SlideShare a Scribd company logo
1 of 1
Download to read offline
Latest achievements:
 Costumer Techint, service transition: My task was to interact with the transition manager
and internal support teams to ensure quick and secure installation of new tsm server V6.3 on
Windows 2008, and settings tsm agents in more than 100 Linux and Windows servers to
complete the transition phase. (2013)
 Costumer Comafi Bank, infrastructure improvement: My responsibility was to install and
configure a new tsm server V6.3 on Windows 2008, and designing migration plan of tsm
clients to the new tsm server which was executed by the entire team of backup & restore.
The project also included a new VLT IBM TS7650G. (2013)
 Costumer Patagonia Bank, File Server Cluster migration with the HSM service: My
responsibility was to ensure successful migration of HSM service which was distributed on
the 3 nodes of File Server Cluster (Windows 2003), and had to be moved to 5 new virtual
servers Windows 2012. To execute the migration I had to interact with the client, project
manager, account team and internal support teams. (2014)
 Costumer Patagonia Bank, infrastructure upgrade: During this project I was working with
the chief architect, project manager, account team, internal and customer support teams. I
had participated in the design of the new backup & restore infrastructure (dimension,
hardware technology). Also I was responsible for the planning and execution of the tasks
such as installation, configuration and migration. I performed 70% of the project, but due to
my trip to New Zealand I had to transfer it to a colleague. Part 1 of this project was to migrate
a heavy tsm server (with db 1.7 Tbs, more than 1000 tsm agents which includes AIX,
Windows, SQL Server, SQL Server Always On, Domino Servers, Exchange Servers, HSM
and storage pool with deduplication) to a new server with new storage. The customer gave a
window of 18 hours that included turning back. Migration took me 9 hours. (2015 - 2016)

More Related Content

Viewers also liked

хоробрі серця
хоробрі серцяхоробрі серця
хоробрі серця19Lika74
 
العدد الخاص من النشرة
العدد الخاص من النشرةالعدد الخاص من النشرة
العدد الخاص من النشرةHafid Chengaou
 
presentations powerpoint
presentations powerpointpresentations powerpoint
presentations powerpointKan Kanchana
 
конференція проект корисна справа 2014
конференція проект корисна справа 2014конференція проект корисна справа 2014
конференція проект корисна справа 201419Lika74
 
Ansökan till program
Ansökan till programAnsökan till program
Ansökan till programtonypezzo
 
Samyak Vaidyak Dr. Shriniwas Kashalikar
Samyak Vaidyak Dr. Shriniwas KashalikarSamyak Vaidyak Dr. Shriniwas Kashalikar
Samyak Vaidyak Dr. Shriniwas Kashalikarghanyog
 

Viewers also liked (9)

хоробрі серця
хоробрі серцяхоробрі серця
хоробрі серця
 
Gradient
GradientGradient
Gradient
 
العدد الخاص من النشرة
العدد الخاص من النشرةالعدد الخاص من النشرة
العدد الخاص من النشرة
 
سائنس اور غلبہ سائنس
سائنس اور غلبہ سائنسسائنس اور غلبہ سائنس
سائنس اور غلبہ سائنس
 
Mbrship.93
Mbrship.93Mbrship.93
Mbrship.93
 
presentations powerpoint
presentations powerpointpresentations powerpoint
presentations powerpoint
 
конференція проект корисна справа 2014
конференція проект корисна справа 2014конференція проект корисна справа 2014
конференція проект корисна справа 2014
 
Ansökan till program
Ansökan till programAnsökan till program
Ansökan till program
 
Samyak Vaidyak Dr. Shriniwas Kashalikar
Samyak Vaidyak Dr. Shriniwas KashalikarSamyak Vaidyak Dr. Shriniwas Kashalikar
Samyak Vaidyak Dr. Shriniwas Kashalikar
 

Similar to Latest achievements

Similar to Latest achievements (20)

prof3
prof3prof3
prof3
 
Resume_Tarun
Resume_TarunResume_Tarun
Resume_Tarun
 
Amitabha Cv 15022010
Amitabha Cv 15022010Amitabha Cv 15022010
Amitabha Cv 15022010
 
Initiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case StudiesInitiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case Studies
 
Windows 10 Migration
Windows 10 MigrationWindows 10 Migration
Windows 10 Migration
 
Jitendra_Jadhav
Jitendra_JadhavJitendra_Jadhav
Jitendra_Jadhav
 
Case study vb migration
Case study vb migrationCase study vb migration
Case study vb migration
 
RajeshPrabhu-G - Infosys projects
RajeshPrabhu-G - Infosys projectsRajeshPrabhu-G - Infosys projects
RajeshPrabhu-G - Infosys projects
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Dell
DellDell
Dell
 
50 migrations in 24 hours
50 migrations in 24 hours50 migrations in 24 hours
50 migrations in 24 hours
 
Corrina Woolley CV 2015
Corrina Woolley CV 2015Corrina Woolley CV 2015
Corrina Woolley CV 2015
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
 
Deepak_Kumar
Deepak_KumarDeepak_Kumar
Deepak_Kumar
 
Gavin Convery - Global Transformation Project Manager - Contract CV.001
Gavin Convery - Global Transformation Project Manager - Contract CV.001Gavin Convery - Global Transformation Project Manager - Contract CV.001
Gavin Convery - Global Transformation Project Manager - Contract CV.001
 
Resume
ResumeResume
Resume
 
Continued Accomplishments during this position
Continued Accomplishments during this positionContinued Accomplishments during this position
Continued Accomplishments during this position
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project Manger
 
Neeraj_PM
Neeraj_PMNeeraj_PM
Neeraj_PM
 

Latest achievements

  • 1. Latest achievements:  Costumer Techint, service transition: My task was to interact with the transition manager and internal support teams to ensure quick and secure installation of new tsm server V6.3 on Windows 2008, and settings tsm agents in more than 100 Linux and Windows servers to complete the transition phase. (2013)  Costumer Comafi Bank, infrastructure improvement: My responsibility was to install and configure a new tsm server V6.3 on Windows 2008, and designing migration plan of tsm clients to the new tsm server which was executed by the entire team of backup & restore. The project also included a new VLT IBM TS7650G. (2013)  Costumer Patagonia Bank, File Server Cluster migration with the HSM service: My responsibility was to ensure successful migration of HSM service which was distributed on the 3 nodes of File Server Cluster (Windows 2003), and had to be moved to 5 new virtual servers Windows 2012. To execute the migration I had to interact with the client, project manager, account team and internal support teams. (2014)  Costumer Patagonia Bank, infrastructure upgrade: During this project I was working with the chief architect, project manager, account team, internal and customer support teams. I had participated in the design of the new backup & restore infrastructure (dimension, hardware technology). Also I was responsible for the planning and execution of the tasks such as installation, configuration and migration. I performed 70% of the project, but due to my trip to New Zealand I had to transfer it to a colleague. Part 1 of this project was to migrate a heavy tsm server (with db 1.7 Tbs, more than 1000 tsm agents which includes AIX, Windows, SQL Server, SQL Server Always On, Domino Servers, Exchange Servers, HSM and storage pool with deduplication) to a new server with new storage. The customer gave a window of 18 hours that included turning back. Migration took me 9 hours. (2015 - 2016)