SlideShare a Scribd company logo
1 of 6
Download to read offline
www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 1
The Institute of Cost Accountants of India
(Statutory body under an Act ofParliament)	 www.icmai.in
theMANAGEMENT
ACCOUNTANTTHE JOURNAL FOR CMAs OCTOBER 2015 VOL. 50 NO. 10 `100
1966 ~ 2015
in infrastructure industries’ PAGE 36
DIGITAL
REVOLUTION
IN INDIA
www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 31
Core business processes, over the years, can become
increasingly complex, inefficient, time consuming and
overwhelming, adding successive layers of unneces-
sary steps and review tollgates that substantially add
to costs, reduce organisational efficiency, increase
process cycle times and end frustrating customers both
within and outside the organisation.This is when one
has to strategically revaluate the core business pro-
cesses for a radical redraw through business process
reengineering (BPR).
BPR is the new buzzword in strategic business man-
agement sessions as organisations are continuously
looking for opportunities to optimise costs and enhance
bottomlines. Global organisations operate in chal-
lenging and volatile world markets that have shown
anaemic growth, coupled with inflationary pressures
in areas of rising labour costs. Organisations are relent-
lessly exploring different avenues to enhance margins.
With limited leverage on the topline measures, they
are looking inwards at their internal cost structures
and finding innovative ways to delight their customers
through excellent service and product offerings while
leveraging new age technologies.
The origins of BPR can be traced back to the 1700s when
Adam Smith, in his epochal Wealth of Nations (1776),
suggested separating work areas to increase productivity.
Frederick Taylor, in the 1880s, suggested that managers
use process reengineering methods to discover the best
processes for performing work, and that these processes
be reengineered to optimise productivity.
In 1990, Michael Hammer, a former computer science
professor at the Massachusetts Institute of Technol-
ogy (MIT), claimed in the Harvard Business Review
that the major challenge for managers is to obliterate
forms of work that do not add value, rather than using
technology for automating it.The statement implicitly
accused managers of having focused on wrong issues,
technology in general, and more specifically informa-
tion technology (IT), which has been used primarily for
automating existing processes rather than using it as
an enabler for making non-value adding work obsolete.
In all the initiatives so far, IT has played a key role as
an enabler to seamlessly connect internal and external
business partners.This has been made successful with
the meteoric increase in the performance of computer
power coupled with a sharp drop in the costs of com-
puting.	 Diagram 2 shows the cost of computing for
different fundamental technologies. Once the switch
was made to electronic computing and modern com-
Diagram 1: Workflow complexity
CMA Parag Bhagat
Global Costing Finance Manager
Global Supply Chain
GE Healthcare
Bangalore
BPRs have been instrumental in driving radical
process transformation for organizations yield-
ing substantial befits in terms of cost optimiza-
tion, process efficiencies and enhancing customer
satisfaction
Framework and Leveraging IT
as a Key Enabler in
COVER STORY
www.icmai.in OCTOBER 2015THE MANAGEMENT ACCOUNTANT32
puter architecture, the progress was rapid and virtually
unbroken even as the transitions were made from one
major technology to another.The decline in the cost of
computation from the earliest period till today, ranged
from around $10,000 per MUCP (million units of
computer power) in the late 19th century to around
$0.0000001 per MUCP today, an improvement of
approximately a trillion.
Those who have lived in the 1980s would be able to
draw some real life examples of BPR that have been
possible with IT. Let’s take banking as an example.
Not too long ago, withdrawal of money from a bank
account meant visiting the particular bank’s branch.
BPR is the new buzzword in strategic
business management sessions as organ-
isations are continuously looking for op-
portunities to optimise costs and enhance
bottomlines. Global organisations operate
in challenging and volatile world markets
that have shown anaemic growth
A cheque was to be filled up, followed by a signature
verification verified by the bank’s officials. A person
had to then stand in a queue, to physically withdraw
the money. It was a pretty demanding ordeal for a cus-
tomer. But with the advent of collaborative computing,
and a powerful universal core banking solution, money
can be withdrawn in a matter of seconds. This has
been possible because of reengineering. Customers
today have access to funds via a global network of
ATMs and branches. Most banking processes have
been transformed—with customer centricity at its
core—to provide self-service, secure online solutions
making branch visits rare. Banks have reaped rewards
in areas of business process efficiency, cost optimisa-
tions, and profitability.
Having explored the origins of BPR and the strategic
role IT can play to harness project goals and objects,
let us briefly summarise what BPR is and is not.
What it is What it is not
Transformation or radical change,
enhances key performance, indi-
cators of cost, quality, service, and
velocity
Incremental change
Eliminates existing process struc-
tures and replaces them with inno-
vative solutions
Automate existing busi-
ness process
Restructures the entire organisa-
tion, needs strong leadership sup-
port and change commitment
Focusing on individual
parts of the process, silo
focus
Customer centric, leverages IT to
transform business processes that
delights customers, both internal
and external
Deployment of an IT
solution to speed up ex-
isting processes
BPR methodologies
There is vast body of knowledge available to practition-
ers who want to learn and apply BPR methodologies.
Five of the most common methodologies are process
reengineering life cycle, integrated BPR, object-ori-
ented business engineering methodology, McKinsey
BPR (diagram 3), and Accenture BPR.
The underlying goals of each methodology are some-
what similar. The McKinsey BPR methodology, for
instance, has three key transformational phases.
Phase 1—Definition of the core process scope
by examining the current state:
Identifying the most important processes to implement
the strategy with the highest value delivery, followed
by measuring the performance gap, and a root cause
analysis. Value stream mapping and the identification
of wastes are key issues. This helps in identifying the
processes where the primary value stream takes place
and has the highest contribution to business objective
achievement. One can leverage various quality tools
like a pareto analysis to identify the high impact areas
1.E +05
1.E +04
1.E +03
1.E +00
1.E +01
1.E +02
1.E -01
1.E -02
1.E -03
1.E -04
1.E -05
1.E -06
1.E -07
1.E -08
1850 1870 1900 1910 1930 1960 1970 2000 2010
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
....................................
CostperMUCP(1996$)
Manual
Mechanical
Electromechanical
Relay
Vacuum
Transistor
Mircoprocessor
. . . . . . .
Diagram 2: Cost of computing
COVER STORY
www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 33
of improvement. Effectively, the core processes with
the highest impact on organisational performance are
selected and targeted as the initial objects. One needs
to decompose the process into smaller sub-processes to
make them manageable tasks that are similar to a work
breakdown structure used in project management
methodologies. It involves setting up of performance
goals that are SMART (simple, measurable, attainable,
realistic, and timely).The project charter involves plans
with the business leaders and stakeholders to get spon-
sorship, funding and support for the BPR initiative.
Phase 2—The redesign phase:
This starts with an overall description of the future
objectives of the organisation and the business pro-
cesses existing within it. It also describes the new
overall business process and the primary sub-pro-
cesses and interconnections. In this phase, a detailed
map of the processes’ future design is developed. The
new process design needs to be tested to verify the
process logic. Implications need to be identified and
described to inform the change specification activity.
Stakeholder inputs and organisational experts are
to be onboarded. Actual changes in work practices,
organisational structures and technological systems
are outlined, based on the process design scheme and
the identified organisational and technological impli-
cations. The phase also involves cost estimations for
the necessary changes that are balanced against the
targeted benefits from the new process.
Piloting plays a pivotal role here. Project managers
entrusted with BPR need to undertake continued
rounds of experimentation and evaluation and ensure
that the project is aligned with the end goals and objec-
tives. A key theme of piloting is building a minimum
viable product (MVP). It boils down to fundamental
functions of the project necessary for basic execution.
The essential functions are determined by the hypoth-
esis being tested. Based on these test results, project
managers determine whether they want to continue
down the path (persevere) or pivot out to a different
solution path. In this age of rapidly changing customer
needs, MVPs ensure that BPR initiatives go through
continued rounds of prototyping, ensuring optimal
use of investment.
In all the initiatives so far, IT has played
a key role as an enabler to seamlessly con-
nect internal and external business part-
ners. This has been made successful with
the meteoric increase in the performance of
computer power coupled with a sharp drop
in the costs of computing
Phase 3—Implementation:
This is the result phase of all the BPR initiatives. One
needs to put in place an implementation plan outlin-
ing scheduled risk mitigation activities, training, and
monitoring. Piloting the implementation in phases
is required for a global footprint spanning multiple
geographies. Some prefer or may need a complete
full-fledged rollout. Also, the resources being required
for the implementation must be defined and assigned.
One of the key areas to consider here are communica-
tion and effective change management. The change
management programme is the detailed description
of how the new processes, and the related organisa-
tion and technology, are to be introduced. A change
management programme includes time plans, train-
ing, workshops, and similar things. It also involves
resource allocation, feedback mechanisms and adverse
events handling.
Another important aspect, is the migration plan,
which describes how changes can be introduced
without disrupting ongoing operations. While one
may have diligently tested and tuned as pilots in a
lab-environment, the ‘real’ process needs to be adjusted
to ensure performance according to defined objec-
tives. One has to conclude the project by capturing
the lessons learnt in a document and schedule the
Diagram 3: BPR Methodology - McKinsey
www.icmai.in OCTOBER 2015THE MANAGEMENT ACCOUNTANT34
final milestone review with the project stakeholders.
Borrowing from a six sigma DMAIC methodology, this
is where the improvement takes place and a control
phase is established to ensure that the organisation
reaps the envisaged gains.
The BPR toolkit
Business processes can be analysed from a value
perspective. Leaders of an organisation relentlessly
examine business processes to ascertain whether they
are value added i.e. those for which the customer is
willing to pay, or are non-value added (NVA), i.e. have
no bearing on customer value. NVAs are devil.The ori-
gins of this concept can be attributed toTaiichi Ohno,
who is credited with the development of the Toyota
Production System (TPS). The TPS is steeped in the
philosophy of “complete elimination of all waste”.This
transformational concept of manufacturing went on to
become lean manufacturing in the US that devised the
seven wastes—transport, inventory, motion, waiting,
over production, and over processing defects—as parts
of this system. This is as critical as the first step in a
business process reengineering project would be to
understand where the waste or the non-value added
activities are. This is critical to align your transfor-
mation goals with the mission of the organisation.
Value stream mapping
A value stream analyses the complete value creation
process in an organisation and then examines it closely
to optimise it for the customer. In fact, it is a simple
yet powerful tool that helps examine a process from
the point of view of the customer and identifies areas
of waste/non-value added processes and helps plan
to obliterate them. Value stream mapping (VSM) is a
key arsenal in the lean leader’s toolkit.
Though initially designed for analysing manufactur-
ing processes, this toolkit has been adapted to other
areas like logistics, supply chain and some service
organisations. The overall VSM process follows the
BPR methodology.
Step 1—Project selection, definition and meas-
urement:
It starts by collecting data and producing the current
state map indicating process times or customer
(demand) requirements. Several techniques can be
used to draw up the current state map, including ref-
erencing the existing process documents like SOPs or
performing a visual review of the current process as
it is being executed in its entirety. Other options could
include surveys or interviews. The future state maps
will be developed using information captured here so
it’s imperative to have a correct understanding of the
business.
Several of the VSM icons (diagram 3) can be used to
map the current process. Additional icons can be put
in as deemed appropriate but the goal here is to map
the process by identifying all possible areas of waste.
Step 2: Critique the current process and map
future state:
The goal of this step is to understand the pain areas
in terms of waste-excessive inventory build ups, exces-
sive cost generation, long wait times in the process,
multiple workflow loops, and other issues that may be
redundant or unused resources and skills.The goal is
to capture all these factors.
Once the current state is known, mapping of the future
state process begins.This is where project management
leadership attributes of creativity, collaboration, nego-
tiation skills, and expertise come in to play. stakeholder
approval and sign offs are sought.
IT plays a critical role when defining the end state
process. For example, the maintenance and operating
workers at Union Carbide’s plant in Taft, Louisiana,
used flowcharting to redraw their old process and cre-
ate new ones. The results were a savings of over $20
million. Ford Motor Company’s vision to streamline
and reengineer its accounts payable department, is
another example.Their reengineering efforts reduced
staff strength in North America from 500 to just 125.
Diagram 4: Value stream mapping icons
COVER STORY
www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 35
Step 3—Implementation:
This is where those months of arduous effort yield
results. One has to implement the new process and
build sufficient controls and validations to ensure
these processes realise the expected benefits by being
embraced by the organisation. One area to watch out
for is to prevent users from reverting to the old pro-
cesses because of resistance to change or poor training
guidance.
Five elements to watch out for
BPR is not easy. Period. Galliers reported in 1998 that
only around 30 percent of BPR projects were success-
ful. It means that the larger population of reengineer-
ing projects fail. Following are some of the key points
to remember in this regard.
Leadership commitment and support:
BPR projects are transformational and envisage a com-
plete redraw of the current core processes.They need
strong executive support as they play the expected role
of business champions and change advocates.This is
crucial for the proposed processes to be embraced by
both internal and external stakeholders.
Effective change management:
Founded as a research company, Prosci has published
seven longitudinal studies over the past several years,
creating one of the largest bodies of knowledge in
change management. According to their study, effec-
tive application of change management increases the
success rate of organisational changes to as high as
96 percent. Prosci’s research has shown that projects
with excellent change management effectiveness are
six times more likely to meet or exceed project objec-
tives. Employees may resist change as they consider
BPR as threats to their jobs, Galliers (1998) and Gerrits
(1994).
Deep domain expertise:
Given the enormity of the BPR project scope, it is
imperative that the project team has subject matter
experts who have deep domain expertise. The goal
will be to prevent making suboptimal solutions that
may improve a part of the process (silo) but may have
severe negative consequences to the overall success
of the process One of the challenges typically faced is
that users may have a good idea of both the current
and end state, but limited expertise in the path that
would realise the future state.
Communication:
One can never over-communicate. Constant updates
ensure alignment with the overall needs of the stake-
holder and supports adoption of new business pro-
cesses. End-user training is another area that is closely
linked to communication. One needs to ensure that the
end-users of the reengineered process are trained effec-
tively so that the envisioned results are truly reaped.
One has to ensure that the communication is tailored
for the audience, timely, accurate and well documented
in terms of project quality plan, the quality log or
checkpoint reports.
IT agility, adaptation, and strong control:
A central tenet of BPR is to exploit IT to support ‘rad-
ical change’. Some authors view IT as the central
enabler of BPR. However BPR has not really worked
as expected. Davenport and Short (1990) attribute
this problem to a lack of appreciation of the deeper
issues, and stress that an awareness of the capabil-
ities of IT can influence the business redesign pro-
cess. They claim that IT has traditionally been used
to hasten work but not to transform it and BPR is all
about using IT to do things differently. Thus IT plays
an important role in BPR. Properly adopting IT can
barriers to respond to the rapidly changing business
environment. BPR can’t be successful, if it is simply
used to speed up the process rather than reengineer it.
While reengineering the core processes, one must
ensure that process controls are not sacrificed. There
are legislative, regulatory, and internal controls. Com-
pliance is the key and the controls must be adhered to.
Conclusion
BPRs are extremely powerful initiatives that are under-
taken by the strategic management to initiate radical
reforms to drive cost and organisational efficiencies,
dramatically improve process cycle times and aim for
superior costumer performance.There is a vast body of
knowledge available to practitioners in terms of meth-
odologies and toolkits. When instituted with successful
change management processes, these initiatives can
yield transformational benefits to the organisation.
bhagat.parag@icai.org
MA

More Related Content

What's hot

Ww idc report the business value of concur invoice (fdm)
Ww idc report  the business value of concur invoice (fdm)Ww idc report  the business value of concur invoice (fdm)
Ww idc report the business value of concur invoice (fdm)Shannon Blackwell
 
Management Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetManagement Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetOnline
 
Industrializing Zero Application Maintenance
Industrializing Zero Application MaintenanceIndustrializing Zero Application Maintenance
Industrializing Zero Application MaintenanceCognizant
 
The Role of IT in Supporting Mergers and Acquisitions
The Role of IT in Supporting Mergers and AcquisitionsThe Role of IT in Supporting Mergers and Acquisitions
The Role of IT in Supporting Mergers and AcquisitionsCognizant
 
3gamma insights - Managing techonlogy in an ever-changing environment
3gamma insights - Managing techonlogy in an ever-changing environment3gamma insights - Managing techonlogy in an ever-changing environment
3gamma insights - Managing techonlogy in an ever-changing environmentJens Ekberg
 
Cost Optimsation Approach from an IT Perspective
Cost Optimsation Approach from an IT PerspectiveCost Optimsation Approach from an IT Perspective
Cost Optimsation Approach from an IT PerspectiveSreeram Yegappan
 
Industrializing investment banking_wp_2
Industrializing investment banking_wp_2Industrializing investment banking_wp_2
Industrializing investment banking_wp_2EMC
 
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...Cezar Cursaru
 
200708_E Strategy Managing Transformation effectively
200708_E Strategy Managing Transformation effectively200708_E Strategy Managing Transformation effectively
200708_E Strategy Managing Transformation effectivelyJean-Claude DE VERA
 
Technology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
Technology Cost Management 4D Framework: A Smarter Way to Manage IT CostsTechnology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
Technology Cost Management 4D Framework: A Smarter Way to Manage IT CostsCognizant
 
3gamma Insights - Agile Outsourcing whitepaper
3gamma Insights - Agile Outsourcing whitepaper 3gamma Insights - Agile Outsourcing whitepaper
3gamma Insights - Agile Outsourcing whitepaper 3gamma
 
Point of View on Demand Organisation Development
Point of View on Demand Organisation DevelopmentPoint of View on Demand Organisation Development
Point of View on Demand Organisation DevelopmentMarjolein Dijkshoorn
 
Tech transfer making it as a risk free approach in pharmaceutical and biotech in
Tech transfer making it as a risk free approach in pharmaceutical and biotech inTech transfer making it as a risk free approach in pharmaceutical and biotech in
Tech transfer making it as a risk free approach in pharmaceutical and biotech iniaemedu
 
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...Peter Reij
 
17 Must-Do's to Create a Product-Centric IT Organization
17 Must-Do's to Create a Product-Centric IT Organization17 Must-Do's to Create a Product-Centric IT Organization
17 Must-Do's to Create a Product-Centric IT OrganizationCognizant
 
Business re engineering
Business re engineeringBusiness re engineering
Business re engineeringAmanda Bynes
 

What's hot (19)

Ww idc report the business value of concur invoice (fdm)
Ww idc report  the business value of concur invoice (fdm)Ww idc report  the business value of concur invoice (fdm)
Ww idc report the business value of concur invoice (fdm)
 
Management Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetManagement Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.Net
 
Industrializing Zero Application Maintenance
Industrializing Zero Application MaintenanceIndustrializing Zero Application Maintenance
Industrializing Zero Application Maintenance
 
The Role of IT in Supporting Mergers and Acquisitions
The Role of IT in Supporting Mergers and AcquisitionsThe Role of IT in Supporting Mergers and Acquisitions
The Role of IT in Supporting Mergers and Acquisitions
 
3gamma insights - Managing techonlogy in an ever-changing environment
3gamma insights - Managing techonlogy in an ever-changing environment3gamma insights - Managing techonlogy in an ever-changing environment
3gamma insights - Managing techonlogy in an ever-changing environment
 
Cost Optimsation Approach from an IT Perspective
Cost Optimsation Approach from an IT PerspectiveCost Optimsation Approach from an IT Perspective
Cost Optimsation Approach from an IT Perspective
 
Industrializing investment banking_wp_2
Industrializing investment banking_wp_2Industrializing investment banking_wp_2
Industrializing investment banking_wp_2
 
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...
Business Performance Solutions Clash Of The Titans The Market Remains Vibrant...
 
200708_E Strategy Managing Transformation effectively
200708_E Strategy Managing Transformation effectively200708_E Strategy Managing Transformation effectively
200708_E Strategy Managing Transformation effectively
 
Technology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
Technology Cost Management 4D Framework: A Smarter Way to Manage IT CostsTechnology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
Technology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
 
Gartner
GartnerGartner
Gartner
 
3gamma Insights - Agile Outsourcing whitepaper
3gamma Insights - Agile Outsourcing whitepaper 3gamma Insights - Agile Outsourcing whitepaper
3gamma Insights - Agile Outsourcing whitepaper
 
Point of View on Demand Organisation Development
Point of View on Demand Organisation DevelopmentPoint of View on Demand Organisation Development
Point of View on Demand Organisation Development
 
4. mba 204 management information systems assignment 2nd semester
4. mba 204 management information systems assignment 2nd semester4. mba 204 management information systems assignment 2nd semester
4. mba 204 management information systems assignment 2nd semester
 
3. mba 203 marketing management assignment 2nd semester
3. mba 203 marketing management assignment 2nd semester3. mba 203 marketing management assignment 2nd semester
3. mba 203 marketing management assignment 2nd semester
 
Tech transfer making it as a risk free approach in pharmaceutical and biotech in
Tech transfer making it as a risk free approach in pharmaceutical and biotech inTech transfer making it as a risk free approach in pharmaceutical and biotech in
Tech transfer making it as a risk free approach in pharmaceutical and biotech in
 
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...
Information Management - Linio White Paper Part 1 'Nice-to-Know vs. Need-to-K...
 
17 Must-Do's to Create a Product-Centric IT Organization
17 Must-Do's to Create a Product-Centric IT Organization17 Must-Do's to Create a Product-Centric IT Organization
17 Must-Do's to Create a Product-Centric IT Organization
 
Business re engineering
Business re engineeringBusiness re engineering
Business re engineering
 

Viewers also liked

A nota técnica do mpf
A nota técnica do mpfA nota técnica do mpf
A nota técnica do mpfRadar News
 
Allspace Anti-Vandal Layouts Brochure
Allspace Anti-Vandal Layouts BrochureAllspace Anti-Vandal Layouts Brochure
Allspace Anti-Vandal Layouts BrochureAnthony Dunne
 
Svend Ove Nielsen - CV 2014-10
Svend Ove Nielsen - CV 2014-10Svend Ove Nielsen - CV 2014-10
Svend Ove Nielsen - CV 2014-10Svend Ove Nielsen
 
Implementering af e rekrutteringsværktøj - Nordic Sugar
Implementering af e rekrutteringsværktøj - Nordic SugarImplementering af e rekrutteringsværktøj - Nordic Sugar
Implementering af e rekrutteringsværktøj - Nordic SugarJulie Maja Nielsen
 
Money Laundering and Its Fall-out - Other Bodies also work hand-in-hand to k...
Money Laundering  and Its Fall-out - Other Bodies also work hand-in-hand to k...Money Laundering  and Its Fall-out - Other Bodies also work hand-in-hand to k...
Money Laundering and Its Fall-out - Other Bodies also work hand-in-hand to k...Resurgent India
 
Medida cautelar reclamação 24.506 são paulo
Medida cautelar   reclamação 24.506 são pauloMedida cautelar   reclamação 24.506 são paulo
Medida cautelar reclamação 24.506 são pauloRadar News
 
Why Master Data Management Projects Fail and what this means for Big Data
Why Master Data Management Projects Fail and what this means for Big DataWhy Master Data Management Projects Fail and what this means for Big Data
Why Master Data Management Projects Fail and what this means for Big DataSam Thomsett
 

Viewers also liked (8)

Ziemas futbols
Ziemas futbolsZiemas futbols
Ziemas futbols
 
A nota técnica do mpf
A nota técnica do mpfA nota técnica do mpf
A nota técnica do mpf
 
Allspace Anti-Vandal Layouts Brochure
Allspace Anti-Vandal Layouts BrochureAllspace Anti-Vandal Layouts Brochure
Allspace Anti-Vandal Layouts Brochure
 
Svend Ove Nielsen - CV 2014-10
Svend Ove Nielsen - CV 2014-10Svend Ove Nielsen - CV 2014-10
Svend Ove Nielsen - CV 2014-10
 
Implementering af e rekrutteringsværktøj - Nordic Sugar
Implementering af e rekrutteringsværktøj - Nordic SugarImplementering af e rekrutteringsværktøj - Nordic Sugar
Implementering af e rekrutteringsværktøj - Nordic Sugar
 
Money Laundering and Its Fall-out - Other Bodies also work hand-in-hand to k...
Money Laundering  and Its Fall-out - Other Bodies also work hand-in-hand to k...Money Laundering  and Its Fall-out - Other Bodies also work hand-in-hand to k...
Money Laundering and Its Fall-out - Other Bodies also work hand-in-hand to k...
 
Medida cautelar reclamação 24.506 são paulo
Medida cautelar   reclamação 24.506 são pauloMedida cautelar   reclamação 24.506 são paulo
Medida cautelar reclamação 24.506 são paulo
 
Why Master Data Management Projects Fail and what this means for Big Data
Why Master Data Management Projects Fail and what this means for Big DataWhy Master Data Management Projects Fail and what this means for Big Data
Why Master Data Management Projects Fail and what this means for Big Data
 

Similar to Parag Bhagat - The Management Accountant - Oct 2015

Optimizing Outcome-Driven Change: It's About the Process, Not the Technology
Optimizing Outcome-Driven Change: It's About the Process, Not the TechnologyOptimizing Outcome-Driven Change: It's About the Process, Not the Technology
Optimizing Outcome-Driven Change: It's About the Process, Not the TechnologyCognizant
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIAAditi Walia
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Parth Shukla
 
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersThe Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersKinetik Solutions Ltd
 
Finance Process Optimization - Mapping the Journey to High Performance
Finance Process Optimization - Mapping the Journey to High PerformanceFinance Process Optimization - Mapping the Journey to High Performance
Finance Process Optimization - Mapping the Journey to High PerformanceStephen G. Lynch
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationChaturvediAnay
 
Business Performance Management Assessment Tools
Business Performance Management Assessment ToolsBusiness Performance Management Assessment Tools
Business Performance Management Assessment ToolsRachel Phillips
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusIshwar Bulbule
 
Bussines Process Engireening.pptx
Bussines Process Engireening.pptxBussines Process Engireening.pptx
Bussines Process Engireening.pptxssuser97f09c
 
Business Transformation Framework
Business Transformation FrameworkBusiness Transformation Framework
Business Transformation FrameworkKunal Sharma
 
Balanced Scorecard and its relationship to UMM
Balanced Scorecard and its relationship to UMMBalanced Scorecard and its relationship to UMM
Balanced Scorecard and its relationship to UMMGihan Wikramanayake
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
Defining a digital transformation maturity model
Defining a digital transformation maturity modelDefining a digital transformation maturity model
Defining a digital transformation maturity modelShekar K. Rao
 
Digital Transformation Lifecycle Explained.pdf
Digital Transformation Lifecycle Explained.pdfDigital Transformation Lifecycle Explained.pdf
Digital Transformation Lifecycle Explained.pdfSatawareTechnologies3
 
Business process re engineering in a bank
Business process re  engineering in a bankBusiness process re  engineering in a bank
Business process re engineering in a bankAli TjRa
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
Kick-Starting Digital Transformation: Four IT Strategies
Kick-Starting Digital Transformation: Four IT StrategiesKick-Starting Digital Transformation: Four IT Strategies
Kick-Starting Digital Transformation: Four IT StrategiesCognizant
 
Definitions And Overview Of Business Performance Management
Definitions And Overview Of Business Performance ManagementDefinitions And Overview Of Business Performance Management
Definitions And Overview Of Business Performance ManagementSamantha Randall
 
Capital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsCapital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsGenpact Ltd
 

Similar to Parag Bhagat - The Management Accountant - Oct 2015 (20)

Optimizing Outcome-Driven Change: It's About the Process, Not the Technology
Optimizing Outcome-Driven Change: It's About the Process, Not the TechnologyOptimizing Outcome-Driven Change: It's About the Process, Not the Technology
Optimizing Outcome-Driven Change: It's About the Process, Not the Technology
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIA
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)
 
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersThe Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
 
Finance Process Optimization - Mapping the Journey to High Performance
Finance Process Optimization - Mapping the Journey to High PerformanceFinance Process Optimization - Mapping the Journey to High Performance
Finance Process Optimization - Mapping the Journey to High Performance
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
 
Business Performance Management Assessment Tools
Business Performance Management Assessment ToolsBusiness Performance Management Assessment Tools
Business Performance Management Assessment Tools
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University Syllabus
 
Bussines Process Engireening.pptx
Bussines Process Engireening.pptxBussines Process Engireening.pptx
Bussines Process Engireening.pptx
 
Business Transformation Framework
Business Transformation FrameworkBusiness Transformation Framework
Business Transformation Framework
 
Balanced Scorecard and its relationship to UMM
Balanced Scorecard and its relationship to UMMBalanced Scorecard and its relationship to UMM
Balanced Scorecard and its relationship to UMM
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
Defining a digital transformation maturity model
Defining a digital transformation maturity modelDefining a digital transformation maturity model
Defining a digital transformation maturity model
 
Digital Transformation Lifecycle Explained.pdf
Digital Transformation Lifecycle Explained.pdfDigital Transformation Lifecycle Explained.pdf
Digital Transformation Lifecycle Explained.pdf
 
Business process re engineering in a bank
Business process re  engineering in a bankBusiness process re  engineering in a bank
Business process re engineering in a bank
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
Kick-Starting Digital Transformation: Four IT Strategies
Kick-Starting Digital Transformation: Four IT StrategiesKick-Starting Digital Transformation: Four IT Strategies
Kick-Starting Digital Transformation: Four IT Strategies
 
Definitions And Overview Of Business Performance Management
Definitions And Overview Of Business Performance ManagementDefinitions And Overview Of Business Performance Management
Definitions And Overview Of Business Performance Management
 
Capital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsCapital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvements
 

Parag Bhagat - The Management Accountant - Oct 2015

  • 1. www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 1 The Institute of Cost Accountants of India (Statutory body under an Act ofParliament) www.icmai.in theMANAGEMENT ACCOUNTANTTHE JOURNAL FOR CMAs OCTOBER 2015 VOL. 50 NO. 10 `100 1966 ~ 2015 in infrastructure industries’ PAGE 36 DIGITAL REVOLUTION IN INDIA
  • 2. www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 31 Core business processes, over the years, can become increasingly complex, inefficient, time consuming and overwhelming, adding successive layers of unneces- sary steps and review tollgates that substantially add to costs, reduce organisational efficiency, increase process cycle times and end frustrating customers both within and outside the organisation.This is when one has to strategically revaluate the core business pro- cesses for a radical redraw through business process reengineering (BPR). BPR is the new buzzword in strategic business man- agement sessions as organisations are continuously looking for opportunities to optimise costs and enhance bottomlines. Global organisations operate in chal- lenging and volatile world markets that have shown anaemic growth, coupled with inflationary pressures in areas of rising labour costs. Organisations are relent- lessly exploring different avenues to enhance margins. With limited leverage on the topline measures, they are looking inwards at their internal cost structures and finding innovative ways to delight their customers through excellent service and product offerings while leveraging new age technologies. The origins of BPR can be traced back to the 1700s when Adam Smith, in his epochal Wealth of Nations (1776), suggested separating work areas to increase productivity. Frederick Taylor, in the 1880s, suggested that managers use process reengineering methods to discover the best processes for performing work, and that these processes be reengineered to optimise productivity. In 1990, Michael Hammer, a former computer science professor at the Massachusetts Institute of Technol- ogy (MIT), claimed in the Harvard Business Review that the major challenge for managers is to obliterate forms of work that do not add value, rather than using technology for automating it.The statement implicitly accused managers of having focused on wrong issues, technology in general, and more specifically informa- tion technology (IT), which has been used primarily for automating existing processes rather than using it as an enabler for making non-value adding work obsolete. In all the initiatives so far, IT has played a key role as an enabler to seamlessly connect internal and external business partners.This has been made successful with the meteoric increase in the performance of computer power coupled with a sharp drop in the costs of com- puting. Diagram 2 shows the cost of computing for different fundamental technologies. Once the switch was made to electronic computing and modern com- Diagram 1: Workflow complexity CMA Parag Bhagat Global Costing Finance Manager Global Supply Chain GE Healthcare Bangalore BPRs have been instrumental in driving radical process transformation for organizations yield- ing substantial befits in terms of cost optimiza- tion, process efficiencies and enhancing customer satisfaction Framework and Leveraging IT as a Key Enabler in COVER STORY
  • 3. www.icmai.in OCTOBER 2015THE MANAGEMENT ACCOUNTANT32 puter architecture, the progress was rapid and virtually unbroken even as the transitions were made from one major technology to another.The decline in the cost of computation from the earliest period till today, ranged from around $10,000 per MUCP (million units of computer power) in the late 19th century to around $0.0000001 per MUCP today, an improvement of approximately a trillion. Those who have lived in the 1980s would be able to draw some real life examples of BPR that have been possible with IT. Let’s take banking as an example. Not too long ago, withdrawal of money from a bank account meant visiting the particular bank’s branch. BPR is the new buzzword in strategic business management sessions as organ- isations are continuously looking for op- portunities to optimise costs and enhance bottomlines. Global organisations operate in challenging and volatile world markets that have shown anaemic growth A cheque was to be filled up, followed by a signature verification verified by the bank’s officials. A person had to then stand in a queue, to physically withdraw the money. It was a pretty demanding ordeal for a cus- tomer. But with the advent of collaborative computing, and a powerful universal core banking solution, money can be withdrawn in a matter of seconds. This has been possible because of reengineering. Customers today have access to funds via a global network of ATMs and branches. Most banking processes have been transformed—with customer centricity at its core—to provide self-service, secure online solutions making branch visits rare. Banks have reaped rewards in areas of business process efficiency, cost optimisa- tions, and profitability. Having explored the origins of BPR and the strategic role IT can play to harness project goals and objects, let us briefly summarise what BPR is and is not. What it is What it is not Transformation or radical change, enhances key performance, indi- cators of cost, quality, service, and velocity Incremental change Eliminates existing process struc- tures and replaces them with inno- vative solutions Automate existing busi- ness process Restructures the entire organisa- tion, needs strong leadership sup- port and change commitment Focusing on individual parts of the process, silo focus Customer centric, leverages IT to transform business processes that delights customers, both internal and external Deployment of an IT solution to speed up ex- isting processes BPR methodologies There is vast body of knowledge available to practition- ers who want to learn and apply BPR methodologies. Five of the most common methodologies are process reengineering life cycle, integrated BPR, object-ori- ented business engineering methodology, McKinsey BPR (diagram 3), and Accenture BPR. The underlying goals of each methodology are some- what similar. The McKinsey BPR methodology, for instance, has three key transformational phases. Phase 1—Definition of the core process scope by examining the current state: Identifying the most important processes to implement the strategy with the highest value delivery, followed by measuring the performance gap, and a root cause analysis. Value stream mapping and the identification of wastes are key issues. This helps in identifying the processes where the primary value stream takes place and has the highest contribution to business objective achievement. One can leverage various quality tools like a pareto analysis to identify the high impact areas 1.E +05 1.E +04 1.E +03 1.E +00 1.E +01 1.E +02 1.E -01 1.E -02 1.E -03 1.E -04 1.E -05 1.E -06 1.E -07 1.E -08 1850 1870 1900 1910 1930 1960 1970 2000 2010 .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... .................................... CostperMUCP(1996$) Manual Mechanical Electromechanical Relay Vacuum Transistor Mircoprocessor . . . . . . . Diagram 2: Cost of computing COVER STORY
  • 4. www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 33 of improvement. Effectively, the core processes with the highest impact on organisational performance are selected and targeted as the initial objects. One needs to decompose the process into smaller sub-processes to make them manageable tasks that are similar to a work breakdown structure used in project management methodologies. It involves setting up of performance goals that are SMART (simple, measurable, attainable, realistic, and timely).The project charter involves plans with the business leaders and stakeholders to get spon- sorship, funding and support for the BPR initiative. Phase 2—The redesign phase: This starts with an overall description of the future objectives of the organisation and the business pro- cesses existing within it. It also describes the new overall business process and the primary sub-pro- cesses and interconnections. In this phase, a detailed map of the processes’ future design is developed. The new process design needs to be tested to verify the process logic. Implications need to be identified and described to inform the change specification activity. Stakeholder inputs and organisational experts are to be onboarded. Actual changes in work practices, organisational structures and technological systems are outlined, based on the process design scheme and the identified organisational and technological impli- cations. The phase also involves cost estimations for the necessary changes that are balanced against the targeted benefits from the new process. Piloting plays a pivotal role here. Project managers entrusted with BPR need to undertake continued rounds of experimentation and evaluation and ensure that the project is aligned with the end goals and objec- tives. A key theme of piloting is building a minimum viable product (MVP). It boils down to fundamental functions of the project necessary for basic execution. The essential functions are determined by the hypoth- esis being tested. Based on these test results, project managers determine whether they want to continue down the path (persevere) or pivot out to a different solution path. In this age of rapidly changing customer needs, MVPs ensure that BPR initiatives go through continued rounds of prototyping, ensuring optimal use of investment. In all the initiatives so far, IT has played a key role as an enabler to seamlessly con- nect internal and external business part- ners. This has been made successful with the meteoric increase in the performance of computer power coupled with a sharp drop in the costs of computing Phase 3—Implementation: This is the result phase of all the BPR initiatives. One needs to put in place an implementation plan outlin- ing scheduled risk mitigation activities, training, and monitoring. Piloting the implementation in phases is required for a global footprint spanning multiple geographies. Some prefer or may need a complete full-fledged rollout. Also, the resources being required for the implementation must be defined and assigned. One of the key areas to consider here are communica- tion and effective change management. The change management programme is the detailed description of how the new processes, and the related organisa- tion and technology, are to be introduced. A change management programme includes time plans, train- ing, workshops, and similar things. It also involves resource allocation, feedback mechanisms and adverse events handling. Another important aspect, is the migration plan, which describes how changes can be introduced without disrupting ongoing operations. While one may have diligently tested and tuned as pilots in a lab-environment, the ‘real’ process needs to be adjusted to ensure performance according to defined objec- tives. One has to conclude the project by capturing the lessons learnt in a document and schedule the Diagram 3: BPR Methodology - McKinsey
  • 5. www.icmai.in OCTOBER 2015THE MANAGEMENT ACCOUNTANT34 final milestone review with the project stakeholders. Borrowing from a six sigma DMAIC methodology, this is where the improvement takes place and a control phase is established to ensure that the organisation reaps the envisaged gains. The BPR toolkit Business processes can be analysed from a value perspective. Leaders of an organisation relentlessly examine business processes to ascertain whether they are value added i.e. those for which the customer is willing to pay, or are non-value added (NVA), i.e. have no bearing on customer value. NVAs are devil.The ori- gins of this concept can be attributed toTaiichi Ohno, who is credited with the development of the Toyota Production System (TPS). The TPS is steeped in the philosophy of “complete elimination of all waste”.This transformational concept of manufacturing went on to become lean manufacturing in the US that devised the seven wastes—transport, inventory, motion, waiting, over production, and over processing defects—as parts of this system. This is as critical as the first step in a business process reengineering project would be to understand where the waste or the non-value added activities are. This is critical to align your transfor- mation goals with the mission of the organisation. Value stream mapping A value stream analyses the complete value creation process in an organisation and then examines it closely to optimise it for the customer. In fact, it is a simple yet powerful tool that helps examine a process from the point of view of the customer and identifies areas of waste/non-value added processes and helps plan to obliterate them. Value stream mapping (VSM) is a key arsenal in the lean leader’s toolkit. Though initially designed for analysing manufactur- ing processes, this toolkit has been adapted to other areas like logistics, supply chain and some service organisations. The overall VSM process follows the BPR methodology. Step 1—Project selection, definition and meas- urement: It starts by collecting data and producing the current state map indicating process times or customer (demand) requirements. Several techniques can be used to draw up the current state map, including ref- erencing the existing process documents like SOPs or performing a visual review of the current process as it is being executed in its entirety. Other options could include surveys or interviews. The future state maps will be developed using information captured here so it’s imperative to have a correct understanding of the business. Several of the VSM icons (diagram 3) can be used to map the current process. Additional icons can be put in as deemed appropriate but the goal here is to map the process by identifying all possible areas of waste. Step 2: Critique the current process and map future state: The goal of this step is to understand the pain areas in terms of waste-excessive inventory build ups, exces- sive cost generation, long wait times in the process, multiple workflow loops, and other issues that may be redundant or unused resources and skills.The goal is to capture all these factors. Once the current state is known, mapping of the future state process begins.This is where project management leadership attributes of creativity, collaboration, nego- tiation skills, and expertise come in to play. stakeholder approval and sign offs are sought. IT plays a critical role when defining the end state process. For example, the maintenance and operating workers at Union Carbide’s plant in Taft, Louisiana, used flowcharting to redraw their old process and cre- ate new ones. The results were a savings of over $20 million. Ford Motor Company’s vision to streamline and reengineer its accounts payable department, is another example.Their reengineering efforts reduced staff strength in North America from 500 to just 125. Diagram 4: Value stream mapping icons COVER STORY
  • 6. www.icmai.inOCTOBER 2015 THE MANAGEMENT ACCOUNTANT 35 Step 3—Implementation: This is where those months of arduous effort yield results. One has to implement the new process and build sufficient controls and validations to ensure these processes realise the expected benefits by being embraced by the organisation. One area to watch out for is to prevent users from reverting to the old pro- cesses because of resistance to change or poor training guidance. Five elements to watch out for BPR is not easy. Period. Galliers reported in 1998 that only around 30 percent of BPR projects were success- ful. It means that the larger population of reengineer- ing projects fail. Following are some of the key points to remember in this regard. Leadership commitment and support: BPR projects are transformational and envisage a com- plete redraw of the current core processes.They need strong executive support as they play the expected role of business champions and change advocates.This is crucial for the proposed processes to be embraced by both internal and external stakeholders. Effective change management: Founded as a research company, Prosci has published seven longitudinal studies over the past several years, creating one of the largest bodies of knowledge in change management. According to their study, effec- tive application of change management increases the success rate of organisational changes to as high as 96 percent. Prosci’s research has shown that projects with excellent change management effectiveness are six times more likely to meet or exceed project objec- tives. Employees may resist change as they consider BPR as threats to their jobs, Galliers (1998) and Gerrits (1994). Deep domain expertise: Given the enormity of the BPR project scope, it is imperative that the project team has subject matter experts who have deep domain expertise. The goal will be to prevent making suboptimal solutions that may improve a part of the process (silo) but may have severe negative consequences to the overall success of the process One of the challenges typically faced is that users may have a good idea of both the current and end state, but limited expertise in the path that would realise the future state. Communication: One can never over-communicate. Constant updates ensure alignment with the overall needs of the stake- holder and supports adoption of new business pro- cesses. End-user training is another area that is closely linked to communication. One needs to ensure that the end-users of the reengineered process are trained effec- tively so that the envisioned results are truly reaped. One has to ensure that the communication is tailored for the audience, timely, accurate and well documented in terms of project quality plan, the quality log or checkpoint reports. IT agility, adaptation, and strong control: A central tenet of BPR is to exploit IT to support ‘rad- ical change’. Some authors view IT as the central enabler of BPR. However BPR has not really worked as expected. Davenport and Short (1990) attribute this problem to a lack of appreciation of the deeper issues, and stress that an awareness of the capabil- ities of IT can influence the business redesign pro- cess. They claim that IT has traditionally been used to hasten work but not to transform it and BPR is all about using IT to do things differently. Thus IT plays an important role in BPR. Properly adopting IT can barriers to respond to the rapidly changing business environment. BPR can’t be successful, if it is simply used to speed up the process rather than reengineer it. While reengineering the core processes, one must ensure that process controls are not sacrificed. There are legislative, regulatory, and internal controls. Com- pliance is the key and the controls must be adhered to. Conclusion BPRs are extremely powerful initiatives that are under- taken by the strategic management to initiate radical reforms to drive cost and organisational efficiencies, dramatically improve process cycle times and aim for superior costumer performance.There is a vast body of knowledge available to practitioners in terms of meth- odologies and toolkits. When instituted with successful change management processes, these initiatives can yield transformational benefits to the organisation. bhagat.parag@icai.org MA