1. Latest achievements:
Costumer Techint, service transition: My task was to interact with the transition manager
and internal support teams to ensure quick and secure installation of new tsm server V6.3 on
Windows 2008, and settings tsm agents in more than 100 Linux and Windows servers to
complete the transition phase. (2013)
Costumer Comafi Bank, infrastructure improvement: My responsibility was to install and
configure a new tsm server V6.3 on Windows 2008, and designing migration plan of tsm
clients to the new tsm server which was executed by the entire team of backup & restore.
The project also included a new VLT IBM TS7650G. (2013)
Costumer Patagonia Bank, File Server Cluster migration with the HSM service: My
responsibility was to ensure successful migration of HSM service which was distributed on
the 3 nodes of File Server Cluster (Windows 2003), and had to be moved to 5 new virtual
servers Windows 2012. To execute the migration I had to interact with the client, project
manager, account team and internal support teams. (2014)
Costumer Patagonia Bank, infrastructure upgrade: During this project I was working with
the chief architect, project manager, account team, internal and customer support teams. I
had participated in the design of the new backup & restore infrastructure (dimension,
hardware technology). Also I was responsible for the planning and execution of the tasks
such as installation, configuration and migration. I performed 70% of the project, but due to
my trip to New Zealand I had to transfer it to a colleague. Part 1 of this project was to migrate
a heavy tsm server (with db 1.7 Tbs, more than 1000 tsm agents which includes AIX,
Windows, SQL Server, SQL Server Always On, Domino Servers, Exchange Servers, HSM
and storage pool with deduplication) to a new server with new storage. The customer gave a
window of 18 hours that included turning back. Migration took me 9 hours. (2015 - 2016)