operations needs, safety, quality, commercial and technical engineering solutions to the variety of tasks project and programmes ranging from a circa £5k to £ 4.5M each, with over 72 individual task projects and programmes at anyone time, along with an operational business unit in parallel. I have played key roles of building several businesses from the concept and from experiencing poor performance, establishing the recovery / development strategy plan, raising finance, stake holding and implementation. I have built a solid foundation of a trusted client network, within the Nuclear Generation industry, and key suppliers that has become a key asset in the role I currently succeed and further develop. I had developed and owned my own business that provided the design, integration and installation of Automation, Control & Mechatronic systems and as part of this had my own workshops facilities and software engineering with a through put to the tune of 4 to 5 control panels and motor control centres on average leaving my workshops per week for the installation teams supporting the Generation, MOD, Manufacturing, Process, Pharmaceuticals and Petro-Chem
  • 2. industries, which I later merged into a group of businesses, taking on a group Technical Director role. My own core engineering knowledge basis is in the areas of Electrical, Control, Instrumentation, and Automation that has included PCS7, WinCC and Discrete and Distributed PLC and SCADA systems, that have been integrated intothe industries I have named. I have taken on behalf of my current, embedded / key seconded client operational roles, this tends to be in the role of developing the recovery methodology / strategy, driving the recovery application and holding the accountability of the poor plant performance of the generation power plant. I have in my career on a number of occasions had to manage and motivate personnel in a changing environment, requiring coaching, mentoring and the appropriate level of support to achieve the businesses goals and results, applying Human Factors and behavioural techniques. I am flexible and understanding, and I will strive for success in the business I work for, I have over the years now my own proven man management skill, style and technique, and find I am able to motivate and achieve results from my work force or teams provided to me. The works I have been involved from an operations, engineering plant build and maintenance role has been in performance and management, cost control, construction, sign-off and life cycle support on civil, building, mechanical, piping, production, fabrication, electrical, control, automation and instrumentation. For a range of clients I have implemented Project Portfolio, Plant Enhancements, Technical Performance Recoveries, Commercial Viability and engrained Cultural Changes covering engineering plant on, electrical, mechanical, control, automation, fabrication, manufacturing, maintenance & installation / construction issues I have been instrumental in the Nuclear Industry in PLEX (Plant Lifetime Extensions) key decisions and process to establish the PLEX and MTP investment portfolio of £3/4BN from the development of System Lifetime Plans, mechanisms in gather the multi-plant needs, setting challenge, prioritising, report development for Investment Councils presenting the requirement to Multi Senior Boards and Councils, In all the roles that I have had, I have been keen to support and transfer my knowledge to others through coaching and mentoring and have taken key roles in mentoring apprentices and engineers at all levels for succession as to pass on to them my wide wealth of knowledge and skill, many whom today have now developed into Senior Engineers, Managers and Directors of some very successful international Blue Chip organisations.
  • 3. As well as managing my own companies team i have personally support the customers with the likes of: > Increased Asset Performance and Recovery, from defining and establishing the origin route problem and recovery definition, through to Implementation of of tactical, and strategic technical, cultural and sustained solutions. > Plant Reliability, Availability and Maintainability across the 68 EPRI SHIP, on a Fleet of Stations > PLEX Definition and Investment circa £3/4Billion across multi-fleet. > Programme Management of high end technical challenges. > Turn-Around and Outage Recovery. > Critical Projects - Programme Management, inc Safety Case IJCO, and fast track solutions, Scheme, Mech, Elec, C&I and However, in the last thirty years of electro mechanical engineering experience, my career path has progressed from hands on installation, progressing through engineering, project management and commercial roles to director, increasing responsibility in plant, people and process, I cover electro-mechanical, instrumentation and automation, and have experience within the Power Gen, Airport, Pharma Steel, Manufacturing, MOD, Marine and Petrochem, Nuclear. Euro and International. I have been appointed in the following Roles in the past:  Technical and Engineering Director  Business Manager Programme Management  Engineering Management of an Number of Contracts at once  Design and Build – Technical and Projects Mang't  Electrical and Mechanical Maintenance, including CBM  Asset Relocation  Brown and Greenfield Power, Control and Networking  Refits and Outages of Assets  Plant Enhancements  Preventative and Reactive Maintenace  Business Based Maintenance  Motor Management  Systems Integration  Control and Automation  Process Plant EC&I  Production Engineering and Fabrication  Prototyping and Development Engineering  Prod Eng and Pref Enhancement  Estimator / Draughtsman.