2. P3 is a General Contractor SPECIALIZING in parking lot maintenance:
Asphalt Patching, Crack Sealing, Seal Coating and Striping
Merged 2 companies in 2004 to form P3
Focused on quality work and customer service
Provide basic and comprehensive approaches to parking lot maintenance
We will always recommend the approach to doing things RIGHT
3. Educate – About past and future trends
Learning – Problems that past trends have created
Strategy – Review your maintenance plan
Feedback – About needs, concerns, and our impact
4. Past Practices – Past recession has created deferred
maintenance for many businesses
Deferred Maintenance – Reductions in maintenance shorten
the lifespan of the parking lot and increase the costs of
repairs
Current Trends– Time to catch up – but with too small of a
budget
5.
6. FUTURE
High tech refining
Warm Mix
Bio Based/Soy
Grey (Heat Island)
Pervious
Asphalt
Proactive
Maintenance
Prices will continue
to rise
PAST
- Low tech refining
- Hot Mix
- Petroleum Based
- Black Top
- Impervious Surfaces
-Deferred Maintenance
- Material Prices
EFFECT
Low quality products
Reduces asphalt life
Increased costs
LEED Credit
High regulation/cost
Reduced costs
The need for
Application Quality
7. Uniformed Crews with new and better equipment (Buggy)
Pacific Pavement Others
Higher quality preparation of your parking lot (1 year old work)
8. Pacific Pavement Others
P3’s approach to evaluation:
Detailed Proposal Options
Removal & Replacement vs Overlay
1 Coat vs 2 Coats
Sand